Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Crew Activity Report / Flight Day 7

The Atlantis Space Shuttle crew (Mission Commander James D. Halsell, Jr., Pilot Scott J. Horowitz, Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev) completed several activities including: (1) installation of final battery in the International Space Station; (2) installation of new storage compartments behind panels in the Zarya module; (3) installation of a new Radio Telemetry System; (4) firing of Atlantis steering jets to perform the second part of three-day maneuver to raise the station's altitude; and (5) transferring more than a ton of gear to the station to await use by the first resident crew.

Source record↗

Comparison of CFD Predictions of the TCA Baseline

The computational fluid dynamics (CFD) comparisons being presented are compared to each other and to wind tunnel (WT) data on the baseline TCA. Some of the CFD computations were done prior to the tests and others later. Only force data (CL vs CD) from CFD will be presented as part of this report. The WT data presented comes from the testing of the baseline TCA in the Langley Unitary Plan Wind Tunnel (UPWT), Test Section #2. There are 2 sets of wind tunnel data being presented: one from test 1671 of model 2a (flapped wing) and the other from test 1679 of model 2b (solid wing). Most of the plots show only one run from each of the WT tests per configuration. But many repeat runs were taken during the tests. The WT repeat runs showed an uncertainty in the drag of +/- 0.5 count. There were times when the uncertainty in drag was better, +/- 0.25 count. Test 1671 data was of forces and pressures measured from model 2a. The wing had cutouts for installing various leading and trailing edge flaps at lower Mach numbers. The internal duct of the nacelles are not designed and fabricated as defined in the outer mold lines (OML) iges file. The internal duct was fabricated such that a linear transition occurs from the inlet to exhaust. Whereas, the iges definition has a constant area internal duct that quickly transitions from the inlet to exhaust cross sectional shape. The nacelle internal duct was fabricated, the way described, to save time and money. The variation in the cross sectional area is less than 1% from the iges definition. The nacelles were also installed with and without fairings. Fairings are defined as the build up of the nacelles on the upper wing surface so that the nacelles poke through the upper surface as defined in the OML iges file. Test 1679 data was of forces measured from model 2a and 2b. The wing for model 2b was a solid wing. The nacelles were built the same way as for model 2a, except for the nacelle base pressure installation. The nacelles were only tested with the fairings for model 2a and 2b during test 1679.

Cappuccio, Gelsomina↗

Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew T.↗

Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew↗

Flight Investigation of the Effects of Pressure-Belt Tubing Size on Measured Pressure Distributions

The pressure-belt technique is commonly used to measure pressure distributions on lifting and nonlifting surfaces where flush, through-the-surface measurements are not possible. The belts, made from strips of small-bore, flexible plastic tubing, are surface-mounted by a simple, nondestructive method. Additionally, the belts require minimal installation time, thus making them much less costly to install than flush-mounted pressure ports. Although pressure belts have been used in flight research since the early 1950s, only recently have manufacturers begun to produce thinner, more flexible tubing, and thin, strong adhesive tapes that minimize the installation-induced errors on the measurement of surface pressures. The objective of this investigation was to determine the effects of pressure-belt tubing size on the measurement of pressure distributions. For that purpose, two pressure belts were mounted on the right wing of a single-engine, propeller-driven research airplane. The outboard pressure belt served as a baseline for the measurement and the comparison of effects. Each tube had an outer diameter (OD) of 0.0625 in. The inboard belt was used to evaluate three different tube sizes: 0.0625-, 0.1250-, and 0.1875-in. OD. A computational investigation of tube size on pressure distribution also was conducted using the two-dimensional Multielement Streamtube Euler Solver (MSES) code.

Rivers, Natale A.↗

Helmet-Mounted Display Research Capabilities of the NASA/Army Rotorcraft Aircrew Systems Concepts Airborne Laboratory (RASCAL)

The Rotorcraft Aircrew Systems Concepts Airborne Laboratory (RASCAL) is a UH-60A Black Hawk helicopter that is being modified by the US Army and NASA for flight systems research. The principal systems that are being installed in the aircraft are a Helmet Mounted Display (HMD) and imaging system, and a programmable full authority Research Flight Control System (RFCS). In addition, comprehensive instrumentation of both the rigid body of the helicopter and the rotor system is provided. The paper will describe the capabilities of these systems and their current state of development. A brief description of initial research applications is included. The wide (40 X 60 degree) field-of-view HMD system has been provided by Kaiser Electronics. It can be configured as a monochromatic system for use in bright daylight conditions, a two color system for darker ambients, or a full color system for use in night viewing conditions. Color imagery is achieved using field sequential video and a mechanical color wheel. In addition to the color symbology, high resolution computer-gene rated imagery from an onboard Silicon Graphics Reality Engine Onyx processor is available for research in virtual reality applications. This synthetic imagery can also be merged with real world video from a variety of imaging systems that can be installed easily on the front of the helicopter. These sensors include infrared or tv cameras, or potentially small millimeter wave radars. The Research Flight Control System is being developed for the aircraft by a team of contractors led by Boeing Helicopters. It consists of a full authority high bandwidth fly-by-wire actuators that drive the main rotor swashplate actuators and the tail rotor actuator in parallel. This arrangement allows the basic mechanical flight control system of the Black Hawk to be retained so that the safety pilot can monitor the operation of the system through the action of his own controls. The evaluation pilot will signal the fly-by-wire actuators through the flight computer from electrical sidearm controllers located in the right hand cockpit. The system will have very substantial input/output capacity and impressive computational power. These systems are installed in the aircraft using predominantly a MIL-STD 1553B data bus architecture. Sensor data from the RFCS, the basic aircraft and rotor system instrumentation including navigation information, and the HMD system are easily exchanged among user systems, or are available at the systems operator station located in the cabin for real time monitoring or data recording.

Jacobsen, R. A.↗

STS-109 Crew Interviews - Altman

STS-109 crew Commander Scott D. Altman is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goals and significance, which are all related to maintenance of the Hubble Space Telescope (HST). After the Columbia Orbiter's rendezvous with the HST, extravehicular activities (EVA) will be focused on several important tasks which include: (1) installing the Advanced Camera for Surveys; (2) installing a cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer); (3) repairing the reaction wheel assembly; (4) installing additional solar arrays; (5) augmenting the power control unit; (6) working on the HST's gyros. The reaction wheel assembly task, a late addition to the mission, may necessitate the abandonment of one or more of the other tasks, such as the gyro work.

Source record↗

STS-109 Flight Day 7 Highlights

The Hubble Space Telescope (HST) is seen on its berthing platform on the rear of the cargo bay of the Columbia Orbiter. Additional footage shows the port solar array of the HST as well as the area where the new thermal blanket was installed. Mission Specialists James Newman and Michael J. Massimino are performing their spacewalk. The footage includes Newman unbolting and sliding out the Faint Object Camera, moving it into storage, then lifting the Advanced Camera for Surveys (ACS) out of the cargo bay, and Massimino installing the ACS. The second stage of their spacewalk shows Newman retrieving the Electronic Support Module out of the cargo bay, and assisting Massimino as he installs the module and its connectors in front of the ACS. As they return to Columbia, additional members of the crew are seen preparing spacesuits for the following day's spacewalk and cleaning the seals on the airlock. The video concludes with Pilot Duane G. Carey interviewing Massimino about his spacewalk using internet questions from school children.

Source record↗

Vacuum Ultraviolet Radiation and Atomic Oxygen Durability Evaluation of HST Bi-Stem Thermal Shield Materials

Bellows-type thermal shields were used on the bi-stems of replacement solar arrays installed on the Hubble Space Telescope (HST) during the first HST servicing mission (SMI) in December 1993. These thermal shields helped reduce the problem of thermal gradient- induced jitter observed with the original HST solar arrays during orbital thermal cycling and have been in use on HST for eight years. This paper describes ground testing of the candidate solar array bi-stem thermal shield materials including backside aluminized Teflon(R)FEP (fluorinated ethylene propylene) with and without atomic oxygen (AO) and ultraviolet radiation protective surface coatings for durability to AO and combined AO and vacuum ultraviolet (VOV) radiation. NASA Glenn Research Center (GRC) conducted VUV and AO exposures of samples of candidate thermal shield materials at HST operational temperatures and pre- and post-exposure analyses as part of an overall program coordinated by NASA Goddard Space Flight Center (GSFC) to determine the on-orbit durability of these materials. Coating adhesion problems were observed for samples having the AO- and combined AO/UV-protective coatings. Coating lamination occurred with rapid thermal cycling testing which simulated orbital thermal cycling. This lack of adhesion caused production of coating flakes from the material that would have posed a serious risk to HST optics if the coated materials were used for the bi-stem thermal shields. No serious degradation was observed for the uncoated aluminized Teflon(R) as evaluated by optical microscopy, although atomic force microscopy (AFM) microhardness testing revealed that an embrittled surface layer formed on the uncoated Teflon(R) surface due to vacuum ultraviolet radiation exposure. This embrittled layer was not completely removed by AO erosion, No cracks or particle flakes were produced for the embrittled uncoated material upon exposure to VUV and AO at operational temperatures to an equivalent exposure of approximately five years in the HST environment. Uncoated aluminized FEP Teflon(R) was determined to be the most appropriate thermal shield material and was used on the bi-stems of replacement solar arrays installed on HST during SMI in December 1993. The SMI -installed solar arrays air scheduled to be replaced during MST's fourth servicing mission (SM3B) in early 2002.

Dever, Joyce↗

REACH: Real-Time Data Awareness in Multi-Spacecraft Missions

Missions have been proposed that will use multiple spacecraft to perform scientific or commercial tasks. Indeed, in the commercial world, some spacecraft constellations already exist. Aside from the technical challenges of constructing and flying these missions, there is also the financial challenge presented by the tradition model of the flight operations team (FOT) when it is applied to a constellation mission. Proposed constellation missions range in size from three spacecraft to more than 50. If the current ratio of three-to-five FOT personnel per spacecraft is maintained, the size of the FOT becomes cost prohibitive. The Advanced Architectures and Automation Branch at the Goddard Space Flight Center (GSFC Code 588) saw the potential to reduce the cost of these missions by creating new user interfaces to the ground system health-and-safety data. The goal is to enable a smaller FOT to remain aware and responsive to the increased amount of ground system information in a multi-spacecraft environment. Rather than abandon the tried and true, these interfaces were developed to run alongside existing ground system software to provide additional support to the FOT. These new user interfaces have been combined in a tool called REACH. REACH-the Real-time Evaluation and Analysis of Consolidated Health-is a software product that uses advanced visualization techniques to make spacecraft anomalies easy to spot, no matter how many spacecraft are in the constellation. REACH reads a real-time stream of data from the ground system and displays it to the FOT such that anomalies are easy to pick out and investigate. Data visualization has been used in ground system operations for many years. To provide a unique visualization tool, we developed a unique source of data to visualize: the REACH Health Model Engine. The Health Model Engine is rule-based software that receives real-time telemetry information and outputs "health" information related to the subsystems and spacecraft that the telemetry belong to. The Health Engine can run out-of-the-box or can be tailored with a scripting language. Out of the box, it uses limit violations to determine the health of subsystems and spacecraft; when tailored, it determines health using equations combining the values and limits of any telemetry in the spacecraft. The REACH visualizations then "roll up" the information from the Health Engine into high level, summary displays. These summary visualizations can be "zoomed" into for increasing levels of detail. Currently REACH is installed in the Small Explorer (SMEX) lab at GSFC, and is monitoring three of their five spacecraft. We are scheduled to install REACH in the Mid-sized Explorer (MIDEX) lab, which will allow us to monitor up to six more spacecraft. The process of installing and using our "research" software in an operational environment has provided many insights into which parts of REACH are a step forward and which of our ideas are missteps. Our paper explores both the new concepts in spacecraft health-and-safety visualization, the difficulties of such systems in the operational environment, and the cost and safety issues of multi-spacecraft missions.

Maks, Lori↗

Optimal Micro-Scale Secondary Flow Control for the Management of High Cycle Fatigue and Distortion in Compact Inlet Diffusers

The purpose of this study on micro-scale secondary flow control (MSFC) is to study the aerodynamic behavior of micro-vane effectors through their factor (i.e., the design variable) interactions and to demonstrate how these statistical interactions, when brought together in an optimal manner, determine design robustness. The term micro-scale indicates the vane effectors are small in comparison to the local boundary layer height. Robustness in this situation means that it is possible to design fixed MSFC robust installation (i.e.. open loop) which operates well over the range of mission variables and is only marginally different from adaptive (i.e., closed loop) installation design, which would require a control system. The inherent robustness of MSFC micro-vane effector installation designs comes about because of their natural aerodynamic characteristics and the manner in which these characteristics are brought together in an optimal manner through a structured Response Surface Methodology design process.

Anderson, Bernhard H.↗

STS-112 Crew Interviews: Sellers

Piers Sellers is an Astronaut from Crowborough, UK. His Bachelor of Science degree is in Ecological science from Scotland's University of Edinburgh and his doctorate is in biometeorology from Leeds University in the UK. After two years of intense training, Sellers's first assignment as a Mission Specialist is on Flight 111 STS-112. The goal of this flight is to continue building the International Space Station. Sellers, accompanied by five astronauts, will install the S1 truss of the space station which will take three EVA's, or Extra Vehicular Activities to complete. In EVA 1, the highest priority, the S1 truss will be attached to the space station. EVA 2, the electrical work, will set up the radiator and cooling equipment for the station. EVA 3, the final process of the flight, will prepare the station for the next mission. The primary reason for installing the truss is to change the center of gravity of the station so when the next truss is installed, it will be at a symmetrical point.

Source record↗

STS-112 Crew Interviews: Yurchikhin

A preflight interview with mission specialist Fyodor Yurchikhin is presented. He worked for a long time in Energia in the Russian Mission Control Center (MCC). Yurchikhin discusses the main goal of the STS-112 flight, which is to install the Integrated Truss Assembly S1 (Starboard Side Thermal Radiator Truss) on the International Space Station. He also talks about the three space walks required to install the S1. After the installation of S1, work with the bolts and cameras are performed. Yurchikhin is involved in working with nitrogen and ammonia jumpers. He expresses the complexity of his work, but says that he and the other crew members are ready for the challenge.

Source record↗

STS-110 Flight Day 6 Highlights

On the sixth day of the STS-110 mission, Mission Specialists Jerry Ross and Lee Morin are seen in the second extravehicular activity (EVA) of this mission to the International Space Station (ISS). The video opens with the two astronauts preparing for the EVA, which will be Ross' eighth, thereby making him the most experienced space-walker in history. This pair of astronauts has been dubbed the Silver Team, largely because they both have grandchildren. As Ross and Morin prepare for the EVA by breathing pure oxygen and experiencing reduced pressure, Mission Specialist Ellen Ochoa maneuvers the robotic arm towards the hatch of the Space Shuttle Atlantis. There is video footage of the astronauts exiting the hatch and preparing their tools and work areas. During this EVA the astronauts will install two tripod-like struts, which will serve as structural attachments between the S-0 truss segment and the Destiny Laboratory Module. While the construction takes place, helmet mounted cameras on the spacesuits provide live video of the astronauts at work, most often using a pistol grip tool used as an electric ratcheting-type drill to loosen and tighten bolts. Following the installation of the struts, Ross and Morin remove the draglinks and keelpins that had functioned to hold the S0 truss structure securely in Atlantis' payload bay during the launch sequence of the mission. They move these to temporary storage positions, bolted on the outside of the ISS. They then install an umbilical system that will provide power to the Mobile Transporter (MT).

Source record↗

STS-111 Flight Day 5 Highlights

On Flight Day 5 of STS-111, the crew of Endeavour (Kenneth Cockrell, Commander; Paul Lockhart, Pilot; Franklin Chang-Diaz, Mission Specialist; Philippe Perrin, Mission Specialist) and the Expedition 5 crew (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer) and Expedition 4 crew (Yury Onufrienko, Commander; Daniel Bursch, Flight Engineer; Carl Walz, Flight Engineer) are aboard the docked Endeavour and International Space Station (ISS). The ISS cameras show the station in orbit above the North African coast and the Mediterranean Sea, as Chang-Diaz and Perrin prepare for an EVA (extravehicular activity). The Canadarm 2 robotic arm is shown in motion in a wide-angle shot. The Quest Airlock is shown as it opens to allow the astronauts to exit the station. As orbital sunrise approaches, the astronauts are shown already engaged in their EVA activities. Chang-Diaz is shown removing the PDGF (Power and Data Grapple Fixture) from Endeavour's payload bay as Perrin prepares its installation position in the ISS's P6 truss structure; The MPLM is also visible. Following the successful detachment of the PDGF, Chang-Diaz carries it to the installation site as he is transported there by the robotic arm. The astronauts are then shown installing the PDGF, with video provided by helmet-mounted cameras. Following this task, the astronauts are shown preparing the MBS (Mobile Base System) for grappling by the robotic arm. It will be mounted to the Mobile Transporter (MT), which will traverse a railroad-like system along the truss structures of the ISS, and support astronaut activities as well as provide an eventual mobile base for the robotic arm.

Source record↗

STS-109 Mission Highlights Resource Tape: Flight Days 4 & 5 - Part 2 of 4

This video, Part 2 of 4, shows the activities of the STS-109 crew (Scott Altman, Commander; Duane Carey, Pilot; John Grunsfeld, Payload Commander; Nancy Currie, James Newman, Richard Linnehan, Michael Massimino, Mission Specialists) during flight days 4 and 5. The activities from other flights days can be seen on 'STS-109 Mission Highlights Resource Tape' Part 1 of 4 (internal ID 2002139471), 'STS-109 Mission Highlights Resource Tape' Part 3 of 4 (internal ID 2002139476), and 'STS-109 Mission Highlights Resource Tape' Part 4 of 4 (internal ID 2002137577). The primary activities during these days were EVAs (extravehicular activities) to replace two solar arrays on the HST (Hubble Space Telescope). Footage from flight day 4 records an EVA by Grunsfeld and Linnehan, including their exit from Columbia's payload bay airlock, their stowing of the old HST starboard rigid array on the rigid array carrier in Columbia's payload bay, their attachment of the new array on HST, the installation of a new starboard diode box, and the unfolding of the new array. The pistol grip space tool used to fasten the old array in its new location is shown in use. The video also includes several shots of the HST with Earth in the background. On flight day 5 Newman and Massimino conduct an EVA to change the port side array and diode box on HST. This EVA is very similar to the one on flight day 4, and is covered similarly in the video. A hand operated ratchet is shown in use. In addition to a repeat of the previous tasks, the astronauts change HST's reaction wheel assembly, and because they are ahead of schedule, install installation and lubricate an instrument door on the telescope. The Earth views include a view of Egypt and Israel, with the Nile River, Red Sea, and Mediterranean Sea.

Source record↗

Flat Wire

The N.Y. State Urban Development Corp., Amp Inc., and Western Electric Corp. are working with NASA to produce flat conductor electrical cable. Flat conductor electrical cable originally designed for spacecraft by the Marshall Space Flight Center, has been installed in a housing project. Because it is very thin the wire can be mounted on surfaces of walls and floors instead of inside of them. Installation costs reduced significantly due to single installation time.

Source record↗

STS-114 Crew Interviews Eileen Collins, CDR

Commander Eileen Collins of the STS-114 space mission is seen during a pre-launch interview. She answers questions about the primary goals of the mission which are to exchange the expedition six and expedition seven crews. Also, she says that a large amount of logistics will be taken up to the International Space Station. The primary payload on this mission include: 1) The Utilization and Logistics Flight-1 (ULF-1); 2) Raffaello Multi-Purpose Logistics Module (MPLM); and 3) External Stowage Platform (ESP-2) which are all explained in detail by the Commander. The Window Observational Research Facility (WORF) rack, Human Research Facility (HRF) rack, Minus Eighty Degree Laboratory Freezer (MELF) and EXPRESS rack are the Space Station equipment to be installed on the International Space Station (I.S.S.). Collins is the Intravehicular Activity (IVA) specialist for this mission who oversees the three Extravehicular Activity (EVA)'s performed by Mission Specialists Soichi Noguchi and Stephen Robinson. The three EVA's include an external camera installation, positioning devices for an ammonia system and the installation of Floating Potential Measuring Unit (FPMU). Commander Collins expresses that she wants to have a successful mission, and also wants to see the Earth from space.

Source record↗