Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures - Nevada National Security Site, Nevada with ROTC 1

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 572, Test Cell C Ancillary Building and Structures, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 572 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: CAS 25-33-01, Building 3220, Equipment Building; CAS 25-33-02, Building 3230, Motor Drive Building; CAS 25-33-03, Building 3231, Pump House; CAS 25-33-04, Building 3232, Cryogenic Evaluation Lab; CAS 25-99-22, Ancillary Facilities. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 572. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 572 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation (CAI) will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If it is determined that complete clean closure cannot be accomplished during the CAI, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Framework for Greenhouse Gas Emissions Reduction Planning: Building Portfolios

The goal of this framework for greenhouse gas (GHG) emissions reduction planning (ERP) is to provide guidance to organizations seeking to reduce GHG emissions for their building portfolios and vehicle fleets. The process described in this framework helps organizations develop an actionable plan that prioritizes emissions reduction measures, identifies solutions, and lays out a phased pathway to achieve deep emissions reductions. The plan aims to result in the achievement of Scope 1 and 2 GHG emissions reduction targets, in alignment with goals set within the U.S. Department of Energy’s (DOE’s) Better Climate Challenge, as well as longer term emissions reduction goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The use of price-based demand response as a resource in electricity system planning

Utilities have conducted IRP for decades to consider both supply- and demand-side resources to meet bulk power system needs. More recently, an increasing number of states are requiring regulated utilities to file plans that identify distribution system needs, including DERs that can avoid or defer certain types of traditional utility investments cost-effectively. Price-based demand response (DR) is an underutilized resource that could substantially contribute to load flexibility. We find that evaluation of price-based DR as a solution to meet identified electricity system needs is uncommon at both planning processes. Where price-based DR is considered as a solution, methodologies are often deficient in the characterization and treatment of this resource. Based on our analysis of utility filings and state requirements, this brief provides recommendations for improving consideration of price-based DR in the context of long-term planning for bulk power and distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Framework for Greenhouse Gas Emissions Reduction Planning: Industrial Portfolios

The Framework for Greenhouse Gas Emissions Reduction Planning: Industrial Portfolios articulates a process to help industrial organizations develop a specific, actionable plan to achieve Scope 1 and Scope 2 greenhouse gas (GHG) emissions reduction – an Emissions Reduction Plan (ERP). An ERP covers an entire portfolio of facilities, yet contains enough detail to be practically useful at the facility level.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of Resilience and Long-Term Planning in Power and Water Systems in the United States

There is recognition among power and water utilities that the frequency and magnitude of high consequence and low probability events could increase as a result of climate change. The interconnected nature of energy-water systems raises the possibility of cascading failures, increasing complexity and risks. Resilience and long-term planning are important ways of weathering the effects of climate change. First, to understand more about resilience, we reviewed existing literature on resilience definitions, metrics, and modeling, focusing on integrated water-power systems. Second, to understand how resilience and planning are being applied in practice, we interviewed utilities and organized, curated, and synthesized the interview data to arrive at several key findings, which are presented here. We found that there is not a consistent definition for resilience, yet it is something that utilities regularly plan for, often with different names and varying methods/measures. However, there is a tangible shift in the industry towards defining and determining measurable resilience metrics. While the exact metrics are a work in progress, utilities are taking steps forward by (1) putting people and culture at the center of resilience, (2) recognizing their own interdependencies, and (3) pursuing better cross-sector collaboration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Framework for Greenhouse Gas Emissions Reduction Planning: Building Portfolios

The goal of this Framework for greenhouse gas (GHG) emissions reduction planning (ERP) is to provide guidance to organizations seeking to reduce GHG emissions for their building portfolios and vehicle fleets. The process described in this framework helps organizations develop an actionable plan that prioritizes emissions reduction measures, identifies solutions, and lays out a phased pathway to achieve deep emissions reductions The plan aims to result in the achievement of Scope 1 and 2 GHG emissions reduction targets, in alignment with goals set within the U.S. Department of Energy’s (DOE’s) Better Climate Challenge, as well as longer term emissions reduction goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

National Aeronautics and Space Administration. 2003 Strategic Plan

As the 21st century begins to unfold, NASA will focus, with renewed vigor, on the challenges and opportunities before us and on developing the unique capabilities that strengthen America and address our national needs. Our Mission is driven by science, exploration, and discovery, and it will be carried out with a firm commitment to fiscal responsibility. We will study climate change and the natural and human-induced hazards to Earth's ecosystem. We will help to counter the threat of international terrorism by developing technologies that can improve the security and safety of our air transportation system. We will lead the world into a new understanding of our planet, our solar system, and the universe around us, and in so doing, we will begin to understand whether life may have developed elsewhere in the cosmos. This strategic plan lays out our hopes for the future and the important things we seek to accomplish for America. We are privileged to be entrusted with these pursuits and thrilled to be able to carry them out. We invite you to join us on this great adventure. Releasing this strategic plan with our 2004 budget request represents our new commitment to the integration of budget and performance reporting. In this way, we will ensure that strategic priorities are aligned with and influence budget priorities. Our new Integrated Budget and Performance Document, a companion volume to this strategic plan, expands on the goals and objectives presented here and identifies the specific long-term and annual performance measures for which we will be held accountable.

STRATEGIC PLANNING↗

Intelligent Tools for Planning Knowledge base Development and Verification

A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

errors↗

From hybrid systems to universal plans via domain compilation

While universal plans tell a system how to reach a goal regardless of what state it is in, such plans are typically too large to represent. Hybrid systems execute plans where each action is implemented to robustly produce effects if the world does not stray outside the action's control envelopes.

embedded real-time planning↗

Kennedy Space Center Florida Scrub-Jay Compensation Plan

Many organizations have interest in using NASA property on KSC. The purpose of this document is to consolidate the goals of ecosystem management associated with Florida Scrub-Jays and compliance with the Endangered Species Act (ESA) in order to streamline and reduce the costs of facility planning, impact assessment, and impact minimization. This will simplify the process and reduce regulatory uncertainty.However, the resulting process must be consistent with the Merritt Island National Wildlife Refuge (MINWR) Comprehensive Conservation Plan (CCP). In addition, this document considers anticipated construction impacts on KSC during the next 10 years and summarizes priorities in a spatially explicit manner. The document describes anticipated compensation requirements to facilitate restoration of degraded habitat in areas most important to the KSC Scrub-Jay population through resources provided to MINWR. The plan assumes that all construction on KSC is compensated on KSC.

Compensation Plan↗

Options for Parallelizing a Planning and Scheduling Algorithm

Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

parallel algorithms↗

Kennedy Space Center Five Year Sustainability Plan

The Federal Government is committed to following sustainable principles. At its heart, sustainability integrates environmental, societal and economic solutions for present needs without compromising the ability of future generations to meet their needs. Building upon its pledge towards environmental stewardship, the Administration generated a vision of sustainability spanning ten goals mandated within Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade. In November 2015, the National Aeronautics and Space Administration (NASA) responded to this EO by incorporating it into a new release of the NASA Strategic Sustainability Performance Plan (SSPP). The SSPP recognizes the importance of aligning environmental practices in a manner that preserves, enhances and strengthens NASA's ability to perform its mission indefinitely. The Kennedy Space Center (KSC) is following suit with KSC's Sustainability Plan (SP) by promoting, maintaining and pioneering green practices in all aspects of our mission. KSC's SP recognizes that the best sustainable solutions use an interdisciplinary, collaborative approach spanning civil servant and contractor personnel from across the Center. This approach relies on the participation of all employees to develop and implement sustainability endeavors connected with the following ten goals: Reduce greenhouse gas (GHG) emissions. Design, build and maintain sustainable buildings, facilities and infrastructure. Leverage clean and renewable energy. Increase water conservation. Improve fleet and vehicle efficiency and management. Purchase sustainable products and services. Minimize waste and prevent pollution. Implement performance contracts for Federal buildings. Manage electronic equipment and data centers responsibly. Pursue climate change resilience. The KSC SP details the strategies and actions that address the following objectives: Reduce Center costs. center dot Increase energy and water efficiencies. Promote smart buying practices. Increase reuse and recycling while decreasing waste. Benefit the community. Meet or exceed the EO and NASA SSPP sustainability goals.

Sustainability↗

EOS Terra Terra Constellation Exit/Future Maneuver Plans Update

This EOS Terra Constellation Exit/Future Maneuver Plans Update presentation will discuss brief history of Terra EOM work; lifetime fuel estimates; baseline vs. proposed plan origin; resultant exit orbit; baseline vs. proposed exit plan; long term orbit altitude; revised lifetime proposal and fallback options.

EOS Terra↗

Trajectory Planning for Mission Survivability of Autonomous Vehicles in Moderately to Extremely Uncertain Environments

Trajectory planning is a particularly challenging task for autonomous vehicles when the uncertainties in their operating environment cannot be characterized statistically. In this paper, we propose a receding horizon control strategy with novel trajectory planning policies that enable dynamic updating of the planned trajectories of autonomous vehicles operating in environments where potential conflicts are, from a statistical perspective, either partially known or completely unknown. The proposed policies utilize two metrics: (1) the number of feasible trajectories; and (2) the robustness of the feasible trajectories. We measure the effectiveness of the suggested policies in terms of mission survivability, which is defined as the probability that the primary mission is accomplished or, if that is not possible, the vehicle lands safely at an alternative site. We show that a linear combination of both metrics is an effective objective function when there is a mix of partially known and unknown uncertainties. When the operating environment is dominated by unknown disturbances, maximizing the number of feasible trajectories results in the highest mission survivability. These findings have significant implications for achieving safe aviation. autonomy.

Aviation autonomy↗

Trajectory Planning for Mission Survivability of Autonomous Vehicles in Moderately to Extremely Uncertain Environments

Trajectory planning is a particularly challenging task for autonomous vehicles when there are moderate to extreme uncertainties in their operating environment, i.e., where the trajectories of hazards are partially known to completely unknown. In this paper, we propose a receding horizon control strategy with novel trajectory planning policies that enable dynamic updating of the planned trajectories of autonomous vehicles. The proposed policies utilize two metrics: (1) the number of feasible trajectories; and (2) the robustness of the feasible trajectories. We measure the effectiveness of the suggested policies in terms of mission survivability, which is defined as the probability that the primary mission is accomplished or, if that is not possible, the vehicle lands safely at an alternative site. We show that a linear combination of both metrics is an effective objective function when there is a mix of partially known and unknown uncertainties. When the operating environment is dominated by unknown disturbances, maximizing the number of feasible trajectories results in the highest mission survivability. These findings have significant implications for achieving safe aviation autonomy.

aviation autonomy↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details.

Space Nuclear Propulsion↗