Operational and Mission Highlights A Monthly Summary of Top Achievements June 2020
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
In August 2020, transuranic (TRU) waste inventory onsite at TA-55 fell below 1,500 containers. Multiple groups within the Associate Laboratory Directorate for Weapons Production (ALDWP) have worked collaboratively to achieve this reduction in waste and residue inventory, all within the constraints of COVID-19 safety requirements.
Abstract not provided.
Abstract not provided.
Laboratory personnel working on a years-long Confinement Vessel Disposition (CVD) Project at the Chemistry and Metallurgy Research (CMR) facility recently shipped its first vessel after closing the emptying and dispositioning portion of the project in 2020. During the 1970s and 1980s, the Laboratory conducted experiments that produced data used in computer modeling. Scientists used these models to evaluate the performance of nuclear weapons.
Working with the Design Agency (Q-6), Production Agency Quality (PAQ) Division, and the NNSA Los Alamos Field Office, Detonator Production recently sold Lot 3354 to NNSA. Detonator Production personnel shipped the lot to Pantex — the Laboratory will continue to support the W76 into the future. The sale and shipment of Lot 3354 was accomplished before the closeout of FY21, achieving a key milestone that required active participation from several stakeholders within the Lab, as well as organizations external to the Laboratory. Both organizations found remedies to address challenges associated with this lot that had persisted since 2019.
A monthly summary of top achievements.
Abstract not provided.
Abstract not provided.
In early February 2022, Laboratory personnel successfully completed the Qualification Design Review (QDR) for the B61-12 Life Extension Program (LEP). QDR is also known as the Delta FDRAAG, short for Delta Final Design Review and Acceptance Group.
When the Laboratory’s Detonator Production team originally completed manufacturing two ALT939 DEV#1 functional cables — the first development units produced in this lot, team members quickly hit an obstacle when electrical testing for these cables failed. Team members sent the cables out for further testing, which revealed the root cause of failure involved the cables’ connectors. Although a challenging issue to resolve, the team worked together and solved the issue ahead of a stipulated deadline, with the cables completed and shipped to support system tests. The team responsible for this challenging work included members from Detonator Production, Nondestructive Testing & Evaluation, and collaborators from Sandia National Laboratories.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Associate Laboratory Director for Plutonium Infrastructure Mark Anthony and a procurement team visited three glovebox fabricators the week of Aug. 23, 2022, to discuss equipment procurement options and assess the vendors’ production capability, factory conditions, and safety records. The team determined that all three fabricators can produce complex gloveboxes and meet Nuclear Quality Assurance-1 standards.
On Sept. 26, Director Thom Mason signed the Laboratory’s annual assessment of four of the weapons systems in our nation’s nuclear stockpile: the B61 family of bombs and the W76, the W78 and the W88 warheads. Addressed to the secretary of energy, the secretary of defense and the chair of the Nuclear Weapons Council, this letter informs the president of the United States of our confidence that the stockpile remains safe, secure, and effective now and into the future as a result of our dedicated sustainment and modernization efforts.
A monthly newsletter containing progress reports and accomplishments that occurred for various projects at Los Alamos National Laboratory throughout January 2023.