Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.

Lichodziejewski, David↗

Hard ACTS to follow

The Advanced Communications Technology Satellite (ACTS), the third phase of NASA's 30/20 GHz satellite communications program, is praised for its frugal usage of both the geosynchronous orbital arch and the frequency spectrum resources necessary for communications satellites. Its objective is to verify Ka-band satellite communications concepts and to develop a flight and ground system for validation of the multibeam communications proof-of-concept technologies. The ACTS ground segment (comprised of four types of terminals) is designed to compliment the spacecraft for the SS launch in 1989. Precise coordination between the ground and spacecraft segments is performed by the baseband processor (BBP), which is an in-orbit switchboard, and the tracking error word, which enables the ground terminals to remain synchronized with onboard timing. Fixed spot beams and scan beams, comprising the two types of spot beams used, both operate at the same frequency and hence, conserve frequency resources. In addition, the time division multiple access serves to enhance system efficiency. It is concluded that Ka-band satellites are a practical approach to the better usage of those resources potentially threatened by communications satellites. Comprehensive graphs and block diagrams of the system are included.

Moy, L.↗

Utilizing expert systems for satellite monitoring and control

Spacecraft analysts in the spacecraft control center for the Cosmic Background Explorer (COBE) satellite are currently utilizing a fault-isolation expert system developed to assist in the isolation and correction of faults in the communications link. This system, the communication link expert assistance resource (CLEAR), monitors real time spacecraft and ground systems performance parameters in search of configuration discrepancies and communications link problems. If such a discrepancy or problem is isolated, CLEAR alerts the analyst and provides advice on how to resolve the problem swiftly and effectively. The CLEAR system is the first real time expert system to be used in the operational environment of a satellite control center at the NASA Goddard Space Flight Center. Clear has not only demonstrated the utility and potential of an expert system in the demanding environment of a satellite control center, but also has revealed many of the pitfalls and deficiencies of development of expert systems. One of the lessons learned from this and other initial expert system projects is that prototypes can often be developed quite rapidly, but operational expert systems require considerable effort. Development is generally a slow, tedious process that typically requires the special skills of trained programmers. Due to the success of CLEAR and several other systems in the control center domain, a large number of expert systems will certainly be developed to support control center operations during the early 1990's. To facilitate the development of these systems, a project was initiated to develop an integrated, domain-specific tool, the generic spacecraft analyst assistent (GenSAA), that alows the spacecraft analysts to rapidly create simple expert systems themselves. By providing a highly graphical point-and-select method of system development, GenSAA allows the analyst to utilize and/or modify previously developed rule bases and system components; thus, facilitating software reuse and reducing development time and effort.

Hughes, Peter M.↗

Liquid rocket booster integration study. Volume 1: Executive summary

The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is the executive summary of the five volume series.

Source record↗

Liquid Rocket Booster Integration Study. Volume 2: Study synopsis

The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is the study summary of the five volume series.

Source record↗

Liquid rocket booster integration study. Volume 3, part 1: Study products

The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is part one of the study products section of the five volume series.

Source record↗

Liquid rocket booster integration study. Volume 3: Study products. Part 2: Sections 8-19

The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is part two of the study products section of the five volume series.

Source record↗

Liquid rocket booster integration study. Volume 5, part 1: Appendices

The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is the appendices of the five volume series.

Source record↗

Autonomy and the human element in space

NASA is contemplating the next logical step in the U.S. space program - the permanent presence of humans in space. As currently envisioned, the initial system, planned for the early 1990's, will consist of manned and unmanned platforms situated primarily in low Earth orbit. The manned component will most likely be inhabited by 6-8 crew members performing a variety of tasks such as materials processing, satellite servicing, and life science experiments. The station thus has utility in scientific and commercial enterprises, in national security, and in the development of advanced space technology. The technical foundations for this next step have been firmly established as a result of unmanned spacecraft missions to other planets, the Apollo program, and Skylab. With the shuttle, NASA inaugurates a new era of frequent flights and more routine space operations supporting a larger variety of missions. A permanently manned space system will enable NASA to expand the scope of its activities still further. Since NASA' s inception there has been an intense debate over the relative merits of manned and unmanned space systems. Despite the generally higher costs associated with manned components, astronauts have accomplished numerous essential, complex tasks in space. The unique human talent to evaluate and respond inventively to unanticipated events has been crucial in many missions, and the presence of crews has helped arouse and sustain public interest in the space program. On the other hand, the hostile orbital environment affects astronaut physiology and productivity, is dangerous, and mandates extensive support systems. Safety and cost factors require the entire station complex, both space and ground components, to be highly automated to free people from mundane operational chores. Recent advances in computer technology, artificial intelligence (AI), and robotics have the potential to greatly extend space station operations, offering lower costs and superior productivity. Extended operations can in turn enhance critical technologies and contribute to the competitive economic abilities of the United States. A high degree of automation and autonomy may be required to reduce dependence on ground systems, reduce mission costs, diminish complexity as perceived by the crew, increase mission lifetime and expand mission versatility. However, technologies dealing with heavily automated, long duration habitable spacecraft have not yet been thoroughly investigated by NASA. A highly automated station must amalgamate the diverse capabilities of people, machines, and computers to yield an efficient system which capitalizes on unique human characteristics. The station also must have an initial design which allows evolution to a larger and more sophisticated space presence. In the early years it is likely that AI-based subsystems will be used primarily in an advisory or planning capacity. As human confidence in automated systems grows and as technology advances, machines will take on more critical and interdependent roles. The question is whether, and how much, system autonomy will lead to improved station effectiveness.

Source record↗

NASA's Spaceliner 100 Investment Area Technology Activities

NASA's has established long term goals for access-to-space. The third generation launch systems are to be fully reusable and operational around 2025. The goals for the third generation launch system are to reduce cost by a factor of 100 and improve safety by a factor of 10,000 over current conditions. The Advanced Space Transportation Program Office (ASTP) at the NASA's Marshall Space Flight Center in Huntsville, AL has the agency lead to develop space transportation technologies. Within ASTP, under the Spaceliner100 Investment Area, third generation technologies are being pursued in the areas of propulsion, airframes, integrated vehicle health management (IVHM), launch systems, and operations and range. The ASTP program will mature these technologies through ground system testing. Flight testing where required, will be advocated on a case by case basis.

Hueter, Uwe↗

EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs

The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.

Cordier, Guy R.↗

Control System Software Development: Fall 2020 Internship Final Report

The Launch Control System (LCS) is an integral part of the Space Launch System (SLS) as it responds and sends instructions to both the vehicle and ground systems. This semester, the focus has been on the development of assurance tests for the Graphical User Interface (GUI) software components of the LCS. This will help ensure that the system software functions as intended. This paper describes the goals, procedures, and results of this process as well as lessons learned that may be useful for future interns working on similar projects.

software↗

NASA KSC Internship Experience & Project Report

As part of the Spring 2021 Engineering Student Trainee rotation with the National Aeronautics and Space Administration (NASA) through the Pathways program at Kennedy Space Center (KSC). I served under KSC’s Engineering directorate as a Pneumatics Engineering Intern for the Environmental and Life support Systems branch (NE-XF). During my Internship, I primarily supported the Exploration Ground Systems (EGS) program under the direct supervision of NE-XF Pneumatics Senior Engineer, Ruben Jaca, and NE-XF matrix supervisor, Stephen M. Anthony. I worked on the completion of a Pressure Vessel and Pressurized System (PVS) certification for a Payload Accommodation Subsystem (PAS) prototype. As part of the Pathways program, I was additionally exposed to various career and skill enhancement activities.

Internship↗

An Integrated Platform for Mission Performance: Goddard Space Flight Center's Meta Information System

Successful management of NASA Goddard Space Flight Centers portfolio of mission projects (i.e. spacecraft, spacecraft instruments / subsystems, and ground systems) depends upon numerous processes, data and information resources coming together throughout the life-cycle of the projects to enable sound decision-making, risk reduction, conformance with requirements and continual improvement. In the summer of 2012, GSFC SMA management recognized that the set of legacy data systems used to support the SMA mission and responsibilities at GSFC were not effective, integrated nor on par with best practices. Accordingly, GSFC SMA management launched a project to transform the GSFC electronic management system to create and deploy an integrated, state-of-the-market information system for process performance, data management and analytics that is currently operating in support of GSFC overall mission performance. The information system, known as Meta, provides controlled, process-based applications, integrated data management, and analytics for a robust set of integrated applications. Since the inception of the project, a lean, award-winning SMA project team has thus far designed, configured and managed the system to serve as an integrated platform for 18 applications that support key processes for GSFC and the Science Mission Directorate at NASA headquarters, such as internal Management System assessments, Supplier Assessments, Supplier Research & Analysis, Problem Reporting for in-house mission projects, On-orbit Anomaly Reporting for GSFC-operated spacecraft, GSFC Project Life-Cycle Reviews, Risk Management and Reporting, and SMA Project Team Reporting. The system has experienced steady growth in utilization with 1,917 users (NASA employees and support contractor personnel) and 44 gigabytes of data and related files managed by the system as of the end of April 2018. Overall, Meta has achieved increasing levels of process management and real-time data / information integration to enable improved process performance, richer analytics and informed decision-making. This paper will present and examine the need, goals, approach and design driving the management and operation of the Meta information system and its ongoing growth as an integrated platform for advancing NASA mission performance.

Integration↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States's human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After nearly 50 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either of the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return to the home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent as to how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort. Key Words: PRA, space launches, human space program, ascent abort, spacecraft, launch vehicles

Bigler, Mark↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States' human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After over 40 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent and how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort.

Bigler, Mark↗

Ground test article for deployable space structure systems

The ground test article fabrication and assembly plan was completed by Santek Engineering, Inc. The plan was reviewed and accepted by Rockwell during an on-site visit to the Santek facility. Raw material and hardware orders were placed by Santek in July. Approximately 98% of the raw materials and 10% of the hardware deliveries have been completed. Several material and hardware substitutions were requested by Santek due to no-bid responses from suppliers or excessive costs for limited quantity items. These substitutions were evaluated and approved by Rockwell Engineering and Material and Process and are being incorporated into the drawing package. Santek started fabrication of detail parts in mid-August. Their current resource utilization is at approximately 50% of the planned eventual commitment and is increasing at a rate commensurate with the fabrication and assembly plan. At this writing, Santek's estimate of completion is 03%. During verification testing of the diagonal member joint, in a program funded by Rockwell discretionary funds, the axial load to unlock the joint was found to increase significantly after a few cycles of operation. This was attributed to galling, poor lubrication, and locking pin geometry. A change of materials, lubricant, and modification of the pin geometry reduced the unlocking load and provided repeatability after 50 cycles of operation. This new design is being implemented into the ground test article.

Malloy, G. D.↗