Grid Integration and Impact Analysis of High-Power Dynamic Wireless Charging System in Distribution Network
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
Here, we investigate a transmission mechanism aiming to improve the data rate between a base station (BS) and a user equipment (UE) through deploying multiple relaying UAVs. We consider the effect of interference incurred by another established communication network, which makes our problem challenging and different from the state of the art. We aim to design the 3D trajectories and power allocation for the UAVs to maximize the data flow of the network while keeping the interference on the existing communication network below a threshold. We utilize the mobility feature of the UAVs to evade the (un)-intended interference caused by (un)-intentional interferers. To this end, we propose an alternating-maximization approach to jointly obtain the 3D trajectories and the UAVs transmission powers. We handle the 3D trajectory design by resorting to spectral graph the power allocation through convex optimization techniques. We also approach the problem from the intentional interferer’s perspective where smart jammers chase the UAVs to effectively degrade the data flow of the network. We also extend our work to the case for multiple UEs. Finally, we demonstrate the efficacy of our proposed method through extensive simulations.
While holistically defining the smart grid is a challenge, one area of interest is demand-response. In 2009, the Department of Energy announced over $\$$4 billion in grant and project funding for the Smart Grid. A significant amount of this funding was allotted to utilities for cost sharing projects to deploy Smart Grid technologies, many of whom have deployed and are deploying advanced metering infrastructure (AMI). AMI is an enabler to increase the efficiency of utilities and the bulk power grid. The bulk electrical system is unique in that it produces electricity as it is consumed. Most other industries have a delay between generation and consumption. This aspect of the power grid means that there must be enough generation capacity to meet the highest demand whereas other industries could over produce during off-peak times. This requires significant investment in generation capacity to cover the few days a year of peak consumption. Since bulk electrical storage doesn't yet exist at scale another way to curb the need for new peak period generation is through demand-response; that is to incentivize consumers (demand) to curtail (respond) electrical usage during peak periods. Of the various methods proposed for enabling demand-response, this paper will focus on the communication requirements for creating an energy market using transactional controls. More specifically, the paper will focus on the communication requirements needed to send the peak period notices and receive the response back from the consumers.
This report focuses on integrating TEG and WSN simulators with DC-DC converter as an interface. Here DC stands for direct current. DC-DC converter is essential to balance a wide range of analog, digital, and radio loads acting on the energy source. Also, the voltage level generated by TEGs under varying temperature conditions could be low, irregular, and insufficient to operate WSN, therefore DC-DC is required to boost up the voltage to a desired level. Most of the main problems of DC-DC converters used in TEG system are related to impedance matching between the internal resistance of TEG and the input resistance of DC-DC converter. This report would address the issue associated with dynamic impedance matching under varying temperature conditions in the effort to integrate TEG and WSN. In this effort, dynamic impedance matching algorithms like perturb and observe (P&O) and extremum seeking control (ESC) algorithms will de implemented and compared to achieve maximum peak power tracking (MPPT). In addition, the report will summarize the experimental study performed at BSU on profiling behavior of WSN prototype.
Explore the source record for details and available documents.
Data centers have grown in physical size and their electrical power consumption has grown to levels of several 100kW and approaching 1 GW in large installations. The low voltage electrical distribution inside of Data Centers consists of several conversion stages and a lot of wiring to bring the power from medium voltage (MV) levels outside of the building to the low voltage levels that the servers and racks require. Energy losses during distribution and conversion and high incident arc flash energy levels at the point of use are significant. The electrical distribution system is complex and costly.
End goal - The CMMS automatically creates a Maintenance Request when a component was in a degraded condition.
One of the major contributors to the total operating costs of domestic nuclear fleet of reactors today is the operation and maintenance (O&M) costs. These include labor-intense preventive maintenance programs involving manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets at periodic frequency, irrespective of its condition. This has resulted in a labor-centric business model to achieve high capacity factors. To achieve optimal maintenance program, it’s time to transition from this labor-centric business model to a technology-centric business model. Fortunately, there are technologies (advanced sensor, data analytics, and risk assessment methodologies) that will support transition from a labor-centric business model to a technology-centric business model. The technology-centric business model will result in significant plant life extension and reduction of time-based maintenance activities. This will drive down O&M costs as labor is a rising cost and technology is a declining cost. This approach will lay the foundation for real-time condition assessment of plant assets, allowing condition-based maintenance to enhance plant safety, reliability, and economics of operation.
This report presents analysis of high-temporal-resolution whole-house electrical consumption data obtained from 17 residential buildings located in the Denver metro and Aspen regions of Colorado as well as survey data collected from the participants related to building characteristics and equipment types.
As advanced natural gas power generation systems evolve, the thrust for increased efficiencies and reduced emissions results in increasingly harsh conditions inside the turbine environment. These high temperatures, pressures, and corrosive atmospheres result in accelerated rates of degradation, leading to failure of turbine materials and components. The University of Arkansas (UA) and Siemens, in collaboration with the DoE's National Energy Technology Laboratory (NETL), are developing a reliable and long-term monitoring capability in the turbine hot gas path in the form of novel ceramic-based thermocouples and integrated wide band gap instrumentation electronics that will contribute to the overall reliability of gas turbines. When equipped with better monitoring and controls, power plants can operate with increased fuel-burning efficiency, improved process dynamics and gas concentrations, and increased overall longevity of the power plant components. This will result in increased turbine availability and a reduction in outages and maintenance costs. One of the key aspects to driving forward turbine monitoring capability is the development of high temperature capable integrated circuit (IC) electronics. Previous papers have described 500 °C + electronics that were developed primarily from a combination of discrete single transistors combined with supporting high temperature passive components. While these circuits have been tested successfully in high temperature spin test environments, the move to an IC approach will greatly increase the performance and reliability of turbine monitoring systems. This program is developing such capability through the implementation of silicon carbide (SiC) based ICs, and this paper details the initial approach and early testing of the developed devices. This research represents an important step towards the realization of a field deployable high reliability turbine condition monitoring system.
Explore the source record for details and available documents.
Axel is an extreme terrain, two-wheeled rover designed to traverse rocky surface and sub-surface landscapes in order to conduct remote science experiments in hard-to-reach locations. The rover's design meets many requirements for a mobile research platform capable of reaching water seeps on Martian cliff sides. Axel was developed by the Mobility and Robotic Systems section at the Caltech Jet Propulsion Laboratory. Unique design criteria associated with extreme terrain mobility led to a unique rover solution, consisting of a central module, which provides long-term energy storage and space for large-scale science payloads, and two detachable Axels that can detach and explore extreme terrain locations that are inaccessible to conventional rovers. The envisioned mission could involve a four-wheeled configuration of Axel called 'DuAxel' that is able to traverse the benign, flattened terrain of a landing site and approach the edge of the targeted crater or cave where it would deploy anchoring legs and detach one of the Axel rovers [1]. A tether provides a secure link between the Axel rover and the central module, acting as an anchor to allow Axel to descend along steep crater walls to collect data from the scientifically relevant sites along the water seeps or crater ledges. After completing its scientific mission Axel would hoist itself up to the central module and dock autonomously (using its on-board stereo cameras), allowing the once-again recombined DuAxel to travel to another location to repeat data collection.
Explore the source record for details and available documents.
Explore the source record for details and available documents.