Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technology readiness level”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Electrochemical deposition of silver crystals aboard Skylab 4

Silver crystals were grown aboard Skylab 4 by an electro-chemical reaction and subsequently returned to earth for comparison with crystals grown at 1- and 5-g. Both the Skylab and earth-grown crystals show a variety of structures. Certain tendencies in structure dependency on gravity level, however, can be discerned. In addition, downward growing dendrite streamers; upward growing chunky crystal streamers; growth along an air/liquid interface; and ribbon, film, and fiber crystal habits were observed in experiments conducted on the ground with solutions of varying concentrations. It was also observed that the crystal structures of space and ground electro-deposited silver crystals were very similar to the structures of germanium selenide and germanium telluride crystals grown in space and on the ground by a vapor transport technique. Consideration of the data leads to the conclusions that: (1) the rate of electrochemical displacement of silver ions from a 5 percent aqueous solution by copper is predominantly diffussion controlled in space and kinetically controlled in 1- and higher-g because of augmentation of mass transport by convection; (2) downward and upward crystal streamers are the result of gravity-driven convection, the flow patterns of which can be delineated. Lateral growths along an air/liquid interface are the result of surface-tension-driven convection, the pattern of which also can be delineated; (3) electrolysis in space or low-g environments can produce either dendritic crystals with more perfect microcrystalline structures or massive, single crystals with fewer defects than those grown on ground or at higher g-levels. Ribbons or films of space-grown silicon crystals would find a ready market for electronic substrate and photocell applications. Space-grown dendritic, metal crystals present the possibility of unique catalysts. Large perfect crystals of various materials are desired for a number of electronic and optical applications; and (4) vapor transport growth of germanium selenide and germanium telluride is affected by convection mechanisms similar to the mechanisms hypothesized for the electrochemical deposition of silver crystals. Evidence and considerations leading to the preceding summaries and conclusions are presented. The implications of the findings and conclusions for technological applications are discussed, and recommendations for further experiments are presented.

Grodzka, P. G.↗

Ensuring US National Aeronautics Test Capabilities

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD). However, changes in the Aerospace landscape, primarily the decrease in demand for testing over the last 20 years required an overarching strategy for management of these national assets. Therefore, NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD. Test facility utilization is a critical factor for ATP because it relies on user occupancy fees to recover a substantial part of the operations costs for its facilities. Decreasing utilization is an indicator of excess capacity and in some cases low-risk redundancy (i.e., several facilities with basically the same capability and overall low utilization). However, low utilization does not necessarily translate to lack of strategic importance. Some facilities with relatively low utilization are nonetheless vitally important because of the unique nature of the capability and the foreseeable aeronautics testing needs. Unfortunately, since its inception, the customer base for ATP has continued to shrink. Utilization of ATP wind tunnels has declined by more than 50% from the FY 2006 levels. This significant decrease in customer usage is attributable to several factors, including the overall decline in new programs and projects in the aerospace sector; the impact of computational fluid dynamics (CFD) on the design, development, and research process; and the reductions in wind tunnel testing requirements within the largest consumer of ATP wind tunnel test time, the Aeronautics Research Mission Directorate (ARMD). Retirement of the Space Shuttle Program and recent perturbations of NASA's Constellation Program will exacerbate this downward trend. Therefore it is crucial that ATP periodically revisit and determine which of its test capabilities are strategically important, which qualify as low-risk redundancies that could be put in an inactive status or closed, and address the challenges associated with both sustainment and improvements to the test capabilities that must remain active. This presentation will provide an overview of the ATP vision, mission, and goals as well as the challenges and opportunities the program is facing both today and in the future. We will discuss the strategy ATP is taking over the next five years to address the National aeronautics test capability challenges and what the program will do to capitalize on its opportunities to ensure a ready, robust and relevant portfolio of National aeronautics test capabilities.

Marshall, Timothy J.↗

Off-Earth Servicing Component Advancement (OESCA) Flight-like Coriolis Mass Flowmeter Development

With the completion of this initial technology development effort, additional work will be required for infusion and advancement through TRL 7. The remainder of the flight-level environmental testing (electromagnetic interference and compatibility or electromagnetic interference/electromagnetic compatibility (EMI/EMC), thermal vacuum or TVAC, along with vibration and shock testing) and post-test functional checkouts will need to be completed and are currently planned as part of an awarded STMD Early Career Initiative (ECI) Project called Advancement of Exploration Components for In-Space Servicing or AXCIS. The results and reports from these additional tests during the ECI effort will complete the technology development package, advancing the TRL to 5 or 6 while providing a vendor capable of manufacturing flight units and a flight-ready design as well as lessons-learned from the environmental testing. The Coriolis flowmeter development unit would then be incorporated into a demonstration testbed system for microgravity testing to further understand how it functions and performs in a space-like environment, advancing the developed technology to TRL 6 or 7. Following this infusion path will enable NASA program(s)/proposal(s) to procure a flight-rated high accuracy Coriolis mass flowmeter for incorporation into in-space and Lunar/Martian surface spacecraft propellant resupply systems which, after successful mission use, will bring the TRL to 7+.

Amy Felt↗

Project Integration Architecture

The Project Integration Architecture (PIA) is a distributed, object-oriented, conceptual, software framework for the generation, organization, publication, integration, and consumption of all information involved in any complex technological process in a manner that is intelligible to both computers and humans. In the development of PIA, it was recognized that in order to provide a single computational environment in which all information associated with any given complex technological process could be viewed, reviewed, manipulated, and shared, it is necessary to formulate all the elements of such a process on the most fundamental level. In this formulation, any such element is regarded as being composed of any or all of three parts: input information, some transformation of that input information, and some useful output information. Another fundamental principle of PIA is the assumption that no consumer of information, whether human or computer, can be assumed to have any useful foreknowledge of an element presented to it. Consequently, a PIA-compliant computing system is required to be ready to respond to any questions, posed by the consumer, concerning the nature of the proffered element. In colloquial terms, a PIA-compliant system must be prepared to provide all the information needed to place the element in context. To satisfy this requirement, PIA extends the previously established object-oriented- programming concept of self-revelation and applies it on a grand scale. To enable pervasive use of self-revelation, PIA exploits another previously established object-oriented-programming concept - that of semantic infusion through class derivation. By means of self-revelation and semantic infusion through class derivation, a consumer of information can inquire about the contents of all information entities (e.g., databases and software) and can interact appropriately with those entities. Other key features of PIA are listed.

Jones, William Henry↗

Ground Testing of an Oxygen Concentrator in a Simulated International Space Station (ISS) Cabin Environment

The method for supplying medical oxygen to respiratorily-compromised astronauts on the International Space Station (ISS) and in future Orion missions consists of drawing oxygen from high pressure oxygen tanks. An Oxygen Concentrator Module (OCM) is a device that pulls in ambient air and separates out the nitrogen, resulting in a high concentration oxygen source. This technology has the potential to eliminate resupply and oxygen-enrichment issues associated with using high pressure oxygen tanks and become an alternative technology to support medical oxygen operations for future exploration missions. In this study, we test the long-term performance of a Commercial Off-the-Shelf (COTS) OCM in a simulated ISS cabin environment. Humidified air, carbon dioxide, and fifteen representative trace contaminants are continuously injected through a enclosed test chamber where the OCM is challenged. This study included the first successful demonstration of the Trace Gas Injection System (TGIS), which reliably and continuously produced ISS levels of trace contaminants, carbon dioxide, and humidity in an enclosed environment. The TGIS is a new and unique ground capability with significant implications for Test Readiness Level (TRL) advancement of COTS items and Government Furnished Equipment (GFE). This study demonstrated that the tested OCM reliably delivers enriched oxygen mostly at desired performance specifications. This study also demonstrated that the OCM does not inadvertently concentrate trace gases in its oxygen product stream, as detectable concentrations of trace contaminants in the oxygen product stream were at all times below the simulated ISS levels.

medical oxygen↗

Ground Testing of an Oxygen Concentrator in a Simulated International Space Station (ISS) Cabin Environment

The method for supplying medical oxygen to respiratorily-compromised astronauts on the International Space Station (ISS) and in future Orion missions consists of drawing oxygen from high pressure oxygen tanks. An Oxygen Concentrator Module (OCM) is a device that pulls in ambient air and separates out the nitrogen, resulting in a high concentration oxygen source. This technology has the potential to eliminate resupply and oxygen-enrichment issues associated with using high pressure oxygen tanks and become an alternative technology to support medical oxygen operations for future exploration missions. In this study, we test the long-term performance of a Commercial Off-the-Shelf (COTS) OCM in a simulated ISS cabin environment. Humidified air, carbon dioxide, and fifteen representative trace contaminants are continuously injected through an enclosed test chamber where the OCM is challenged. This study included the first successful demonstration of the Trace Gas Injection System (TGIS), which reliably and continuously produced ISS levels of trace contaminants, carbon dioxide, and humidity in an enclosed environment. The TGIS is a new and unique ground capability with significant implications for Test Readiness Level (TRL) advancement of COTS items and Government Furnished Equipment (GFE). This study demonstrated that the tested OCM reliably delivers enriched oxygen mostly at desired performance specifications. This study also demonstrated that the OCM does not inadvertently concentrate trace gases in its oxygen product stream, as detectable concentrations of trace contaminants in the oxygen product stream were at all times below the simulated ISS levels.

medical oxygen↗

Compact Mid-Wave Imaging System (CMIS) for Retrieval of Cloud Motion Vectors and Cloud Geometric Heights

The Johns Hopkins University Applied Physics Laboratory (JHU/APL) is developing a compact, light-weight, and low power midwave-infrared (MWIR) imager called the Compact Midwave Imaging Sensor (CMIS), under the support of the NASA Earth Science Technology Office Instrument Incubator Program. The goal of this CMIS instrument development and demonstration project is to increase the technical readiness of CMIS, a multi-spectral sensor capable of retrieving 3D winds and cloud heights 24/7, for a space mission. The CMIS instrument employs an advanced MWIR detector that requires less cooling than traditional technologies and thus permits a compact, low-power design, which enables accommodation on small spacecraft such as CubeSats. CMIS provides the critical midwave component of a multi-spectral sensor suite that includes a high-resolution Day-Night Band and a longwave infrared (LWIR) imager to provide global cloud characterization and theater weather imagery. In this presentation, an overview of the CMIS project, including the high-level sensor design, the concept of operations, and measurement capability will be presented. System performance for a variety of different scenes generated by a cloud resolving model (CRM) will also be discussed.

midwave↗

Urban Air Mobility Noise: Current Practice, Gaps, and Recommendations

AN Air Mobility (UAM) is an opportunity for aviation to improve transportation systems across the world. Representative UAM vehicle attributes include electrical vertical takeoff and landing (eVTOL) vehicles that can accommodate up to 6 passengers (or equivalent cargo), are possibly autonomous, perform missions of up to 100 nautical miles at altitudes up to 3000 ft. above ground level, have flight speeds up to 200 knots, and weigh between 800 and 8000 pounds. Along with the many anticipated benefits, there will be noise issues that need to be addressed. In 2018, NASA formed an Urban Air Mobility Noise Working Group (UNWG) to assemble noise experts from industry, universities and government agencies to identify, discuss, and address UAM noise issues. This oral presentation summarizes technology gaps and goals associated with four areas of interest: Tools & Technologies, Ground & Flight Testing, Human Response & Metrics, and Regulation & Policy, and is drawn from a draft white paper [1] by the same title. Tools & Technologies include noise prediction tools and noise reduction technologies that have been developed for conventional rotorcraft and fixed-wing vehicles that may be applicable or need to be modified for UAM. Prediction tools need to be able to account for variable speed rotors and other temporal variation effects that impact community noise. A reprioritization of noise sources needs to be done since UAM vehicles include multiple rotors/propellers, often in proximity to one another and/or the airframe, with dynamic transition, and new noise sources such as electric motors or hybrid-electric propulsion. Scattering and propagation methods need to be developed that include the vehicle components and surfaces near a receiver such as buildings and vertiports. Validation databases are needed to quantify prediction uncertainties. Prediction tools used to evaluate community noise will need source models appropriate for a wide range of UAM vehicles. Existing noise reduction technologies need to be evaluated and new noise reduction technologies should be developed in anticipation of future noise requirements. Although the prediction and treatment of interior cabin noise is a secondary goal, it is recognized that new tools and methods may be needed due to the uniqueness of the vehicle design and the presence of both acoustic and structure-borne loads. Ground & Flight Testing has been a critical part of validating noise reduction technologies and verifying that an air vehicle is ready for certification. UAM vehicles introduce new challenges for test procedures such as different source noise directivity, unsteady sources due to maneuvers, and a variety of takeoff and approach trajectories. The operating environment will be more complex than current aircraft with the introduction of vertiports in populated areas with “urban canyons” making reflections an important part of noise prediction and annoyance. It is expected that new test procedures and measurement methods will be necessary. Consideration will need to be given for both piloted and autonomous operations. Human Response & Metrics may be very different for UAM noise compared to current experience with airport noise. Current metrics used to certify rotorcraft and fixed-wing aircraft may not be as useful for evaluating UAM noise. Operations at lower altitudes may influence annoyance. Psychoacoustic and community testing will be needed to quantify annoyance and assess appropriate metrics. In addition to conventional noise level metrics, considerations such as audibility and temporal variation of the sound may be required. Differences between indoor or outdoor exposure will have an impact with dependence on urban and residential flight paths. Aircraft noise is currently regulated at a national level and typically involves partnerships with the industry to establish regulations. Regulators realize that current policies and procedures may not be appropriate for some of the emerging air vehicles and new procedures may be needed to address UAM noise. Development of new policies and procedures are needed so that local communities do not hastily attempt to establish their own restrictions that will both limit growth of the market and create an inconsistent and confusing regulatory environment. To expedite this development, it is crucial early measurement data are shared through partnership arrangements to support both noise certification and noise modeling/noise assessment. At the same time, an effective engagement strategy should be developed to address local community noise issues associated with UAM vehicles and flight operations as they arise.

urban air mobility↗

Autonomous Ocean World Exploration: Advancement of a Virtual Testbed

The search for life (extinct or extant) and potentially habitable bodies in our solar system and beyond is one of the 12 priority science questions outlined in the National Acadamies’ 2022 decadal survey [5]. Extraterrestrial destinations containing liquid water present an opportunity to search for life as we know it, and in recent years an increasing number of such locations have been discovered within our solar system. Several Jovian moons—Europa, Ganymede, and Callisto [10]—and the Saturnian moons Enceladus [8] and Titan [9] are known or suspected to harbor massive subsurface oceans. Of these "ocean worlds", Europa is the focus of at least one planned NASA orbiter mission, Europa Clipper [4], and an early lander mission concept, the Europa Lander [2, 3]. Whereas most robotic missions to the Moon and Mars (e.g. orbiters, rovers, landers) to date have had ground controllers on Earth tightly involved in mission operations, missions to more distant worlds will require a high degree of onboard autonomy due to long communication lags and blackouts, harsh environments (radiation, cold), and more limited battery and hardware life. The past decade has seen great advances in both AI technologies and computing scalability and performance that offer promising solutions for spacecraft autonomy and motivate the software system and research programs described in this paper. The Ocean Worlds Autonomy Testbed for Exploration, Research, and Simulation (OceanWATERS) [1], which has been in development at the NASA Ames Research Center since 2018, is a virtual environment for testing lander autonomy solutions. It is built on the Robot Operating System (ROS), runs on consumer-grade Linux workstations, and was released as open source in 2020. OceanWATERS provides a physical and visual simulation of a prototypical lander in a Europa-like environment (Figure 1). The lander was modeled after requirements and specifications made in JPL’s Europa Lander Study of 2016 [3]. Simulated lander systems include stereo cameras and spotlights mounted on an antenna mast that pans and tilts, a 6 degrees of freedom (DoF) robotic arm with a force-torque sensor and two interchangeable end effectors, and a battery pack power system. The environment consists of multiple terrain models including a highly detailed model sourced from the FROST dataset [11], simulation of surrounding planetary bodies based on an ephemeris model, and lighting from the sun with associated surface illumination, reflectance, and shadows. Operations supported by OceanWATERS include panoramic and directed imaging of the environment and lander workspace, Cartesian and joint-level arm commanding, grinding of the terrain surface (e.g. digging a trench), and scooping of ground material (Figure 2) which can be discarded or collected as science samples in a receptacle that can be emptied (science operations themselves are not simulated). These operations are realized as ROS Actions and are complimented by a wide selection of telemetry that is continually produced by each lander subsystem. The power system model is driven by the open-source Generic Software Architecture for Prognostics (GSAP) [11] that predicts the battery’s remaining useful life and other characteristics. As a testbed for high-level autonomy, OceanWATERS provides an execution framework based on PLEXIL [12], an open-source plan specification language and execution engine developed largely at Ames. NASA's initial development of OceanWATERS, as well the Ocean Worlds Lander Autonomy Testbed (OWLAT) [6], a complimentary physical testbed developed at JPL, was the first step in a plan for realizing candidate onboard autonomy solutions for such planetary landers. In 2020 NASA solicited applications for its Autonomous Robotics Research for Ocean Worlds (ARROW) program, and in 2021 the similar Concepts for Ocean worlds Life Detection Technology (COLDTech) program. Collectively six research teams, based in universities and companies across the United States, were awarded grants to develop and demonstrate autonomy solutions on OceanWATERS and OWLAT. These 1–2-year projects have now finished or are nearing completion, and a wide variety of autonomy challenges in ocean world surface missions were addressed. Prototyped and demonstrated solutions have included autonomous discovery, response and adaptation to system faults and unexpected environmental events, world model synthesis through perception, plan synthesis using learned models, methods to optimize sample target selection and prioritize science data transmission, extension of PLEXIL for stochastic decision-making, and an integration of a model of JPL’s mission-ready COLDArm [7]. Technologies used in these projects include many forms of machine learning, causal reasoning, automated planning, Markov decision processes, formal methods, and other advanced techniques. A more detailed summary of the ARROW and COLDTech projects is given herein. OceanWATERS has had significant enhancements since its open-source release in 2020. Many of its new features were driven or shaped by feedback from the ARROW and COLDTech teams and requirements of their projects. In support of enabling autonomous adaptation to spacecraft faults (a specific capability solicited by both programs), a fault injection and detection framework was developed that supports a wide and growing range of fault types such as locked joints, image loss, and battery failures. The power system model was completed and integrated into the simulator, starting as a single-cell battery model and later upgraded to a multi-cell model with associated faults such as cell disconnection. Arm/terrain interaction was improved by adding a force-torque sensor and associated faults, and an analytic dig force model based on the Balovnev bucket force equations. Environment fidelity was increased by modeling terrain deformation resulting from digging and scooping; visual improvements were made in textures, lighting, and shadows. To facilitate interoperation with OWLAT, a unified command and telemetry interface between the testbeds was developed at the ROS level, along with a PLEXIL interface. The number of lander operations was greatly expanded (e.g. with Cartesian-based arm and antenna movement), and a framework was designed for users to build their own lander actions. A GUI for PLEXIL plan selection was created (Figure 3), and an expansive set of plans were added, such as those that illustrate patterns for fault handling. This paper provides a self-contained high-level description of OceanWATERS, focusing on more detailed coverage of the aforementioned enhancements. It provides a high-level summary of the projects undertaken by participants in the ARROW and COLDTech programs and how these efforts have helped shape OceanWATERS. Finally, potential future work and directions for the testbed are listed, as likely informed by the recent planetary science decadal survey [5].

K Michael Dalal↗

Optimized Heat Pipe Backup Cooling System Tested with a Stirling Convertor

In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal variable conductance heat pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor by bypassing the heat during stops. In a previous NASA Small Business Innovation Research (SBIR) Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for the Stirling RPS. In 2012, one of these VCHPs was successfully tested at NASA Glenn Research Center with a Stirling convertor as an Advanced Stirling Radioisotope Generator (ASRG) backup cooling system. The prototype; however, was not optimized and did not reflect the final heat rejection path. ACT through further funding has developed a semioptimized prototype with the finalized heat path for testing at Glenn with a Stirling convertor. The semioptimized system features a two-phase radiator and is significantly smaller and lighter than the prior prototype to reflect a higher level of flight readiness. The VCHP is designed to activate and remove heat from the GPHS during stoppage with a small temperature increase from the nominal vapor temperature. This small temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the multilayer insulation (MLI). The VCHP passively allows the Stirling convertor to be turned off multiple times during a mission with potentially unlimited off durations. Having the ability to turn the Stirling off allows for the Stirling to be reset and reduces vibrations on the platform during sensitive measurements or procedures. This paper presents the design of the VCHP and its test results with a Stirling convertor at Glenn. Tests were carried for multiple on and off cycles to demonstrate repeatability. The impacts associated with the addition of the VCHP to the system are also addressed in terms of mass and additional heat losses due to the presence of the VCHP.

Heat Pipe↗

Missions/Planning Panel

A panel discussion was held to develop a viewpoint of space power technology needs and state of readiness for future mission scenarios. Among the points made in the discussion, it was agreed that missions, particularly the far term ones, do serve to drive technology; however, as the missions become nearer term, issues of schedule and cost severely limit the willingness to accept risk. There are, in fact, no rewards to a mission manager for introducing new technology. Mission downscaling is the usual response to technology limitations. All panelists agreed that there exists a serious gap between when technologists feel their job is done and what mission managers need for decision. Typically a two to three year engineering development gap exists. It is essential to take technologies to the engineering model level and conduct a flight demonstration to close this gap. All agreed that increased effort should be made to achieve stronger interactions between planners and technologists and that workshops like the present one are a step in the right direction. Technologists need mission credibility and vice versa.

Fordyce, J. S.↗

Methods Developed by the Tools for Engine Diagnostics Task to Monitor and Predict Rotor Damage in Real Time

Tools for Engine Diagnostics is a major task in the Propulsion System Health Management area of the Single Aircraft Accident Prevention project under NASA s Aviation Safety Program. The major goal of the Aviation Safety Program is to reduce fatal aircraft accidents by 80 percent within 10 years and by 90 percent within 25 years. The goal of the Propulsion System Health Management area is to eliminate propulsion system malfunctions as a primary or contributing factor to the cause of aircraft accidents. The purpose of Tools for Engine Diagnostics, a 2-yr-old task, is to establish and improve tools for engine diagnostics and prognostics that measure the deformation and damage of rotating engine components at the ground level and that perform intermittent or continuous monitoring on the engine wing. In this work, nondestructive-evaluation- (NDE-) based technology is combined with model-dependent disk spin experimental simulation systems, like finite element modeling (FEM) and modal norms, to monitor and predict rotor damage in real time. Fracture mechanics time-dependent fatigue crack growth and damage-mechanics-based life estimation are being developed, and their potential use investigated. In addition, wireless eddy current and advanced acoustics are being developed for on-wing and just-in-time NDE engine inspection to provide deeper access and higher sensitivity to extend on-wing capabilities and improve inspection readiness. In the long run, these methods could establish a base for prognostic sensing while an engine is running, without any overt actions, like inspections. This damage-detection strategy includes experimentally acquired vibration-, eddy-current- and capacitance-based displacement measurements and analytically computed FEM-, modal norms-, and conventional rotordynamics-based models of well-defined damages and critical mass imbalances in rotating disks and rotors.

Baaklini, George Y.↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

An Overview of the NASA Aeronautics Test Program Strategic Plan

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

Marshall, Timothy J.↗

Human-in-the-Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chamber) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international partners.

Henninger, Donald L.↗

Effective Crew Operations: An Analysis of Technologies for Improving Crew Activities and Medical Procedures

NASA's vision for space exploration (February 2004) calls for development of a new crew exploration vehicle, sustained lunar operations, and human exploration of Mars. To meet the challenges of planned sustained operations as well as the limited communications between Earth and the crew (e.g., Mars exploration), many systems will require crews to operate in an autonomous environment. It has been estimated that once every 2.4 years a major medical issue will occur while in space. NASA's future travels, especially to Mars, will begin to push this timeframe. Therefore, now is the time for investigating technologies and systems that will support crews in these environments. Therefore, this summer two studies were conducted to evaluate the technology and systems that may be used by crews in future missions. The first study evaluated three commercial Indoor Positioning Systems (IPS) (Versus, Ekahau, and Radianse) that can track equipment and people within a facility. While similar to Global Positioning Systems (GPS), the specific technology used is different. Several conclusions can be drawn from the evaluation conducted, but in summary it is clear that none of the systems provides a complete solution in meeting the tracking and technology integration requirements of NASA. From a functional performance (e.g., system meets user needs) evaluation perspective, Versus performed fairly well on all performance measures as compared to Ekahau and Radianse. However, the system only provides tracking at the room level. Thus, Versus does not provide the level of fidelity required for tracking assets or people for NASA requirements. From an engineering implementation perspective, Ekahau is far simpler to implement that the other two systems because of its wi-fi design (e.g., no required runs of cable). By looking at these two perspectives, one finds there was no clear system that met NASA requirements. Thus it would be premature to suggest that any of these systems are ready for implementation and further study is required.

Harvey, Craig↗

Multi-Evaporator Miniature Loop Heat Pipe for Small Spacecraft Thermal Control

This paper presents the development of the Thermal Loop experiment under NASA's New Millennium Program Space Technology 8 (ST8) Project. The Thermal Loop experiment was originally planned for validating in space an advanced heat transport system consisting of a miniature loop heat pipe (MLHP) with multiple evaporators and multiple condensers. Details of the thermal loop concept, technical advances and benefits, Level 1 requirements and the technology validation approach are described. An MLHP breadboard has been built and tested in the laboratory and thermal vacuum environments, and has demonstrated excellent performance that met or exceeded the design requirements. The MLHP retains all features of state-of-the-art loop heat pipes and offers additional advantages to enhance the functionality, performance, versatility, and reliability of the system. In addition, an analytical model has been developed to simulate the steady state and transient operation of the MHLP, and the model predictions agreed very well with experimental results. A protoflight MLHP has been built and is being tested in a thermal vacuum chamber to validate its performance and technical readiness for a flight experiment.

Ku, Jentung↗

Arcjet thruster research and technology. Phase 1: Executive summary

The principal objective of this two phase program is to conduct the development research required to make the low power arcjet a flight ready technology. Many important results were obtained during Phase 1 to move closer to this objective. Fundamental analyses were performed of the arcjet nozzle, the gas kinetic reaction effects, the thermal environment, and the arc stabilizing vortex. These aided the conceptual understanding of the arcjet and guided design work. A hydrazine (N2H4) arcjet was designed that combined a flight qualified catalyst bed with a modular arcjet. Extensive testing was performed which demonstrated the feasibility of using this propellant in an arcjet for the first time. Startup techniques were developed, stability maintained, material compatibility tests conducted, and performance mapping tests performed. Specific impulse values from 400 to 730 seconds were produced with a non-optimized design. These levels are higher than were originally thought possible and proved that extremely high enthalpy values can be obtained with constricted arc technology. Erosion rate data are promising for lifetime extensions to meet flight application requirements. Power control unit (PCU) development was started with the design and fabrication of a laboratory high switching frequency supply. Valuable data were obtained on PCU operation and on the interaction with the dynamic arc. Phase 2 efforts presently underway are resolving key issues for multi-hundred hour lifetimes, are continuing to investigate arcjet/PCU interactions, and will demonstrate duty cycle N2H4 arcjet/PCU operation in a simulated flight mode for lifetimes consistent with initial applications.

Source record↗