Modeling Wildfire Emissions from the 2003 and 2007 Santa Ana Events: Discussion
No abstract available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract available
No abstract available
This paper provides an overview of technology development for the Terrestrial Planet Finder Interferometer (TPF-I). TPF-I is a mid-infrared space interferometer being designed with the capability of detecting Earth-like planets in the habitable zones around nearby stars. The overall technology roadmap is presented and progress with each of the testbeds is summarized. The current interferometer architecture, design trades, and the viability of possible reduced-scope mission concepts are also presented.
The Phoenix mission is designed to study the arctic region of Mars. To achieve this goal, the spacecraft must be delivered to a narrow corridor at the top of the Martian atmosphere, which is approximately 20 km wide. This paper will discuss the details of the Phoenix orbit determination process and the effort to reduce errors below the level necessary to achieve successful atmospheric entry at Mars. Emphasis will be placed on properly modeling forces that perturb the spacecraft trajectory and the errors and uncertainties associated with those forces. Orbit determination covariance analysis strongly influenced mission operations scenarios, which were chosen to minimize errors and associated uncertainties.
On May 25, 2008, the Mars Phoenix Lander (PHX) successfully landed in the northern planes of Mars in order to continue and complement NASA's "follow the water" theme as its predecessor Mars missions, such as Mars Odyssey (ODY) and Mars Exploration Rovers, have done in recent years. Instruments on the lander, through a robotic arm able to deliver soil samples to the deck, will perform in-situ and remote-sensing investigations to characterize the chemistry of materials at the local surface, subsurface, and atmosphere. Lander instruments will also identify the potential history of key indicator elements of significance to the biological potential of Mars, including potential organics within any accessible water ice. Precise trajectory control and targeting were necessary in order to achieve the accurate atmospheric entry conditions required for arriving at the desired landing site. The challenge for the trajectory control maneuver design was to meet or exceed these requirements in the presence of spacecraft limitations as well as other mission constraints. This paper describes the strategies used, including the specialized targeting specifically developed for PHX, in order to design and successfully execute the propulsive maneuvers that delivered the spacecraft to its targeted landing site while satisfying the planetary protection requirements in the presence of flight system constraints.
Land ice loss from Antarctica is a significant and accelerating contribution to global sea level rise; however, Antarctic mass balance estimates are complicated by insufficient knowledge of surface mass balance processes such as snow accumulation. Snow accumulation is challenging to observe on a continental scale and in situ data are sparse, so we largely rely on estimates from atmospheric models. Here we employ a novel technique, GPS interferometric reflectometry (GPS-IR), to measure upper (less than 2 m) firn column thickness changes across a 23-station GPS array in West Antarctica. We compare the results with antenna heights measured in situ to establish the method's daily uncertainty (0.06 m) and with output from two atmospheric reanalysis products to categorize spatial and temporal variability of net snow accumulation. GPS-IR is an effective technique for monitoring surface mass balance processes that can be applied to both historic GPS data sets and future experiments to provide critical in situ observations of processes driving surface height evolution.
We have conducted a survey of 341 interplanetary coronal mass ejections (ICMEs) using STEREO A/B data, analyzing their properties while extending a Level 3 product through 2016. Among the 192 ICMEs with distinguishable sheath region and magnetic obstacle, the magnetic field maxima in the two regions are comparable, and the dynamic pressure peaks mostly in the sheath. The north/south direction of the magnetic field does not present any clear relationship between the sheath region and the magnetic obstacle. About 71% of ICMEs are expanding at 1 au, and their expansion speed varies roughly linearly with their maximum speed except for ICMEs faster than 700 km/s. The total pressure generally peaks near the middle of the well-defined magnetic cloud (MC) passage, while it often declines along with the non-MC ICME passage, consistent with our previous interpretation concerning the effects of sampling geometry on what is observed. The hourly average iron charge state reaches above 12+ approx. 31% of the time for MCs, approx. 16% of the time for non-MC ICMEs, and approx. 1% of the time for non- ICME solar wind. In four ICMEs abrupt deviations of the magnetic field from the nominal field rotations occur in the magnetic obstacles, coincident with a brief drop or increase in field strength-features could be related to the interaction with dust. In comparison with the similar phases of solar cycle 23, the STEREO ICMEs in this cycle occur less often and are generally weaker and slower, although their field and pressure compressions weaken less than the background solar wind.
The Cassini-Huygens spacecraft arrived at Saturn in 2004, beginning a four-year tour. Much of mission’s continued success at Saturn can be attributed to the excellent performance of the propulsion systems and attitude control. In order to better understand this performance, the Cassini Navigation Team has continued to analyze and refine the execution-error models for the propulsion systems. This paper documents the evolution of the execution-error models employed for maneuvers, along with the analysis, procedures, and software associated with the model development.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided
During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species 80Ge and 17,18F accounted for 763 of these hours. This included an experiment using 17F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich 81Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. The majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes. This ion source uses a quartz tube in the transfer line between the production target and the ion source to selectively slow down some elements such as rubidium and cesium.
Abstract Not Provided
Abstract Not Provided
Abstract Not Provided