Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

STS-69 Flight Day 3 Highlights

On the third day of the STS-69 mission, the flight crew (Cmdr. Dave Walker, Pilot Ken Cockrell, and Mission Specialists Jim Voss, Mike Gernhardt, and Jim Newman) test the Orbital Maneuvering System and prepare for the retrieval of the SPARTAN satellite with a checkout procedure of the space shuttle's robot arm. Physiological and chemical experiments on fluid dynamics are conducted as part of the Sea Lab project. Urine and blood samples from the crew are collected and studied under microgravity conditions, and a slime mold experiment is conducted to determine the properties of motion, growth, and chemistry in zero gravity conditions. Earth views include cloud cover, a hurricane, and a close-up of its eye.

Source record↗

Knowledge base rule partitioning design for CLIPS

This describes a knowledge base (KB) partitioning approach to solve the problem of real-time performance using the CLIPS AI shell when containing large numbers of rules and facts. This work is funded under the joint USAF/NASA Advanced Launch System (ALS) Program as applied research in expert systems to perform vehicle checkout for real-time controller and diagnostic monitoring tasks. The Expert System advanced development project (ADP-2302) main objective is to provide robust systems responding to new data frames of 0.1 to 1.0 second intervals. The intelligent system control must be performed within the specified real-time window, in order to meet the demands of the given application. Partitioning the KB reduces the complexity of the inferencing Rete net at any given time. This reduced complexity improves performance but without undo impacts during load and unload cycles. The second objective is to produce highly reliable intelligent systems. This requires simple and automated approaches to the KB verification & validation task. Partitioning the KB reduces rule interaction complexity overall. Reduced interaction simplifies the V&V testing necessary by focusing attention only on individual areas of interest. Many systems require a robustness that involves a large number of rules, most of which are mutually exclusive under different phases or conditions. The ideal solution is to control the knowledge base by loading rules that directly apply for that condition, while stripping out all rules and facts that are not used during that cycle. The practical approach is to cluster rules and facts into associated 'blocks'. A simple approach has been designed to control the addition and deletion of 'blocks' of rules and facts, while allowing real-time operations to run freely. Timing tests for real-time performance for specific machines under R/T operating systems have not been completed but are planned as part of the analysis process to validate the design.

Mainardi, Joseph D.↗

STS-69 Flight Day 1 Video File

The first day of the STS-69 flight is highlighted in this video. Shown are the prelaunch and launch activities and the in-orbit SPARTAN-201 satellite pre-deployment checkout of the robot arm in the shuttle's bay. The flight crew consisted of Cmdr. Dave Walker, Pilot Ken Cockrell, and Mission Specialists Jim Voss, Jim Newman, and Mike Gernhardt. Earth views of cloud cover are included.

Source record↗

STS-69 Flight Day 5 Video File

Awakening to the theme song of the television show 'Rin Tin Tin', the astronauts, Cmdr. Dave Walker, Pilot Ken Cockrell, and Mission Specialists Jim Voss, Jim Newman, and Mike Gernhardt, of the STS-69 mission began their fifth day in orbit. The deployment of the Wake Shield Facility (WSF) was accomplished successfully, although it was delayed several hours due to communication problems between the satellite and its carrier platform located in the shuttle's cargo bay. The WSF satellite's main purpose was to grow up to seven layers of semiconductor films in a vacuum-like state while orbiting behind the space shuttle. The shuttle's Global Positioning System and Satellite Tracking System were both given checkout tests.

Source record↗

STS-69 Flight Day 6 Highlights

After being awakened by the Beatles song, 'A Hard Days Night', the flightcrew of the STS-69 mission, Cmdr. Dave Walker, Pilot Ken Cockrell, and Mission Specialists Jim Voss, Jim Newman, and Mike Gernhardt, began their sixth day in orbit by monitoring the free orbiting Wake Shield Facility (WSF). Later Cmdr. Walker conducted an interview with television reporters from Atlanta and Boston, answering questions about the mission and general questions about NASA's space program. The crew filmed a video for themselves performing daily routines (eating, shaving, exercising), as well as some of the physiological experiments, and shuttle equipment maintenance and checkout. One of the secondary experiments included the Commercial Generic Bioprocessing Apparatus-7 (CGBA-7), which served as an incubator and experiment station for a variety of tests (agricultural, pharmaceutical, biomedical, and environmental). Earth views included some cloud cover, the Gulf of Mexico, Texas, and the Atlantic Ocean.

Source record↗

STS-69 Flight Day 7 Video File

On the seventh day of the STS-69 mission, the astronauts, Cmdr. Dave Walker, Pilot Ken Cockrell, and Mission Specialists Jim Voss, Jim Newman, and Mike Gernhardt, were awakened by the theme song from the movie 'Patten.' Voss and Gernhardt performed a pre-EVA (Extravehicular Activity) checkout of the new thermal spacesuits that they will be wearing in two days. Solving problems with the Wake Shield Facility (WSF) occupied the other astronauts for most of this day. Earth views included tropical storm Marilyn in the Caribbean.

Source record↗

Automated data acquisition technology development:Automated modeling and control development

This report documents the completion of, and improvements made to, the software developed for automated data acquisition and automated modeling and control development on the Texas Micro rackmounted PC's. This research was initiated because a need was identified by the Metal Processing Branch of NASA Marshall Space Flight Center for a mobile data acquisition and data analysis system, customized for welding measurement and calibration. Several hardware configurations were evaluated and a PC based system was chosen. The Welding Measurement System (WMS), is a dedicated instrument strickly for use of data acquisition and data analysis. In addition to the data acquisition functions described in this thesis, WMS also supports many functions associated with process control. The hardware and software requirements for an automated acquisition system for welding process parameters, welding equipment checkout, and welding process modeling were determined in 1992. From these recommendations, NASA purchased the necessary hardware and software. The new welding acquisition system is designed to collect welding parameter data and perform analysis to determine the voltage versus current arc-length relationship for VPPA welding. Once the results of this analysis are obtained, they can then be used to develop a RAIL function to control welding startup and shutdown without torch crashing.

Romine, Peter L.↗

STS-74 Post Flight Presentation

The flight crew of the STS-74 Space Shuttle Orbiter Atlantis (Cmdr. Ken Cameron, Pilot Jim Halsell, and Mission Specialists Chris Hadfield, Jerry Ross, and William McArthur) present an overview of their flight mission, whose primary objective was the rendezvous and space docking with the Russian Mir Space Station. Video film footage includes: prelaunch and launch activities; shuttle launch; installation of the Russian-made docking module to the orbiter; in-orbit rendezvous; in-orbit docking between Mir and the orbiter; general crew activities; transfer of supplies, equipment, and a crystal growth experiment to Mir; data collection of Mir thruster firings; undocking maneuvers and Mir fly around; pre-return checkout of flight systems; and reentry and landing of the orbiter. Earth views include horizon sunsets, atmospheric boundary layers, and a variety of geographical location footage (New Orleans; Atlanta; James Bay, Canada; Poland; Turkey; Mt. Pinatubo, Philippines; Salt Lake City, Utah; and Colorado).

Source record↗

STS-72 Flight Day 2

On this second day of the STS-72 mission, the flight crew, Cmdr. Brian Duffy, Pilot Brent W. Jett, and Mission Specialists Leroy Chiao, Daniel T. Barry, Winston E. Scott, and Koichi Wakata (NASDA), awakened to music from the motion picture 'Star Wars.' The crew performed a systems checkout, prepared for the retrieval of the Japanese Space Flyer Unit (SFU), tested the spacesuits for the EVA, and activated some of the secondary experiments. An in-orbit news interview was conducted with the crew via satellite downlinking. Questions asked ranged from the logistics of the mission to the avoidance procedures the Endeavour Orbiter performed to miss hitting the inactive Air Force satellite, nicknamed 'Misty' (MSTI). Earth views included cloud cover, several storm systems, and various land masses with several views of the shuttle's open cargo bay in the foreground.

Source record↗

STS-73 Post Flight Presentation

The post flight presentation of the STS-73 Space Shuttle's United States Microgravity Lab. (USML) mission was presented by the flight crew, Cmdr. Kenneth Bowersox, Pilot Kent Rominger, Payload Specialists Albert Sacco and Fred Gregory, and Mission Specialists Kathryn Thornton, Catherine 'Cady' Collman, and Michael Lopez-Alegria, using color video and slides. Film footage includes the prelaunch and launch activities, the USML and Middeck experiments (Advanced Protein Crystallization Facility (APCF), the Astroculture(tm) (ASC) hardware and experiment, the Commercial Generic Bioprocessing Apparatus (CGBA), the Crystal Growth Furnace (CGF), the Drop Physics Module (DPM), the Geophysical Fluid Flow Cell (GFFC), the Glovebox (GBX), the Zeolite Crystal Growth (ZCG) experiment, the Surface Tension Driven Convection Experiment (STDCE), the Protein Crystal Growth (PCG) experiment, three Measuring Microgravity experiments (the Space Acceleration Measurement System (SAMS), the Three Dimensional Microgravity Accelerometer (3DMA), and the Orbital Acceleration Research Experiment (OARE)), and the High-Packed Digital Television (HI-PAC) demonstration system), pre-return flight systems checkout, reentry, and space shuttle landing. The USML experiments were monitored via the HI-PAC system downlink. Earth views included mostly geographical locations (Mediterranean Sea; Turkey; Lake Powell, Arizona/Utah area; San Francisco Bay; Baltimore, Maryland; Washington, DC; India; Tibet; China; Bhutan; Philadelphia; and the Himalayas).

Source record↗

STS-76 Flight Day 8

On this eighth day of the STS-76 mission, the flight crew, Cmdr. Kevin P. Chilton, Pilot Richard A. Searfoss, and Mission Specialists Linda M. Godwin, Michael R. Clifford, and Ronald M. Sega are shown undocking from the Mir Space Station. With Mir some 60 nautical miles behind them, the Atlantis astronauts prepared for the return to Earth. Chilton, Searfoss and Clifford perform a routine checkout of Atlantis' flight control surfaces and a hotfire test of the orbiter's reaction control system jets. Views include the undocking maneuver; Atlantis as seen from the Mir Space Station; Atlantis' fly-round of Mir; and the firing of the Reaction Control System (RCS) primary thrusters.

Source record↗

STS-74 Mission Highlights Resource Tape

The flight crew of the STS-74 Space Shuttle Orbiter Atlantis Cmdr. Ken Cameron, Pilot Jim Halsell, and Mission Specialists Chris Hadfield, Jerry Ross, and William McArthur present an overview of their flight mission, whose primary objective is the rendezvous and space docking with the Russian Mir Space Station. Video film footage includes the following: prelaunch and launch activities; shuttle launch; in-orbit rendezvous; installation of the Russian-made docking module; in-orbit docking between Mir and the orbiter; general crew activities; transfer of supplies, equipment, and a crystal growth experiment to Mir; data collection from Mir thruster firings; undocking maneuvers and a Mir fly around; pre-return checkout of flight systems; and the reentry and landing of the orbiter. Earth views include horizon sunsets, atmospheric boundary layers, and a variety of geographical location footage (New Orleans; Atlanta; James Bay, Canada; Poland; Turkey; Mt. Pinatubo, Philippines; Salt Lake City, Utah; and Colorado).

Source record↗

South Atlantic Anomaly Entry and Exit as Measured by the X-Ray Timing Explorer

The Rossi X-ray Timing Explorer (RXTE) carries instruments that must switch off high voltages (HV) when passing through the South Atlantic Anomaly (SAA). The High Energy X-ray Timing Experiment (HEXTE) contains a particle monitor that detects the increased particle flux associated with the SAA and autonomously reduces its voltage. The Proportional Counter Array (PCA) relies on uplinked predictions of SAA entry/exit times based on ephemeris data provided by the Flight Dynamics Facility. A third instrument, the All-Sky Monitor (ASM) also uses a predicted SAA model to reduce voltage when passing through the SAA. Data collected from the HEXTE particle monitor, as well as other instrument readings near the times of SAA entry/exit offer the potential for refining models of the boundaries of the SAA. The SAA has an increased particle flux which causes high rates of detection in the RXTE instruments designed to observe x-rays. The high counting rates could degrade the PCA if HV is not reduced during SAA passages. On the other hand, PCA downtime can be minimized and the science return can be optimized by having the best possible model of the SAA boundary. Thus, the PCA team planned an extensive effort during in-orbit checkout to utilize both the HEXTE particle monitor data and instrument counting rates to refine the model of the SAA boundary. The times of SAA entry and exit are compared with the definitive epemeris to determine the precise location (latitude and longitude) of the SAA boundary. Over time, the SAA and its perimeter were mapped. The RXTE Science Operations Center is continuously working to feed back the results of this effort into the science scheduling process, improving the SAA model as it affects the RXTE instruments, thus obtaining more accurate estimates of the SAA entry/exit times.

Smith, Evan↗

Research and technology 1995 annual report

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, the John F. Kennedy Space Center is placing increasing emphasis on its advanced technology development program. This program encompasses the efforts of the Engineering Development Directorate laboratories, most of the KSC operations contractors, academia, and selected commercial industries - all working in a team effort within their own areas of expertise. This edition of the Kennedy Space Center Research and Technology 1995 Annual Report covers efforts of all these contributors to the KSC advanced technology development program, as well as technology transfer activities. Major areas of research include environmental engineering, automation, robotics, advanced software, materials science, life sciences, mechanical engineering, nondestructive evaluation, and industrial engineering.

Source record↗

Scientific and Technical Support for the Galileo Net Flux Radiometer Experiment

Tasks required during the post launch period are briefly as follows: attend Project Science Group meetings; support in-flight checkouts; maintain and keep safe the spare instrument and ground support equipment (GSE); organize and maintain documentation; finish calibration measurements, documentation, and analysis; characterize and diagnose instrument anomalies; develop descent data analysis tools; and science data analysis and publication. This report provides background information on the net flux radiometer (NFR) instrument as well as being a complete progress report on the support for the Galileo NFR. experiment.

Sromovsky, Lawrence A.↗

Advanced Communication Technology Satellite (ACTS) Very Small Aperture Terminal (VSAT) Network Control Performance

This paper discusses the performance of the network control function for the Advanced Communications Technology Satellite (ACTS) very small aperture terminal (VSAT) full mesh network. This includes control of all operational activities such as acquisition, synchronization, timing and rain fade compensation as well as control of all communications activities such as on-demand integrated services (voice, video, and date) connects and disconnects Operations control is provided by an in-band orderwire carried in the baseboard processor (BBP) control burst, the orderwire burst, the reference burst, and the uplink traffic burst. Communication services are provided by demand assigned multiple access (DAMA) protocols. The ACTS implementation of DAMA protocols ensures both on-demand and integrated voice, video and data services. Communications services control is also provided by the in-band orderwire but uses only the reference burst and the uplink traffic burst. The performance of the ACTS network control functions have been successfully tested during on-orbit checkout and in various VSAT networks in day to day operations. This paper discusses the network operations and services control performance.

Coney, T. A.↗

Summary Report of Mission Acceleration Measurements for STS-75, Launched February 22, 1996

Two accelerometers provided acceleration data during the STS-75 mission in support of the third United States Microgravity Payload (USMP-3) experiments. The Orbital Acceleration Research Experiment (OARE) and the Space Acceleration Measurement System (SAMS) provided a measure of the microgravity environment of the Space Shuttle Columbia. The OARE provided investigators with quasi-steady acceleration measurements after about a six hour time lag dictated by downlink constraints. SAMS data were downlinked in near-real-time and recorded on-board for post-mission analysis. An overview of the mission is provided as are brief discussions of these two accelerometer systems. Data analysis techniques used to process SAMS and OARE data are discussed Using a combination of these techniques, the microgravity environment related to several different Orbiter, crew, and experiment operations is presented and interpreted. The microgravity environment represented by SAMS and OARE data is comparable to the environments measured by the instruments on earlier microgravity science missions. The OARE data compared well with predictions of the quasi-steady environment. The SAMS data show the influence of thruster firings and crew motion (transient events) and of crew exercise, Orbiter systems, and experiment operations (oscillatory events). Thruster activity on this mission appears to be somewhat more frequent than on other microgravity missions with the combined firings of the F5L and F5R jets producing significant acceleration transients. The specific crew activities performed in the middeck and flight deck, the SPREE table rotations, the waste collection system compaction, and the fuel cell purge had negligible effects on the microgravity environment of the USMP-3 carriers. The Ku band antenna repositioning activity resulted in a brief interruption of the ubiquitous 17 Hz signal in the SAMS data. In addition, the auxiliary power unit operations during the Flight Control System checkout appeared to have a significant impact on the microgravity environment.

Rogers, Melissa J. B.↗

Summary Report of Mission Acceleration Measurements for STS-78. Launched June 20, 1996

The microgravity environment of the Space Shuttle Columbia was measured during the STS-78 mission using accelerometers from three different instruments: the Orbital Acceleration Research Experiment, the Space Acceleration Measurement System and the Microgravity Measurement Assembly. The quasi-steady environment was also calculated in near real-time during the mission by the Microgravity Analysis Workstation. The Orbital Acceleration Research Experiment provided investigators with real-time quasi-steady acceleration measurements. The Space Acceleration Measurement System recorded higher frequency data on-board for post-mission analysis. The Microgravity Measurement Assembly provided investigators with real-time quasi-steady and higher frequency acceleration measurements. The Microgravity Analysis Workstation provided calculation of the quasi-steady environment. This calculation was presented to the science teams in real-time during the mission. The microgravity environment related to several different Orbiter, crew and experiment operations is presented and interpreted in this report. A radiator deploy, the Flight Control System checkout, and a vernier reaction control system reboost demonstration had minimal effects on the acceleration environment, with excitation of frequencies in the 0.01 to 10 Hz range. Flash Evaporator System venting had no noticeable effect on the environment while supply and waste water dumps caused excursions of 2 x lO(exp -6) to 4 x 10(exp -6) g in the Y(sub b) and Z(sub b) directions. Crew sleep and ergometer exercise periods can be clearly seen in the acceleration data, as expected. Accelerations related to the two Life Science Laboratory Equipment Refrigerator/Freezers were apparent in the data as are accelerations caused by the Johnson Space Center Projects Centrifuge. As on previous microgravity missions, several signals are present in the acceleration data for which a source has not been identified. The causes of these accelerations are under investigation.

Hakimzadeh, Roshanak↗