Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEVADA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Nevada National Security Site 2019 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report presents groundwater and leachate sample results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site in Nye County, Nevada. Since 1993, groundwater samples have been collected and static water levels have been measured from the aquifer immediately below the Area 5 RWMS. The data are evaluated for evidence of effects on the aquifer related to the Area 5 RWMS. Leachate from the Cell 18 lined mixed waste cell has been sampled since 2011, and leachate from the Cell 25 lined mixed waste cell was first sampled in 2019 after it began receiving waste in August 2018. Leachate data are analyzed for hazardous contaminants to determine appropriate leachate handling and disposal. This report includes five years of data from 2015 through 2019.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discrete Fracture Network Modeling to Estimate Upscaled Parameters for the Topopah Spring, Lava Flow, and Tiva Canyon Aquifers at Pahute Mesa, Nevada National Security Site

This report describes the results of Discrete Fracture Network (DFN) simulations for the Topopah Spring Aquifer (TSA), Lava Flow Aquifer, and Tiva Canyon Aquifer (TCA), at Pahute Mesa on the Nevada National Security Site (NNSS), formerly the Nevada Test Site. The research focuses on calculating upscaled groundwater flow and contaminant transport parameters using DFNs generated according to fracture characteristics observed in the TSA, LFA and TCA at Pahute Mesa. The highly fractured and heterogeneous nature of these aquifers makes them candidates for stochastic DFN modeling of radionuclide transport on a small scale with subsequent upscaling. One hundred independent DFN realizations are generated for each aquifer, and the upscaled parameters for continuum simulations of subsurface flow and transport in fractured media at Pahute Mesa are calculated. Our goal is to implement a modeling approach that can translate parameters to larger-scale models that account for local-scale flow and transport processes, such as channelization of flow and transport along a few well connected, large fractures. Additionally, to simulate advective and advective-diffusive transport through the fracture networks, the Time Domain Random Walk (TDRW) approach is applied to account for matrix diffusion into a finite half-space. Moreover, a novel approach to calculate dynamic (active) fracture surface area to reflect flow channeling is implemented. This work will improve the representation of radionuclide transport processes in largescale, regulatory-focused models by providing estimates of hard-to-measure flow and contaminant transport parameters at large scales. In this report, we (1) show recent results of flow and transport simulations on multiple DFN realizations of the TSA, LFA, TCA; (2) discuss the resulting distributions of estimated upscaled parameters; (3) describe the estimation of upscaled parameters for an equivalent parallel-plate continuum model and (4) present a comparison between simulated transport from the equivalent continuum model and an actual DFN.

54 ENVIRONMENTAL SCIENCES↗

2019 Nevada National Security Site Environmental Report Attachment A: Site Description

This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2019. Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological settings and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

54 ENVIRONMENTAL SCIENCES↗

2019 Nevada National Security Site Environmental Report Summary

This document is a summary of the full 2019 Nevada National Security Site Environmental Report (NNSSER) prepared by the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office. This summary provides an abbreviated and more readable version of the full NNSSER.

54 ENVIRONMENTAL SCIENCES↗

Pahute Mesa-Oasis Valley Hydrostratigraphic Framework Model for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada (Rev. 0)

A new, revised three-dimensional (3-D) hydrostratigraphic framework model (HFM) for the Central and Western Pahute Mesa Corrective Action Units 101 and 102 was completed in 2019. The initial (Phase I) model was completed in 2002 and was documented in A Hydrostratigraphic Model and Alternatives for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada (BN, 2002). Subsequent flow and transport modeling revealed the need to collect additional data to reduce uncertainties. The Phase II data collection and characterization effort included extensive well drilling and testing activities, and rebuilding of the Phase I 3-D HFM, resulting in the Phase II HFM (NSTec, 2014). Further drilling (Well ER-20-12), data collection, and interpretive work (e.g., Thirsty Canyon Lineament [Wurtz and Day, 2018]) were incorporated into the Pahute Mesa-Oasis Valley (PM-OV) HFM. The PM-OV HFM incorporates the area of interest from the Phase II HFM and adds additional areas, primarily to the north and west with minor additions to the south and east. The new, expanded area matches the PM-OV groundwater basin as defined in Fenelon et al. (2016) and includes Pahute Mesa, a former nuclear testing area at the Nevada National Security Site; and Oasis Valley, a groundwater discharge area downgradient from contaminant source areas on Pahute Mesa. The data and information necessary to build the PM-OV HFM are provided in Navarro (2019). The PM-OV HFM will be used by hydrologic modelers who are tasked with developing a model to determine how contaminants are transported by groundwater flow in an area of complex geology. The model area is large (more than 6,250 square kilometers) and geologically complex, including Paleozoic- to Mesozoic-age structures (e.g., thrust faults, Thirsty Canyon Lineament), at least seven Tertiary-age calderas, several intrusive bodies, and many relatively recent basin-and-range normal faults. Investigators from the U.S. Geological Survey; National Security Technologies, LLC; National Laboratories; and U.S. Department of Energy contractors have organized the more than 300 volcanic units and other rocks in the model area into 77 hydrostratigraphic units (HSUs). The volcanic rocks are subdivided into 42 aquifers, 11 confining units, and 9 composite units (containing both aquifer and confining unit rocks). The underlying pre-Tertiary rocks were divided into 5 HSUs, comprising 2 aquifers and 3 confining units. The model also includes 1 alluvial aquifer unit, 8 intrusive confining units, and 1 granite confining unit. The model depicts the thickness, extent, and geometric relationships of these HSUs (“layers” in the model) along with all the major structural features that control them, including calderas and faults. The most substantive differences between the Phase II HFM and the PM-OVHFM include (1) addition of the new data and resulting revised interpretations from the additional area encompassed by the PM-OV groundwater basin; (2) incorporation of 16 new faults; (3) 12 boreholes from the northern extension; (4) 2 additional caldera-collapse collars; and (5) correlation of the simulated faulting and hydrostratigraphy in the eastern part of the model domain with the delineations represented in the neighboring Rainier Mesa-Shoshone Mountain HFM-Prime and Yucca Flat-Climax Mine HFM. All PM-OV HFM delineations were based on published and unpublished data from geophysical investigations, surface geologic maps, and drill-hole records. Phase II approached model uncertainty using the model-building software to test model configurations and hydrologic consequences using a range of values for parameters such as fault offset amounts and HSU elevations. The PM-OV HFM expands on this approach to encompass the entire PM-OV groundwater basin.

54 ENVIRONMENTAL SCIENCES↗

Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex (Q3 Transportation Report, FY20) Transportation Report

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Analysis of Transient Groundwater Flow Near the Cheshire Test at Pahute Mesa, Nevada National Security Site

This report focuses on analysis and determination of the causes of transient water levels measured between 1964 and 2017 near the Cheshire underground nuclear test, which was detonated on February 14, 1976 in Area 20 (USDOE, 2015) of the Pahute Mesa (PM) testing areas of the Nevada National Security Site (NNSS) located in southern Nevada (Figure 1). Transient water levels near Cheshire indicate influences of a water-production well and yet-unexplained water level rise attributed to testing effects (Jackson and Fenelon, 2018; Jackson et al. 2021). Transient groundwater flow is relevant to the implementation of the hydrologic source term (HST), which prescribes the quantity and release rates of radionuclide source terms to be applied at individual test locations in assessment of regional-scale radionuclide transport (Carle and Tompson, 2021; Carle et al., 2021), as previously investigated for NNSS testing areas at PM (Pawloski et al., 2001), Frenchman Flat (Carle et al, 2007), Yucca Flat (Mcnab, 2009; Tompson, 2009), and Rainier Mesa (Carle, 2011; Tompson et al., 2011).

54 ENVIRONMENTAL SCIENCES↗

Analysis of Transient Groundwater Flow Near the Cheshire Test at Pahute Mesa, Nevada National Security Site

This report focuses on analysis and determination of the causes of transient water levels measured between 1964 and 2017 near the Cheshire underground nuclear test, which was detonated on February 14, 1976 in Area 20 (USDOE, 2015b) of the Pahute Mesa (PM) testing areas of the Nevada National Security Site (NNSS) located in southern Nevada (Figure 1). Transient water levels near Cheshire indicate influences of a water-production well and yet-unexplained water level rise attributed to testing effects (Jackson and Fenelon, 2018; Jackson et al. 2021). Transient groundwater flow is relevant to the implementation of the hydrologic source term (HST), which prescribes the quantity and release rates of radionuclide source terms to be applied at individual test locations in assessment of regional-scale radionuclide transport (Carle and Tompson, 2021; Carle et al., 2021), as previously investigated for NNSS testing areas at PM (Pawloski et al., 2001), Frenchman Flat (Carle et al, 2007), Yucca Flat (Carle et al., 2009; Mcnab, 2009; Tompson et al., 2009), and Rainier Mesa (Carle, 2011; Tompson et al., 2011).

54 ENVIRONMENTAL SCIENCES↗

Contaminant Transport Parameters for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 1

This document presents a summary and framework of available transport data and other information directly relevant to the development of the groundwater transport model for Central and Western Pahute Mesa (PM) corrective action units (CAU). This model is referred to as the “PM CAU transport model” in this document. Central and Western PM are two areas of the Nevada National Security Site (NNSS) that historically were used for underground nuclear testing. These nuclear tests resulted in groundwater contamination in the vicinity of the underground test areas. As a result, the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program is currently conducting a corrective action investigation (CAI) of the PM underground test areas. This work is a part of the Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site, Revision 0, with Rotc-1 and Errata Sheet

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAU 477. To support this recommendation, a corrective action investigation (CAI) was performed in March and April 1999. The purpose of the CAI was to fulfill the following data needs as defined during the Data Quality Objective (DQO) process: • Determine whether the muckpile contents are hazardous under the Resource Conservation and Recovery Act, contain total petroleum hydrocarbons (TPH) contamination at levels exceeding the Nevada Administrative Code (NAC) limits, or contain contamination exceeding background levels. • If contaminants of concern (COCs) are present, determine what further action will be needed.

54 ENVIRONMENTAL SCIENCES↗

2010 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site from December 2009 through December 2010. It also represents the second year of the enhanced monitoring network and the 5-year proof-of-concept monitoring period that is intended to validate the compliance boundary.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

2007 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 443 are specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada and includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the CNTA.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

​Understanding a Stratigraphic Hydrothermal Resource – Geophysical Imaging at Steptoe Valley, Nevada

Sandia National Laboratories partnered with a multi-disciplinary group of subject matter experts to evaluate a stratigraphic geothermal resource in Steptoe Valley, Nevada using both established and novel geophysical imaging techniques. The stratigraphic reservoir in northern Steptoe Valley was previously discovered during oil and gas exploration. Subsequent studies, such as the Nevada Play Fairway Analysis, included data which further highlighted potential resource targets in the basin. Geophysical surveys, complemented with refined geologic mapping and geochemical sampling, were deployed to further characterize the resource. The resulting 3D geologic interpretation, conceptual model refinements, and reservoir simulations suggest that a >100MWe power-capable reservoir is likely economically accessible using conventional well placement and stimulation techniques in the Paleozoic carbonates of the deep/central basin of northern Steptoe Valley. Additional geophysical characterization and exploration drilling efforts are recommended to calibrate interpretation and determine where/how to potentially develop the northern Steptoe resource. The geophysical tools, interpretations, lessons learned, and public data generated by this study establish an exploration methodology to inform decisions for characterization and development of northern Steptoe Valley and other stratigraphic geothermal reservoirs in the western U.S.

15 GEOTHERMAL ENERGY↗

A Cultural Resource Survey of 661.5 Acres on the Tonopah Test Range (TTR), Nellis Air Force Base, Nye County, Nevada

This report presents the results of a Section 110 cultural resource survey of Pedro Lake and the surrounding area. Sandia National Laboratories’ (Sandia) cultural resources program, in collaboration with personnel from the cultural resource department from the Northern Ranges of the Nevada Test and Training Range (NTTR), Nellis Air Force Base (NAFB) surveyed 267.71 hectares (ha) (661.50 acres [ac]) for the project, located on the Tonopah Test Range (TTR) at Nellis Air Force Base, Nye County, Nevada. The survey resulted in the update of two previously recorded archaeological sites, the documentation of 15 newly discovered archaeological sites, and 18 isolated occurrences. The results of the survey are presented herein.

54 ENVIRONMENTAL SCIENCES↗

Seismic velocity modeling and earthquake relocations for the southern Nevada National Security Site (NNSS), with a focus on Rock Valley

The Rock Valley Direct Comparison (RV/DC) is the third phase of the Source Physics Experiment (SPE; Snelson et al., 2014), a project aimed at improving seismic discrimination between explosive sources and natural earthquakes. Phases I and II of SPE focused on studying the generation of shear waves in endmember geologies (granite and alluvium, respectively), while Phase III aims to detonate a chemical explosion co-located with the source region of the 1993 Rock Valley earthquake sequence, located in the Rock Valley Fault Zone (RVFZ), in the southern portion of the Nevada Test Site (now the Nevada National Security Site, or NNSS).

58 GEOSCIENCES↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum to the Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada, Revision 0

This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗