SEARCH · Engineering Papers
Results for “JASON”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
The Majorana Demonstrator
A brief review of the history and neutrino physics of double beta decay is given. A description of the MAJORANA DEMONSTRATOR research and development program, including background reduction techniques, is presented in some detail. The application of point contact (PC) detectors to the experiment is discussed, including the effectiveness of pulse shape analysis. The predicted sensitivity of a PC detector array enriched to 86% to 76Ge is given.
Quantum Sensing for High Energy Physics
Report of the first workshop to identify approaches and techniques in the domain of quantum sensing that can be utilized by future High Energy Physics applications to further the scientific goals of High Energy Physics.
Transient RF and Optical Plasma Signatures, STL-024-17, Year 2 of 2
Explore the source record for details and available documents.
Emulator for rotary energy sources
An emulator is described herein, wherein the emulator is configured to emulate a rotary energy generator. The rotary energy generator can be one of a wind turbine, a diesel engine, or a hydrokinetic generator. The emulator includes an electromechanical motor that is mechanically linked to a generator. A motor drive is electrically coupled to the electromechanical motor, and controls torque at a rotor of the electromechanical motor. Electromagnetic torque produced by the generator is estimated, and the motor drive is controlled based upon the estimated generator torque.
Optimizing the LSST Observing Strategy for Dark Energy Science: DESC Recommendations for the Wide-Fast-Deep Survey
Cosmology is one of the four science pillars of LSST, which promises to be transformative for our understanding of dark energy and dark matter. The LSST Dark Energy Science Collaboration (DESC) has been tasked with deriving constraints on cosmological parameters from LSST data. Each of the cosmological probes for LSST is heavily impacted by the choice of observing strategy. This white paper is written by the LSST DESC Observing Strategy Task Force (OSTF), which represents the entire collaboration, and aims to make recommendations on observing strategy that will benefit all cosmological analyses with LSST. It is accompanied by the DESC DDF (Deep Drilling Fields) white paper (Scolnic et al.). We use a variety of metrics to understand the effects of the observing strategy on measurements of weak lensing, large-scale structure, clusters, photometric redshifts, supernovae, strong lensing and kilonovae. In order to reduce systematic uncertainties, we conclude that the current baseline observing strategy needs to be significantly modified to result in the best possible cosmological constraints. We provide some key recommendations: moving the WFD (Wide-Fast-Deep) footprint to avoid regions of high extinction, taking visit pairs in different filters, changing the 2x15s snaps to a single exposure to improve efficiency, focusing on strategies that reduce long gaps (>15 days) between observations, and prioritizing spatial uniformity at several intervals during the 10-year survey.
Quantification of Paragenetic Controls on Chemomechanical Sensitivity of the Morrow B Sandstone During CO2 Injection Farnsworth Unit Texas.
Abstract not provided.
Systems with multi-circuited, phase-change composite heat exchangers
A system comprising a first plurality of microchannels, a second plurality of microchannels in thermal communication with the first plurality of microchannels such that the first plurality of microchannels and second plurality of microchannels form a heat exchanger, and a phase change composite in thermal communication with the heat exchanger and methods of operating are disclosed herein.
An ad hoc performance comparison of candidate technologies for rural broadband deployment
The need for network connectivity in rural and underserved areas is well known. An ad hoc comparison of data throughput for various broadband technologies is reported.
Energy Implications of Using Upper Room Germicidal Ultraviolet Radiation and HVAC Strategies to Combat SARS-CoV-2
Explore the source record for details and available documents.
Start-up and Emergency Shutdown Modeling for a Coal-fired 10MWe sCO₂ Power Plant
As part of a Phase II Front End Engineering Design (FEED) study for the DOE Fossil Fuel Large Scale Pilots program, investigations of novel start-up and emergency shutdown methods for a stoker-fed, coal-fired, 10MWe sCO₂ power plant proposal were performed. These investigations were performed using 1D transient system models of the plant created within the GT-SUITE system modeling platform. The system model components were created using vendor quotation data (heat exchangers), performance maps (turbomachines), or FMU models (fired heater). Previously, Echogen Power Systems (Echogen) has used a sCO₂ power cycle start-up method that fills the system with liquid CO₂ to facilitate easy use of an electrically-driven start pump to transition the system from initial CO₂ fill to turbo-compressor initialization. The novel start-up method presented attempts this transition with a minimal filling of the system with liquid CO₂, to reduce the total CO₂ inventory required. This method leaves the start pump vulnerable to a two phase inlet condition as system pressure is below the CO₂ saturation pressure for the condenser cooling water temperature (Tcw). System model cases at Tcw of 18°C, 26°C, and 32°C, corresponding to cold, design, and hot ambient days, were analyzed to determine if the SP inlet condition could be kept as a subcooled liquid and estimate the CO₂ inventory reduction amount./p> Stoker-fed, coal-fired heaters continue to emit heat for some time even after emergency shutdown from events such as a power failure. This heat emission would lead to a failure of the fired heater, as the metal overheats, if the CO₂ flow is shut off. The emergency shutdown method presented utilizes CO₂ vented by a controllable vent valve (CRV) to provide CO₂ cooling flow to the fired heater. To determine the effectiveness of this method at keeping the fired heater peak tubing metal temperature below the ASME material temperature limit, for pressures below 5 MPa, of 816 °C, system model cases with CRV diameters ranging from 4” to 10”, and an alternative CO₂ vent routing with CRV size of 6”, were investigated./p>
sCO2 Primary Power Large-Scale Pilot Plant FEED Summary
Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.
Modeling and Experiments on a Dedicated Outdoor Air System Using Liquid Desiccant Heat and Mass Exchangers
Liquid desiccants can provide efficient dehumidification but have yet to see widespread adoption. Most systems studied previously use natural gas-combustion to heat and regenerate the desiccant, and a central chiller plant or cooling tower for removing the heat of absorption. Here we present modeling and experimental results on a novel packaged air conditioner integrating liquid-desiccant heat and mass exchangers with a vapor compression cycle. The packaged system does not need cold or hot water from a central plant or cooling tower and is suitable for rooftop unit air conditioners. The system uses the evaporator to cool the liquid desiccant that is absorbing moisture from the air, and the condenser to heat the liquid desiccant to regenerate it. Efficiency is improved by reducing the load on the evaporator for a given supply-air dewpoint. This paper presents the measured dehumidification efficiency for a 10- ton packaged air conditioner, focusing on dehumidifying ventilation air. The paper also presents a numerical model to predict the outlet conditions and dehumidification efficiency, which we compare with the measured data.
Presentation - Development of the Experiment for Space Radiation Analysis (ESRA) CubeSat Mission to GTO
Explore the source record for details and available documents.
Systems with multi-circuited, phase-change composite heat exchangers
A system comprising a first plurality of microchannels, a second plurality of microchannels in thermal communication with the first plurality of microchannels such that the first plurality of microchannels and second plurality of microchannels form a heat exchanger, and a phase change composite in thermal communication with the heat exchanger and methods of operating are disclosed herein.
A Thermally-Driven Transcritical CO2 Heat Pump for Upgrading LWR-Grade Heat to High Temperatures
Explore the source record for details and available documents.
FY23 ION Based Approaches to Address Labor and Knowledge Retention
This study will seek to outline the current problem facing the nuclear industry related to staffing, training, and retaining the necessary workforce for long-term sustainability. A review of published reports and knowledge gained by working in the nuclear energy sector will form the basis for this scoping study. This study will not seek to draw any conclusions regarding the underlying causes of these personnel issues but will attempt to ask questions and help outline future research. The Integrated Operations for Nuclear business model provides opportunities to partially mitigate some of the current issues facing staffing the nuclear fleet. Upgrading safety and control systems from analog to digital as advocated by the Integrated Operations for Nuclear process allows the nuclear facility to compete for the best and brightest candidates and offers them a broad and sustainable career path where their skills can be valued and utilized in the broader industrial sectors. This study will seek to identify the primary reasons that the nuclear industry is facing this labor crisis and seek to identify possible solutions that will be fully evaluated in future research.
241-AY-102 Leak detection pit drain line visual inspection - 15678
In October 2012, Washington River Protection Solutions LLC (WRPS) determined that waste had leaked into the annulus of Tank 241-AY-102. WRPS conducted an extensive review of Tank AY-102 and increased both inspection and monitoring of the tank; however, the precise cause and location of the leak could not be determined. In parallel with the leak in the primary tank, the Tank AY-102 leak detection pit (LDP) was accumulating water through the drain system external to the secondary tank liner. Liquid collecting in the LDP is suspected to be from water intrusion and collects at a rate such that the LDP must be pumped routinely. Following a routine pumping event on June 20, 2013, elevated radiation dose rates were noted on the transfer hose and surface contamination readings were found on the transfer pump when it was removed from the Tank AY-102 LDP. These two field readings suggested that tank waste from a secondary liner breach could be leaking into the LDP. As a result, WRPS initiated a plan to ascertain the integrity of the secondary tank liner including a robotic inspection of the LDP. To perform the robotic visual inspection, a custom robotic crawler with a deployment device was designed, built, and operated by IHI Southwest for WRPS to inspect the 6 in (152 mm) leak detection pit drain line. To ensure success when deployed in the field, the inspection equipment was demonstrated at both the IHI facility in Denver, Colorado, and the Hanford Site using full scale piping mockups. On November 20, 2013 WRPS inspected the 6 in (152 mm) diameter drain line. The deployment device successfully attached to the drain line, and the crawler entered the drain line and traversed to within approximately 7 ft (2.1 m) of the central sump located under the center of the tank before losing traction. Crawler performance was satisfactory, and the quality of the camera image and lighting provided sufficient detail to document the current condition of the visible regions of the pipe. The inspection showed that the majority of the drain line was dry. Two wet areas were observed, a portion of the line nearest the LDP and a portion near the center of the tank. The portion nearest the LDP was under water prior to pumping on November 14, 2013. Although sediment and debris were seen during the inspection, it is believed to be construction debris and corrosion products. No material was found in the inspection that looked like tank waste or the material seen in the Tank AY-102 annulus (i.e., no greenish or yellowish deposits or dark fluids, dried salt deposits, or crystalline material). The contamination levels seen on the crawler were consistent with past values seen on LDP pumping equipment. Sampling and analysis of the recovered residues from the crawlers did not find material consistent with tank waste. (authors)