Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “report, 2022”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

TRACER Radar b1 Data Processing: Corrections, Calibrations, and Processing Report

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility deployed the first ARM Mobile Facility (AMF1) to Houston, Texas for the Tracking Aerosol Convection Interactions Experiment (TRACER) field campaign. The TRACER campaign was conducted from October 1, 2021 to September 30, 2022, with an intensive operational period (IOP) from June 1 to September 30, 2022.

54 ENVIRONMENTAL SCIENCES↗

WHOLESCALE - Water & Hole Observations Leverage Effective Stress Calculations And Lessen Expenses (Final Technical Report 2020 - 2024)

The WHOLESCALE acronym stands for Water & Hole Observations Leverage Effective Stress Calculations and Lessen Expenses. The goal of the WHOLESCALE project is to simulate the spatial distribution and temporal evolution of stress in the geothermal system at San Emidio in Nevada, United States. To reach this goal, the WHOLESCALE team has developed a methodology to incorporate and interpret data from four methods of measurement into a multi-physics model that couples thermal, hydrological, and mechanical (T H-M) processes. The WHOLESCALE team has applied this methodology at the San Emidio geothermal field, located ~100 km north of Reno, Nevada in the northwestern Basin and Range province. The WHOLESCALE team includes 30 individuals working at two universities, two national laboratories, and one industry partner. Two master-degree students and five post-doctoral researchers have gained professional experience and earned partial financial support via the WHOLESCALE project. The WHOLESCALE team has taken advantage of the perturbations created by changes in pumping operations during planned shutdowns in 2016, 2021, and 2022 to infer temporal changes in the state of stress in the geothermal system at San Emidio, Nevada, U.S. The WHOLESCALE results support the working hypothesis that increasing pore-fluid pressure reduces the effective normal stress acting across fault zones. During normal operations, pumping in deep production wells decreases fluid pressures and thus increases the effective normal stresses on faults, reducing microseismicity. During planned shutdowns, the cessation of production increases pore-fluid pressure and reduces effective normal stress. The WHOLESCALE products generated during the 4-year period between 2020 and 2024 include: three articles published in the open-access, peer-reviewed scientific literature, two master’s theses, 20 presentations or papers at scientific conferences, and 17 data sets available on public repositories. The WHOLESCALE project has been completed in two phases that included three performance periods separated by two Go/No-go Stage Gate Reviews. Tasks were classified by data type (i.e., Geologic Structure, Borehole, Geodesy, Hydrology, Seismology, and Modeling). The first phase of the project started July 31, 2020 and included ongoing project coordination (Task 1), a project kickoff (Task 2), analysis of existing data (Task 3), development of the initial stress model & deployment design (Task 4), and Go/No-go Decision Point #1 (Task 5). Phase II began with implementing the 2022 deployment (Task 6), followed by Go/No-go Decision Point #2 (Task 7) The remainder of Phase II consisted of analyzing data collected during deployment (Task 8), calibration of the stress model on all observations (Task 9), and the Final Review (August 23, 2024) & Reporting (Task 10).

15 GEOTHERMAL ENERGY↗

Disruption halo current rotation scaling on Alcator C-Mod and HBT-EP

Asymmetric halo currents (HCs) can exert large net forces on the vacuum vessel and other components during disruptions on tokamaks. The displacements caused by these forces can then be amplified if these asymmetric forces rotate at frequencies resonant with the vessel. This paper reports on the investigation of a recently proposed scaling law for the disruption HC rotation frequency [Saperstein et al., “Halo current rotation scaling in post-disruption plasmas,” Nucl. Fusion 62, 026044 (2022)] that combines measurements on Alcator C-Mod with those on HBT-EP. We find that a new non-circular version of the scaling law [ ⟨ f rot ⟩ m / ⟨ m ⟩ ∝ 1 B T ( S / π )] takes into consideration the dependence of frot on the poloidal structure of the MHD instability (m) driving the asymmetry and describes the disruption-averaged rotation frequency on C-Mod. Disruption rotation is also found to be insensitive to the vertical position and impurity content of the plasma at the onset of the disruption. However, a stagnation in the time evolution of frot is occasionally observed. In conclusion, observations are consistent with the dominance of poloidal rotation during the disruption, which is motivated by the poloidal drift nature of the scaling law.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Volume 10: Flow Test Facilities

Adding additional flow testing facilities has been considered as part of the High Flux Isotope Reactor (HFIR) Sustaining and Enhancing Neutron Science (SENSe) Initiative at Oak Ridge National Laboratory (ORNL) to support HFIR operations and experiments. This prospect has prompted many ideas and discussions regarding potential features, configurations, locations, and applications for the facilities. A working group of ORNL staff members was formed in fiscal year 2022 to recommend one or more configurations to best support future HFIR operations and scientific capacities and to develop order-of magnitude cost estimates and timing. The ideas discussed in this report include options ranging from upgrading existing small-scale testing facilities to building a full-scale HFIR mockup for detailed thermohydraulic testing and fuel assessment.

07 ISOTOPE AND RADIATION SOURCES↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implications of seagrass changes on manatee distributions in the Indian River Lagoon waters surrounding NASA’s Kennedy Space Center

The presentation will discuss Kennedy Space Center’s (KSC) long term monitoring of seagrass and manatees in the Banana River (BR) prior to 2010, the remarkable decline in seagrass habitat that occurred thereafter, and the notable shift in manatee distribution. For Banana River, from 2010 to 2015, seagrass declined while manatee presence increased, with an average of 525 manatees per flight in 2015. After 2016, both seagrasses and manatee presence declined. Concurrently, increasing manatee numbers were reported for Mosquito Lagoon (ML), where historical manatee occurrence was relatively low. In 2016, aerial surveys were expanded to include the southern half of ML to document this significant distribution shift. By 2022, ML had become the hub of manatee occurrence on KSC, with an average of 946 manatees per flight and only 48 per flight in BR. These data enhance information for IRL stakeholders regarding seagrass habitat and manatee protection in the northern IRL.

Seagrass↗

Implications of Seagrass Changes on Manatee Distributions in the Indian River Lagoon Waters Surrounding NASA's Kennedy Space Center

The presentation will discuss Kennedy Space Center’s (KSC) long term monitoring of seagrass and manatees in the Banana River (BR) prior to 2010, the remarkable decline in seagrass habitat that occurred thereafter, and the notable shift in manatee distribution. For Banana River, from 2010 to 2015, seagrass declined while manatee presence increased, with an average of 525 manatees per flight in 2015. After 2016, both seagrasses and manatee presence declined. Concurrently, increasing manatee numbers were reported for Mosquito Lagoon (ML), where historical manatee occurrence was relatively low. In 2016, aerial surveys were expanded to include the southern half of ML to document this significant distribution shift. By 2022, ML had become the hub of manatee occurrence on KSC, with an average of 946 manatees per flight and only 48 per flight in BR. These data enhance information for IRL stakeholders regarding seagrass habitat and manatee protection in the northern IRL.

Indian River Lagoon↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Launch Complex 39A, SWMU 008 2023 Long-Term Monitoring Report Kennedy Space Center, Florida

The 2023 Long-Term Monitoring (LTM) Report (LTMR) presents the annual and semi-annual groundwater monitoring results for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, at Kennedy Space Center (KSC), Florida. The reporting period covered under this LTMR is from January to December 2023, and represents the first year of site-wide monitoring following Air Sparge (AS) system shutdown at the end of 2022. AS system operation at LC39A began operation in 2015. The AS system consisted of a total of 173 AS wells ranging in depth from 11 to 37 feet below land surface. The overall remedial objective for the AS Interim Measure was to actively decrease concentrations of COCs to less than their respective Florida Department of Environmental Protection Natural Attenuation Default Concentrations, so that LC39A can transition into an LTM program. This objective was achieved in 2022, with 2023 marking Year 1 of the LTM program to monitor the residual groundwater plume. VOC results indicate that COC concentrations have continued to decrease or stabilize, with no rebound observed since AS system shutdown. Vinyl chloride was the only COC detected above its GCTL, with the highest concentration detected at 8.0 μg/L. PFAS results detected 15 different PFAS compounds (out of 32 analyzed) between the six monitoring wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). PFOS was detected in one of the six samples above the FDEP Provisional GCTL at a concentration of 200 ng/L. PFOA was not detected above the FDEP Provisional GCTL in any of the six samples. PFOS and PFOA also currently have United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 ng/L. PFOS was detected in all six samples above the USEPA MCL. PFOA was detected in three of the six samples above the USEPA MCL. Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the six wells. Additional PFAS sampling will occur as part of a PFAS Site Assessment to be conducted in the future. Based on Year 1 LC39A LTM results, recommendations for 2024 are to continue with the second year of LTM in 2024 with the same monitoring well network as Year 1 (18 wells). The three wells that were on a semi-annual schedule will transition to an annual schedule to align with the remaining wells. The next annual event is scheduled for May 2024. The three wells that were found to be inadvertently destroyed will be properly abandoned and a replacement well in the vicinity of former monitoring well 21ST-MW0030I will be installed. This new well will be added to the LTM sampling plan upon installation.

Deborah M. Wilson↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere (Final Technical Report)

The Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere project’s goal was to expand Low-to-Moderate Income (LMI) solar access for homeowners and renters. The LIFT project researched and gathered data on 453 LMI community solar project across the country. Following three years of research, the project delivered three groundbreaking research papers in June 2022, focused on 1) customer experience, 2) the growth of community solar programs, and 3) project-level financial best practices for serving LMI communities. These were followed by a user-friendly web-based Toolkit allowing users to interact with project data and key findings in November 2022. The customer experience research examined community solar subscribers’ primary motivations to join and remain satisfied with projects. Our research identified 453 projects across the country that dedicated some portion of the system capacity to LMI households. Seventeen of these projects participated in the LIFT customer experience research, allowing the project team to survey their customers and gain insight into how LMI subscribers feel about community solar and the programs that serve them. Subscribers in our sample indicated that the most critical issue that motivated them to participate in their program, however, was not savings but helping the environment. This was true for both LMI and non-LMI subscribers. Helping the environment was also the most important issue for LMI subscribers to measure how well their program was working for them. LIFT also explored how rapidly community solar has grown since its inception in 2006, publishing results in the Growth of U.S. Community Solar Serving LMI Households report. The results showed that community solar projects serving LMI households are one of the fastest growing segments of the solar industry. The report identifies and recommends ways developers should overcome real or perceived risks to LMI customer acquisition and subscriber management. Through the analysis of community solar project finance research, LIFT showed that most community solar projects serving LMI households are financed in the same ways mainstream community solar projects are financed. The value stacks and financial returns are no different, although LMI inclusion and participation rate varied across programs in our sample, ranging from between 10% and 100%. Based on the findings from the LIFT research, the team built a web-based user-friendly Toolkit, consisting of case studies, project finance best practices, and several tools built around the national dataset of 453 community solar projects that serve LMI households. These allow users to engage with the dataset in multiple ways; to explore the landscape of LMI community solar in the U.S., and to design community solar projects to optimize LMI inclusion, equity, and savings levels. The Toolkit also includes a library of LIFT-generated and LIFT-curated resources for users to learn more about how to best serve LMI communities through community solar. LIFT officially published the Toolkit on October 31, 2022, followed by a launch event (public webinar) on November 17, 2022. The core LIFT partners continue to engage in outreach and dissemination efforts to promote the LIFT Toolkit and research publications. Our driving motivation is to continue enabling solar developers to leverage the findings of this three-year research effort. By implication, the LIFT Toolkit is designed for use by utilities, energy service providers, and financiers or investors as a learning and decision-making tool to rapidly scale project models that optimize LMI inclusion and maximize real household savings.

14 SOLAR ENERGY↗

Study of Storage Requirements and Costs for Shaping Renewables and Nuclear Energy (FY23 Summary Report)

To decarbonize electricity generation primarily by using wind and solar resources, it is likely that additional low (or zero) carbon dioxide (CO 2 ) alternatives will be required for ensuring a reliable electricity supply. This study extends the work and modeling framework that we consolidated in FY 2022, by assessing the zero-CO 2 pathways of a Texas power system in which the availability of variable renewable energy (VRE), nuclear energy, and energy storage types (i.e., battery and thermal energy storage [TES]) are considered the sole resources available for expansion. Using the Risk Analysis Virtual Environment (RAVEN) and Holistic Energy Resource Optimization Network (HERON) frameworks, this study investigates the market of two nuclear energy technologies (i.e., large light-water reactors [LWRs] and LWR-type small modular reactors [SMRs]) under two plausible storage coupling scenarios (i.e., electric coupling and direct thermal coupling). We also explore optimal environments for nuclear energy deployment, and identify key performance characteristics that make nuclear energy economically viable in areas with significant intermittent energy sources. Our analysis encompasses 24 cases. We model the least-cost grid systems, highlight the potential for a coupled LWR-TES approach, and utilize SMRs to achieve deep decarbonization in an affordable, technically feasible manner. We also examine seasonal variations in balancing electricity supply and demand, and account for varying performance, costs, and grid constraints. Overall, the findings of our modeling afford valuable insights for supporting future technology investment decisions in the energy sector.

25 ENERGY STORAGE↗

Radiological Dispersal Device (RDD) Recovery Guidance: After Action Report from Pilots - Responding to Feedback from Pilots Reviewing RDD Recovery Guidance

The goal of this After Action report is to utilize feedback from the pilot participants to improve the guidance for responding to radiological dispersal device (RDD) events, which can include deliberate acts to release radioactive materials into the environment using explosives or other means or accidental releases (e.g., release from a medical isotope source). This longer-term recovery guidance is an extension of the initial response guidance that was released in a 2017 interagency report called RDD Response Guidance: Planning for the First 100 Minutes. Recovery teams reviewed the longer-term recovery guidance during pilot sessions that were held in Harris County, Texas (March 8-10, 2022) and Seattle, Washington (May 2-3, 2022). The pilot teams reviewed the RDD Recovery Guidance Presentation, which contains a summary of the more detailed RDD Recovery Guidance draft document. The feedback from both pilots was grouped and binned into unique themes (e.g., “checkpoint challenges”) that align with the recovery missions and tactics that they reviewed. PNNL authors of the recovery guidance then prepared responses that describe how they recommend addressing the feedback for each theme. The responses typically included recommendation plans for improving the guidance document, but also described when no changes are needed because the guidance already contains the suggested improvement. These pilot recommendations will be brought to the interagency team to finalize plans for updating and improving recovery guidance materials.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Grid Cost and Total Emissions Reductions Through Mass Deployment of Geothermal Heat Pumps for Building Heating and Cooling Electrification in the United States

This report presents the results of a study on the potential grid impacts of national-scale mass deployment of geothermal heat pumps (GHPs) coupled with weatherization in single-family homes (SFHs) from 2022 to 2050. GHPs are a technology readiness level 10, commercially available technology across the United States. This study is an impact analysis only; installed costs and available land areas for installing GHPs are not accounted for in determining their estimated deployment. The three scenarios studied were (1) continuing to operate the grid as it is today (the Base scenario), (2) a scenario to reach 95% grid emissions reductions by 2035 and 100% clean electricity by 2050 (the Grid Decarbonization scenario), and (3) a scenario in which the Grid Decarbonization scenario is expanded to include the electrification of wide portions of the economy, including building heating (the Electrification Futures Study or EFS scenario). The analysis team modeled each of these three scenarios with and without GHP deployment to a large percentage of US building floor space. In all cases, deployment of approximately 5 million GHPs per year demonstrated system cost savings on the grid, consumer fuel cost savings through eliminated fuel combustion for space heating, and CO 2 emission reductions from avoided on-site fuel combustion—and, in the case of the Base scenario, CO 2 emissions reductions from the electric power sector. GHPs have traditionally been viewed as a building energy technology. The most notable result of this study, however, is the demonstration that GHPs coupled with weatherization in SFHs are primarily a grid cost reduction tool and technology that, when deployed at a national scale, also substantially reduces CO 2 emissions, even in the absence of any other decarbonization policy.

15 GEOTHERMAL ENERGY↗

E-Area Low-Level Waste Facility Inadvertent Human Intruder Limits and Doses in Support of the PA2022

This report documents the inadvertent human intruder (IHI) analysis for the E-Area Low-Level Waste Facility (ELLWF) at the Savannah River Site (SRS), near Aiken, South Carolina. This analysis supports the 2022 Performance Assessment for ELLWF, complying with the Department of Energy standard for operation of low-level waste disposal facilities (USDOE, 2017). The ELLWF is an operating waste disposal facility and is scheduled to continue accepting waste to 2065. One task of the 2022 Performance Assessment (PA) is to establish waste inventory limits for the various disposal units at ELLWF. This is done by modeling future contaminant release and transport through applicable pathways to human receptors, comparing predicted doses per disposed curie with applicable performance measures, to obtain inventory limits which will assure that doses to receptors do not exceed performance measures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TRACER-MAP_2022_absorption_coefficient

Absorption coefficient for PM2.5 measured by the Tri-color Absorption Photometer averaged every 2 minutes for July-August 2022. The location of the measurement is indicated by latitude and longitude coordinates; TRACER-MAP included time at the AMF site in La Porte and additional sites around Houston. Three wavelengths are reported: 365, 520 and 640 nm. The AAE is also reported using the three wavelengths. The data is reported as 2 minute averages.

54 ENVIRONMENTAL SCIENCES↗

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Key Takeaways: Second Cohort of Action Plans for Rapid Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. As a result, Action Plans for power sector decarbonization were developed by the first cohort of countries. The fist cohort included India, Australia, Chile, the European Union, and the United Kingdom. The first cohort's Action Plans were presented at CEM14 in India in July 2023. These Action Plans, supported by the 21st Century Power Partnership and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The second set of Action Plans has been developed by Brazil, Canada, the United States, and Uruguay, released at CEM15 in Brazil in October 2024.

21st Century Power Partnership↗