Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

On-Orbit Assembly Task Definition Study

McDonnell Douglas Space Systems Company at Kennedy Space Center (MDSSC-KSC) has been tasked since November 1987 to provide support to the Space Station Evolution Working Group (EWG) based at NASA's Langley Research Center (LaRC). Work in the first year of this study included extensive data gathering and the development of study methodologies. The OEXP case studies as summarized in NASA Technical Memorandum 4075, Exploration Studies Technical Report FY 1988 Status, and NASA Document Z-2.1-002, Study Requirements Document FY 1989 Studies (SRD), define the mission scenarios and technical requirements which MSFC engineers and their contractors (Martin Marietta and Boeing) utilized in their design of exploration vehicles. LaRC selected case studies and vehicle designs upon which the study team performed processing analyses. An on-orbit SSF refurbishment crew of four dedicated to OEXP vehicle processing was baselined for all studies. In some Instances, LaRC modified the vehicle designs, launch manifests, or mission scenarios provided by MSFC to obtain specific data from the processing analyses. The results from the following case studies analyzed during 1989 are provided in this report: Phobos Gateway On-Orbit Assembly and Launch, Lunar Evolution Vehicle On-Orbit Refurbishment, and Mars Mission Vehicle On-Orbit Assembly and Launch. In addition, a concept for facility accommodations at Space Station Freedom (SSF) was developed and support equipment to be provided at the facility was defined. In support of the MSFC Launch/On-Orbit Processing (LOOP) study, LaRC asked us to assess ground and on-orbit processing Impacts resulting from launching the OEXP vehicles on several different ETO launch vehicles. Results developed by this study, Including processing tasks and times, and personnel and equipment requirements, will be entered Into the VPOD data base. VPOD will be used by LaRC to analyze future OEXP vehicles configurations, SSF facility and resource Impacts, and life cycle cost predictions.

Vargo, Rick↗

Internship Abstract - Aerosciences and Flight Mechanics Intern

Mars is a hard place to land on, but my internship with NASA's Aerosciences & Flight Mechanics branch has shown me the ways in which men and women will one day land safely. I work on Mars Aerocapture, an aeroassist maneuver that reduces the fuel necessary to "capture" into Martian orbit before a descent. The spacecraft flies through the Martian atmosphere to lose energy through heating before it exits back into space, this time at a slower velocity and in orbit around Mars. Spacecraft will need to maneuver through the Martian atmosphere to accurately hit their orbit, and they will need to survive the generated heat. Engineering teams need simulation data to continue their designs, and the guidance algorithm that ensures a proper orbit insertion needs to be refined - two jobs that fell to me at the summer's start. Engineers within my branch have developed two concept aerocapture vehicles, and I run simulations on their behavior during the maneuver. I also test and refine the guidance algorithm. I spent the first few weeks familiarizing myself with the simulation software, troubleshooting various guidance bugs and writing code. Everything runs smoothly now, and I recently sent my first set of trajectory data to a Thermal Protection System group so they can incorporate it into their heat-bearing material designs. I hope to generate plenty of data in the next few weeks for various engineering groups before my internship ends mid-August. My major accomplishment so far is improving the guidance algorithm. It is a relatively new algorithm that promises higher accuracy and fuel efficiency, but it hasn't undergone extensive testing yet. I've had the opportunity to work with the principal developer - a professor at Iowa State University - to find and fix several issues. I was also assigned the task of expanding the branch's aerodynamic heating simulation software. I am excited to do this because engineers in the future will use my work to generate meaningful data and make design decisions. My internship has taught me to how to teach myself. There are no tutors, study sessions or professor office hours. When I am given an assignment I am expected to figure out how to accomplish it, and I have grown in my problem solving abilities. My summer experience has reinforced my drive to work at NASA, and I can definitely see myself working full time on the aerocapture project, or something similar.

Rangel, John↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Research on the use of space resources

The second year of a multiyear research program on the processing and use of extraterrestrial resources is covered. The research tasks included: (1) silicate processing, (2) magma electrolysis, (3) vapor phase reduction, and (4) metals separation. Concomitant studies included: (1) energy systems, (2) transportation systems, (3) utilization analysis, and (4) resource exploration missions. Emphasis in fiscal year 1982 was placed on the magma electrolysis and vapor phase reduction processes (both analytical and experimental) for separation of oxygen and metals from lunar regolith. The early experimental work on magma electrolysis resulted in gram quantities of iron (mixed metals) and the identification of significant anode, cathode, and container problems. In the vapor phase reduction tasks a detailed analysis of various process concepts led to the selection of two specific processes designated as ""Vapor Separation'' and ""Selective Ionization.'' Experimental work was deferred to fiscal year 1983. In the Silicate Processing task a thermophysical model of the casting process was developed and used to study the effect of variations in material properties on the cooling behavior of lunar basalt.

Carroll, W. F.↗

Pilot Field Test Study

The Field Test study is currently in full swing, preceded by the successful completion of the Pilot Field Test study that paved the way for collecting data on the astronauts in the medical tent in Kazakhstan. Abigail Sherriff worked alongside Logan Dobbe on one Field Test aspect to determine foot clearance over obstacles (5cm, 10cm, and 15cm) using APDM Inc. Internal Measurement Units (IMU) worn by the astronauts. They created a program to accurately calculate foot clearance using the accelerometer, magnetometer, and gyroscope data with the IMUs attached to the top of the shoes. To validate the functionality of their program, they completed a successful study on test subjects performing various tasks in an optical motion studio, considered a gold standard in biomechanics research. Future work will include further validation and expanding the program to include other analyses.

Sherriff, Abigail↗

Digitizing Named Entities Found Within Letters of Agreement

Letters of Agreement (LOAs) are text-based air traffic control documents that contain procedures and actions agreed upon by the different parties, typically two or more FAA facilities, that are subject to an agreement. The documents contain among other things generic constraints, which are explicit and implicit combinations of procedures that limit a flight’s trajectory and affects pilot actions. For example, a controller may be required, to assign a specific altitude to an aircraft crossing the boundary between two airspaces. Although LOA generic constraints directly impact the trajectory of an aircraft, they are not currently available in a digital form that can be used for (or directly ingested into automated) flight planning. Instead, the constraints are manually input into an onboard or ground based system. LOA documents are primarily stored at a controlling facility and the generic constraints are implemented by experienced air traffic controllers and pilots primarily using voice instructions. This increases the workload of the controllers, likelihood of error (e.g., due to noisy communication) and makes it impractical for implementation with unmanned aircraft. Therefore, steps must be taken to make existing constraints machine interpretable to enable e.g., automated handoffs which in turn would reduce controller workload. With recent advances in natural language processing, especially the rise in digitization of text documents (e.g., medical documents) and automated extraction of information therein, it is now possible to extract flight specific constraints from LOAs. The goal of this work is to digitize named entities through a combination of natural language processing tasks: named entity disambiguation, toponym resolution, and numeric parsing to extract general constraint components contained within LOAs, herein referred to as Entity Enhancement (EE). Starting with a small list of named entities (e.g., ARTCC, Tower, Altitude and Speed), EE can extract the named entities while simultaneously converting the string-based output into a digital format using an ensemble of processes like rule-based gazetteers and syntactic-lexical patterns. The digital format contains a diverse set of information based on the entity label in question, ranging from standardized facility names to units of measure (e.g., feet) and other numeric information. Upon validating our approach using a truth dataset, we show an overall F1-Score of 0.71 for the extraction process. Looking beyond entity enhancement, we are also working towards the goal of completely digitizing the general constraints by performing EE and fitting them into a standardized exchange model (XM) such as the Aeronautical Information Exchange Model (AIXM). This will allow for easy distribution and dissemination of LOA constraints to air users, better searchability within documents, and enable ingestion into automated flight planning. Finally, we show a preliminary version of the proposed XM architecture and demonstrate how the model can be populated from the EE output.

Stephen S. B. Clarke↗

Advanced Air Mobility(AAM) Ecosystems Working Group Briefing Urban Air Mobility Noise Working Group (UNWG) Subgroup 2: Ground & Flight Testing

Overview of Urban Air Mobility Noise Working Group (UNWG) activities of Subgroup 2, responsible for developing Urban Air Mobility (UAM) vehicle ground and flight testing recommendations for those tasked with evaluating the acoustic characteristics of UAM vehicles under development. This topic is being briefed to an audience at the Advanced Air Mobility (AAM) Ecosystems Working Group Meeting (AEWG).

acoustics↗

NASA 2018 Green Propulsion Roadmap

The Green Propulsion Working Group (GPWG) is a technical guidance working group formed April 2017 under the Agency's Capability Leadership Team The GPWG was tasked with recommending an agency road map and providing guidance to NASA on green propulsion technology development and infusion The GPWG's efforts focus on ionic liquid propellants and related technologies The GPWG was chartered with three representatives from NASA Centers currently exploring green propulsion technologies As other Centers may explore programs that utilize green propulsion, membership of the working group can be expanded to include more interested parties Working group also solicits and coordinates with other government agencies (e.g. AFRL, MDA) In 2015, JANNAF hosted a Technical Interchange Meeting (TIM) on Green Monopropellant Alternatives to Hydrazine (GMAH) Included both Government and non-Government contributions on the State-of-the-Art in Green Propulsion Technology Following the TIM, a Government-only session (USAF/AFRL/NASA/MDA/DLA) reviewed and identified remaining technical gaps in Green Propulsion In 2016, an inter-agency team (AFRL/NASA/MDA) worked together to develop an informal inter-agency "roadmap" based on the outcome of the TIM Approach consisted of near-term, mid-term, and long-term technology advancement areas, approaching incrementally larger thrust classes The NASA Green Propulsion Working Group reviewed the work of the 2016 Inter-Agency Working Group, and concurs that the identified technical gaps and technology development areas are still relevant and necessary to see green propulsion technology advanced The GPWG recommends the 2016 roadmap be adopted as baseline for NASA needs, with some additions The focus of the 2016 inter-agency roadmap was primarily on the thruster technology. The Agency must also invest in understanding the broader propulsion system-level technology gaps in parallel. Timeframes are considered suggested from a priority standpoint, but are also flexible as some efforts will need to occur in the nearer term or concurrently in order to meet specific mission requirements The GPWG developed 2018 roadmap breaks down the technology development goals into Technology Development Areas (TDA's), and identifies the near-, mid, and long-term sub-goals within those areas. Those TDA's are: Thruster Hardware Development Modeling & Tools Development Materials Properties and Compatibility Propellant Development.

Cavender, Dan↗

Safety Aboard the International Space Station

As with any task that NASA takes on, safety is of utmost importaqce. There are pages of safety codes and procedures that must be followed before any idea can be brought to life. Unfortunately, the International Space Station s (ISS) safety regulations and procedures are based on lg standards rather than on Og. To aide in making this space age home away from home a less hazardous environment, I worked on several projects revolving around the dangers of flammable items in microgravity. The first task I was assigned was to track flames. This involves turning eight millimeter video recordings, of tests run in the five second drop tower, into avi format on the computer. The footage is then compressed and altered so that the flame can be seen more clearly. Using another program called Spotlight, line profiles were used to collect data describing the luminescence of the flame at different points. These raw data are saved as text files and run trough a macro so that a Matlab program can analyze it. By fitting the data to a curve and determining the areas of brightest luminescence, the behavior of the flame can be recorded numerically. After entering the data into a database, researchers can come back later and easily get information on flames resulting from different gas and liquid mixtures in microgravity. I also worked on phase two of the FATE project, which deals with safety aboard the ISS. This phase involves igniting projected droplets and determining how they react with secondary materials. Such simulations represent, on a small scale, the spread of onboard fires due to the effervescence of burning primary materials. I set up existing hardware to operate these experiments and ran tests with it, photographing the results. I also made CAD drawings of the apparatus and the area available on the (SF)2 rig for it to fit into. The experiment will later be performed on the KC-135, and the results gathered will be used to reanalyze current safety standards for the ISS, including the distance of required separation for flammable materials. Additional information is included in the original extended abstract.

Mintz, Shauna M.↗

Shuttle orbiter KU-band radar/communications system design evaluation

An expanded introduction is presented which addresses the in-depth nature of the tasks and indicates continuity of the reported effort and results with previous work and related contracts, and the two major modes of operation which exist in the Ku-band system, namely, the radar mode and the communication mode, are described. The Ku-band radar system is designed to search for a target in a designated or undesignated mode, then track the detected target, which might be cooperative (active) or passive, providing accurate, estimates of the target range, range rate, angle and angle rate to enable the orbiter to rendezvous with this target. The radar mode is described along with a summary of its predicted performance. The principal sub-unit that implements the radar function is the electronics assembly 2(EA-2). The relationship of EA-2 to the remainder of the Ku-band system is shown. A block diagram of EA-2 is presented including the main command and status signals between EA-2 and the other Ku-band units.

Source record↗

The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

Bronstein, L.↗

A comparison of control modes for time-delayed remote manipulation

Transmission time delay in the communication channel of a manual control system is investigated. A time delay can exist in remote manipulation systems, caused by long communication distances or bandwidth limitations. Ferrell 1 conducted the first research in time-delayed manipulation using a two degree-of-freedom manipulator. His subjects, working at time delays of 1.0, 2.1, and 3.2 s, could accomplish tasks even requiring great accuracy. The subjects spontaneously adopted a pattern of moving cautiously, then waiting to see the results of their actions. In experiments with a six degree-of-freedom master-slave manipulator system and time delays of 1.0 to 6 s, Black 2 saw that subjects tried to use the move-and-wait strategy; but there were often difficulties. The subjects seemed to have a problem in holding the master arm stationary while waiting for feedback. Any undesired drifting of the master arm introduced a discrepancy between the positions of the master and slave. This discrepancy was not perceived because of the time delay. The subject would then begin his next move with an inherent error. The difficulty of effectively using the move-and-wait strategy with a master-slave manipulator suggested that rate control might be a more effective control mode with time delay.

Starr, G. P.↗

Improved turbopump dynamics

A study was initiated to investigate the practicality of increasing rotor critical speeds by changes in manufacturing method. The technique would be to build a pump with an all laser welded shaft and case; such unit to be opened by laser cutting and rebuilt by rewelding the same surface. Use of a split casing, common in industry, would permit assembly of the rotor outside the case. A team was formed to perform the study; however, the work of the team was severely restricted by conflict with higher priority tasks. No manpower was available to evaluate alternate configurations. Thus, much of the synergetic effects of cohesive design modification was lost. Although very limited results were achieved, nothing was found to indicate that the method is not worth further investigation.

Kiefling, L.↗

Integration of dynamic, aerodynamic and structural optimization of helicopter rotor blades

The purpose of the research is to study the integration of structural, dynamic, and aerodynamic considerations in the design-optimization process for helicopter rotorblades. This is to be done in three phases. Task 1 is to bring on-line computer codes that could perform the finite-element frequency analyses of rotor blades. The major features of this program are summarized. The second task was to bring on-line an optimization code for the work. Several were tried and it was decided to use CONMIN. Explicit volume constraints on the thicknesses and lumped masses used in the optimization were added. The specific aeroelastic constraint that the center of mass must be forward of the quarter chord in order to prevent flutter was applied. The bending-torsion coupling due to cg-ea offset within the blade cross section was included. Also included were some very simple stress constraints. The first three constraints are completed, and the fourth constraint is being completed.

Peters, David A.↗

Unified Engineering Software System

Collection of computer programs performs diverse functions in prototype engineering. NEXUS, NASA Engineering Extendible Unified Software system, is research set of computer programs designed to support full sequence of activities encountered in NASA engineering projects. Sequence spans preliminary design, design analysis, detailed design, manufacturing, assembly, and testing. Primarily addresses process of prototype engineering, task of getting single or small number of copies of product to work. Written in FORTRAN 77 and PROLOG.

Purves, L. R.↗

A dynamic case-based planning system for space station application

We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

Oppacher, F.↗

Multibody modeling and verification

A summary of a ten week project on flexible multibody modeling, verification and control is presented. Emphasis was on the need for experimental verification. A literature survey was conducted for gathering information on the existence of experimental work related to flexible multibody systems. The first portion of the assigned task encompassed the modeling aspects of flexible multibodies that can undergo large angular displacements. Research in the area of modeling aspects were also surveyed, with special attention given to the component mode approach. Resulting from this is a research plan on various modeling aspects to be investigated over the next year. The relationship between the large angular displacements, boundary conditions, mode selection, and system modes is of particular interest. The other portion of the assigned task was the generation of a test plan for experimental verification of analytical and/or computer analysis techniques used for flexible multibody systems. Based on current and expected frequency ranges of flexible multibody systems to be used in space applications, an initial test article was selected and designed. A preliminary TREETOPS computer analysis was run to ensure frequency content in the low frequency range, 0.1 to 50 Hz. The initial specifications of experimental measurement and instrumentation components were also generated. Resulting from this effort is the initial multi-phase plan for a Ground Test Facility of Flexible Multibody Systems for Modeling Verification and Control. The plan focusses on the Multibody Modeling and Verification (MMV) Laboratory. General requirements of the Unobtrusive Sensor and Effector (USE) and the Robot Enhancement (RE) laboratories were considered during the laboratory development.

Wiens, Gloria J.↗

Ada and software management in NASA: Assessment and recommendations

Recent NASA missions have required software systems that are larger, more complex, and more critical than NASA software systems of the past. The Ada programming language and the software methods and support environments associated with it are seen as potential breakthroughs in meeting NASA's software requirements. The findings of a study by the Ada and Software Management Assessment Working Group (ASMAWG) are presented. The study was chartered to perform three tasks: (1) assess the agency's ongoing and planned Ada activities; (2) assess the infrastructure (standards, policies, and internal organizations) supporting software management and the Ada activities; and (3) present an Ada implementation and use strategy appropriate for NASA over the next 5 years.

Source record↗