Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “simulation modeling training analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

761 records · Page 43

Examples of Use of SINBAD Database for Nuclear Data and Code Validation

Benchmark experiments can serve several purposes and the availability of suitable experimental data is fundamental to ensure that modelling tools meet the requirements of nuclear industry and licensing needs. Essentially, they are used for: - validation of nuclear cross-section data, - validation of nuclear codes and models used, - qualification and training of users through benchmarking and code comparison exercises. The Shielding Integral Benchmark Archive and Database (SINBAD) project was started in the early 1990's at the OECD Nuclear Energy Agency Data Bank (NEA DB) and the Radiation Safety Information Computational Center (RSICC) as a collection of quality experiments for validating and benchmarking computer codes and data for radiation transport and shielding applications. Currently, the SINBAD database comprises over 100 benchmark compilations and evaluations of relevance to: - reactor shielding, pressure vessel dosimetry (48); - fusion blanket neutronics (31); - accelerator shielding (23). In order to facilitate their use, the data are organized in the standardized format structure. The index and the master document (called abstract) use the Hyper Text Markup Language (HTML) format with links to text files, figures, Portable Document Format (pdf) documents and computer code inputs. The format allows easy access and forward/backward navigation among the data and has proved to be suitable, general enough and above all easy (and low-cost) to maintain. In addition to the characterization of the radiation source, description of the shielding set-up, the instrumentation and the relevant detector measurements, most sets in SINBAD contain also the deterministic or Monte Carlo radiation transport computer model used for the interpretation of the experiment and, where available, results from uncertainty analysis. The set of primary documents used for the benchmark compilation and evaluation are provided in computer readable form. The database is intended for different types of users, including nuclear data evaluators, computer code developers, experiment designers and university students. SINBAD is available from the NEA Data Bank and RSICC (see https://www.oecdnea.org/science/wprs/shielding/sinbad/). Up to now several hundreds of SINBAD packages were distributed from the NEA DB and RSICC. Since 2011 the maintenance and further development of the database is coordinated in the scope of the OECD NEA Nuclear Science Committee (NSC) Working Party on Scientific Issues of Reactor Systems (WPRS) Expert Group on Radiation Transport and Shielding (EGRTS). A key objective of the group is to identify, evaluate and preserve experimental data on shielding benchmarks. The Expert Group maintains close links with the International Reactor Physics Experiment Evaluation (IRPhE) and International Criticality Safety Benchmark Evaluation (ICSBEP) projects, as well as in co-ordination with the JEFF and EFF NEA Data Bank projects and with the SATIF community of accelerator shielding specialists. In the last years, much effort was devoted to the quality review of the available benchmark information.

42 ENGINEERING↗

Volumetric Assessment of UPRITE Exercises From Marker-Based Motion Capture

BACKGROUND Lack of volumetric data on full-body movement of exercises presents a challenge to ensuring the fit of crew member’s full range of motion on the International Space Station (ISS). The Upright Proprioception Retention via In-flight Training and Evaluation (UPRITE) is a sensorimotor countermeasure device designed for maintaining crew members’ proprioception in a microgravity environment. A footplate—attached to a static base—rotates in two degrees of freedom (pitch and roll) up to a 20 deg angle. An initial volumetric assessment assuming an upright standing posture produced a cone-like shape with a narrow bottom and wide top. Such general volumetric assessments risk creating an overly conservative volume estimate, taking up more space than is necessary on the already limited interior space of the ISS, and neglecting necessary volume due to oversimplifying assumptions. Rather, higher-fidelity volumetric assessments offer more comprehensive insights in an environment where every area counts. The main objective of this work is to provide the spatial parameters of exercises on the UPRITE such that it is placed on the ISS according to its volumetric demands or that usage is adjusted to fit the available space. METHODS In 2023, a data collection was performed originally to inform loads and dynamics of system use and was recently leveraged for volumetric assessment. Three human subjects representing different body types (~63-76 inches in stature) performed a variety of board manipulations using UPRITE with body weight offload. The test collected the 3D positional data of a modified full-body Plug-in Gait marker set [1] via a 16-camera OptiTrack MoCap system. After processing – filling marker gaps and trimming data – in OptiTrack Motive, the recorded marker location data, which included device markers, was exported to a readable trajectory file. To accurately represent the full volume defining landmarks, additional markers were digitally added to an unscaled Modified Full Body Model [2]. The model was then scaled according to its subject parameters upon which an inverse kinematics analysis was performed. A custom plugin yielded model marker location data files. Volumetric analyses were performed on the recorded trajectory and model trajectory files using a custom Python-built tool that extracted the marker location data and plotted it in a 3D space. Concerned with only the maximum volume of the motion, a 3D convex hull analysis was applied to the plot, extracting the vertices or external points of the eventual 3D CAD output, dubbed aptly as a “volume shell”. This overall approach was based on guidance in a NASA-STD-3001 Technical Brief [3]. RESULTS AND DISCUSSION Batch volumetric assessment on the exercises for each subject was performed, producing high-fidelity volume shells in minimal time. Preliminary results highlighted the value in higher-fidelity volumes based on collected data when possible. For example, revolving a single posture in the cone assessment would not have sufficiently captured a single leg stance; rather, it would need to involve swinging the leg both forward and back. Additional observations and the maximal dimensions of the volumes, including those based on scaled data for ISS anthropometric requirements, will be presented at the Human Research Program Investigator’s Workshop. CONCLUSIONS While this work’s primary objective was for the UPRITE-to-ISS integration, the tool built to conduct this analysis has wide applications for future exercise systems as an informational tool for optimal device placement. The tool and its findings also have implications for exercise device design and spacecraft interior considerations on Gateway, the Lunar Pressurized Rover, and beyond. REFERENCES [1] Bell, C. A., et al. (2023) Recent Improvements and Verification of a Full Body Model in OpenSim. NASA Human Research Program Investigator’s Workshop. https://ntrs.nasa.gov/citations/20230001080 [2] Lostroscio, K., et al (2023) The Digital Astronaut Simulation. AHFE International Conference on Human Factors in Design, Engineering, and Computing for All. [3] Exercise Overview. (2023) NASA-STD-3001 Technical Brief. https://www.nasa.gov/wp-content/uploads/2023/12/ochmo-tb-031-exercise-overview.pdf?emrc=9d454c?emrc=9d454c

L D Quinto↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Thermal and kinematic properties of ejecta in SN1987A revealed by XRISM

We present an analysis of high-resolution spectra from the shock-heated plasmas in SN 1987A, based on an observation using the Resolve instrument onboard the X-Ray Imaging and Spectroscopy Mission (XRISM). The 1.7–10 keV Resolve spectra are accurately represented by a single-component, plane-parallel shock plasma model, with a temperature of $2.84_{-0.08}^{+0.09}$ keV and an ionization parameter of $2.64_{-0.45}^{+0.58}$ × $10^{11}\,\,{\rm s\,\, cm}^{-3}$. The Resolve spectra are also well reproduced by the 3D magneto-hydrodynamic simulation presented by Orlando et al. (2020, A&A, 636, A22) suggesting substantial contribution from the ejecta. The metal abundances obtained with Resolve align with the Large Magellanic Cloud value, indicating that the X-rays in 2024 originate from “non-metal-rich” shock-heated ejecta and the reverse shock has not reached the inner metal-rich region of ejecta. Doppler widths of the atomic lines from Si, S, and Fe correspond to velocities of 1500–1700 km s$^{-1}$, where the thermal broadening effects in this non-metal-rich plasma are negligible. Therefore, the line broadening seen in Resolve spectra is determined by the large bulk motion of ejecta. For reference, we determined a $90\%$ upper limit on non-thermal emission from a pulsar wind nebula at $4.3 \times 10^{-13}$ erg cm$^{-2}$ s$^{-1}$ in the 2–10 keV range, aligning with NuSTAR findings by Greco et al. (2022, ApJ, 931, 132). Additionally, we searched for the $^{44}$Sc K line feature and found a $1\sigma$ upper limit of $1.0 \times 10^{-6}$ photons cm$^{-2}$ s$^{-1}$, which translates to an initial $^{44}$Ti mass of approximately $2 \times 10^{-4}\, M_{\odot }$, consistent with previous X-ray to soft gamma-ray observations (Boggs et al. 2015, Science, 348, 670; Grebenev et al. 2012, Nature, 490, 373; Leising 2006, ApJ, 651, 1019).

ISM: supernova remnants↗