Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. In order to determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules and operational requirements are developed and then finalized.

DeMott, Diana↗

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. To determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators, and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules, and operational requirements are developed and then finalized.

DeMott, Diana L.↗

Apollo 16 Press Kit

The Apollo 16 spacecraft is scheduled for launch on Apr. 16, 1972 from Complex 39A at the Kennedy Space Center, Florida by the Saturn V launch vehicle. Crewmen are mission commander John W. Young, command module pilot Thomas K. Mattingly II and lunar module pilot Charles M. Duke Jr. Objectives of the mission, to last up to 12 days, as outlined by NASA: to perform selenological inspection, survey and sampling of materials in a preselected region of Descartes using a lunar roving' vehicle; deploy and activate Apollo surface experiments; develop man's capability to work in the lunar environment; obtain photographs of candidate exploration sites; and toconduct inflight experiments and photographic tasks in lunar orbit. Following launch, the spacecraft will reach Earth Parking Orbit and remain in orbit for about two and one-half revolutions prior to Translunar Injection. Next, the Command and Service Module docks with the Lunar Module and the spacecraft "coasts" to the moon. In orbit around the moon, the Command and Service Module/Lunar Module combination will descend to within 50,000 feet of the lunar surface before undocking. The Lunar Module will continue to descend while the Command and Service Module returns to an orbit approximately 60 miles high. Stay time on the lunar surface is scheduled for approximately 73 hours. The ascent stage of the Lunar Module then lifts the astronauts back into lunar orbit where they will dock with the Command/Service Module. The Lunar Module is jettisoned and Transearth Injection follows. Just prior to reentry into the earth's atmosphere, the Service Module is jettisoned, and the astronauts in the Command Module splashdown in the Pacific Ocean. The target point for end-of-mission splashdown is at 05 degrees 0 minutes north latitude and 158 degrees 40 minutes west longitude or approximately 985 nautical miles south of Honolulu, Hawaii. Splashdown is scheduled for Apr. 28, 1972 at 10:30 a.m. Hawaiian Standard Time (2:30 p.m. CST). Recovery forces for Apollo 16, stationed in both the Atlantic and Pacific Oceans, will consist of three ships, nine aircraft and nearly 1,700 personnel. CTF-130 (Manned Spacecraft Recovery Force, Pacific) forces will be stationed south of Hawaii. Three ships, eight helicopters and three Air Force HC-130H aircraft, and nearly 1,100 personnel, will take part. Task Force 140 (Manned Spacecraft Recovery Force, Atlantic), comprising one ship, six HC-130H aircraft, three helicopters and approximately 300 personnel, will be positioned for possible launch abort operations. Two ships in the Atlantic will also be used for acoustical testing. Other forces, primarily aircraft and personnel of the Air Force Aerospace Rescue and Recovery Service will be on alert around the world for contingency recovery support.

Source record↗

System, Apparatus, and Method for Active Debris Removal

Systems, apparatuses, and methods for removal of orbital debris are provided. In one embodiment, an apparatus includes a spacecraft control unit configured to guide and navigate the apparatus to a target. The apparatus also includes a dynamic object characterization unit configured to characterize movement, and a capture feature, of the target. The apparatus further includes a capture and release unit configured to capture a target and deorbit or release the target. The collection of these apparatuses is then employed as multiple, independent and individually operated vehicles launched from a single launch vehicle for the purpose of disposing of multiple debris objects.

Griffith, Sr., Anthony D.↗

Combustion Joining of Regolith Tiles for In-Situ Fabrication of Launch/Landing Pads on the Moon and Mars

To mitigate dust problems during launch-landing operations in lunar and Mars missions, it is desired to build solid pads on the surface. Recently, strong tiles have been fabricated from lunar regolith simulants using high-temperature sintering. The present work investigates combustion joining of these tiles through the use of exothermic intermetallic reactions. Specifically, nickel aluminum (1:1 mole ratio) mixture was placed in a gap between the tiles sintered from JSC-1A lunar regolith simulant. Upon ignition by a laser, a self-sustained propagation of the combustion front over the mixture occurred. Joining was improved with increasing the tile thickness from 6.3 mm to 12.7 mm. The temperatures sufficient for melting the glass phase of JSC-1A were recorded for 12.7-mm tiles, which explains the observed better joining.

Ferguson, Robert E.↗

Fluid Transient Analysis During Priming of Evacuated Line

Pressure surges are critical in the design of spacecraft propellant feed lines. The pressure transients that occur during priming of feed lines are very important in the design and analysis of liquid propulsion systems. During the start-up of the propulsion system of a spacecraft, the process of filling of an evacuated pipeline is called priming. Priming can generate severe pressure peaks due to the slam (water hammer) of the propellant against a closed thruster valve. The downstream conditions strongly affect the pressure surge. In space systems, satellites, or interplanetary probes, the propellant lines are vacuum-pumped or filled with low pressure helium or nitrogen before the launch. Before operations, these lines are primed with a vaporizing liquid, sometimes in the presence of a non-condensable gas (NCG), which produces water hammer phenomena. The objective of the current study is to use a finite volume based network flow solver (Generalized Fluid System Simulation Program, GFSSP) for the numerical simulation of Priming in (a) a straight feedline and (b) a flow network. The geometrical configurations and dimensions for the pipe and other components used for the current study are identical to experimental study of Prickett et al.

Bandyopadhyay, Alak↗

Need for Cost Optimization of Space Life Support Systems

As the nation plans manned missions that go far beyond Earth orbit to Mars, there is an urgent need for a robust, disciplined systems engineering methodology that can identify an optimized Environmental Control and Life Support (ECLSS) architecture for long duration deep space missions. But unlike the previously used Equivalent System Mass (ESM), the method must be inclusive of all driving parameters and emphasize the economic analysis of life support system design. The key parameter for this analysis is Life Cycle Cost (LCC). LCC takes into account the cost for development and qualification of the system, launch costs, operational costs, maintenance costs and all other relevant and associated costs. Additionally, an effective methodology must consider system technical performance, safety, reliability, maintainability, crew time, and other factors that could affect the overall merit of the life support system.

Costs↗

Flight Systems Integration & Test: Lessons Learned for Future Success

This paper offers a comprehensive view of flight system integration and test (I&T) lessons learned related to mishaps and close calls, focusing on what can be done to improve the I&T process to avoid recurrence. Specific areas within the realm of I&T that are covered in this paper include: I&T team communication and training; design of flight and ground systems for I&T; planning and scheduling; configuration management and process documentation; ground support equipment and tools; cleanrooms and contamination; mechanical integration, handling, and deployments; electrical integration and electrostatic discharge; functional testing and troubleshooting; environmental testing and facilities; and launch site operations. To illustrate "real-world" lessons learned for I&T, examples from throughout the history of the U.S. space program are presented. Also presented are some best practices for I&T that can help mitigate mishaps and close calls on the ground or during flight.

Integration & Test↗

Internal Radio-Frequency Instrumentation System (IRIS) Overview

Wireless instrumentation has long been sought for spaceflight applications, but practical implementations capable of providing the utility of wired sensors have proven elusive. The power needed to drive transmitters/receivers in traditional "active" wireless sensor radios requires either frequent battery replacement or prohibitive duty cycling. This prevents installing such sensors early in a vehicle's integration and treating them as always-on throughout its operation. "Passive" solutions such as radio frequency identification (RFID) techniques provide an appealing alternative, though most common RFID sensing approaches such as surface acoustic wave (SAW) RFID do not lend themselves easily to integrating arbitrary suites of sensors and sensor processors. In this talk we detail the design, fabrication, and evaluation of the Internal Radio-frequency Instrumentation System (IRIS), an RFID-enabled instrumentation solution that integrates an EPC Global Class 1 Generation 2 interface with processor-based wireless sensors. IRIS thermocouple sensors can operate in a low-power hibernation state with instantaneous over-the-air wakeup for nearly a decade on a small (255 mAh) coin cell battery. In their active state, they can acquire and stream 10 Hz data for more than 200 days. This allows wireless sensors to be installed and powered on early in vehicle integration and continue to operate after launch through a lengthy mission, opening the vehicle design trade space to wireless sensing in a meaningful and unprecedented way.

Wagner, Raymond↗

Optical Polarisation Variability of Radio-Loud Narrow-Line Seyfert 1 Galaxies: Search for Long Rotations of the Polarisation Plane

This work describes multi-site optical polarimetric observations of several radio-loud Narrow Line Seyfert 1 galaxies. This source class, and the sources in this study, were discovered to be detectable at gamma-ray energies by the Large Area Telescope (LAT) aboard the Fermi satellite. GSFC has played a key role in the development, launch, and operation of Fermi/LAT.

Angelakis, E.↗

CHANGO: A Software Tool for Boost Stage Guidance of the Space Launch System Exploration Mission 1

The Space Launch System (SLS) Exploration Mission 1 (EM-1) test flight will use open-loop guidance for Boost Stage (BS) flight. A table of attitude commands as a function of altitude, called the chi table, will be loaded onto the flight computers. The chi table will be generated using the measured winds on launch day by the Chi Angle Optimizer (CHANGO) software tool. Details of CHANGO’s design are given, including a Three Degrees-of-Freedom (3-DOF) simulation and a numerical minimization routine. CHANGO’s use in launch day operations is also described.

Ahmad, Naeem↗

Low-cost, Risk-Reduction Testing of Class D Spacecraft Photovoltaic Systems

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A low-cost, portable, and end-to-end photovoltaic-system test appropriate for NASAs new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metal-halide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, high-fidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility.At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendors panel-level data and periodic inspection, the method ensures system integrity from Integration and Test (IT) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

photovoltaic↗

Overview of the Main Propulsion System for a Nuclear Thermal Propulsion Flight Demonstrator

A demonstration of a Nuclear Thermal Propulsion (NTP) engine has not been conducted in over 50 years. Several tests were conducted during the NERVA program but no NTP engine was ever flown in space. In the last several years there has been a considerable amount of conceptual design work on NTP engines conducted. With the prospect of human Mars missions in the 2030’s there has been a renewed interest in NTP engines. A concept design study was conducted with the intent to design 2 flight demonstrator vehicles that would buy down programmatic and technical risks associated with launching and operating nuclear reactors in space. The intent of the first demonstrator mission would be to employ a simplified NTP engine and buy down programmatic risks whereas the second demonstrator would buy down technical risks with a NTP engine designed to be similar to an operational NTP model. The results of the study showed that a simplified NTP engine demonstrator could be feasibly built and flown in the near term with mostly high TRL, commercial off-the-shelf components.

Simpson, S. P.↗

Virtual Project Management Challenge

Technical knowledge is essential to the work done by NASA practitioners. So it may be surprising to learn that the most ingenious and elegant solutions to project challenges often arise not from a specific technical discipline perspective, but from a systems-focused mindset. While technical discipline expertise is a critical component of project success, sometimes the simplest resolution to a problem involves a systems-wide solution. Because of this, encouraging a systems mentality among project team members can be a powerful tool in mitigating risk and eliminating threats. Join us for an exploration of the critical ways in which a systems engineering and integration perspective can enhance project management efforts. Presenter Bo Bejmuk is the former Space Shuttle Orbiter Program Director and manager of Sea Launch Program operations and development for Boeing. He recently served as Chairman of the Standing Review Board for the NASA Constellation Program. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

Bo Bejmuk↗

RainCube, a Ka-band Precipitation Radar in a 6U CubeSat

RainCube (Radar in a CubeSat) is a 6U CubeSat mission between the Jet Propulsion Laboratory (JPL) and Tyvak Nano-Satellite Systems (Tyvak). The objective of the mission is to develop, launch, and operate a 35.75 GHz nadirpointing precipitation profiling radar payload to validate a new architecture for Ka-band radars and an ultra-compact deployable Ka-band antenna design in the space environment. RainCube will also demonstrate the feasibility of a radar payload on a CubeSat platform. The radar payload is the evolution of two previous JPL research and development technologies – the miniaturized Ka-band atmospheric radar (miniKaAR) and the 0.5m diameter Ka-band parabolic deployable antenna (KaPDA). JPL has contracted Tyvak to develop the spacecraft bus, integrate the payload, and operate the spacecraft. RainCube is currently in integration and test with an expected ready-for-delivery in September 2017.

Williams, Austin↗

Environmental Testing of the HERMeS TDU-2 Hall Thruster

The Hall Effect Rocket with Magnetic Shielding (HERMeS) is a 12.5 kW magnetically shielded Hall thruster presently under development for deep-space missions. A development model HERMeS thruster, TDU-2, with borosilicate channel walls, has successfully undergone proto-qualification testing including random vibration and thermal-vacuum, demonstrating the thruster can survive critical launch and operational environmental requirements. The three-axis random vibrational tests were performed with the thruster body mounted directly to the shaker table using a modified loading schedule to compensate for the vibration isolation dampers under design for the flight thruster. Initial random vibration testing revealed issues with fragmentation of magnetic coil potting material and thruster spool mount fabrication weaknesses that were addressed with an alternate potting material and fabrication revisions that were then successfully retested with an additional round of random vibration tests. Thermal-vacuum testing involved three cycles of full-power 600 V 12.5 kW thruster operation from -121°C to +373°C which included eight hours at peak temperature as well as a hot restart. A thermal model of the test configuration was developed and validated with the experiment results within an average difference of 5°C. Before and after the random vibrational and thermal-vacuum tests, the thruster performance, plasma plume, thrust vector angle, discharge characteristics, and magnetic field profile were measured. The thruster performance, magnetic field, and most other parameters remained invariant throughout the environmental testing campaign. During the thermal testing, an increase in the discharge oscillation amplitude of 11% was observed as well as subtle thrust vector changes of ±0.2° as the thruster warmed from -121°C to +373°C.

Sorenson, Ryan↗

Autonomous Amphibious Rescue System

The US Marines are in the process of retiring 900+ Assault Amphibious Vehicles (AAVs) and replacing them with new Amphibious Combat Vehicles ACVs. There is the potential to convert “swords into ploughshares” in this transition, by upgrading and repurposing the retiring AAVs into a national civilian asset. Add Advanced Sensors & Communications to Enhance Safety and Search Capabilities. Add Remote Operations Capabilities. Add Autonomous Operations Capabilities. Launch & Recovery Platform: Equip with Remote/Autonomous: 1. Deployable airborne systems 2. Deployable ground systems 3. Deployable marine systems to support Search and Rescue Missions in Extreme Conditions.

Remote Capability↗

Regulatory Approach for Nuclear Thermal Propulsion Reactor Systems

Nuclear Thermal Propulsion (NTP) is being developed to support crewed or cargo transfer missions to Mars. Obtaining regulatory approval for NTP engine testing proves a challenge for not only the technology maturation required but also the fabrication, launch and operational nuclear regulatory environments. Existing regulations currently apply to either (1) high power, long duration commercial power plants, or (2) low power, short duration research reactors. NTP systems find themselves in a separate and unique area due to their higher power but short operating duration. This is supplemented by use of the reactor coolant as propellant. When planning the regulatory approach for NTP systems, operations in space and testing on Earth must be considered – each have their own challenges. This paper identifies a preliminary pathway for regulatory approval to operate a NTP demonstration engine as well as supporting test data that is recommended to be generated during the development program to support major regulatory milestones and deliverables.

Regulatory↗