Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “correctness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102). The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in their respective CRs. The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b). The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) and its ensuing ROTC (DOE/EMNV, 2018), and the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The Plan is implemented by the Environmental Program Services (EPS) contractor. Implementation of the Plan provides data to complete corrective actions prescribed by the FFACO to protect the public from groundwater contaminated by historical underground nuclear testing. The Plan’s scope comprises sample collection and analysis requirements for assessing the extent of groundwater contamination from underground nuclear testing. Sampling wells located in the communities surrounding the Nevada National Security Site (NNSS) is performed by other organizations (e.g., management and operating [M&O] contractor) and is therefore not included within the Plan. The results of the community sampling are presented in the annual NNSS environmental reports.

54 ENVIRONMENTAL SCIENCES↗

CY2020 Annual Closure Monitoring Report for Corrective Action Unit 98: Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2020–December 2020, Revision 1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in calendar year (CY) 2020 by the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity at Corrective Action Unit (CAU) 98, Frenchman Flat (FF), at the Nevada National Security Site (NNSS), Nevada (Figure 1-1). This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates [FDs]); and verification of use restrictions (URs), institutional controls, and water use. Groundwater samples were collected; water levels were measured; and well site surveillance was conducted in support of the Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada (NNSA/NFO, 2016) and its ensuing Records of Technical Change (ROTCs).

54 ENVIRONMENTAL SCIENCES↗

Coulomb phase corrections to the transverse analyzing power AN(t) in high energy forward proton-proton scattering

Study of the polarized proton-proton elastic scattering in the Coulomb Nuclear interference region allows one to measure forward hadronic spin-flip amplitude including the phase. However, in a precision experimental data analysis, a phase shift correction δC due to the long distance Coulomb interaction should be taken into account. For the unpolarized scattering, δC is commonly considered as well established. Here, we evaluate the Coulomb phase shifts for the spin-flip electromagnetic and hadronic amplitudes. The difference between spin-flip and non-flip Coulomb phase shifts was found to be negligible for current experimental accuracy in the high energy transverse spin elastic pp measurements. However, effective alteration of the hadronic spin-flip amplitude by the long distance electromagnetic corrections can be noticeable.

43 PARTICLE ACCELERATORS↗

A Procedure to Correct the Historical Atmospheric Longwave Irradiance Data When the World Reference Is Established with Respect to the International System of Units

Historical and traceable atmospheric longwave irradiance data sets with traceability to the International System of units (SI) are essential for renewable energy and atmospheric science research and applications. To date, all pyrgeometers used to measure the irradiance are traceable to the interim World InfraRed Standard Group (WISG) not to SI units. In 2013 the Absolute Cavity Pyrgeometer (ACP), [Reda et al., 2012] was developed at the National Renewable Energy Laboratory (NREL) to measure the atmospheric longwave irradiance. The ACP has been compared against the InfraRed Integrating Sphere (IRIS) developed by the Physikalisch-Meteorologisches Observatorium Davos/World Radiation Center (PMOD/WRC) [J. Grobner, 2012]. ACP and IRIS are absolute instruments traceable to SI units through the International Temperature Scale ITS-90. Results of six comparisons between ACP and IRIS at different location have shown that the irradiance measured by WISG pyrgeometers is underestimating clear-sky atmospheric longwave irradiance by 2 to 6 W/m 2 [Grobner et al., 2014]. Therefore, once the world reference is established with traceability to SI units the WISG would be corrected then used to calibrate field pyrgeometers with traceability to SI units. The described method below is used to correct the historical atmospheric longwave irradiance data sets in anticipation of the WISG scale change.

54 ENVIRONMENTAL SCIENCES↗

Non-Empirical and Self-Interaction Corrections for DFTB: Towards Accurate Quantum Simulations for Large Mesoscale Systems (Final Report)

This project was comprised of two complementary (but parallel) thrusts: (1) implementing massively-parallelized computing hardware (with new computational hardware that may replace GPUs) in the density functional tight binding (DFTB) approach and (2) developing new capabilities in DFTB to calculate the electronic structure and dynamics of large chemical systems. While classical molecular dynamics can handle hundreds of thousands of atoms, it cannot provide a first-principles based description of chemical systems at the quantum level. At the other extreme, conventional Kohn-Sham DFT methods can probe the true quantum mechanical nature of chemical systems; however, these methods cannot tackle the large sizes and length scales relevant to dynamics simulations of realistic systems. The DFTB formalism utilized in this project provides a viable approach for probing these large systems at a quantum mechanical level of detail. However, to utilize the DFTB approach for accurate calculations of electronic properties, it is crucial to incorporate quantum-based corrections in DFTB since exchange-correlation effects can still remain very strong in these large systems. At the same time, enhancing the computational efficiency of DFTB is also essential since optimal computational performance is required for addressing the large size scales associated with realistic chemical systems. As such, the new non-empirical corrections and computing hardware enhancements implemented in this project will enable accurate and computationally efficient approaches to directly probe electronic properties in these large, complex systems.

36 MATERIALS SCIENCE↗

A Procedure to Correct the Historical Atmospheric Longwave Irradiance Data When the World Reference Is Established with Respect to the International System of Units

Historical atmospheric longwave irradiance data sets with traceability to the International System of Units (SI) are essential for renewable energy and atmospheric science research and applications. To date, all pyrgeometers used to measure the irradiance are traceable to the interim World Infrared Standard Group (WISG), not to SI units. In 2013, the Absolute Cavity Pyrgeometer (ACP) (Reda et al. 2012) was developed at the National Renewable Energy Laboratory (NREL) to measure the atmospheric longwave irradiance. The ACP has been compared against the InfraRed Integrating Sphere (IRIS), developed by the Physikalisch-Meteorologisches Observatorium Davos/World Radiation Center (PMOD/WRC) (Gröbner 2012). The ACP and the IRIS are absolute instruments traceable to SI units through the International Temperature Scale of 1990. Results of six comparisons between the ACP and the IRIS at different locations have shown that the irradiance measured by WISG pyrgeometers underestimates clear-sky atmospheric longwave irradiance by 2 W/m 2 to 6 W/m 2 (Gröbner et al. 2014); therefore, once the world reference is established with traceability to SI units, the WISG would be corrected, then used to calibrate field pyrgeometers with traceability to SI units. The following described method is used to correct the historical atmospheric longwave irradiance data sets in anticipation of the WISG scale change.

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada (CY2021, Revision 0)

This report includes visual inspection results, maintenance and repair activities, and recommendations for calendar year (CY) 2021 for use restrictions (URs) at corrective action sites (CASs) located on the Nevada National Security Site (NNSS) and on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. This document is formatted by project activity (i.e., Industrial Sites, Soils, and Defense Threat Reduction Agency [DTRA]); then by corrective action unit (CAU); and then by CAS.

54 ENVIRONMENTAL SCIENCES↗

Contaminant Transport Parameters for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 1

This document presents a summary and framework of available transport data and other information directly relevant to the development of the groundwater transport model for Central and Western Pahute Mesa (PM) corrective action units (CAU). This model is referred to as the “PM CAU transport model” in this document. Central and Western PM are two areas of the Nevada National Security Site (NNSS) that historically were used for underground nuclear testing. These nuclear tests resulted in groundwater contamination in the vicinity of the underground test areas. As a result, the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program is currently conducting a corrective action investigation (CAI) of the PM underground test areas. This work is a part of the Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unclassified Source Term and Radionuclide Data for the Groundwater Flow and Contaminant Transport Model for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 1

This report documents the evaluation of information and data available on the unclassified source term and radionuclide (RN) contamination for Central and Western Pahute Mesa (PM): Corrective Action Units (CAUs) 101 and 102. The Central and Western PM CAUs constitute two areas of the Nevada National Security Site (NNSS) used for underground nuclear testing (Figure 1-1). Eighty-five underground nuclear tests were conducted at the PM CAUs between 1965 and 1992 (NNSA/NFO, 2015b). Underground nuclear tests deposit radioactive elements in the subsurface, resulting in groundwater contamination in the vicinity of the underground test locations. At the PM CAUs, the testing resulted in more than 2.68 × 10 7 curies (Ci) of radioactivity (decay-corrected to September 30, 2012) remaining underground (Finnegan et al., 2016). Of the 85 underground nuclear tests conducted at the PM CAUs, three were shallow tests detonated within 200 meters (m) of the surface and referred to as the “near-surface tests”; the remaining 82 were detonated deeper than 200 m below ground surface (bgs) and are referred to as the “deep underground tests” in this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrologic Data for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 1

This hydrologic data document (HDD) has been prepared for Corrective Action Units (CAUs) 101 and 102, Central and Western Pahute Mesa, in order to support the development of a groundwater flow and contaminant transport model. Central and Western Pahute Mesa are two of the five CAUs on the Nevada National Security Site (NNSS) (formerly the Nevada Test Site [NTS]) used for underground nuclear testing (Figure 1-1). The nuclear tests resulted in groundwater contamination in the vicinity of the underground test areas. As a result, the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program is currently conducting a corrective action investigation (CAI) of the Pahute Mesa underground test areas. This work is a part of the Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The CAU groundwater flow and transport model is composed of two pieces, a flow model and a transport model, that together provide the contaminant boundary forecasts required by the FFACO. The hydrologic data necessary for the flow model portion of the CAU model are presented in this report. The transport data necessary for the transport model portion of the CAU model will be provided in a separate report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SARS-CoV-2 transmission control in California correctional facilities

LBNL provided technical assistance to the CalPROTECT project, which is a collaboration between the University of California, Berkeley and the University of California, San Francisco. The CalPORTECT team provided support and guidance to the California Department of Corrections and Rehabilitation (CDCR) and the California Correctional Health Care Services (CCHCS) in their response to the COVID-19 pandemic. The CalPROTECT team provided recommendations to mitigate the risk posed to the residents and staff who live and work in CDCR prisons through considering scientific knowledge of the virus, analyzing anonymized resident and staff level data from CCHCS, evaluation of statewide and institution-level policies, and data collection during site visits to CDCR prisons during the pandemic.

59 BASIC BIOLOGICAL SCIENCES↗

COMBLE Radar b1 Processing: Corrections, Calibrations, and Processing Report

The U.S. Department of Energy’s (DOE) Atmospheric Radiation Measurement (ARM) user facility recently concluded its Cold-Air Outbreaks in the Marine Boundary Layer Experiment (COMBLE), with its campaign emphasis on marine boundary-layer clouds and mixed-phase clouds during cold-air outbreaks. The COMBLE campaign featured the deployment of the first ARM Mobile Facility (AMF1) to northern Scandinavia (Andenes, Norway), including its standard complement of ARM cloud radars. In keeping with user demands stemming from the previous AMF Cloud, Aerosol, and Complex Terrain Interactions (CACTI) field campaign in Argentina, a post-campaign radar mentor effort was initiated for COMBLE. This activity was intended to improve the usability of the ARM cloud radar data sets in response to overall demands for calibrated, corrected data sets for downstream studies and retrieval applications. In addition to the terrain complexities previously important to CACTI data sets (e.g., clutter designation and/or removal), COMBLE presented new challenges to existing ARM radar mentor capabilities. These included the extension of existing methodologies (e.g., relative calibration adjustment [RCA] target techniques) to frozen environments and the potential issues with their applicability when considering mixed-phase precipitation conditions. As in the previous CACTI documentation (Hardin et al. 2020), the overall calibration and conditioning process in ARM nomenclature is referred to as generating a “b1” datastream. For the radars, these “b1” standards refer to a datastream that has been calibrated (and cross-calibrated), with effort to deliver the highest-quality (well-characterized) data possible. The “b1” radar mentor reporting (this current document) is intended to detail (i) the status/quality of the original “a1” (raw) data sets during the COMBLE AMF campaign, (ii) the corrections and calibrations that are applied to generate the b1 datastreams available on ARM’s Data Discovery, and (iii) the details of the applied methods, e.g., how radar offset/calibration numbers were determined.

54 ENVIRONMENTAL SCIENCES↗

Record of Technical Change for Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada For Calendar Year 2022

This report includes visual inspection results, descriptions of maintenance and repair activities, and recommendations for calendar year (CY) 2022 for use restrictions (URs) at corrective action sites (CASs) located on the Nevada National Security Site (NNSS) and on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. This document is formatted by project activity (i.e., Industrial Sites, Soils, and Defense Threat Reduction Agency [DTRA]); then by corrective action unit (CAU); and then by CAS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2020 Postclosure Groundwater Monitoring and Inspection Report, Central Nevada Test Area, Subsurface Corrective Action Unit 443

This report presents the groundwater monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) from the Central Nevada Test Area (CNTA), Nevada, Site, Subsurface Corrective Action Unit (CAU) 443 in Nye County, Nevada (Figure 1). The CNTA is the site of an underground nuclear test in 1968 that resulted in residual contamination near the detonation depth of 3200 feet (ft); the contamination requires long-term monitoring. Responsibility for the environmental restoration and long-term monitoring was transferred from DOE’s National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The environmental restoration and site closure process were completed in 2015 in accordance with the amended 1996 Nevada Federal Facility Agreement and Consent Order (FFACO) (State of Nevada et al. 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The Closure Report, Central Nevada Test Area, Subsurface Corrective Action, Unit 443 (DOE 2018), also called the Closure Report, originally was completed in January 2016 and revised in October 2018; it describes LM’s plan for long-term postclosure monitoring. This includes monitoring of the radioisotopes of interest and water elevations, inspecting the site and maintaining the institutional controls (ICs), evaluating and reporting data, and documenting the site’s records and data management processes (DOE 2018).

54 ENVIRONMENTAL SCIENCES↗

Postclosure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report presents results of the biennial postclosure site inspection conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Central Nevada Test Area (CNTA), Nevada, Site (Figure 1) surface Corrective Action Unit (CAU) 417. The report has been prepared in accordance with the Post-Closure Monitoring Plan contained in the Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada (NNSA/NV 2001), hereafter called the CAU 417 Closure Report. The site closure process was completed in 2001 in accordance with the amended Federal Facility Agreement and Consent Order (FFACO 1996, as amended) (FFACO) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Responsibility for environmental site restoration was transferred from the DOE National Nuclear Security Administration Nevada Field Office to LM on October 1, 2006. This report summarizes investigation activities associated with CAU 417 that LM conducted from September 2018 through August 2020. A postclosure inspection was conducted in 2020 to document the physical condition of the CAU 417 soil covers, monuments, signs, fencing, and use-restricted areas.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Closure Report for the Project Shoal Area: Subsurface Corrective Action Unit 447 Shoal,Nevada, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has prepared this Closure Report for subsurface Corrective Action Unit (CAU) 447 at the Shoal, Nevada, Site, which was formerly called the Project Shoal Area. The Shoal site was the location of an underground nuclear test in 1963 that resulted in residual radionuclide contamination at the detonation depth of 1211 feet (ft) (DOE 2015a). The environmental restoration process and Corrective Action strategy are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) statues and regulations. Responsibility for the environmental site restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The Shoal site is south of U.S. Highway 50, approximately 30 miles southeast of Fallon, in Churchill County, Nevada (Figure 1). The site was selected for underground nuclear testing in 1961, as part of the Vela Uniform Program. Vela was a research and development program directed toward locating, detecting, and identifying underground and high-altitude nuclear detonations. The Vela Uniform program was specific to underground detonations (AEC 1964). The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States’ ability to detect, identify, and locate underground nuclear detonations. The underground nuclear test at Shoal was a joint effort between the U.S. Department of Defense (DOD) and the U.S. Atomic Energy Commission (AEC), which was the predecessor agency to DOE. Figure 1 is a map showing the site location.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MOSAiC Radar b1 Processing: Corrections, Calibrations, and Processing Report

The U.S. Department of Energy’s (DOE) Atmospheric Radiation Measurement (ARM) user facility deployed many instruments on board a German ice breaker, the Research Vessel (RV) Polarstern, for one year from October 2019 to October 2020. The purpose of the Multidisciplinary Drifting Observatory for the Study of Arctic Climate (MOSAiC) field campaign was to study the decline in the sea-ice pack around the North Pole, and what factors may be at play. After the campaign ended, efforts were undertaken to provide a calibrated radar data set for future studies. MOSAiC presented new challenges to this process, as existing methodologies often were not applicable for the frozen environment with little to no ground clutter, and concurrent engineering updates or calibrations could not be accomplished once the ship set off. Like the previous Cloud, Aerosol, and Complex Terrain Interactions (CACTI) and Cold-air Outbreaks in the Marine Boundary Layer Experiment (COMBLE) documentation (Hardin et al. 2020, Matthews et al. 2023), the data correction and calibration process is known in ARM as creating a “b1” datastream. This means that the radar datastreams have been well characterized to the best possible quality. This report will detail the status of the raw “a1” level data sets during the MOSAiC campaign, the corrections that were applied to create the “b1” data files, and the details of the applied methods.

54 ENVIRONMENTAL SCIENCES↗