Radio Active Waste Plants - Back to the Future
This paper outlines the potential to provide smaller, potentially modular radwaste plants, suitable for new reactor proposals, within increasingly strict environmental control regimes, and with reduced discharge authorisations. Aker Kvaerner have been involved in the design, build and commissioning of radwaste plants over many years and provided the plant for Sizewell B, one of the last major PWRs to be built anywhere in the world. Unit operations and design characteristics of radioactive waste processing plant are discussed. It is concluded that these have changed little in the past 30 years. The traditional build characteristics and metrics of large radioactive waste processing facilities are described in both the reprocessing and the power generation industries. New reactor and fuel characteristics are described and used to highlight areas of potential design improvement, reducing the size, complexity, construction programme and cost of future power reactor radwaste facilities. In summary - implications for Design: Taking these factors into account, we can now expect that compared to Sizewell B radwaste plant, it is possible to match the AP1000 metrics given in Figure 4 above. In principle, this could deliver a building and plant volume of the order of one third to one half of that for Sizewell. It may be possible to make larger reductions in building volume although this is primarily due to the removal of evaporation and relocation of gaseous waste processing. The expected improvements are: - Reduced complexity and interactions significantly improve operational safety - Process intensification and close alignment of processes against reactor waste streams deliver reduced plant size. - Accelerated construction; this becomes possible because of reduced building size, and improved, fit-for-purpose building design. - Programme: The use of skid mounted package plant, modular 'pack' systems for filters and ion exchangers, can shorten construction time. - Allowance for sub contractor support service, by provision of Docking Bays and subcontractor Laydown areas, allows the future use of specialist waste services. - Environmental; Reduced operational source terms gives potential for significantly reduced liquid and gaseous effluent levels. - Solid Waste; improved ion exchange processes deliver equivalent performance with reduced waste volumes. - Increased use of modular design and skid mounted systems. - As a whole, these allow optimal design for the whole life cycle. - Although more intensive, the processes have still not changed from those of the past. Hence, Back to the Future. (authors)