2019 Groundwater Monitoring Report Project Shoal Area: Subsurface Corrective Action Unit 447

The Project Shoal Area is a site in Nevada where an underground nuclear test was conducted in 1963. It later came to be known as the Shoal, Nevada, Site. Surface contamination at the site has been remediated, but investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and water-level monitoring are conducted as part of the subsurface corrective action strategy, which has focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network. It has also included enhancements to the monitoring well network to address uncertainties in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone since the first hydrologic characterization (HC) wells were installed in 1996. Revisions to the site conceptual model and enhancements to the monitoring strategy were provided to Nevada Division of Environmental Protection (NDEP) in the Addendum to: Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the Subsurface Corrective Action Unit 447 Shoal, Nevada, Site. NDEP approved the addendum to the CADD/CAP, which included an expanded contaminant boundary and compliance boundary for the site.

54 ENVIRONMENTAL SCIENCES↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Vincent Mullins Landfill in Tucson, Arizona

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vincent Mullins Landfill in Tucson, Arizona, for a feasibility study of renewable energy production. Under the RE-Powering America's Land initiative, the EPA provided funding to the National Renewable Energy Laboratory (NREL) to support the study. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this report is to assess the site for a possible PV installation and estimate the cost and performance of different PV configurations, as well as to recommend financing options that could assist in the implementation of a PV system. In addition to the Vincent Mullins site, four similar landfills in Tucson are included as part of this study. The feasibility of a PV system depends greatly on both site-specific and economic factors. Site specific factors include the available area for an array, solar resource, distance to transmission lines, and distance to major roads. In addition, the operating status, ground conditions, and restrictions associated with redevelopment of contaminated sites impact the feasibility of a PV system. Economic factors include purchase price of the electricity produced, power purchase agreement (PPA) price, and retail electric rates along with federal, state, and utility incentives for PV systems. Based on an assessment of these factors, the Vincent Mullins Landfill and other closed landfills in Tucson were found to be suitable sites for deployment of utility-scale PV systems. This study evaluated two development scenarios for implementing large-scale PV systems on Tucson’s landfills—one in which the city owns and operates the system, and one where a private entity is allowed to develop the site using a PPA. Table ES-1 summarizes the predicted economics of the two scenarios along with the system size, energy production, and cost.

14 SOLAR ENERGY↗

Data Quality Objectives Supporting the Environmental Direct Radiation Monitoring Program for the Idaho National Laboratory

This document presents the development of the data quality objectives (DQOs) for the Idaho National Laboratory (INL) Environmental Direct Radiation Monitoring Program and follows the Environmental Protection Agency (EPA) DQO process (EPA 2006). This document also develops and presents the logic to determine the specific number of direct radiation monitoring locations around INL facilities on the desert west of Idaho Falls and in Idaho Falls, at locations bordering the INL Site, and in the surrounding regional area. The selection logic follows the guidance from the Department of Energy (DOE) (2015) for environmental surveillance of DOE facilities.

54 ENVIRONMENTAL SCIENCES↗

Simulation and Optimization of Large Scale Subsurface Environmental Impacts; Investigations, Remedial Design and Long Term Monitoring

The global impact to human health and the environment from large scale chemical / radionuclide releases is well documented. Examples are the wide spread release of radionuclides from the Chernobyl nuclear reactors, the mobilization of arsenic in Bangladesh, the formation of Environmental Protection Agencies in the United States, Canada and Europe, and the like. The fiscal costs of addressing and remediating these issues on a global scale are astronomical, but then so are the fiscal and human health costs of ignoring them. An integrated methodology for optimizing the response(s) to these issues is needed. This work addresses development of optimal policy design for large scale, complex, environmental issues. It discusses the development, capabilities, and application of a hybrid system of algorithms that optimizes the environmental response. It is important to note that 'optimization' does not singularly refer to cost minimization, but to the effective and efficient balance of cost, performance, risk, management, and societal priorities along with uncertainty analysis. This tool integrates all of these elements into a single decision framework. It provides a consistent approach to designing optimal solutions that are tractable, traceable, and defensible. The system is modular and scalable. It can be applied either as individual components or in total. By developing the approach in a complex systems framework, a solution methodology represents a significant improvement over the non-optimal 'trial and error' approach to environmental response(s). Subsurface environmental processes are represented by linear and non-linear, elliptic and parabolic equations. The state equations solved using numerical methods include multi-phase flow (water, soil gas, NAPL), and multicomponent transport (radionuclides, heavy metals, volatile organics, explosives, etc.). Genetic programming is used to generate the simulators either when simulation models do not exist, or to extend the accuracy of them. The uncertainty and sparse nature of information in earth science simulations necessitate stochastic representations. For discussion purposes, the solution to these site-wide challenges is divided into three sub-components; plume finding, long term monitoring, and site-wide remediation. Plume finding is the optimal estimation of the plume fringe(s) at a specified time. It is optimized by fusing geo-stochastic flow and transport simulations with the information content of data using a Kalman filter. The result is an optimal monitoring sensor network; the decision variable is location(s) of sensor in three dimensions. Long term monitoring extends this approach concept, and integrates the spatial-time correlations to optimize the decision variables of where to sample and when to sample over the project life cycle. Optimization of location and timing of samples to meet the desired accuracy of temporal plume movement is accomplished using enumeration or genetic algorithms. The remediation optimization solves the multi-component, multiphase system of equations and incorporates constraints on life-cycle costs, maximum annual costs, maximum allowable annual discharge (for assessing the monitored natural attenuation solution) and constraints on where remedial system component(s) can be located, including management overrides to force certain solutions to be chosen are incorporated for solution design. It uses a suite of optimization techniques, including the outer approximation method, Lipchitz global optimization, genetic algorithms, and the like. The automated optimal remedial design algorithm requires a stable simulator be available for the simulated process. This is commonly the case for all above specifications sans true three-dimensional multiphase flow. Much work is currently being conducted in the industry to develop stable 3D, three-phase simulators. If needed, an interim heuristic algorithm is available to get close to optimal for these conditions. This system process provides the full capability to optimize multi-source, multiphase, and multicomponent sites. The results of applying just components of these algorithms have produced predicted savings of as much as $90,000,000(US), when compared to alternative solutions. Investment in a pilot program to test the model saved 100% of the $20,000,000 predicted for the smaller test implementation. This was done without loss of effectiveness, and received an award from the Vice President - and now Nobel peace prize winner - Al Gore of the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A multiscale landscape approach for prioritizing river and stream protection and restoration actions

River and stream conservation programs have historically focused on a single spatial scale, for example, a watershed or stream site. Recently, the use of landscape information (e.g., land use and land cover) at multiple spatial scales and over large spatial extents has highlighted the importance of incorporating a landscape perspective into stream protection and restoration activities. Previously, we developed a novel framework that links information about watershed-, catchment-, and reach-scale integrity with stream biological condition using scatterplots and a landscape integrity map. Here we examined an application of this approach for streams in urban and other settings in King County, Washington State, United States, where we related stream macroinvertebrate condition to two indices of landscape integrity, the US Environmental Protection Agency's (USEPA) nationally available Index of Watershed Integrity (IWI) and Index of Catchment Integrity (ICI). We generated a scatterplot of IWI versus ICI for sample sites, where points represented site macroinvertebrate condition from poor to good. The same data were also visualized as a landscape integrity map that displayed catchments of King County according to the level of watershed and catchment integrity (high or low IWI/ICI). Almost three-quarters of poor-condition sites were associated with high-integrity watersheds and catchments (i.e., underperforming sites), which suggested that either one or both national indicators were insufficient for this area, and that sites underperformed because of local-scale factors. In response, we used a catchment-scale indicator related to forest condition (PctForestCat) after examining several GIS-based dispersal indicators from the National Hydrography Dataset and other candidates from the USEPA's StreamCat dataset. We then compared the results of the scatterplots and maps based on the current and original analyses and found that many of the sites previously classified as underperforming now performed as expected, that is, they were poor-condition sites in poor-condition catchments. This analysis demonstrates how results based on a national dataset can be improved by developing an alternative that represents regionally important stressors. The methods used to develop an effective landscape indicator based on StreamCat datasets, and the utility of the multiscale approach, could provide important tools for prioritizing, optimizing, and communicating stream conservation actions.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures - Nevada National Security Site, Nevada with ROTC 1

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 572, Test Cell C Ancillary Building and Structures, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 572 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: CAS 25-33-01, Building 3220, Equipment Building; CAS 25-33-02, Building 3230, Motor Drive Building; CAS 25-33-03, Building 3231, Pump House; CAS 25-33-04, Building 3232, Cryogenic Evaluation Lab; CAS 25-99-22, Ancillary Facilities. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 572. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 572 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation (CAI) will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If it is determined that complete clean closure cannot be accomplished during the CAI, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Final Performance Report

U.S./China Energy and Environmental Technology Center (EETC), Payson Center for International Development, Law School of Tulane University was officially established in 1997 with initial funds from private sector, US Environmental Protection Agency and the US Department of Energy (DOE.) Lately, DOE has provided EETC funds for operations with cost share from the Ministry of Science and Technology, China. EETC was created to facilitate the development of friendly, broad-based U.S./China relations. Tulane University signed the Memorandum of Understanding (MOU) with the Chinese People’s Institute of Foreign Affairs (1995) to promote the formation of Chinese partners for EETC. EETC’s original goal is to enhance the competitiveness of US clean fossil energy technology in China so that, as her economy expands, local and global environment are well protected. Specifically, through the demonstration and broadly deployment of US developed clean coal technology for power generation, transmission, and emission reductions in China. EETC is also focused on US industry partnerships for local economic development. One of the main the objectives of the EETC is to promote the efficient, responsible production and utilization of energy with a focus on clean fossil energy, promote US clean energy and environmental technologies, and encourage environmental performance while improving the quality of life in China. Another objective is to assist China with environmental and energy policy development and provide supports for China’s development with expertise (best practices) from US industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NESHAP Annual Report for CY 2015 Sandia National Laboratories Tonopah Test Range

This National Emission Standards for Hazardous Air Pollutants (NESHAP) Annual Report has been prepared in a format to comply with the reporting requirements of 40 CFR 61.94 and the April 5, 1995 Memorandum of Agreement (MOA) between the Department of Energy (DOE) and the Environmental Protection Agency (EPA). According to the EPA approved NESHAP Monitoring Plan for the Tonopah Test Range (TTR), 40 CFR 61, subpart H, and the MOA, no additional monitoring or measurements are required at TTR in order to demonstrate compliance with the NESHAP regulation.

54 ENVIRONMENTAL SCIENCES↗

Data Validation Package May 2016 Groundwater Sampling at the Lakeview, Oregon, Processing Site August 2016

This biennial event includes sampling five groundwater locations (four monitoring wells and one domestic well) at the Lakeview, Oregon, Processing Site. For this event, the domestic well (location 0543) could not be sampled because no one was in residence during the sampling event (Note: notification was provided to the resident prior to the event). Per Appendix A of the Groundwater Compliance Action Plan, sampling is conducted to monitor groundwater quality on a voluntary basis. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). One duplicate sample was collected from location 0505. Water levels were measured at each sampled monitoring well. The constituents monitored at the Lakeview site are manganese and sulfate. Monitoring locations that exceeded the U.S. Environmental Protection Agency (EPA) Secondary Maximum Contaminant Levels for these constituents are listed in Table 1. Review of time-concentration graphs included in this report indicate that manganese and sulfate concentrations are consistent with historical measurements.

2016 Groundwater Sampling Lakeview, Oregon↗

NESHAP annual report for CY2016. Sandia National Laboratories, Tonopah Test Range

This National Emission Standards for Hazardous Air Pollutants (NESHAP) Annual Report has been prepared in a format to comply with the reporting requirements of 40 CFR 61.94 and the April 5, 1995 Memorandum of Agreement (MOA) between the Department of Energy (DOE) and the Environmental Protection Agency (EPA). According to the EPA approved NESHAP Monitoring Plan for the Tonopah Test Range (TTR), 40 CFR 61, subpart H, and the MOA, no additional monitoring or measurements are required at TTR in order to demonstrate compliance with the NESHAP regulation.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

Treated bottom ash medium and method of arsenic removal from drinking water

A method for low-cost arsenic removal from drinking water using chemically prepared bottom ash pre-treated with ferrous sulfate and then sodium hydroxide. Deposits on the surface of particles of bottom ash form of activated iron adsorbent with a high affinity for arsenic. In laboratory tests, a miniscule 5 grams of pre-treated bottom ash was sufficient to remove the arsenic from 2 liters of 2400 ppb (parts per billion) arsenic-laden water to a level below 50 ppb (the present United States Environmental Protection Agency limit). By increasing the amount of pre-treated bottom ash, even lower levels of post-treatment arsenic are expected. It is further expected that this invention supplies a very low-cost solution to arsenic poisoning for large population segments.

54 ENVIRONMENTAL SCIENCES↗

Standard review plan for evaluating nuclear power reactor license termination plans

This standard review plan (SRP) guides the staff of the U.S. Nuclear Regulatory Commission (NRC) in conducting safety reviews of license termination plans (LTPs). The principal purpose of this SRP is to ensure the quality and uniformity of NRC staff reviews and to present a well-defined base from which to evaluate the requirements for terminating the license of a nuclear power plant. It is also the purpose of this SRP to make information about regulatory matters widely available, so that interested members of the public and the nuclear industry can gain a better understanding of the NRC staff's review process. Specific guidance for licensees is included in Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for Nuclear Power Reactors." Licensees may also use this SRP to assist in developing an LTP. The SRP presents the acceptance criteria for all areas of review for license termination, and identifies the matters to be reviewed, the basis for the review, and the conclusions that are sought. For example, NUREG-1757, "Consolidated Decommissioning Guidance" offers additional guidance on how to demonstrate compliance with the unrestricted release, restricted release, and alternative criteria for license termination, in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 20, "Standards for Protection against Radiation," Subpart E, "Radiological Criteria for License Termination." To avoid duplication of information, this SRP references applicable sections of NUREG-1757 for additional guidance. In addition, the NRC has issued supplemental guidance that will subsequently be consolidated into NUREG-1757 to address partial site release before LTP approval, and compliance with 10 CFR Part 20, Subpart E. It should be noted that the memorandum of understanding (MOU) between the Environmental Protection Agency and NRC may contain consultation triggers for some radionuclides that may be lower than the NUREG-1757 Vol. 2 Revision 1, Appendix H screening values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Underground Test Area Activity Preemptive Review Guidance Nevada National Security Site, Nevada, Revision 0

Preemptive reviews (PERs) of Underground Test Area (UGTA) Activity corrective action unit (CAU) studies are an important and long-maintained quality improvement process. The CAU-specific PER committees provide internal technical review of ongoing work throughout the CAU lifecycle. The reviews, identified in the UGTA Quality Assurance Plan (QAP) (Sections 1.3.5.1 and 3.2), assure work is comprehensive, accurate, in keeping with the state of the art, and consistent with CAU goals. PER committees review various products, including data, documents, software/codes, analyses, and models. PER committees may also review technical briefings including Federal Facility Agreement and Consent Order (FFACO)-required presentations to the Nevada Division of Environmental Protection (NDEP) and presentations supporting key technical decisions (e.g., investigation plans and approaches). PER committees provide technical recommendations to support regulatory decisions that are the responsibility of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and NDEP.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada, (Rev.0, with ROTC 1)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site (formerly, the Nevada Test Site): 25-41-03, EMAD Facility; 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV); and 25-33-05, Building 3901, Engine Transport System Maintenance Building. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the SAFER Plan, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report will be prepared and submitted to NDEP for review and approval. The schedule for completion of the closure report will be established at the FFACO annual meeting.

54 ENVIRONMENTAL SCIENCES↗

Annual Report on Institutional Computing Resources: Multi-scale Modeling of Green House Gas Emissions Performed on Institutional Computing Project HIGRADchem

Agreements to limit greenhouse gas emissions require scientifically valid methods for monitoring and validating anthropogenic emissions. The task of monitoring CO 2 emissions is difficult because relatively small increases need to be detected against CO 2 's variable and large background concentrations. To ensure fair compliance everywhere on the globe, remotely sensed measurements and an understanding of the atmospheric transport of CO 2 from its sources are required. The climate treaty verification LDRD project addresses these challenges. The Remote Sensing Verification Project (RSVP) test2bed located in the Four Corners region of Arizona, Utah, Colorado, and New Mexico offers a unique opportunity to develop new approaches for estimating emissions of CO 2 . Two major power plants located in this area produce very large signals of co-emitted CO 2 and NO 2 in this rural region. In addition to the Environmental Protection Agency (EPA) maintaining Continuous Emissions Monitoring Systems (CEMS) on each of the power plant stacks, the RSVP program has deployed an array of in-situ and remote sensing instruments, which provide both point and integrated measurements.

54 ENVIRONMENTAL SCIENCES↗

DOE Climate Change Vulnerability and Adaptation Planning: Three Relevant Case Studies - 16056

Executive Order 13653, Preparing the United States for the Impacts of Climate Change, was issued in 2013. The President emphasized the importance for federal agencies to take action to enhance climate preparedness and resilience. The U.S. Department of Energy released the DOE Climate Change Adaptation Plan in 2014 to build resilience and mitigation across the Department, and to assure inclusion of climate change adaptation as part of its planning and operations. DOE's Office of Environmental Management has an important mission to manage safe cleanup of environmental legacy contamination brought about from five decades of nuclear weapons development and government sponsored nuclear energy research. Specifically, Environmental Management is responsible for remediation of soil and groundwater, deactivation and decommissioning of facilities, and disposal of hazardous and radioactive waste. Three case studies are discussed in this paper that demonstrate the cost benefit and importance for Environmental Management to assess climate change vulnerability and implement planning procedures: 1. Los Alamos National Laboratory in New Mexico has experienced $0.5 billion in unanticipated costs as a result of climate-related events including: extreme drought, wildfires, deluge rains, and historic flooding over the past 15 years. 2. The U.S. Environmental Protection Agency American Cyanamid Superfund Site, situated on the New Jersey coast was hit by Hurricane Irene in 2011. Three major contaminated, solvent impoundment berms were breached within the 100-year flood plain, causing major damage to the facility. 3. For radioactive waste disposal facilities in low-lying areas in proximity to groundwater, climate change vulnerability and assessment is prudent for operational management. One such Superfund hazardous and radioactive waste disposal facility, the Environmental Management Waste Management Facility located at the DOE Oak Ridge Reservation in Tennessee, has documented surface and ground water management challenges since construction began in 2001, driven by changing regional weather patterns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guanidinium-Based Ionic Covalent Organic Framework for Rapid and Selective Removal of Toxic Cr(VI) Oxoanions from Water

Ionic covalent organic frameworks make up an emerging class of functional materials in which the included ionic interfaces induce strong and attractive interactions with ionic species of the opposite charge. Here, the strong and selective binding forces between the confined diiminoguanidinium groups in the framework and tetrahedral oxoanions have led to unparalleled effectiveness in the removal of the toxic chromium(VI) pollutant from aqueous solutions. Lastly, the new functional framework can take up from 90 to 200 mg/g of chromium(VI), depending on the solution pH, and is capable of decreasing the chromium(VI) concentration in water from 1 ppm to 10 ppb within minutes (an order of magnitude below the current U.S. Environmental Protection Agency maximum contaminant level of 100 ppb), demonstrating superior properties among known ion exchange materials and natural sorbents.

36 MATERIALS SCIENCE↗