Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Benchmarking treewidth as a practical component of tensor network simulations

Tensor networks are powerful factorization techniques which reduce resource requirements for numerically simulating principal quantum many-body systems and algorithms. The computational complexity of a tensor network simulation depends on the tensor ranks and the order in which they are contracted. Unfortunately, computing optimal contraction sequences (orderings) in general is known to be a computationally difficult (NP-complete) task. In 2005, Markov and Shi showed that optimal contraction sequences correspond to optimal (minimum width) tree decompositions of a tensor network’s line graph, relating the contraction sequence problem to a rich literature in structural graph theory. While treewidth-based methods have largely been ignored in favor of dataset-specific algorithms in the prior tensor networks literature, we demonstrate their practical relevance for problems arising from two distinct methods used in quantum simulation: multi-scale entanglement renormalization ansatz (MERA) datasets and quantum circuits generated by the quantum approximate optimization algorithm (QAOA). We exhibit multiple regimes where treewidth-based algorithms outperform domain-specific algorithms, while demonstrating that the optimal choice of algorithm has a complex dependence on the network density, expected contraction complexity, and user run time requirements. We further provide an open source software framework designed with an emphasis on accessibility and extendability, enabling replicable experimental evaluations and future exploration of competing methods by practitioners.

97 MATHEMATICS AND COMPUTING↗

Site Environmental Report for 2016

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2016. The format and content of this report satisfy the requirements of both DOE Order 231.1B Admin Chg 1, Environment, Safety, and Health Reporting, and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the operating contract’s performance evaluation process. For fiscal year (FY) 2016, which began October 1, 2015, and ended September 30, 2016, the EMS was given a performance rating of A minus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2016 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. To support this rating, Berkeley Lab prepared a list of projects completed during the performance period that achieved reduced environmental impacts. The EMS was also graded through the federal Office of Management and Budget’s EMS Annual Report Data, in which elements of the International Organization for Standardization (ISO) 14001 standard are rated and the degree of integration between the EMS and Berkeley Lab’s sustainable practices is measured. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2016, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided (Chapter 3), including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2016. Six minor violations issued during these inspections are discussed, one of which was rescinded in 2017. This report also includes information on environmental monitoring performed in 2016 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits with the exception of some stormwater discharges. While most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state's stormwater permit, iron and aluminum exceeded permitted levels. Berkeley Lab is aggressively implementing controls to reduce iron and aluminum discharge levels. The controls include construction of asphaltic berms to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to absorb metal contaminants. The radiological dose assessments (Chapter 5) performed in 2016 concluded that the maximum dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.12% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/year); the dose from all radiation sources at Berkeley Lab was approximately 0.1% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.4% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2017

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2017. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2017, which began October 1, 2016, and ended September 30, 2017, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2017 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2017, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided, including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2017. Thirteen minor violations issued during City of Berkeley inspections of above and underground storage tanks, treatment units, and hazardous waste storage areas are discussed in this chapter. This report also includes information on environmental monitoring performed in 2017. The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits, with the exception of some stormwater discharges. Most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state’s stormwater permit; however, iron and aluminum exceeded Numeric Action Levels. To reduce iron and aluminum discharge levels, Berkeley Lab is aggressively implementing controls such as construction of asphaltic berms and check dams to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to collect sediment and absorb metal contaminants. The radiological dose assessments performed in 2017 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.1% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.06% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.2% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2018

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences, with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2018. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). LBNL activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. As presented in Chapter 2, Berkeley Lab implements an Environmental Management System (EMS) to oversee environmental compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2018, which began October 1, 2017, and ended September 30, 2018, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade, to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2018 rating was based on how Berkeley Lab met the objective in DOE’s FY 2018 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2018, Berkeley Lab received a score of green. A week-long formal conformity audit of the EMS was conducted at the end of July by a qualified external party, as is required every three years. The audit team found that Berkeley Lab’s EMS continues to conform to the ISO standard with no major nonconformance. An overview of environmental protection and restoration programs is provided in Chapter 3, including information about compliance activities, operating permits, and regulatory agency inspections and audits that occurred during 2018. Twenty-one minor violations and two Class II violations were issued during agency inspections of programs governing aboveground and underground storage tanks, hazardous waste treatment units, hazardous waste storage areas, hazardous materials management, and wastewater, stormwater, and air emission sources. This report also includes information on environmental monitoring performed in 2018 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions have been effective in reducing concentrations of volatile organic compounds (VOCs) in the groundwater, although concentrations appear to be reaching asymptotic levels in some areas. Site groundwater plumes are stable or are attenuating, and VOCs are not migrating off site. All emissions and discharges from LBNL operations were within environmental compliance release limits except oxides of nitrogen and carbon monoxide from boilers (under 5 million BTUs) from Buildings 2, 66, and 88. The radiological dose assessments (Chapter 5) performed in 2018 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.04% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.15% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.5% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Mechanisms of boron fiber strengthening by thermal treatment

The fracture strain for boron on tungsten fibers was studied for improvement by heat treatment under vacuum or argon environments. The mechanical basis for this improvement is thermally-induced axial contraction of the entire fiber, whereby strength-controlling core flaws are compressed and fiber fracture strain increased by the value of the contraction strain. By highly sensitive measurements of fiber density and volume, the physical mechanism responsible for contraction under both environments was identified as boron atom diffusion out of the fiber sheath. The fiber contracts because the average volume of the resulting microvoid was determined to be only 0.26 plus or minus 0.09 the average atomic volume of the removed atom. The basic and practical implications of these results are discussed with particular emphasis on the theory, use, and limitations of heat-induced contraction as a simple cost-effective secondary processing method.

Dicarlo, J. A.↗

Mechanisms of boron fiber strengthening by thermal treatment

The fracture strain for boron on tungsten fibers can be improved by heat treatment under vacuum or argon environments. The mechanical basis for this improvement is thermally-induced axial contraction of the entire fiber, whereby strength-controlling core flaws are compressed and fiber fracture strain increased by the value of the contraction strain. By highly sensitive measurements of fiber density and volume, the physical mechanisms responsible for contraction under both environments was identified as boron atom diffusion out of the fiber sheath. The fiber contracts because the average volume of the resulting microvoid was determined to be only 0.26 + or - 0.09 the average atomic volume of the removed atom. The basic and practical implications of these results are discussed with particular emphasis on the theory, use, and limitations of heat-induced contraction as a simple cost-effective secondary processing method.

Dicarlo, J. A.↗

Expected performance of m-solution backtracking

This paper derives upper bounds on the expected number of search tree nodes visited during an m-solution backtracking search, a search which terminates after some preselected number m problem solutions are found. The search behavior is assumed to have a general probabilistic structure. The results are stated in terms of node expansion and contraction. A visited search tree node is said to be expanding if the mean number of its children visited by the search exceeds 1 and is contracting otherwise. It is shown that if every node expands, or if every node contracts, then the number of search tree nodes visited by a search has an upper bound which is linear in the depth of the tree, in the mean number of children a node has, and in the number of solutions sought. Also derived are bounds linear in the depth of the tree in some situations where an upper portion of the tree contracts (expands), while the lower portion expands (contracts). While previous analyses of 1-solution backtracking have concluded that the expected performance is always linear in the tree depth, the model allows superlinear expected performance.

Nicol, D. M.↗

Distortion of homogeneous turbulence by axisymmetric strain and dilatation

Rapid distortion theory is applied to study distortion of homogeneous turbulence subject to two different axisymmetric strain modes: the axisymmetric contraction (AC, nozzle-type flow), and the axisymmetric expansion (AE, diffuser-type flow). The paper explores the differences in effects of the two axisymmetric strain modes on the anisotropy of correlations and structures of turbulence; examines the effect of dilatation on the distortion of turbulence; and provides a theoretical background for turbulence model development. It is found that velocity and vorticity fluctuations are enhanced more efficiently by contraction than by expansion; contraction produces much higher anisotropy in velocity and vorticity than expansion; root-mean-square pressure is slightly reduced during contraction, whereas it increases rapidly during expansion; and vortical structures of rodlike shape develop in a contraction flow, while disklike structures develop in an expansion flow. A simple model that reflects the dependence of turbulence evolution on structural parameters such as the Reynolds-stress anisotropy and total strain is proposed, and is shown to outperform all other models for all cases examined, regardless of the mean strain rate.

Lee, Moon Joo↗

Numerical investigations in three-dimensional internal flows

The flow in the transonic test facility was investigated using the three dimensional computational fluid dynamics techniques. The application of the full Navier-Stokes three dimensional code to the flow qualities in the contraction section of transonic wind tunnel is discussed. Initially, two dimensional solutions indicated the possibility for large secondary flow to exist as a result of the asymmetries involved in the contraction section as it is constructed. The results of a full three dimensional solution indicate that only minor pressure variations actually occur in the contraction section within any given cross flow plane. Further analysis of the three dimensional solution indicated that these slight lateral pressure gradients lead to negligible secondary flows, except within a small region in the corners within the boundary layer. On the basis of present solution, it would not be expected that any flow asymmetries and/or secondary flow present within contraction section are associated with the methods by which the contraction is implemented in its present configuration.

Rose, William C.↗

Intramuscular pressure and electromyography as indexes of force during isokinetic exercise

A direct method for measuring force production of specific muscles during dynamic exercise is presently unavailable. Previous studies indicate that both intramuscular pressure (IMP) and electromyography (EMG) correlate linearly with muscle contraction force during isometric exercise. The objective of this study was to compare IMP and EMG as linear assessors of muscle contraction force during dynamic exercise. IMP and surface EMG activity were recorded during concentric and eccentric isokinetic plantarflexion and dorsiflexion of the ankle joint from the tibialis anterior (TA) and soleus (SOL) muscles of nine male volunteers. Ankle torque was measured using a dynamometer, and IMP was measured via catheterization. IMP exhibited better linear correlation than EMG with ankle joint torque during concentric contractions of the SOL and the TA, as well as during eccentric contractions. IMP provides a better index of muscle contraction force than EMG during concentric and eccentric exercise through the entire range of torque. IMP reflects intrinsic mechanical properties of individual muscles, such as length-tension relationships, which EMG is unable to assess.

Aratow, M.↗

Determination of coronal magnetic fields from vector magnetograms

This report covers technical progress during the second year of the contract entitled 'Determination of Coronal Magnetic Fields from Vector Magnetograms,' NASW-4728, between NASA and Science Applications International Corporation, and covers the period January 1, 1993 to December 31, 1993. Under this contract SAIC has conducted research into the determination of coronal magnetic fields from vector magnetograms, including the development and application of algorithms to determine force-free coronal fields above selected observations of active regions. The contract began on June 30, 1992 and has a completion date of December 31, 1994. This contract is a continuation of work started in a previous contract, NASW-4571, which covered the period November 15, 1990 to December 14, 1991. During this second year we have concentrated on studying additional active regions and in using the estimated coronal magnetic fields to compare to coronal features inferred from observations.

Mikic, Zoran↗

NASA FAR Supplement: The NASA Supplement to the Federal Acquistion Regulation

This supplement to the Federal Acquisition Regulation (FAR) is divided into the following sections: General, Competition and Acquisition Planning, Contracting Methods and Contract Types, Socioeconomic Programs, General Contracting Requirements, Special Categories of Contracting, Contract Management, Clauses and Forms, and Agency Supplementary Regulations.

Source record↗

Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development: Program Cost estimates - volume 3

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

McCurry, J. B.↗

Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development: Technical Results - Volume 2

Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

Source record↗

Development and Applications of a Self-Contained, Non-Invasive EVA Joint Angle and Muscle Fatigue Sensor System

The University of Maryland Space Systems Laboratory, as a participant in NASA's INSTEP program, is developing a non-invasive, self-contained sensor system which can provide quantitative measurements of joint angles and muscle fatigue in the hand and forearm. The goal of this project is to develop a system with which hand/forearm motion and fatigue metrics can be determined in various terrestrial and zero-G work environments. A preliminary study of the prototype sensor systems and data reduction techniques for the fatigue measurement system are presented. The sensor systems evaluated include fiberoptics, used to measure joint angle, surface electrodes, which measure the electrical signals created in muscle as it contracts; microphones, which measure the noise made by contracting muscle; and accelerometers, which measure the lateral muscle acceleration during contraction. The prototype sensor systems were used to monitor joint motion of the metacarpophalangeal joint and muscle fatigue in flexor digitorum superficialis and flexor carpi ulnaris in subjects performing gripping tasks. Subjects were asked to sustain a 60-second constant-contraction (isometric) exercise and subsequently to perform a repetitive handgripping task to failure. Comparison of the electrical and mechanical signals of the muscles during the different tasks will be used to evaluate the applicability of muscle signal measurement techniques developed for isometric contraction tasks to fatigue prediction in quasi-dynamic exercises. Potential data reduction schemes are presented.

Ranniger, C. U.↗

A Wind Tunnel Investigation of Three NACA 1-Series Inlets at Mach Numbers up to 0.92

Pressure distributions on three NACA 1-series inlets have been obtained in the Langley 16-Foot Transonic Tunnel. The cowl diameter ratio (ratio of cowl highlight diameter to cowl maximum diameter) was 0.85 for all three inlets. The cowl length ratio (ratio of cowl length to cowl maximum diameter) was 1.0 for two of the inlets (NACA 1-85-100) and 0.439 for the other (NACA 1-85-43.9) inlet. One of the inlets with a cowl length ratio of 1.0 had an internal contraction ratio (ratio of highlight area to throat area) of 1.009 and the other had a contraction ratio of 1.250. The inlet with a cowl length ratio of 0.439 also had an internal contraction ratio of 1.250. All three inlets had longitudinal rows of static pressure orifices on the top and bottom external cowl surfaces. The inlet with a contraction ratio of 1.009 also had a row of static pressure orifices on the side of the cowl (external surface). The two inlets with a contraction ratio of 1.250 had a longitudinal row of static pressure orifices on the diffuser surface.

Re, Richard J.↗

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.↗

The Structure and Dynamics of the Solar Corona

This report covers technical progress during the third year of the NASA Space Physics Theory contract "The Structure and Dynamics of the Solar Corona," between NASA and Science Applications International Corporation, and covers the period June 16, 1998 to August 15, 1999. This is also the final report for this contract. Under this contract SAIC, the University of California, Irvine (UCI), and the Jet Propulsion Laboratory (JPL), have conducted research into theoretical modeling of active regions, the solar corona, and the inner heliosphere, using the MHD model. During the three-year duration of this contract we have published 49 articles in the scientific literature. These publications are listed in Section 3 of this report. In the Appendix we have attached reprints of selected articles. We summarize our progress during the third year of the contract. Full descriptions of our work can be found in the cited publications, a few of which are attached to this report.

Mikic, Zoran↗