Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Digital Twin + AI: Control Room of the Future

A digital twin enhances power grid control room operations by providing real-time monitoring, predictive insights, simulation capabilities, remote control, training opportunities, data integration, and decision support. This technology empowers control room operators to effectively manage the grid, optimize performance, and ensure reliable and efficient energy distribution.

control room of the future↗

Simulation of 15% and 50% Thermal Power Dispatch to an Industrial Facility Using a Flexible Generic Full-Scope Pressurized Water Reactor Plant Simulator

Nuclear power plants in the United States are increasingly challenged to compete in wholesale electricity markets due to the low electricity costs and increasingly dynamic grid conditions from competing generation sources. An alternative market for nuclear power is industrial facilities that can use the thermal and/or electrical power generated by a nuclear power plant to offset the economic losses incurred by electricity market challenges. A generic pressurized water reactor (PWR) simulator was used to show the results of a basic design for a generic thermal power extraction system and tests were run using a set of procedures to show what happens when a nuclear power plant transitions from full electrical power dispatch to 15% and 50% thermal power dispatch. This type of operation leads to losses in turbine performance efficiency due to the deviation from the design operating point, but because the thermal power is also used by the industry load without conversion losses, the combined thermal efficiency of the PWR increases. For the 15% case, the thermal efficiency increased from 32% to 41.9%, while for the 50% case, the efficiency increased up to 60.1%. In addition, for 50% thermal power dispatch, the power dissipated by the condenser decreased from approximately 2000 to approximately 1300 MW (thermal), indicating a substantially diminished impact on the environment in terms of releasing heat into the cooling water reservoir.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Green Methanol via an Integrated Direct Air Capture, CO 2 Electrolyzer, and Hydrogenation Reactor

This project pioneered a groundbreaking reactor design to produce green methanol by harnessing the electrochemical CO 2 reduction reaction (eCO 2 RR), a cornerstone of power-to-fuels technology. The effort integrated three innovative technologies to achieve carbon-neutral methanol production at a target cost of under $\$$800/ton: 1. Direct Air Capture (DAC): Using a cutting-edge sorbent material developed at Holocene, scalable models were developed to integrate captured atmospheric CO₂ into the reactor system. 2. Intermediate-Temperature CO 2 Electrolyzer: Developed by the University of Tennessee (UTK), this electrolyzer utilizes a cost-effective, proton-conducting solid acid electrolyte (CsH 2 PO 4 , CDP) and a mixed-metal oxide cathode. It achieves high faradaic efficiencies (>98%) by effectively suppressing hydrogen evolution at high current densities, converting CO 2 to CO with remarkable selectivity. 3. Catalysis and Reactor Engineering: Oak Ridge National Laboratory (ORNL) contributed world-class expertise in heterogeneous catalysis and reactor design. Their advanced ASPEN modeling drove systems integration and supported techno-economic and life cycle analyses. This effort was further bolstered by partnerships with industry leaders Air Company and Plug Power, who provided critical guidance on scaling, systems engineering, and the integration of water electrolyzers into large-scale operations. During Phase 1, the team focused on modeling and validating a lab-scale reactor demonstrating the feasibility of the integrated approach. Key accomplishments include a 52% increase in current density at 0.8 V while maintaining >98% CO faradaic efficiency, successful 10× scale-up of the electrolyzer with performance within 5% of coin-cell results, best-in-class durability (168-hour test at 0.6 V with 0.14 mA/cm 2 -h degradation), validated TEA confirming the $\$$800/ton methanol target, and completed preliminary LCA showing potential for net-negative GHG emissions under renewable energy scenarios.

10 SYNTHETIC FUELS↗

Long plasma duration operation analyses with an international multi-machine (tokamaks and stellarators) database

Combined high-fusion performance and long-pulse operation is one of the key integration challenges for fusion energy development in magnetic devices. Addressing these challenges requires an integrated vision of physics and engineering aspects with the purpose of simultaneously increasing time duration and fusion performance. Significant progress has been made in tokamaks and stellarators, including very recent achievement in duration and/or performance. This progress is reviewed by analyzing the experimental data (109 plasma pulses with a total of 3200 data points, i.e. on average 29 data per pulse) provided by ten tokamaks (in alphabetical order: Axially Symmetric Divertor Experiment Upgrade, DIII-D, Experimental Advanced Superconducting Tokamak, Joint European Torus, JT-60 Upgrade, Korea Superconducting Tokamak Advanced Research, tokamak à configuration variable, Tokamak Fusion Test Reactor, Tore Supra, W Environment in Steady-State Tokamak) and two stellarators (Large Helical Device and Wendelstein 7-X) expanding the pioneering work of Kikuchi (Kikuchi M. and Azumi M. 2015 Frontiers in Fusion Research II: Introduction to Modern Tokamak Physics (Springer)). Data have been gathered up to January 2022 and coordination has been provided by the recently created International Energy Agency-International Atomic Energy Agency international Coordination on International Challenges on Long duration OPeration group. By exploiting the multi-machine international database, recent progress in terms of injected energies (e.g. 1730 MJ in L-mode, 425 MJ in H-mode), durations (1056 s in L-mode, 101 s in H-mode), injected powers, and sustained performance will be reviewed. Progress has been made to sustain long-pulse operation in tokamaks and stellarators with superconducting coils, actively cooled components, and/or with metallic walls. The graph of the fusion triple products as a function of duration shows a dramatic reduction of, at least two orders of magnitude when increasing the plasma duration from less than 1 s to 100 s. Indeed, long-pulse operation is usually reached in dominant electron-heating modes at reduced density (current drive optimization) but with low ion temperatures ranging from 1 to 3 keV for discharges above 100 s. Difficulties in extending the duration may arise from coupling high heating powers over long durations and the evolving plasma-wall interaction towards an unstable operational domain. Possible causes limiting the duration and critical issues to be addressed prior to ITER operation and DEMO design are reported and analyzed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The SuperCam Instrument Suite on the NASA Mars 2020 Rover: Body Unit and Combined System Tests

The SuperCam instrument suite provides the Mars 2020 rover, Perseverance, with a number of versatile remote-sensing techniques that can be used at long distance as well as within the robotic-arm workspace. These include laser-induced breakdown spectroscopy (LIBS), remote time-resolved Raman and luminescence spectroscopies, and visible and infrared (VISIR; separately referred to as VIS and IR) reflectance spectroscopy. A remote micro-imager (RMI) provides high-resolution color context imaging, and a microphone can be used as a stand-alone tool for environmental studies or to determine physical properties of rocks and soils from shock waves of laser-produced plasmas. SuperCam is built in three parts: The mast unit (MU), consisting of the laser, telescope, RMI, IR spectrometer, and associated electronics, is described in a companion paper. The on-board calibration targets are described in another companion paper. Here we describe SuperCam’s body unit (BU) and testing of the integrated instrument. The BU, mounted inside the rover body, receives light from the MU via a 5.8 m optical fiber. The light is split into three wavelength bands by a demultiplexer, and is routed via fiber bundles to three optical spectrometers, two of which (UV and violet; 245–340 and 385–465 nm) are crossed Czerny-Turner reflection spectrometers, nearly identical to their counterparts on ChemCam. The third is a high-efficiency transmission spectrometer containing an optical intensifier capable of gating exposures to 100 ns or longer, with variable delay times relative to the laser pulse. This spectrometer covers 535–853 nm ( $105\text{--}7070~\text{cm}^{-1}$ Raman shift relative to the 532 nm green laser beam) with $12~\text{cm}^{-1}$ full-width at half-maximum peak resolution in the Raman fingerprint region. The BU electronics boards interface with the rover and control the instrument, returning data to the rover. Thermal systems maintain a warm temperature during cruise to Mars to avoid contamination on the optics, and cool the detectors during operations on Mars.Results obtained with the integrated instrument demonstrate its capabilities for LIBS, for which a library of 332 standards was developed. Examples of Raman and VISIR spectroscopy are shown, demonstrating clear mineral identification with both techniques. Luminescence spectra demonstrate the utility of having both spectral and temporal dimensions. Finally, RMI and microphone tests on the rover demonstrate the capabilities of these subsystems as well.

47 OTHER INSTRUMENTATION↗

Portable Industrial Control Systems Simulator (Final Report)

Industrial Control Systems (ICS) are more integrated than they have ever been before, but also the division between IT (Information Technology) and OT (Operational Technology) is becoming a grey area. As the integration of IT and OT occurs more often, cyber attack will also increase. Cyber attacks on Critical Infrastructure can be highly detrimental to society, notably via compromised Industrial Control Systems (ICS). Virtual and physical simulation has been used in medical fields, mathematics, architecture, aeronautics, space, and many more. Virtualization & Simulation in a lab environment is ideal because there is a need for the ability to test theories and designs is a safe and cost-effective way without risking equipment damage or, more importantly, human life. Furthermore, OT and ICS are some of the most difficult systems to use for research and development. They are either committed to operations or widely expensive to set up in a life-like environment. Virtualization and simulation will allow these otherwise accessible systems to be a test bed for the training, development, and research of SRNL customers or engineers and scientists at SRNL. This will allow the testbed to fit into a small form factor and interact with a simulator with minimum hardware components for easy transports and replication effort within the environment.

42 ENGINEERING↗

Wireless Instrumented RB Experiment Preliminary Design and Analysis

The ability to deploy new nuclear fuels for current or future reactor concepts requires carefully designed experiments to generate data to support fuel qualification. Ideally these experiments would include state of-the-art sensing to maximize the amount of in situ data that can be collected during operation. Furthermore, advanced reactor systems can take advantage of integrated in-core sensing technologies to maximize fuel utilization, reduce unnecessary conservativism in design margins, and improve operator’s understanding of limiting peaking factors. Before any novel sensing technologies can be readily adopted for nuclear applications, they must first demonstrate acceptable performance in test reactors. This report summarizes the preliminary design and analysis of the most highly instrumented irradiation experiment ever performed in the removable beryllium (RB) positions of the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL). The Wireless Instrumented RB Experiment 2021 (WIRE-21) will test a wide range of sensors including wireless sensors being developed by Westinghouse Electric Company (WEC) that could provide in situ measurements of peak fuel temperatures and fuel rod pressurization due to fission gas release. The ability to wirelessly transmit a signal through the fuel rod’s cladding is critical to improving fuel monitoring capabilities without requiring signal penetrations through the cladding pressure boundary, which would significantly impact fuel fabrication, handling, and operation. Other sensors that will be tested in WIRE-21 include an array of thermocouples, self-powered neutron detectors (SPNDs), and spatially distributed fiber-optic temperature sensors. More generally, WIRE-21 will establish a flexible irradiation vehicle design to allow accelerated, economical testing of advanced sensor technologies while leveraging the extremely high neutron flux that is available in HFIR. This report summarizes the mechanical design for WIRE-21, the experimental test matrix, initial neutronic and thermal design analyses, and the active monitoring and control system enhancements necessary to support testing of advanced sensor technologies. The containment for WIRE-21 is similar to previous RB irradiation vehicles but includes a few modifications, most notably the use of integrated compression seals to pass a larger number of sensor leads through the experiment’s pressure boundary. In addition to the sensor leads, inert gas lines are passed into the experiment to enable active temperature control and the ability to pneumatically actuate a bellows-driven pressure sensor. WIRE-21 is targeting temperatures (300–350°C) and neutron fluence levels (~10 22 n/cm 2 ) relevant to light water reactors (LWRs), but the flexible design of the experiment vehicle allows much higher operating temperatures (>1,100°C). Neutronic calculations determine the neutron flux conditions as well as the nuclear heating within the experiments. These results are used as inputs to detailed thermal finite element calculations, which are required to evaluate the complex, three-dimensional heat transfer that occurs within WEC’s wireless sensor enclosures. Initial results show that the temperatures of the sensors’ enclosures and the metal bellows can be operated near the temperature range of LWR coolants and cladding while simultaneously increasing the temperature of a surrogate fuel material to values in the range of 800–1200°C to simulate centerline fuel temperatures during LWR operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decarbonization During Predevelopment of Modular Building Solutions

Off-site construction methods offer the opportunity to compress costs of net-zero energy (NZE) housing using the advantages of mass production. There has been limited investigation on trade-offs between site-built and industrialized construction from the perspective of reducing the incremental cost of NZE strategies and reducing greenhouse gas emissions during embodied and operational stages. Blokable, LLC, a vertically integrated modular builder, wanted to know how the learning curves of mass production would help them decarbonize their existing modular housing prototype at a relative cost advantage. The method developed for this question looked at the life cycle assessment of an individual apartment and used learning-curve efficiencies to approximate the relative advantage of construction-at-scale. Greenhouse gas emissions were quantified by a learning-affected, whole-life carbon emissions model and demonstrated a path to a 60% reduction of whole-life CO2-equivalent in the 2030 production year. The resultant roadmap considers a best-first approach to decarbonizing a modular building product line, and the method can be replicated for other modular builders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advancements Toward ASME Nuclear Code Case for Compact Heat Exchangers

Our research team proposes to advance the state of the ASME section III code (nuclear service) for Compact Heat Exchangers (CHX). This work will improve the technical state of CHXs and lay the foundation necessary for these heat exchangers to be certified for use in nuclear service. During the course of this work, we will advance the understanding of the performance, integrity, and lifetime of the CHXs for use in any industrial application, making their use more attractive and accessible to the industry. We will do this by developing qualification and inspection procedures that utilize Non-destructive evaluation (NDE) and advanced in-service inspection techniques, with insight from the industrial utility leader EPRI. We have enlisted colleagues at MPR Associates (MPR), an elite nuclear code consulting firm, who are experts on the ASME section III code and who, with input from members of the ASME section III committee, will direct the testing and help develop a series of documents that define the rules and regulations for use of the CHX. Colleagues at North Carolina State University (NCSU) and Oregon State University (OSU) will conduct extensive tensile, creep, and fatigue experiments on diffusion bonded samples (manufactured by US-based Vacuum Process engineering) along with modeling using the elastic perfectly plastic assumptions and comprehensive full inelastic finite element analysis (FEA). This work will allow analysis by design and confidence in the strength of different internal structures. To ensure industry acceptance and long term confidence, team members at the University of Wisconsin–Madison (UW), University of Michigan (UM), Georgia Tech (GT), and the University of Idaho (UI) will extensively test prototypic heat exchangers manufactured by US-based manufactures CompRex and Vacuum Process Engineering (VPE), a leader in the development of advanced CHX. This testing will include the use of various working fluids (salt, sodium, helium, and sCO2) to evaluate operational issues as well as structural integrity under the most severe conditions. Post-test analysis of the tested CHXs coupled with pre/in-service/post NDE (ultrasonic and radiography) led by the Electric Power Research Institute (EPRI) will be incorporated into the development of the rules and regulations for their use in nuclear service.

42 ENGINEERING↗

Study of Additive Manufacturing Application to Geothermal Technologies

Geothermal reservoir characterization, field construction, and reservoir operations are very technology intensive activities that contribute significantly to the cost of delivering electricity produced from geothermal resources. Many geothermal technologies, such as downhole tools and drilling equipment, have unusual material, design, and manufacturing considerations dictated by the harsh geothermal environment and extreme aspect ratios required for deployment in a borehole. An additional challenge that faces geothermal applications is the low tool production volume needed to support the industry. Whereas tens of thousands of Oil & Gas wells are drilled and completed in the U.S. annually, there are typically only tens of geothermal wells that are drilled and completed. If a tool typically used in Oil & Gas applications cannot be directly used for geothermal, then the cost associated with making the tool suitable for geothermal is often prohibitive. There is therefore a much smaller inventory of technologies available to geothermal as compared to Oil & Gas and the level of efficiency and sophistication associated with field practice suffers accordingly. A number of advanced manufacturing methods, such as additive manufacturing, have received increased R&D as well as commercial attention in recent years because of their ability to rapidly prototype complex parts. Additive manufacturing in particular provides an opportunity to increase the technology available to the geothermal industry by either reducing fabrication costs associated with complex components or enabling economic production of low volume parts where specialized tooling is often required. Additional potential benefits of additive manufacturing include increased design freedom to make higher performing parts that cannot be made conventionally, the ability to integrate components into assemblies without joining operations, and the ability to economically fabricate variations on design in cases, such as casting molds, where there are large up-front costs associated with tooling. We have recently completed a study that investigated technology needs, representative use cases, manufacturability, and a techno-economic framework for comparing conventional to additive manufacturing methods for geothermal applications. This paper will provide an overview of this recent effort, describe the different elements of the assessment, and summarize the key takeaways related to both the feasibility of using additive manufacturing for geothermal technology applications as well as the potential benefits and impacts.

Polsky, Yarom↗

EXERGETIC: De-Risking Next-Generation Resilient Geothermal Hybrids via At-Scale Evaluation Using Virtual Emulation Digital Twin Environment for Efficient Operation

The DOE-GTO-funded project, award number 5.1.2.12, entitled "EXERGETIC - De-risking Next Generation Resilient Geothermal Hybrids via at-Scale Evaluation Using a Virtual Emulation Digital Twin Environment for Efficient Operation," advances the solution to these challenges by developing and validating a geothermal co-emulation environment implemented at the National Laboratory of the Rockies (NLR)'s Advanced Research on Integrated Energy Systems (ARIES) platform. This framework enables the de-risking of next-generation geothermal and geothermal hybrid systems through high-fidelity modeling, real-time digital emulation, advanced control strategies, and techno-economic assessment. The project focused on geothermal hybrid configurations that integrate geothermal power plants with concentrated solar power and underground thermal energy storage, enabling enhanced efficiency, flexibility, and grid support capabilities. The main goal of this project was the development of a geothermal digital co-emulation environment to demonstrate the technical and economic value of geothermal hybrid systems and their contribution to grid stability and flexibility. The EXERGETIC framework combined physics-based models, controls, and real assets at ARIES, including digital real-time simulators (DRTS), a 20-MW-scale controllable grid interface (CGI), and a 2-MW conventional generator. Detailed transient models were developed for the key subsystems of a hybrid geothermal plant, including parabolic trough solar collectors, reservoir thermal energy storage (RTES), and a binary Organic Rankine Cycle (ORC) power plant. The ORC model explicitly captured thermal inertia and off-design operation and integrated control strategies to dynamically respond to electric load profiles. The models were validated against published experimental and numerical studies, demonstrating strong agreement and confirming the accuracy and robustness of the modeling approach. The resulting digital twin represents geothermal-solar-storage systems at multiple scales (1 MW to 100 MW) and enables realistic emulation of grid-connected operation. The control architecture allows the geothermal resource to provide stable baseload generation, while solar and stored thermal energy supply flexible, dispatchable support during periods of high demand or variable grid conditions. A key contribution of the EXERGETIC project is the demonstration that geothermal hybrid systems can be designed to be active grid assets rather than passive baseload generators. Using the ARIES platform, the digital twin was evaluated under multiple grid scenarios, including load following, voltage support at the distribution level, and frequency response at the transmission level. Results show that hybrid geothermal systems can respond effectively to dynamic grid conditions, providing inertia-like behavior, primary frequency support, and voltage regulation through coordinated control. In addition to the performance and grid services capability analysis of geothermal and hybrid geothermal systems, the EXERGETIC project also focused on scalability and techno-economic analysis of geothermal hybrid plants. In particular, for the scalability analysis, machine-learning (ML)-based surrogate models were trained using data generated from the geothermal digital twin under different grid-connected scenarios and plant capacities. These ML models demonstrated strong interpolation and extrapolation capabilities across plant sizes, accurately reproducing both steady-state and transient responses with very low errors. Regarding the techno-economic analysis, plant performance results were integrated with cost models for hybrid geothermal systems, and the levelized cost of electricity (LCOE) was used as the main economic metric to evaluate system performance across a range of system capacities, solar shares, solar multiples, and storage durations. Results indicate that economies of scale significantly reduce geothermal LCOE as plant capacity increases, with large-scale systems (25-100 MW) achieving substantially lower costs than small plants. Hybridization with solar thermal energy and storage further improves economic performance by increasing capacity utilization and enabling flexible dispatch. In addition, thermal storage plays a critical role in reducing LCOE by maximizing geothermal, solar, and stored energy resources. In summary, the results from this project demonstrate that geothermal hybrid systems represent a promising alternative for increasing the energy conversion efficiency of geothermal technologies, contributing to the preservation of geothermal resources, and supporting the transition of geothermal plants from traditional baseload resources into flexible, resilient, and cost-competitive energy conversion technologies.

15 GEOTHERMAL ENERGY↗

Initial Assessment of CTF for Time-at-Temperature Applications

The US nuclear industry is interested in improving the economics of their fleet of light-water reactors (LWRs) by uprating US plants. One option being considered is to regain lost margin from overly conservative fuel safety limits. The current limit requires avoidance of critical heat flux (CHF) and prevents further operation of fuel that experiences a dry-out in boiling water reactors (BWRs) or departure from nucleate boiling (DNB) in pressurized water reactors (PWRs); however, it has been shown that temporary, mild dry-out of the fuel does not necessarily increase the risk of fuel failure during its normal anticipated operating life. Such mild dry-out or DNB events may occur during a plant anticipated operational occurrence (AOO), such as a locked rotor in a PWR or a pump trip in a BWR. The time-at-temperature (TAT) approach to regulating fuel operation aims to demonstrate that the fuel rod’s integrity is not challenged during such a mild transient that leads to CHF in which the fuel operates at an elevated temperature for a brief period of time. However, implementing this approach will require extensive fuel material experimental data, as well as supporting modeling and simulation (M&S) predictions, to ensure that the predicted fuel response during AOOs, with all applicable uncertainty considered, will not threaten the safety of the fuel during the transient or the remainder of its anticipated lifecycle. To address this need, a comprehensive effort is being proposed that includes generating cladding material data under TAT conditions, assessment of available code capabilities for TAT conditions, development of new mechanistic models, and demonstration of the M&S capabilities for AOOs of interest. This will require a joint effort between the Nuclear Energy Advanced Modeling and Simulation (NEAMS) and Advanced Fuels Campaign (AFC) programs, as well as close collaboration with nuclear industry stakeholders. The outcome of this collaboration will result in development and assessment of capabilities that can be used by the nuclear industry to support qualification of a TAT-based fuel failure criteria safety limit. This report focuses on the thermal hydraulics (T/H) modeling capabilities and summarizes currently available data for validating the T/H subchannel code CTF for TAT conditions, as well as preliminary assessment results of the code. The initial assessment also resulted in implementation of an alternative post-CHF heat transfer package, which has been shown to significantly improve accuracy. This report is not a final assessment and does not consider all available validation data; it is intended that a future assessment will more fully validate the code for this application.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Learning-based Supervisory Control Architecture for Electric Vehicle Charging System Paired with Energy Storages

A Machine Learning-based predictive model is developed for optimal dispatching energy storage system integrated with Electric Vehicle battery charger. The model is effectively trained using transfer learning algorithm and successfully validated via measurement data to achieve high fidelity and accuracy. The study findings provide possibilities for future development of the presented approach to implement computational heavy predictive algorithms with multi-step predictions in emerging modular bidirectional charger topologies to realize vehicle-to-grid (V2G) technology. The online tuning can be explored using the new measurements obtained during the operation, henceforth, enhancing the controller performance for integrating multiple DERs into distribution power networks that shows huge interest for the utilities and regulatory agencies. Multiple operation scenatios have been evaluated and simulation results are discussed to verify intended performance of the proposed control solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Wildfires on Solar Generation, Reserves and Energy Prices

Wildfire seasons in the Western U.S. become more prolonged and intense in recent years bringing significant variability and uncertainty of solar generation. It greatly challenges the bulk power system and electricity market operation managed by California Independent System Operator (CAISO) as California leads both the wildfire records and the solar power integration. This study presents a screening-level analysis of the impact of wildfires on solar generation, operating reserve and energy prices applying historical real-world wildfire and market operation data. To the best of the authors knowledge, it is a first-of-its-kind study and will lay the foundation for market impact quantification and wildfire mitigation strategies design based on projected wildfire activities in future years.

electricity price↗

Addressing Human and Organizational Factors in Nuclear Industry Modernization: An Operationally Focused Approach to Process and Methodology

Utility owners and operators of commercial nuclear power plants in the United States (U.S.) are and will be modernizing their nuclear power plants by performing a digital transformation involving design of an integrated set of systems that together enable a technology centric operating plant. The Plant Modernization Pathway of the U.S. Department of Energy Light Water Reactor Sustainability Program has a strategic action plan that lays the groundwork for a digital transformation of the nuclear industry. The model for this transformation is an advanced concept of operations, with an end point vision, “To achieve the maximum aggregate benefit enabled by this digital transformation.” To achieve this, the digital infrastructure for a nuclear plant must be designed as an integrated set of systems that together enable a technology centric operating model. The digital transformation process obviously needs to involve technology considerations and systems engineering, but it also needs to include human and organizational expertise. Thus, human and organizational factors, including sociotechnical systems methods and techniques (e.g., Cognitive Systems Engineering, Systems Theoretic Accident Modeling and Processes, human systems integration, and Macroergonomics) need to be considered for digital transformation projects in order to effectively integrate human and organizational expertise efforts into the new work system that results from nuclear power plant digital modernization. That is, the work system is the basic unit of sociotechnical systems analysis and contains three components: personnel, technical, and organization and management. These components should be jointly optimized with respect to the interdependence of systems performance criteria of effectiveness, efficiency and safety. Joint optimization can be achieved through the application of three human and organization functions: knowledge representation, knowledge elicitation, and cross-functional integration. This report provides a strategic framework for effective integration of human and organizational expertise within nuclear power plant digital modernization efforts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimental Studies of Nonlinear Integrable Optics with Elliptic Potentials

The stable transport of charged particle beams is the core challenge in designing and operating accelerators. The current paradigm for transverse focusing is based on quadrupole and dipole elements, described as a linear integrable Hamiltonian by Courant and Snyder. The operational limits of high intensity accelerators are often determined by collective instabilities within the beam. Nonlinear elements may be added to suppress certain forms of these collective effects, but restrict the range of stable trajectories. These shortcomings motivate extending to a nonlinear integrable system which can offer the benefits of suppressing collective instabilities without limiting the stable trajectories. Danilov and Nagaitsev proposed a novel nonlinear integrable system with elliptical potentials, which could be implemented as magnetic elements in an accelerator. Such a system has been implemented for practical verification in the integrable optics test accelerator (IOTA), a small storage ring constructed for beam dynamics studies. Electron beam studies in IOTA treat the low-emittance beam as a macroparticle for detailed probing of the expected single particle dynamics. This dissertation details new measurements of the nonlinear integrable system relevant for practical implementation. Turn-by-turn measurements of the kicked beam responses are used for phase space reconstruction and analysis of the predicted nonlinear dynamics. The stability and aperture for various nonlinear configurations are measured with beam losses. Amplitude dependent detuning, a core figure of merit for suppressing instabilities, is measured and compared with high fidelity particle tracking simulations. The synchrotron radiation images of circulating beam allow direct measurements of the topology and lifetime in configurations where nonlinear focusing terms dominate.

Wieland, John [Michigan U.] (ORCID:000000028971852↗

A modeling framework for designing and evaluating curbside traffic management policies at Dallas-Fort Worth International Airport

Emerging mobility technologies are changing the transportation system landscape. This is especially evident at airports, such as the Dallas-Fort Worth International Airport (DFW). Without careful analysis, these changes could lead to inefficient and costly airport operations. This paper presents a modeling framework that integrates travel mode encoding, demand projection, and microsimulation to enable airports to develop, simulate, and evaluate curbside traffic managements policies and measure their impact. Here, the framework is utilized to analyze several traffic scenarios and policies for DFW: a baseline scenario which represents DFW traffic pattern as observed in 2018 and projected to 2045, a transit network company (TNC) electrification policy, a TNC queuing policy, a policy that increased transit ridership, a bus-only policy which considers the use of only buses inside DFW, an autonomous vehicle (AV) policy which investigates the impact of autonomous vehicle (AV) adoption on airport operations, and an example COVID-19 scenario which models the impact of the COVID19 pandemic. The simulations’ results demonstrate that: increasing the DFW transit ridership postpones the need for airport curbside expansion the most; encouraging shared-mobility with the bus-only policy produces the most savings in curbside congestion delays; automation and electrification for all passenger vehicle trips to/from DFW generates the most saving in fuel consumption and emissions; and uncontrolled AV adoption incurs the highest increase in fuel consumption, delay, and emissions and could require immediate airport capacity extension. Without policy intervention or investment in additional infrastructure capacity, these results predict the current operations would face significant congestion on high demand days starting as early as 2028. While derived in close partnership with DFW, the methodology presented here can be generalized to any airport.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗