Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Concept of Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Toward Real Time Data Analysis for Smart Grids

This paper describes the architecture and design of a novel system for supporting large-scale real-time data analysis for future power grid systems. The widespread deployment of renewable generation, smart grid controls, energy storage, plug-in hybrids, and new conducting materials will require fundamental changes in the operational concepts and principal components of the grid. As a result, the whole system becomes highly dynamic and requires constant adjusting based on real time data. Even though millions of sensors such as phase measurement units (PMU) and smart meters are being widely deployed, a data layer that can analyze this amount of data in real time is needed. Unlike the data fabric in other cloud services, the data layer for smart grids has some unique design requirements. First, this layer must provide real time guarantees. Second, this layer must be scalable to allow a large number of applications to access the data from millions of sensors in real time. Third, reliability is critical and this layer must be able to continue to provide service in face of failures. Fourth, this layer must be secure. We address these challenges though a scalable system architecture that integrates the I/O and data processing capability in a devise set of devices. Data process operations can be placed anywhere from sensors, data storage devices, to control centers. We further employ compression to improve performance. We design a lightweight compression customized for power grid data. Our system can reduce end-to-end response time by reduce I/O overhead through compression and overlap compression operations with I/O. The initial prototype of our system was demonstrated with several use cases from PNNL’s FPGI and show that our system can provide real time guarantees to a diverse set of applications.

Data Analytics, Power Grid, Big Data↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment, including the habitat, -would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat, the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle A.↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment?including the habitat--would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat?the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment-including the habitat-would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Architecture 5.0. More recent work, dubbed the Evolvable Mars Campaign (EMC), explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat-the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of a modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle A.↗

Ares V: Progress Toward Unprecedented Heavy Lift

Ares V represents the vehicle that will again make possible human exploration beyond low Earth orbit. The Ares V is part of NASA s Constellation Program architecture developed to support the International Space Station (ISS), establish a permanent human presence on the Moon, and explore it to an extent far greater than was possible with the Apollo Program. Ares V will carry the lunar lander to orbit where it will join the Orion crew spacecraft, launched by the smaller Ares I launch vehicle. Then the Ares V upper stage will send the Orion and lander to the Moon. Ares V is also intended to launch automated cargo landers to the Moon. The Ares vehicles are designed to employ the proven technologies and experience from the Space Shuttle, Delta IV, and earlier U.S. programs, as well as sharing common components where feasible. The Ares V is in an early stage of concept development. However, commonality allows it to benefit from development work already under way on the Ares I, including the first stage booster, and upper stage, J-2X upper stage engine. This paper will discuss progress to date on the Ares V and its potential for freeing payload designers from current mass and volume constraints. Progress includes development progress on Ares I elements that will be shared by the two launch vehicles. The Ares I first stage recently completed a successful test firing of Development Motor 1 (DM-1). The J-2X engine is proceeding with manufacturing of components for the first development engines that will be used for testing. Several component-level tests have been completed or are under way that will help verify designs and confirm solutions to design challenges. The Ares V Earth departure stage will benefit from the Ares I upper stage development, including design, manufacturing, and materials testing. NASA is also working with government and industry to collect data on flights and testing of the operational RS-68 engine and potential upgrades. The Ares V team continues to evaluate technical options, vehicle configurations, and operations concepts for the Ares V. The team recently completed a Fall Face-to-Face meeting that served as a stepping-stone to the Systems Requirements Review (SRR). This four-day meeting served as an information exchange for the various teams at several NASA field centers and supporting contractors.

Sumrall, Phil↗

NASA's Decadal Planning Team Mars Mission Analysis Summary

In June 1999 the NASA Administrator chartered an internal NASA task force, termed the Decadal Planning Team, to create new integrated vision and strategy for space exploration. The efforts of the Decadal Planning Team evolved into the Agency-wide team known as the NASA Exploration Team (NEXT). This team was also instructed to identify technology roadmaps to enable the science-driven exploration vision, established a cross-Enterprise, cross-Center systems engineering team with emphasis focused on revolutionary not evolutionary approaches. The strategy of the DPT and NEXT teams was to "Go Anywhere, Anytime" by conquering key exploration hurdles of space transportation, crew health and safety, human/robotic partnerships, affordable abundant power, and advanced space systems performance. Early emphasis was placed on revolutionary exploration concepts such as rail gun and electromagnetic launchers, propellant depots, retrograde trajectories, nano structures, and gas core nuclear rockets to name a few. Many of these revolutionary concepts turned out to be either not feasible for human exploration missions or well beyond expected technology readiness for near-term implementation. During the DPT and NEXT study cycles, several architectures were analyzed including missions to the Earth-Sun Libration Point (L2), the Earth-Moon Gateway and L1, the lunar surface, Mars (both short and long stays), one-year round trip Mars, and near-Earth asteroids. Common emphasis of these studies included utilization of the Earth-Moon Libration Point (L1) as a staging point for exploration activities, current (Shuttle) and near-term launch capabilities (EELV), advanced propulsion, and robust space power. Although there was much emphasis placed on utilization of existing launch capabilities, the team concluded that missions in near-Earth space are only marginally feasible and human missions to Mars were not feasible without a heavy lift launch capability. In addition, the team concluded that missions in Earth s neighborhood, such as to the Moon, can serve as stepping-stones toward further deep-space missions in terms of proving systems, technologies, and operational concepts. The material contained in this presentation was compiled to capture the work performed by the Mars Sub-Team of the DPT NEXT efforts in the late 1999-2001 timeframe.

Drake, Bret G.↗

NASA Advanced Explorations Systems: Concepts for Logistics to Living

The NASA Advanced Exploration Systems (AES) Logistics Reduction and Repurposing (LRR) project strives to enable a largely mission-independent cradle-to-grave-to-cradle approach to minimize logistics contributions to total mission architecture mass. The goals are to engineer logistics materials, common crew consumables, and container configurations to meet the following five basic goals: 1. Minimize intrinsic logistics mass and improve ground logistics flexibility. 2. Allow logistics components to be directly repurposed for on-orbit non-logistics functions (e.g., crew cabin outfitting) thereby indirectly reducing mass/volume. 3. Compact and process logistics that have not been directly repurposed to generate useful on-orbit components and/or compounds (e.g., radiation shielding, propellant, other usable chemical constituents). 4. Enable long-term stable storage and disposal of logistics end products that cannot be reused or repurposed (e.g., compaction for volume reduction, odor control, and maintenance of crew cabin hygienic conditions). 5. Allow vehicles in different mission phases to share logistics resources. This paper addresses the work being done to meet the second goal, the direct repurposing of logistics components to meet other on-orbit needs, through a strategy termed Logistics to Living (L2L). L2L has several areas but can be defined as repurposing or converting logistical items (bags, containers, foam, components, etc.) into useful crew items or life support augmentation on-orbit after they have provided their primary logistics function. The intent is that by repurposing items, dedicated crew items do not have to be launched and overall launch mass is decreased. For non-LEO missions, the vehicle interior volume will be relatively fixed so L2L will enable this volume to be used more effectively through reuse and rearrangement of logistical components. Past work in the area of L2L has already conceptually developed several potential technologies [Howe, Howard 2010]. Several of the L2L concepts that have shown the most potential in the past are based on NASA cargo transfer bags (CTBs) or their equivalents which are currently used to transfer cargo to and from the ISS. A high percentage of all logistics supplies are packaging mass and for a 6-month mission a crew of four might need over 100 CTBs. These CTBs are used for on-orbit transfer and storage but eventually becomes waste after use since down mass is very limited. The work being done in L2L also considering innovative interior habitat construction that integrate the CTBs into the walls of future habitats. The direct integration could provide multiple functions: launch packaging, stowage, radiation protection, water processing, life support augmentation, as well as structure. Reuse of these CTBs would reduce the amount of waste generated and also significantly reduce future up mass requirements for exploration missions. Also discussed here is the L2L water wall , an innovative reuse of an unfolded CTB as a passive water treatment system utilizing forward osmosis. The bags have been modified to have an inner membrane liner that allows them to purify wastewater. They may also provide a structural water-wall element that can be used to provide radiation protection and as a structural divider. Integration of the components into vehicle/habitat architecture and consideration of operations concepts and human factors will be discussed. In the future these bags could be designed to treat wastewater, concentrated brines, and solid wastes, and to dewater solid wastes and produce a bio-stabilized construction element. This paper will describe the follow-on work done in design, fabrication and demonstrations of various L2L concepts, including advanced CTBs for reuse/repurposing, internal outfitting studies and the CTB-based forward osmosis water wall.

Shull, Sarah A.↗

Evidence Report: Risk of Injury and Compromised Performance due to EVA Operations

During future missions to the Moon and Mars, each crewmember will most likely perform up to 24 hours a week of extravehicular activity (EVA) in support of exploration, science, construction, and maintenance tasks. Achieving mission objectives will require EVA systems and operations concepts that maximize human performance and efficiency while minimizing health and safety risks for crewmembers. Currently, over 450 EVAs have been performed in microgravity using the Extravehicular Mobility Unit (EMU). The EMU space suit has enabled the successful assembly and maintenance of the International Space Station (ISS) for over 20 years, as well as deployment of payload experiments, solar arrays, satellite launches and repairs. This EVA work was accomplished at a slower cadence than is expected for Moon and Mars, with ISS crewmembers performing no more than 7 EVAs during a single mission and without any back-to-back EVAs. Despite their success, ISS EVAs have resulted in more injury to EVA crewmembers than may be acceptable for long-duration exploration missions. The Apollo astronauts completed EVA tasks in suits that were designed for their short-duration lunar missions, although suit mobility problems were evident. The more frequent EVAs and more varied EVA tasks that are anticipated during the future longer-duration exploration missions will require EVA suits and systems that are better oriented to human health and performance than those used during the Apollo Program. Many of the problems that were encountered with the Apollo EVA suits (e.g., limited mobility and dexterity, high and aft center of gravity, and other features requiring significant crew compensation) will need to be corrected or mitigated to optimize EVA objectives of exploration missions. It is critical that we understand how EVA system design variables such as suit pressure, weight/mass, center-of-gravity location, joint ranges of motion, and biomedical monitoring, affects the ability of astronauts to perform safe, efficient, and effective EVAs. To achieve this understanding, EVA researchers will need to develop and execute an integrated human testing program across multiple environments. The research will provide objective data that will enable informed design decisions and crewmember standards, thereby ensuring EVA systems that optimize crewmember health, safety, efficiency, and performance. This report describes the risks to crew health, safety, performance, and efficiency caused by EVA operations, and it provides the evidence base to substantiate the importance of the risk.

EVA↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite's White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with and turnaround maintenance performed. The fight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development. NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This recent partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of the X-37 effort, the team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff research and development and provides valuable experience to implement the exploration vision.

Turner, Susan↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

Electrical Load Modeling and Simulation

Electricity consumer demand response and load control are playing an increasingly important role in the development of a smart grid. Smart grid load management technologies such as Grid FriendlyTM controls and real-time pricing are making their way into the conventional model of grid planning and operations. However, the behavior of load both affects, and is affected by load control strategies that are designed to support electric grid planning and operations. This chapter discussed the natural behavior of electric loads, how it interacts with various load control and demand response strategies, what the consequences are for new grid operation concepts and the computing issues these new technologies raise.

Demand Response↗

Modeling of a direct solar receiver reactor for decomposition of sulfuric acid in thermochemical hydrogen production cycles

Hydrogen production thermochemical cycles, based on the recirculation of sulfur-based compounds, are among the best suited processes to produce hydrogen using concentrated solar power. The sulfuric acid decomposition section is common to each sulfur-based cycle and represents one of the fundamental steps. A new direct solar receiver reactor concept is conceived, conceptually designed and simulated. A detailed transport phenomena model, including mass, energy and momentum balance expressions as well as suitable decomposition kinetics, is described adopting a finite volume approach. A single unit reactor is simulated with an inlet flow rate of 0.28 kg/s (corresponding to a production of approximately 11 kg H2 /h in a Hybrid Sulfur process) and a direct solar irradiation at a constant power of 143 kW/m 2 . Results, obtained for the high temperature catalytic decomposition of SO 3 into SO 2 and O 2 , demonstrate the effectiveness of the proposed concept, operating at pressures of 14 bar. A maximum temperature of 879 C is achieved in the reactor body, with a corresponding average SO 2 mass fraction of 27.8%. The overall pressure drop value is 1.7 bar. The reactor allows the SO 3 decomposition into SO 2 and O 2 to be realized effectively, requiring an external high temperature solar power input of 123.6 kJ/molSO 2 (i.e. 123.6 kJ/mol H2 ).

14 SOLAR ENERGY↗

Radiation damage and annealing of three coaxial n-type germanium detectors: Preparation for spaceflight missions to asteroid 16 Psyche and Mars’ moon Phobos

Three n-type high-purity germanium (HPGe) detectors were irradiated with protons at solar and galactic cosmic ray energies, with fluences corresponding to 3 years of exposure to the interplanetary radiation environment. Following 1 GeV proton irradiations (8x10 8 protons cm –2 ), annealing of the detectors at 105° and 115 °C resulted in full energy resolution recovery after 240 and 140 h of annealing, respectively. A second irradiation, consisting of 7.25x10 9 protons cm –2 with a solar-proton-like energy spectrum, resulted in full recovery within <316 h of annealing at 105 °C. Prior spaceflight experience raised concerns about annealing-induced leakage currents. During this study, one of the three detectors was annealed for a cumulative time of 57 days, and there was no evidence for increased leakage currents. However, gamma-ray photopeak detection efficiency was found to be strongly anti-correlated with cumulative anneal time for all three detectors. The energy- and time-dependence of the efficiency loss is consistent with the loss of active volume at the inner borehole, which we attribute to thermal diffusion of the lithium contact during annealing. The data collected during this study validate aspects of the design of two in-development planetary gamma-ray spectrometers; one to the asteroid (16) Psyche and one to Mars’ moon Phobos. The annealing strategy and operations concepts for these two instruments are informed by the results of this study.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Probing cosmic inflation with the LiteBIRD cosmic microwave background polarization survey

LiteBIRD, the Lite (Light) satellite for the study of B-mode polarization and Inflation from cosmic background Radiation Detection, is a space mission for primordial cosmology and fundamental physics. The Japan Aerospace Exploration Agency (JAXA) selected LiteBIRD in May 2019 as a strategic large-class (L-class) mission, with an expected launch in the late 2020s using JAXA’s H3 rocket. LiteBIRD is planned to orbit the Sun–Earth Lagrangian point L2, where it will map the cosmic microwave background polarization over the entire sky for three years, with three telescopes in 15 frequency bands between 34 and 448 GHz, to achieve an unprecedented total sensitivity of $2.2\, \mu$K-arcmin, with a typical angular resolution of 0.5° at 100 GHz. The primary scientific objective of LiteBIRD is to search for the signal from cosmic inflation, either making a discovery or ruling out well-motivated inflationary models. The measurements of LiteBIRD will also provide us with insight into the quantum nature of gravity and other new physics beyond the standard models of particle physics and cosmology. We provide an overview of the LiteBIRD project, including scientific objectives, mission and system requirements, operation concept, spacecraft and payload module design, expected scientific outcomes, potential design extensions, and synergies with other projects.

59 BASIC BIOLOGICAL SCIENCES↗

Large-Scale Data Challenges in Future Power Grids

This paper describes technical challenges in supporting large-scale real-time data analysis for future power grid systems and discusses various design options to address these challenges. Even though the existing U.S. power grid has served the nation remarkably well over the last 120 years, big changes are in the horizon. The widespread deployment of renewable generation, smart grid controls, energy storage, plug-in hybrids, and new conducting materials will require fundamental changes in the operational concepts and principal components. The whole system becomes highly dynamic and needs constant adjustments based on real time data. Even though millions of sensors such as phase measurement units (PMUs) and smart meters are being widely deployed, a data layer that can support this amount of data in real time is needed. Unlike the data fabric in cloud services, the data layer for smart grids must address some unique challenges. This layer must be scalable to support millions of sensors and a large number of diverse applications and still provide real time guarantees. Moreover, the system needs to be highly reliable and highly secure because the power grid is a critical piece of infrastructure. No existing systems can satisfy all the requirements at the same time. We examine various design options. In particular, we explore the special characteristics of power grid data to meet both scalability and quality of service requirements. Our initial prototype can improve performance by orders of magnitude over existing general-purpose systems. The prototype was demonstrated with several use cases from PNNL’s FPGI and was shown to be able to integrate huge amount of data from a large number of sensors and a diverse set of applications.

Smart Grid, Real Time, Commercial Products, Big Da↗

Improvement of capabilities of the Distributed Electrochemistry Modeling Tool for investigating SOFC long term performance

This report provides an overview of the work performed for Solid Oxide Fuel Cell (SOFC) modeling during the 2012 Winter/Spring Science Undergraduate Laboratory Internship at Pacific Northwest National Laboratory (PNNL). A brief introduction on the concept, operation basics and applications of fuel cells is given for the general audience. Further details are given regarding the modifications and improvements of the Distributed Electrochemistry (DEC) Modeling tool developed by PNNL engineers to model SOFC long term performance. Within this analysis, a literature review on anode degradation mechanisms is explained and future plans of implementing these into the DEC modeling tool are also proposed.

30 DIRECT ENERGY CONVERSION↗

FY16 Summary Report: Participation in the KOSINA Project

Salt formations represent a promising host for disposal of nuclear waste in the United States and Germany. Together, these countries provided fully developed safety cases for bedded salt and domal salt, respectively. Today, Germany and the United States find themselves in similar positions with respect to salt formations serving as repositories for heat-generating nuclear waste. German research centers are evaluating bedded and pillow salt formations to contrast with their previous safety case made for the Gorleben dome. Sandia National Laboratories is collaborating on this effort as an Associate Partner, and this report summarizes that teamwork. Sandia and German research groups have a long-standing cooperative approach to repository science, engineering, operations, safety assessment, testing, modeling and other elements comprising the basis for salt disposal. Germany and the United States hold annual bilateral workshops, which cover a spectrum of issues surrounding the viability of salt formations. Notably, recent efforts include development of a database for features, events, and processes applying broadly and generically to bedded and domal salt. Another international teaming activity evaluates salt constitutive models, including hundreds of new experiments conducted on bedded salt from the Waste Isolation Pilot Plant. These extensive collaborations continue to build the scientific basis for salt disposal. Repository deliberations in the United States are revisiting bedded and domal salt for housing a nuclear waste repository. By agreeing to collaborate with German peers, our nation stands to benefit by assurance of scientific position, exchange of operational concepts, and approach to elements of the safety case, all reflecting cost and time efficiency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological source tracking in oil/gas, medical and other industries: requirements and specifications for passive RFID technology

Subsurface sensors that employ radioisotopes, such 241Am-Be and 137Cs, for reservoir characterization must be tracked for safety and security reasons. Other radiological sources are also widely used in medicine. The radiological source containers, in both applications, are small, mobile and used widely worldwide. The nuclear sources pose radiological dispersal device (RDD) security risks. Security concerns with the industrial use of radionuclide sources is in fact quite high as it is estimated that each year hundreds of sealed sources go missing, either lost or stolen. Risk mitigation efforts include enhanced regulations, source-use guidelines, research and development on electronic tracking of sources. This report summarizes the major elements of the requirements and operational concepts of nuclear sources with the goal of developing automated electronic tagging and locating systems.

42 ENGINEERING↗