Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Legacy of Operational Space Medicine During the Space Shuttle Program

The Johnson Space Center s Medical Science Division branches were involved in preparing astronauts for space flight during the 30 year period of the Space Shuttle Program. These branches included the Flight Medicine Clinic, Medical Operations and the Behavioral Health Program. The components of each facet of these support services were: the Flight Medicine Clinic s medical selection process and medical care; the Medical Operations equipment, training, procedures and emergency medical services; and the Behavioral Health and Performance operations. Each presenter will discuss the evolution of its operations, implementations, lessons learned and recommendations for future vehicles and short duration space missions.

Stepaniakm, P.↗

Developments at the Advanced Design Technologies Testbed

A report presents background and historical information, as of August 1998, on the Advanced Design Technologies Testbed (ADTT) at Ames Research Center. The ADTT is characterized as an activity initiated to facilitate improvements in aerospace design processes; provide a proving ground for product-development methods and computational software and hardware; develop bridging methods, software, and hardware that can facilitate integrated solutions to design problems; and disseminate lessons learned to the aerospace and information technology communities.

VanDalsem, William R.↗

Cargo Commercial Orbital Transportation Services Environmental Control and Life Support Integration

The International Space Station s (ISS) largest crew and cargo resupply vehicle, the Space Shuttle, retired in 2011. To help augment ISS resupply and return capability, NASA announced a project to promote the development of Commercial Orbital Transportation Services (COTS) for the ISS in January of 2006. By December of 2008, NASA entered into space act agreements with SpaceX and Orbital Sciences Corporation for COTS development and ISS Commercial Resupply Services (CRS). The intent of CRS is to fly multiple resupply missions each year to ISS with SpaceX s Dragon vehicle providing resupply and return capabilities and Orbital Science Corporation s Cygnus vehicle providing resupply capability to ISS. The ISS program launched an integration effort to ensure that these new commercial vehicles met the requirements of the ISS vehicle and ISS program needs. The Environmental Control and Life Support System (ECLSS) requirements cover basic cargo vehicle needs including maintaining atmosphere, providing atmosphere circulation, and fire detection and suppression. The ISS-COTS integration effort brought unique challenges combining NASA s established processes and design knowledge with the commercial companies new initiatives and limited experience with human space flight. This paper will discuss the ISS ECLS COTS integration effort including challenges, successes, and lessons learned.

Duchesne, Stephanie↗

Investigation of Spiral Bevel Gear Condition Indicator Validation Via AC-29-2C Using Damage Progression Tests

This report documents the results of spiral bevel gear rig tests performed under a NASA Space Act Agreement with the Federal Aviation Administration (FAA) to support validation and demonstration of rotorcraft Health and Usage Monitoring Systems (HUMS) for maintenance credits via FAA Advisory Circular (AC) 29-2C, Section MG-15, Airworthiness Approval of Rotorcraft (HUMS) (Ref. 1). The overarching goal of this work was to determine a method to validate condition indicators in the lab that better represent their response to faults in the field. Using existing in-service helicopter HUMS flight data from faulted spiral bevel gears as a "Case Study," to better understand the differences between both systems, and the availability of the NASA Glenn Spiral Bevel Gear Fatigue Rig, a plan was put in place to design, fabricate and test comparable gear sets with comparable failure modes within the constraints of the test rig. The research objectives of the rig tests were to evaluate the capability of detecting gear surface pitting fatigue and other generated failure modes on spiral bevel gear teeth using gear condition indicators currently used in fielded HUMS. Nineteen final design gear sets were tested. Tables were generated for each test, summarizing the failure modes observed on the gear teeth for each test during each inspection interval and color coded based on damage mode per inspection photos. Gear condition indicators (CI) Figure of Merit 4 (FM4), Root Mean Square (RMS), +/- 1 Sideband Index (SI1) and +/- 3 Sideband Index (SI3) were plotted along with rig operational parameters. Statistical tables of the means and standard deviations were calculated within inspection intervals for each CI. As testing progressed, it became clear that certain condition indicators were more sensitive to a specific component and failure mode. These tests were clustered together for further analysis. Maintenance actions during testing were also documented. Correlation coefficients were calculated between each CI, component, damage state and torque. Results found test rig and gear design, type of fault and data acquisition can affect CI performance. Results found FM4, SI1 and SI3 can be used to detect macro pitting on two more gear or pinion teeth as long as it is detected prior to progressing to other components or transitioning to another failure mode. The sensitivity of RMS to system and operational conditions limit its reliability for systems that are not maintained at steady state. Failure modes that occurred due to scuffing or fretting were challenging to detect with current gear diagnostic tools, since the damage is distributed across all the gear and pinion teeth, smearing the impacting signatures typically used to differentiate between a healthy and damaged tooth contact. This is one of three final reports published on the results of this project. In the second report, damage modes experienced in the field will be mapped to the failure modes created in the test rig. The helicopter CI data will then be re-processed with the same analysis techniques applied to spiral bevel rig test data. In the third report, results from the rig and helicopter data analysis will be correlated. Observations, findings and lessons learned using sub-scale rig failure progression tests to validate helicopter gear condition indicators will be presented.

gears↗

A Comparison of the SOCIT and DebriSat Experiments

This paper explores the differences between, and shares the lessons learned from, two hypervelocity impact experiments critical to the update of Department of Defense (DOD) and National Aeronautics and Space Administration (NASA) satellite breakup models. The procedures as well as the processes of the fourth Satellite Orbital Debris Characterization Impact Test (SOCIT4) were analyzed and related to the ongoing DebriSat experiment. SOCIT4 accounted for about 90% of the entire satellite mass, but only analyzed approximately 59% with a total of approximately 4,700 fragments. DebriSat aims to recover and analyze 90% of the initial mass and to do so, fragments with at least a longest dimension of 2 mm are collected and processed. DebriSat's use of modern materials, especially carbon fiber, significantly increases the fragment count and to date, there are over 126,000 fragments collected. Challenges, such as procedures and human inputs, encountered throughout the DebriSat experiment are also shared. While, SOCIT4 laid the foundation for the majority of DebriSat processes, the technological advancements since SOCIT4 allow for more accurate, rigorous, and in-depth, procedures that will aid the update of satellite breakup models.

Ausay, E.↗

Aerobracking the ExoMars TGO: the JPL Navigation Experience

In October 2016, ESA’s Trace Gas Orbiter entered into orbit around Mars. The transfer from its initial 24-hour elliptical orbit into the final 2-hour science orbit was helped by means of 952 aerobraking passes between March 2017 and February 2018. For this first aerobraking operation by European Space Operations Centre (ESOC), a dedicated partnership was organized between ESOC and NASA’s Jet Propulsion Laboratory (JPL) to allow for JPL navigation team’s support during the TGO aerobraking operations. The Mission Design and Navigation section at JPL supported the mission by providing consulting in aerobraking navigation operations and independent orbit determination solutions during TGO’s aerobraking. This paper discusses the JPL Navigation team’s experience, challenges faced, and lessons learned during TGO’s aerobraking at Mars. Topics include the collaboration between the two navigation teams, configuration of orbit determination for aero drag passes, arrangement of automated orbit determination, and reporting processes.

Young, Brian↗

Lessons Learned from the Development and Implementation of the Atmosphere Resource Recovery and Environmental Monitoring Project

The Advanced Exploration Systems (AES) Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) Project have been developing atmosphere revitalization and environmental monitoring subsystem architectures suitable for enabling sustained crewed exploration missions beyond low Earth orbit (LEO). Using the International Space Station state-of-the-art (SOA) as the technical basis, the ARREM Project has contributed to technical advances that improve affordability, reliability, and functional efficiency while reducing dependence on a ground-based logistics resupply model. Functional demonstrations have merged new process technologies and concepts with existing ISS developmental hardware and operate them in a controlled environment simulating various crew metabolic loads. The ARREM Project's strengths include access to a full complement of existing developmental hardware that perform all the core atmosphere revitalization functions, unique testing facilities to evaluate subsystem performance, and a coordinated partnering effort among six NASA field centers and industry partners to provide the innovative expertise necessary to succeed. A project overview is provided and the project management strategies that have enabled a multidiscipinary engineering team to work efficiently across project, NASA field center, and industry boundaries to achieve the project's technical goals are discussed. Lessons learned and best practices relating to the project are presented and discussed.

Roman, Monsi C.↗

Lessons Learned During Solutions of Multidisciplinary Design Optimization Problems

Optimization research at NASA Glenn Research Center has addressed the design of structures, aircraft and airbreathing propulsion engines. During solution of the multidisciplinary problems several issues were encountered. This paper lists four issues and discusses the strategies adapted for their resolution: (1) The optimization process can lead to an inefficient local solution. This deficiency was encountered during design of an engine component. The limitation was overcome through an augmentation of animation into optimization. (2) Optimum solutions obtained were infeasible for aircraft and air-breathing propulsion engine problems. Alleviation of this deficiency required a cascading of multiple algorithms. (3) Profile optimization of a beam produced an irregular shape. Engineering intuition restored the regular shape for the beam. (4) The solution obtained for a cylindrical shell by a subproblem strategy converged to a design that can be difficult to manufacture. Resolution of this issue remains a challenge. The issues and resolutions are illustrated through six problems: (1) design of an engine component, (2) synthesis of a subsonic aircraft, (3) operation optimization of a supersonic engine, (4) design of a wave-rotor-topping device, (5) profile optimization of a cantilever beam, and (6) design of a cvlindrical shell. The combined effort of designers and researchers can bring the optimization method from academia to industry.

Patnaik, Suna N.↗

Using Systems Theoretic Process Analysis and Causal Analysis to Map and Manage Organizational Information to Enable Digitalization and Information Automation

The overarching goal of this Light Water Reactor Sustainability Program–supported research and development project is to provide planning tools and comprehensive guidance to utilities considering or undertaking full nuclear plant modernization. The results of this research will provide the nuclear industry with a comprehensive and usable solution, including guidance, lessons learned, methods, and planning tools. This research is currently working to provide guidance on digitalization and information automation to enable the evolution of data to information, insight, and action—thereby allowing utilities to operate safely and cost-competitively with all other electrical generation sources. Light Water Reactor Sustainability Program researchers have also recently started investigating how human and technology integration principles, information automation, and digitalization enable data evolution. These researchers are currently in the process of validating the use of System-Theoretic Process Analysis to define high-level safety constraints in the United States Nuclear Regulatory Commission’s problem identification and resolution process (i.e., a plant compliance information gathering activity). The next step in this research, which is described in the following sections of this report, is to map out data evolution in a use case to identify inefficiencies in another aspect of plant compliance information gathering and communication activities—event investigations and root cause analyses.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Challenges and Opportunities for Ensuring Entry System Technology Readiness for Ice Giants Probe Missions

The Ice Giants represent a distinct class of planets within our solar system, and appear to be similar to most exoplanets that have been detected thus far. Exploring Ice Giants in our Solar System would allow us to better understand their formation and evolution processes, and thus help establish scientific links to exoplanets. In situ exploration using probes similar to Galileo, along with an orbiter or a relay spacecraft, will require entry followed by deployment of the descent probe containing science instruments into Uranus or Neptune atmosphere. The challenge is not in the deployment of the probe, but in the atmospheric entry prior to deployment. The entry system has to have a capable, robust and efficient ablative thermal protection system (TPS) designed to protect the descent probe from the thermal and mechanical entry loads. Although entries into Ice Giants may not be as demanding as the Galileo entry at Jupiter, the entry environments will be more severe than environments for Mars, Sample Return missions, and Venus, and will therefore require robust TPS. While Galileo Probe’s success, nearly 25 years ago, should give us confidence, the recession data from the Galileo entry informs us that the entry environment was under-predicted and the design thickness was barely adequate. The lesson learned from the Galileo probe for future Ice Giant missions will require us to be cautious and demand a more robust design. The TPS technology used on the Galileo entry system no longer exists due to atrophy of manufacturing processes. Instead of attempting to revive Galileo-legacy TPS technology, NASA invested in a new and innovative TPS called HEEET (Heat-shield for Extreme Entry Environment Technology). HEEET has been matured, and is now ready to support future missions not only to the Ice Giants but also for Venus, high-speed sample return, and Saturn probe missions. This lead talk, intended for the technology section of the workshop, will cover entry, descent, and deployment (EDD), with an emphasis on entry. A brief history of the TPS challenges for extreme entry missions will be given, along with a quick overview of the concept of operations for EDD. The development and maturation of HEEET system capability will be described. Data gathered in ground-test facilities in the US will be highlighted to show that the technology is mature and ready for Ice Giant missions. All thermal protection systems carry some risk as a result of ground test limitations and Ice Giant missions present some unique challenges. These challenges are not only technical, but also due to limitations in the currently established manufacturing and integration. In addition, the concerns that arise due to the potential for atrophy for future Ice Giant missions a decade or more from now will be analyzed. Plausible avenues for mitigation will be presented. There are two planned companion presentations by Dr. Prabhu and Dr. Hwang that will dive deeper into the challenges and opportunities. This intended talk will set the stage for their presentations.

Venkatapathy, Ethiraj↗

SCOS 2: An object oriented software development approach

The Spacecraft Control and Operations System 2 (SCOS 2), is intended to provide the generic mission control system infrastructure for future ESA missions. It represents a bold step forward in order to take advantage of state-of-the-art technology and current practices in the area of software engineering. Key features include: (1) use of object oriented analysis and design techniques; (2) use of UNIX, C++ and a distributed architecture as the enabling implementation technology; (3) goal of re-use for development, maintenance and mission specific software implementation; and (4) introduction of the concept of a spacecraft control model. This paper touches upon some of the traditional beliefs surrounding Object Oriented development and describes their relevance to SCOS 2. It gives rationale for why particular approaches were adopted and others not, and describes the impact of these decisions. The development approach followed is discussed, highlighting the evolutionary nature of the overall process and the iterative nature of the various tasks carried out. The emphasis of this paper is on the process of the development with the following being covered: (1) the three phases of the SCOS 2 project - prototyping & analysis, design & implementation and configuration / delivery of mission specific systems; (2) the close cooperation and continual interaction with the users during the development; (3) the management approach - the split between client staff, industry and some of the required project management activities; (4) the lifecycle adopted being an enhancement of the ESA PSS-05 standard with SCOS 2 specific activities and approaches defined; and (5) an examination of some of the difficulties encountered and the solutions adopted. Finally, the lessons learned from the SCOS 2 experience are highlighted, identifying those issues to be used as feedback into future developments of this nature. This paper does not intend to describe the finished product and its operation, but focusing on the journey to arrive there, concentrating therefore on the process and not the products of the SCOS 2 software development.

Symonds, Martin↗

The Apollo Experience Lessons Learned for Constellation Lunar Dust Management

Lunar dust will present significant challenges to NASA's Lunar Exploration Missions. The challenges can be overcome by using best practices in system engineering design. For successful lunar surface missions, all systems that come into contact with lunar dust must consider the effects throughout the entire design process. Interfaces between all these systems with other systems also must be considered. Incorporating dust management into Concept of Operations and Requirements development are the best place to begin to mitigate the risks presented by lunar dust. However, that is only the beginning. To be successful, every person who works on NASA's Constellation lunar missions must be mindful of this problem. Success will also require fiscal responsibility. NASA must learn from Apollo the root cause of problems caused by dust, and then find the most cost-effective solutions to address each challenge. This will require a combination of common sense existing technologies and promising, innovative technical solutions

Wagner, Sandra↗

Crowdsourcing Global Perspectives in Ecology Using Social Media

Transparent, open, and reproducible research is still far from routine, and the full potential of open science has not yet been realized. Crowdsourcing–defined as the usage of a flexible open call to a heterogeneous group of individuals to recruit volunteers for a task –is an emerging scientific model that encourages larger and more outwardly transparent collaborations. While crowdsourcing, particularly through citizen- or community-based science, has been increasing over the last decade in ecological research, it remains infrequently used as a means of generating scientific knowledge in comparison to more traditional approaches. We explored a new implementation of crowdsourcing by using an open call on social media to assess its utility to address fundamental ecological questions. We specifically focused on pervasive challenges in predicting, mitigating, and understanding the consequences of disturbances. In this paper, we briefly review open science concepts and their benefits, and then focus on the new methods we used to generate a scientific publication. We share our approach, lessons learned, and potential pathways forward for expanding open science. Our model is based on the beliefs that social media can be a powerful tool for idea generation and that open collaborative writing processes can enhance scientific outcomes. We structured the project in five phases: (1) draft idea generation, (2) leadership team recruitment and project development, (3) open collaborator recruitment via social media, (4) iterative paper development, and (5) final editing, authorship assignment, and submission by the leadership team. We observed benefits including: facilitating connections between unusual networks of scientists, providing opportunities for early career and underrepresented groups of scientists, and rapid knowledge exchange that generated multidisciplinary ideas. We also identified areas for improvement, highlighting biases in the individuals that self-selected participation and acknowledging remaining barriers to contributing new or incompletely formed ideas into a public document. While shifting scientific paradigms to completely open science is a long-term process, our hope in publishing this work is to encourage others to build upon and improve our efforts in new and creative ways.

54 ENVIRONMENTAL SCIENCES↗

MSFC Skylab experimenter's reference

The methods and techniques for experiment development and integration that evolved during the Skylab Program are described to facilitate transferring this experience to experimenters in future manned space programs. Management responsibilities and the sequential process of experiment evolution from initial concept through definition, development, integration, operation and postflight analysis are outlined in the main text and amplified, as appropriate, in appendixes. Emphasis is placed on specific lessons learned on Skylab that are worthy of consideration by future programs.

Source record↗

GEOTAIL Spacecraft historical data report

The purpose of this GEOTAIL Historical Report is to document ground processing operations information gathered on the GEOTAIL mission during processing activities at the Cape Canaveral Air Force Station (CCAFS). It is hoped that this report may aid management analysis, improve integration processing and forecasting of processing trends, and reduce real-time schedule changes. The GEOTAIL payload is the third Delta 2 Expendable Launch Vehicle (ELV) mission to document historical data. Comparisons of planned versus as-run schedule information are displayed. Information will generally fall into the following categories: (1) payload stay times (payload processing facility/hazardous processing facility/launch complex-17A); (2) payload processing times (planned, actual); (3) schedule delays; (4) integrated test times (experiments/launch vehicle); (5) unique customer support requirements; (6) modifications performed at facilities; (7) other appropriate information (Appendices A & B); and (8) lessons learned (reference Appendix C).

Boersig, George R.↗

Implementations of Sensor Webs Utilizing Uninhabited Aerial Systems

In this paper we describe the web services, processes, communication protocols and ad-hoc service chains utilized in the late summer and early fall 2007 Ikhana UAS response to the wildfires burning in southern California. Additionally, we describe the lessons learned that will be applied to the upcoming Global Hawk UAS Aura Satellite Validation Experiment planned for early 2009.

Sullivan, Donald V.↗

Space Shuttle Software Development and Certification

Man-rated software, "software which is in control of systems and environments upon which human life is critically dependent," must be highly reliable. The Space Shuttle Primary Avionics Software System is an excellent example of such a software system. Lessons learn from more than 20 years of effort have identified basic elements that must be present to achieve this high degree of reliability. The elements include rigorous application of appropriate software development processes, use of trusted tools to support those processes, quantitative process management, and defect elimination and prevention. This presentation highlights methods used within the Space Shuttle project and raises questions that must be addressed to provide similar success in a cost effective manner on future long-term projects where key application development tools are COTS rather than internally developed custom application development tools

Orr, James K.↗

Evolution of Software-Only-Simulation at NASA IV and V

Software-Only-Simulations have been an emerging but quickly developing field of study throughout NASA. The NASA Independent Verification Validation (IVV) Independent Test Capability (ITC) team has been rapidly building a collection of simulators for a wide range of NASA missions. ITC specializes in full end-to-end simulations that enable developers, VV personnel, and operators to test-as-you-fly. In four years, the team has delivered a wide variety of spacecraft simulations that have ranged from low complexity science missions such as the Global Precipitation Management (GPM) satellite and the Deep Space Climate Observatory (DSCOVR), to the extremely complex missions such as the James Webb Space Telescope (JWST) and Space Launch System (SLS).This paper describes the evolution of ITCs technologies and processes that have been utilized to design, implement, and deploy end-to-end simulation environments for various NASA missions. A comparison of mission simulators are discussed with focus on technology and lessons learned in complexity, hardware modeling, and continuous integration. The paper also describes the methods for executing the missions unmodified flight software binaries (not cross-compiled) for verification and validation activities.

Embedded↗