Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “workshop summary”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Technology for Space Station Evolution. Volume 2: Data Management System/Environmental Control and Life Support Systems

NASA's Office of Aeronautics and Space Technology conducted a workshop on technology for space station evolution 16-19 Jan. 1990. The purpose of the workshop was to collect and clarify Space Station Freedom technology requirements for evolution and to describe technologies that can potentially fill those requirements. These proceedings are organized into an Executive Summary and Overview and five volumes containing the Technology Discipline Presentations. Volume 2 consists of the technology discipline sections for the Data Management System and the Environmental Control and Life Support Systems. For each technology discipline, there is a Level 3 subsystem description, along with the invited papers.

Source record↗

Technology for Space Station Evolution. Volume 3: EVA/Manned Systems/Fluid Management System

NASA's Office of Aeronautics and Space Technology (OAST) conducted a workshop on technology for space station evolution 16-19 Jan. 1990 in Dallas, Texas. The purpose of this workshop was to collect and clarify Space Station Freedom technology requirements for evolution and to describe technologies that can potentially fill those requirements. These proceedings are organized into an Executive Summary and Overview and five volumes containing the Technology Discipline Presentations. Volume 3 consists of the technology discipline sections for Extravehicular Activity/Manned Systems and the Fluid Management System. For each technology discipline, there is a Level 3 subsystem description, along with the papers.

Source record↗

Technology for Space Station Evolution. Volume 4: Power Systems/Propulsion/Robotics

NASA's Office of Aeronautics and Space Technology (OAST) conducted a workshop on technology for space station evolution on 16-19 Jan. 1990. The purpose of this workshop was to collect and clarify Space Station Freedom technology requirements for evolution and to describe technologies that can potentially fill those requirements. These proceedings are organized into an Executive Summary and Overview and five volumes containing the Technology Discipline Presentations. Volume 4 consists of the technology discipline sections for Power, Propulsion, and Robotics. For each technology discipline, there is a Level 3 subsystem description, along with the papers.

Source record↗

Technology for Space Station Evolution. Volume 5: Structures and Materials/Thermal Control System

NASA's Office of Aeronautics and Space Technology (OAST) conducted a workshop on technology for space station evolution on 16-19 Jan. 1990. The purpose of this workshop was to collect and clarify Space Station Freedom technology requirements for evolution and to describe technologies that can potentially fill those requirements. These proceedings are organized into an Executive Summary and Overview and five volumes containing the Technology Discipline Presentations. Volume 5 consists of the technology discipline sections for Structures/Materials and the Thermal Control System. For each technology discipline, there is a level 3 subsystem description, along with papers.

Source record↗

Computational support of the laminar flow supersonic wind tunnel, CNSFV code development, Maglev, and grid generation

This final report covers the work done on corporate agreement NCC2-616 over a period of 5 1/2 years. It is broken into three segments of approximately 1 1/2 to 2 years each. The report is a summary report and is not intended to be comprehensive of all the work done under this corporate agreement. A more complete coverage of the work done is obtained from the papers and reports listed in the 'Papers' section. Additional reporting of significant work was done through 'Technical Highlights' and 'Research and Technical Summaries'. A listing of copies are given in the 'Technical Highlights and R and T' section. The work was also reported in a series of seminars, conference meetings, branch reviews, workshops, and project reviews. A list of these talks is given in the 'Presentation' section. Also during this time three students ranging from high school to graduate level were supervised. A list of the students and the type of work accomplished is given in the 'Mentoring' section. The report concludes with the 'Appendices' sections which include the three papers produced during the last 1 1/2 years of this corporate agreement.

Klopfer, Goetz H.↗

Summary Report of Working Group 1: Laser-Plasma Acceleration

Advances in and physics of the acceleration of particles using underdense plasma structures driven by lasers were the topics of presentations and discussions in Working Group 1 of the 2010 Advanced Accelerator Concepts Workshop. Such accelerators have demonstrated gradients several orders beyond conventional machines, with quasi-monoenergetic beams at MeV-GeV energies, making them attractive candidates for next generation accelerators. Workshop discussions included advances in control over injection and laser propagation to further improve beam quality and stability, detailed diagnostics and physics models of the acceleration process, radiation generation as a source and diagnostic, and technological tools and upcoming facilities to extend the reach of laser-plasma accelerators.

43 PARTICLE ACCELERATORS↗

Summary Report of Working Group 1: Laser-Plasma Acceleration

Advances in and physics of the acceleration of particles using underdense plasma structures driven by lasers were the topics of presentations and discussions in Working Group 1 of the 2010 Advanced Accelerator Concepts Workshop. Such accelerators have demonstrated gradients several orders beyond conventional machines, with quasi-monoenergetic beams at MeV-GeV energies, making them attractive candidates for next generation accelerators. Workshop discussions included advances in control over injection and laser propagation to further improve beam quality and stability, detailed diagnostics and physics models of the acceleration process, radiation generation as a source and diagnostic, and technological tools and upcoming facilities to extend the reach of laser-plasma accelerators.

43 PARTICLE ACCELERATORS↗

ESMD Risk Management Workshop: Systems Engineering and Integration Risks

This report has been developed by the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) Risk Management team in close coordination with the Systems Engineering Team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the SE RFP Development process. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

Systems Engineering↗

Preliminary design of a lunar construction utility vehicle

Construction of a lunar base, prior to manned occupancy, is one of the most demanding technological challenges facing space system designers today. A flexible lunar construction machine is needed that can be operated remotely and that can perform a variety of construction tasks over a wide range of lunar conditions. A preliminary lunar construction utility vehicle (LCUV) design has been developed as part of a capstone design course at Old Dominion University and is described in this summary report. The design requirements are taken from a 1988 USRA Summer Design Report entitled The Lunar Split Mission: A Robotic Constructed Lunar Base Scenario, and from the proceedings of a workshop hosted by United Technologies Corporation entitled Report of the In Situ Resources Utilization Workshop. The first report describes a bootstrap base concept in which a minimum of essential surface elements are delivered and configured such that minimum EVA is required to bring the initial base on-line. The base is to be built in three phases, the first of which will be unmanned, while the second and third will be manned. The key to these concepts is the development of a semiautonomous, telerobotic lunar construction utility vehicle (LCUV). The tasks required of this robotic vehicle during the phase 1 build-up are as follows: (1) surface element transportation, handling, and assembly; (2) soil excavation and movement for site preparation; (3) radiation protection and materials processing; and (4) repair and maintenance of surface elements. In order to meet the stated requirements, the LCUV must be: (1) transformable to perform a wide variety of tasks; (2) self supporting; (3) designed to allow for telerobotic control as well as autonomous operation; (4) able to transport one fully configured space station common module (SSCM); (5) upgradable to allow for future growth; and (6) easy to maintain.

Bryant, C. A.↗

High-Average Power Facilities

There has been significant progress in the development of high-power facilities in recent years yet major challenges remain. The task of WG4 was to identify which facilities were capable of addressing the outstanding R&D issues presently preventing high-power operation. To this end, information from each of the facilities represented at the workshop was tabulated and the results are presented herein. A brief description of the major challenges is given, but the detailed elaboration can be found in the other three working group summaries.

99 GENERAL AND MISCELLANEOUS↗

Space robotics: Recent accomplishments and opportunities for future research

The Langley Guidance, Navigation, and Control Technical Committee (GNCTC) was one of six technical committees created in 1991 by the Chief Scientist, Dr. Michael F. Card. During the kickoff meeting Dr. Card charged the chairmen to: (1) establish a cross-Center committee; (2) support at least one workshop in a selected discipline; and (3) prepare a technical paper on recent accomplishments in the discipline and on opportunities for future research. The Guidance, Navigation, and Control Committee was formed and selected for focus on the discipline of Space robotics. This report is a summary of the committee's assessment of recent accomplishments and opportunities for future research. The report is organized as follows. First is an overview of the data sources used by the committee. Next is a description of technical needs identified by the committee followed by recent accomplishments. Opportunities for future research ends the main body of the report. It includes the primary recommendation of the committee that NASA establish a national space facility for the development of space automation and robotics, one element of which is a telerobotic research platform in space. References 1 and 2 are the proceedings of two workshops sponsored by the committee during its June 1991, through May 1992 term. The focus of the committee for the June 1992 - May 1993 term will be to further define to the recommended platform in space and to add an additional discipline which includes aircraft related GN&C issues. To the latter end members performing aircraft related research will be added to the committee. (A preliminary assessment of future opportunities in aircraft-related GN&C research has been included as appendix A.)

Montgomery, Raymond C.↗

Report of On-Site Inspection Workshop-20: Debriefing on OSI Build-Up Exercises (BUE) I and II/IV and Preparations for BUE III

OSI Workshop-20, “Debriefing on OSI Build-Up Exercises (BUE) I and II/IV and Preparations for BUE III”, took place on 29 October – 2 November 2012 at the Vienna International Centre. There were a total of 83 participants from both the Provisional Technical Secretariat (PTS) and 19 States Signatories. This workshop is part of the planning and preparation process leading up to the 2014 Integrated Field Exercise (IFE14). The opening plenary session provided an overview of the build-up exercises (BUEs) and the overall planning process for IFE14 and preparations for BUE I and BUE II/IV, and the closing session provided a summary of findings. Other sessions consisted of a summary of the preparations for BUE I (launch phase), review and discussion of the execution of BUE I, review and discussion of BUE II/IV (pre-inspection and post-inspection phases), and review and planning of elements of BUE III (inspection phase) and IFE14. BUE I was conducted in mid-April and BUE II/IV in mid-September 2012. BUE III is planned for 26 May – 7 June 2013 and IFE14 for November-December 2014. The purpose of this workshop was to give the participants who took part in the exercises and participants at the workshop a chance to review the preparation and execution of BUE I and BUE II/IV, assess them as to their value to the exercise build-up process, determine what went well and what did not go well, and provide recommendations to help the planning for BUE III and IFE14. This was accomplished by means of presentations by PTS staff and other participants, discussions following the presentations and separate expert working group discussions. The consensus of the participants was that BUE I and BUE II/IV validated the exercise concept contained in CTBT/PTS/INF.1105 (Concept for Preparation and Conduct of the Next Integrated Field Exercise). The many details dealt with in the launch, pre-inspection and post inspection exercises provided an opportunity to test a host of issues prior to IFE14. The exercises showed that the PTS has made considerable progress in developing capabilities in logistics, administration and planning of an OSI since IFE08, and pointed as well to a number of areas where more attention is needed – most notably in the areas of health and safety and equipment checking at the base of operations. A number of areas for which results from the two initial exercises can be applied to BUE III and IFE14 were identified. Also, the review of plans and preparations for BUE III and IFE14 provided the participants with an excellent baseline of information on these two exercises. Probably the most significant impressions that resulted from this workshop are the significant level of complexity involved with preparing the OSI verification regime, the extent of planning involved in the preparation of exercises, and the great value of these types of BUE for assessing and building OSI capabilities. The recommendations section at the end of this report contains the findings of the workshop, grouped into lessons learned from the first two BUEs, proposals relevant to BUE III and IFE14 and issues for the attention of Working Group B.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Northern Region Coal Prospects

This presentation was delivered to the audience attending the U.S. DOE/USEA Northern Regional Coal Workshop in Bismarck, ND on March 11, 2026. The presentation highlights the opportunity for coal plants in the region to provide power to military installations and data centers. There is also an analysis on how coal-fired power stations maintain regional supply during extreme cold weather events. Finally, a summary slide is presented that highlights a recent business case analysis on diverting captured carbon dioxide for use in enhanced oil recovery in the Bakken.

Bakken↗

Biomorphic Explorers

This paper presents, in viewgraph form, the first NASA/JPL workshop on Biomorphic Explorers for future missions. The topics include: 1) Biomorphic Explorers: Classification (Based on Mobility and Ambient Environment); 2) Biomorphic Flight Systems: Vision; 3) Biomorphic Explorer: Conceptual Design; 4) Biomorphic Gliders; 5) Summary and Roadmap; 6) Coordinated/Cooperative Exploration Scenario; and 7) Applications. This paper also presents illustrations of the various biomorphic explorers.

Thakoor, Sarita↗

Policy Document on Earth Observation for Urban Planning and Management: State of the Art and Recommendations for Application of Earth Observation in Urban Planning

A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.

Nichol, Janet↗

Results Outbrief from the 2014 CombustionLab Workshop

On October 24-25, 2014, NASA Headquarters and the NASA Glenn Research Center sponsored the CombustionLab Workshop in Pasadena, CA as part of the 30th Annual Meeting of the American Society for Gravitational and Space Research. The two-day event brought together scientists and engineers from academia, industry, other government agencies, and international space agencies. The goal of the workshop was to identify key engineering drivers and research priorities, and to provide overall recommendations for the development of the next generation of combustion science experiments for the International Space Station (ISS). The workshop was divided in to 6 topical areas: Droplets, Sprays and Aerosols; Non-Premixed Flames; Premixed Flames; High Pressure and Supercritical Reacting Systems; Fire Safety; Heterogeneous Reaction Processes. Each of these areas produced summary findings which were assembled into a report and were integrated into the NASA budget planning process. The summary results of this process are presented with implementation plans and options for the future.

microgravity↗

Texas Solar Collaboration DOE Rooftop Solar Challenge City of Houston Project Summary

The City of Houston is committed to achieving a sustainable solar infrastructure. In 2008, Houston was named a United States Department of Energy (DOE) Solar America City. As a Solar America City, Houston teamed with the Houston Advanced Research Center (HARC), Sandia National Laboratory (Sandia), industry, and academia, to implement the Solar Houston Initiative and prepare the Solar Houston Plan. The Solar Houston initiative was focused on identifying and overcoming barriers associated with establishing a solar infrastructure that is incorporated into the City of Houston’s overall energy plan. A broad group of Houston area stakeholders, facilitated by HARC, came together to develop a comprehensive solar plan that went beyond technology to address barriers and establish demonstrations, public outreach, education programs and other activities. The plan included proposed scopes of work in four program areas: policies, solar integration, public outreach, and education. Through the support of the DOE SunShot Rooftop Solar Challenge (RSC) grant to the Texas Collaboration (San Antonio, Austin, and Hosuton), Houston has been able to implement several of the recommendations of the Solar Houston Plan. Specific recommendations that this project was able to support include; Working with the other Texas Solar America Cities (San Antonio and Austin), to harmonize permitting and inspection processes to simplify for installers and lower soft costs of installation; Participating in state level solar policy groups such as the Texas Renewable Energy Industries Association (TRIEA); Continued coordination with the local transmission and distribution utility (CenterPoint) and retail electric providers (REP); Identification of opportunities to improve permitting and interconnection; Providing training on PV systems to City inspectors; Educating the public by continuing outreach, training, and workshops, particularly using the the Green Building Resources Center; Evaluating methods of addressing financial barriers to residential solar; Maintaining www.solarhoustontx.org; and Continuing meetings with stakeholders to get ongoing feedback from the solar community on their needs. The following sections provide a brief summary of the activities completed under each of the nine tasks specifically related to the RSC grant. Reports and other backup information are included in the appendices.

14 SOLAR ENERGY↗

Integrated Hydro-terrestrial Modeling 2.0: Progress and Path Forward on Building a National Capability

It is the role of the U.S. federal government and its supporting agencies, including academia and future scientists, to ensure that its people have sustained and equitable freshwater services, as well as the critical knowledge necessary to make decisions about the future as it relates to freshwater services. Clear and consistent information and guidance from federal agencies is critical. Integrated Hydro-Terrestrial Modeling (IHTM), as a United States (U.S.) national capability, focuses on understanding, quantifying, and managing the replenishment of water supply through hydrologic cycle processes and their governing forces. To provide that information, we need enhanced IHTM capabilities that capitalize on the strengths of each U.S. governmental agency and its core mission. The first IHTM workshop was held in 2019, and its subsequent report was published in 2020. The U.S. Global Change Research Program (USGCRP) and member agencies held a second IHTM workshop (IHTM 2.0) from October 31 to November 2, 2023 in Reston, Virginia. The IHTM 2.0 workshop focused on the need to support a multiscale framework to accelerate research insights, better integrate operational and planning perspectives, and bridge national-to-regional capabilities to address major interdependent societal water challenges. The workshop was organized according to a “WHAT” and “HOW” framework, with the common underlying “WHY” being the integrated water resource challenges and the “WHO” defined through interagency and cooperating academic partners. The report provides a summary of plenary presentations and breakout discussions, and a road map that focuses on near-term activities.

99 GENERAL AND MISCELLANEOUS↗