Past and Present Research in Atomic Physics [Slides]
This presenter shares his research experiences in atomic physics with Capital High School.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This presenter shares his research experiences in atomic physics with Capital High School.
The Electric Power Research Institute (EPRI) led a U.S. Department of Energy (DOE) funded study for a membrane-based post-combustion CO 2 capture (PCC) system retrofit to an existing U.S. coal power plant. EPRI teamed with technology suppliers, Membrane Technology and Research (MTR), engineering consultants Nexant, Trimeric Corporation and Bechtel Power Corporation, to develop a first-of-a-kind initial design and cost estimate for a PCC system at Duke Energy’s East Bend Station (EBS) in Kentucky. This project provides a comprehensive overview of the plant design proposed and develops estimated costs to within +/- 30% accuracy for retrofitting the existing EBS coal-fired power plant with the latest MTR’s second-generation Polaris™ membrane technology for CO 2 flue gas removal. The projects primary objective was to develop a design for Duke Energy that will require “minimally invasive surgery” on their existing 600-MWe coal-fired power plant, located on the Ohio River in Boone County, Kentucky. Unlike the current commercially available solvent-based capture systems that require a reliable source of steam to operate, the MTR membrane-based capture system is driven primarily by electric power. This direct, bolt-on approach to retrofitting carbon capture could potentially reduce the impact on the existing power plant, by minimal disruption of the existing facility’s infrastructure and operating procedures. This may also reduce the amount of retrofit downtime before the power plant can resume normal operations. A second objective was to reduce the cost of each ton of captured CO 2 while maintaining the existing 600 MW net output of the East Bend Station. With this aim in mind, various options to provide the necessary auxiliary power for the capture system were evaluated for the site. The full report describes in detail the overall design, layout and components of the entire EBS membrane capture system. The equipment and sizes, the capital cost estimate encompassing both engineering design and construction for the carbon capture process and balance of plant systems is presented. A detailed techno-economic analysis is also undertaken to examine the business case for capture.
California’s energy planning is centered around meeting the emissions reduction and renewable energy requirements of Senate Bill 350 by 2030. However, state power system planning is expected to eventually address California’s requirement to achieve 100% of total retail electricity sales from renewable energy and zero-carbon resources by 2045, as mandated by Senate Bill 100. To comply with these directives, California needs to investigate the further development of energy efficiency, storage, and a diverse range of renewable energy, zero-carbon emission, and transmission resources, including offshore wind. Wind resources off the coast of California have the potential to generate a significant portion of the state’s electric energy as it moves toward a zero-carbon economy and can help diversify its energy mix. Floating offshore wind technology, which is suitable for the deep waters along the California coast, is currently in a precommercial phase, with approximately 84 megawatts (MW) installed worldwide at the end of 2019. Globally there are over 7,000 MW in planning and permitting phases of development, with the first commercial-scale projects expected to be operational in 2024. This study provides site-specific cost and performance data for floating offshore wind to inform California’s long-term energy planning. The identification of new resources to meet California’s policy goals at least cost is part of the Integrated Resource Planning (IRP) process, which is coordinated by the California Public Utilities Commission (CPUC). In 2019–2020 IRP modeling, offshore wind was included for the first time as a candidate resource in some sensitivity cases (CPUC 2019). The data and information presented in this report can be used to update offshore wind inputs in future IRP cycles. The authors conducted a geospatial cost analysis over portions of the offshore wind resource area of California. The analyzed spatial domain includes sites with a mean wind speed of at least 7 meters per second and water depths between 40 meters (m) and 1,300 m. Costs and energy production vary across this analysis domain. We calculated these parameters on a grid layout with over 750 sites, with each site representing a 1,000-MW commercial offshore wind power plant. Levelized cost of energy (LCOE) was calculated at each site over the analysis domain. The resulting variation in LCOE across the analysis domain is illustrated through heat maps in this report. Five study areas were selected within the analysis domain where more detailed cost analysis was conducted and cost parameters, such as annual energy production, capital cost expenditures (CapEx), operational cost expenditures (OpEx), and net capacity factors are reported. These five study areas include Morro Bay, Diablo Canyon, Humboldt, Cape Mendocino and Del Norte.
This report explores the long-term electrification opportunities for the Valley Transit Authority’s (VTA) transit bus fleet. The potential for transit bus electrification at VTA as well as the economic impacts of partial and complete electrification are explored. We use the Revenue Operation and Device Optimization model to determine the optimal charging, operation and lowest capital and operating cost solution to achieve different levels of electrification to meet their existing routes. This study finds that, relying on only depot charging, around 70% of the daily trips by VTA’s transit bus fleet can be replaced with battery electric buses (BEBs) today. The benefits and drawbacks of five methods for improving the electrification potential beyond that achievable with only depot charging are discussed including (1) increase charger power, (2) purchase of larger vehicle batteries, (3) en-route charging, (4) purchasing additional buses and swapping them to enable the existing routes/blocks1 to be met, and (5) route/block redesign. A strategy is developed to enable full fleet electrification by increasing charger power or allowing intraday charging as a proxy for the options mentioned above. This method allows us to develop an understanding of the impacts and trade-offs of full fleet electrification. Two charging strategies are examined. Immediate charging, when the bus is charged as soon as it arrives at a depot or en-route charging station, and smart charging, which uses a controller to determine the best times to charge to achieve the lowest charging cost, while maintaining the same trip schedules. Smart charging is effective at reducing the peak power consumption, which can be reduced by between 31% and 65% compared to immediate charging. This translates directly to lower electricity demand charges and lower costs for possible distribution system upgrades. The total lifetime net present value (NPV) costs for different scenarios are presented in Figure ES-1. Scenarios are separated into three sections. The first stacked bar on the left is the base case (business-as-usual) where all buses are diesel hybrids, the next four bars include partial and full fleet electrification utilizing only immediate charging, and the last four bars include partial and full fleet electrification utilizing smart charging. The results show that smart charging scenarios are within ±4% of the lifetime NPV cost of the diesel-hybrid only (business-as-usual) scenario. The scenarios with full fleet electrification (i.e., including intraday charging) are 4% lower cost and those with partial fleet electrification (i.e., without intraday charging) are 2%–3% higher. However, it is important to note that the intraday charging scenarios do not include any additional costs for the equipment necessary to achieve intraday charging (e.g., additional chargers, larger batteries, new route design). Additionally, it is worth noting that the Low Carbon Fuel Standard (LCFS) credit received for implementing electric buses is essential to achieving these results.
Gas absorption towers with structured packing and solvent have been used for Carbon Dioxide (CO 2 ) Capture for about many decades. To overcome process limitations and practical disadvantages for CO 2 capture from the stationary emitter (e.g. NG and coal power plant), many new designs have been proposed and explored at the various scales in the last decade with aim of either low energy penalty or low capital cost. To reduce the size of the absorption tower and hence the total cost of CO 2 capture, the University of Kentucky Center for Applied Energy Research Center (UK CAER) has designed and built a novel CO 2 capture absorption tower or Compact Absorber, integrated into an existing large-bench scale CO 2 capture unit. The Compact Absorber has three sections. The top of the column is a fogging section where the solvent is sprayed through a nozzle producing droplets flowing downward in a co-current fashion with the flue gas. The center of the column is a frothing section where the solvent and flue gas flow through regenerative frothing screens designed by Industrial Climate Solutions, Inc. The bottom of the column is a typical structured packing section were the flue gas and solvent flow in a counter-current fashion. The parametric campaign will be conducted in order to optimize the operating parameters for CO 2 capture including liquid/gas ratio, lean loading, and temperature, liquid residence time. A simulated flue gas with 14% CO 2 will be used along with a UK CAER developed proprietary solvent. The 100-hour parametric campaign is designed using a statistical approach of the Sequential Design of Experiments (sDOE). sDOE is one of the CCSI tools that provides an adaptive statistical approach for designing future experiments based on the results of previous experiments. Application of a typical DOE provides the user with the minimum number of experiments required to get the same data, but sDOE allows the user to make an informed choice of experiments based on the results of previous experiments. The complete absorption column has been constructed and has been partially commissioned. Initial data has been collected by operating using the fogging section and the frothing section. The fogging section produces solvent droplets of about 100 μm sauter mean diameter and as small as 25 μm using a hydraulic nozzle by BETE. The frothing section produces bubbles of about 5mm with high mixing of solvent promoting the higher mass transfer from gas to liquid. The absorber reaches the capture efficiency of about 50% with only two sections in operation. Based on the current results, it can be deduced that increasing the solvent feed temperature and including the packed section for absorption the capture efficiency will increase further. Initial data will be collected using all three sections of the absorber and will be used for sDOE. Non-Uniform Space Filling model of sDOE will be used to prioritize the input conditions resulting into maximum capture efficiency. sDOE is performed using the platform called Framework Optimization, Quantification of Uncertainty, and Surrogates (FOQUS). The method and results demonstrating the progress of the parametric campaign from the initial set of experiments to the final stage of obtaining optimized parameters using sDOE tool will be presented in detail.
Both direct current fast charging (DCFC) and Hydrogen stations are working to create successful long-term business models; however, analyses for DCFC and hydrogen fueling infrastructure are almost always performed separately. This work provides a detailed exploration of the benefit of integrating DCFC and hydrogen stations to lower the total system cost from load balancing and equipment cost sharing. To achieve this we have adapted the REopt optimization framework to simultaneously optimize the design and operation of integrated DCFC and H2 fueling station. Results indicate that 1) combining hydrogen fueling and DCFC stations can significantly reduce lifetime costs compared to separated stations. 2) Co-location with additional site load reduces DCFC costs, however, integration of DCFC with hydrogen provides an even greater cost reduction. 3) Adding PV to combined stations further reduces the lifetime station cost. 4) Capital investments in station combination today can help reduce the cost of operating DCFC tomorrow and 5) product diversification acts as a hedge against variability and enables a more dynamic response to market changes.
The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.
Purpose and Audience A wide spectrum of laboratory owners, ranging from universities to federal agencies, have explicit goals for energy efficiency and greenhouse gas reductions in their facilities. For example, new federal buildings and major renovations of existing buildings are to reduce fossil fuel-generated energy consumption by 90% in 2025, and 100% in 2030, compared with a 2003 baseline (FEMP n.d.). Minnesota SB2030 standard requires achieving an 80% reduction from the average building baseline for commercial, institutional, and industrial buildings (SB2030 n.d). A laboratory—new or existing—is much more likely to meet energy efficiency goals if quantitative metrics and targets are explicitly specified and tracked over the life cycle of the building, from design through construction, commissioning, operations, and renovations. If efficiency targets are not explicitly and properly defined, any additional capital costs or design time associated with attaining higher efficiencies can be difficult to justify relative to other priorities. The purpose of this guide is to provide guidance on how to specify and compute energy efficiency metrics and benchmarks for laboratories, at the whole-building as well as the system level. The information in this guide can be used to incorporate quantitative metrics and targets into new construction or retrofit of existing facilities. For information on strategies and technologies to achieve energy efficiency, the reader is referred to I2SL resources, including technology best practice guides and case studies.
NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems, with and without storage, built in the first quarter of 2020 (Q1 2020). Our methodology includes bottom-up accounting for all system and project-development costs incurred when installing residential, commercial, and utility-scale systems, and it models the capital costs for such systems.
The Early Site Permit (ESP) process offered under Title 10 Code of Federal Regulations (CFR) Part 52, Subpart A, was promulgated by the Nuclear Regulatory Commission (NRC) in 1989 to address industry concerns with the former licensing process under 10 CFR Part 50. Previously, the licensing process required large expenditures of time and money by applicants well before key site specific environmental, safety, and emergency planning issues could be resolved. As envisioned, the ESP process is meant to resolve these issues well in advance of when a decision is made to build a nuclear power facility and before substantial capital is invested in the construction of a new nuclear facility. The ESP application is required to provide design information pertaining to structures, systems, and components along with site-specific parameters (such as meteorology, demographics, and hydrology) and address site safety, environmental protection, and emergency planning. Although an ESP applicant does not need to specify a particular nuclear plant design, as in construction permit applications, it does need to provide sufficient surrogate design information (developed to bound the nuclear plant design(s) that are being considered by the applicant) so that the NRC can make a determination on the acceptability of the site and the environmental impacts, and determine whether designs bounded by the surrogate design information provided by the applicant can be qualified for the proposed site.
Convective storms vertically transport water vapor and condensate from Earth’s surface to the upper troposphere. Life on Earth is fundamentally linked to this transport which determines the hydrological cycle, and the intensity of severe weather responsible for the destruction of life and property. Despite advances in high-resolution modeling and better observational capabilities, the scientific community continues to be confronted with knowledge gaps about convective storms that limit our predictive capabilities. The ongoing developments in the high-resolution Energy Exascale Earth System Model (E3SM), large eddy simulations, and AI-based analytics to evaluate uncertainties are expected to provide a comprehensive framework for new scientific discovery. The model-experiment (MODEX) approach suggests that the aforementioned advancements in model development and AI-based inference techniques should be complemented by similar advancements in the experimental (observational) side so that the former does not outstrip the ability of the latter to provide meaningful constraints. What are the recent advancements in observations that will provide the necessary leap forward in improving our predictive capabilities? To address this question, we propose a new experimental paradigm called Multisensor Agile Adaptive Sampling (MAAS) that capitalizes on advancements in communications (5G), computational resources (edge/fog computing), sensor capabilities, and machine learning (ML) and AI techniques (Kollias et al., 2020). The MAAS framework allows for the collection of higher spatiotemporal resolution and quality observations of convective storms than is traditionally possible. The MAAS framework is scalable and applicable to atmospheric observatories such as those operated by the Department of Energy (DoE) Atmospheric Radiation Measurement (ARM) facility.
Many manufacturing industries require substantial capital and utilize energy intensive processes that involve complex phenomena. One example of such an industry is the steel industry, which is the fourth largest energy consuming industry in the U.S. By harnessing the power of High-Performance Computing (HPC) to enhance current simulation and visualization methods in the steel industry, it should be possible to increase resolution and/or decrease time of these methods by a factor of 1000. In this way, information can be obtained in a time frame that is useful for making business and engineering decisions, optimizing manufacturing processes and, ultimately, improving the completeness of U.S. industries. For example, if coke usage in blast furnaces were optimized such that the average coke rate was reduced from 797 lb/net tonne of hot metal (NTHM) to 604 lb/NTHM, costs could be reduced by $894 million/year. Additionally, members of the steel industry need the flexibility to efficiently operate blast furnaces at a range of production rates in order to meet fluctuating market demands. Large scale parameter studies can be utilized to discover workable operating parameters at a range of production rates.
This project sought to evaluate the technical and economic viability of the Aquapod©, a transformational low energy (<200 kJ/kg water) waste heat coupled forward osmosis (FO) technology, to manage effluents, meet cooling water demands, and achieve water conservation in a coal-fired power plant environment. The Aquapod© process is innovative because it is heat-driven, avoids the evaporation of water, and uses no toxic chemicals such as ammonia or amines. The Aquapod© process accomplishes this using an aqueous two-phase system (ATPS) coupled FO process. The evaluation revealed that the Aquapod© process offers a pathway to exploit waste heat resources within a power plant to achieve flue-gas desulfurization (FGD) wastewater volume reduction and water recovery with minimal pretreatment. Water recovery of 80% from FGD wastewater was achieved with minimal pretreatment, exceeding the project target of 50%. The estimated electrical energy of 2.16 kWh/m 3 of water produced for the Aquapod© process met the project target of < 3.6 kWh/m 3 . The heat required for the process operation was approximately 186 kJ/kg of produced water, which was slightly lower than the project target of 200 kJ/kg. The estimated treatment cost for installing and operating the Aquapod© process in conjunction with a spray dryer evaporator to achieve zero-liquid discharge (ZLD) of the 100 gpm FGD wastewater was $13.24/m 3 over a 30-year lifetime. As a point of reference, this study’s host power plant currently incurs a cost of $3.70/m 3 – $8.87/m3 on a discharged volume basis to discharge its wastewater into the publicly owned treatment works (POTW) after physical-chemical treatment. Therefore, the Illinois power plant would incur an incremental cost increase of $4.37/m 3 – 9.54/m 3 to achieve ZLD using the Aquapod© and spray dryer combination. Ample opportunities exist to further lower the ZLD capital and operating costs in the next design iteration to attain pipe parity at the higher end of the site treatment costs.
Data from Pacific Northwest National Laboratory’s conversion hydrothermal liquefaction (HTL) program for wet waste was used to update the pathway techno-economic analysis (TEA) for the fiscal year 2020 State of Technology (2020 SOT). The modeled fuel blendstock MFSP for the 2020 SOT is estimated at $4.50/GGE (with ammonia stripping of the AP), a reduction of $0.61/GGE, or 12%, relative to the 2019 SOT (Snowden-Swan et al. 2020). Progress in the HTL area includes increased reactor LHSV from 3.6 to 4.0 and a newly designed staged approach for the sludge pumping and heating, resulting in a 1 cent and 26 cent reduction in modeled MFSP, respectively. The newly designed heat exchanger configuration is less material and capital intensive than the previous SOT, and provides a system design that is more scalable with regard to practical fabrication limitations. Further improvements may be possible with the use of core inserts to enhance tube velocity and heat transfer rates. Biocrude hydrotreating research progress improved weight hourly space velocity (WHSV) from 0.67 to 0.72 hr-1 in the guard bed and from 0.39 to 1.02 hr-1 in the main hydrotreating bed, a 7% and 162% improvement, respectively. Hydrotreating performance was not sacrificed at the higher throughput rates and catalyst activity remained stable over the run. The demonstrated increase in WHSVs reduced the modeled MFSP by $0.34/GGE.
This report analyzes U.S. PV manufacturing announcements from 2017 through July-2019 and explores the potential impact of tariffs on the competitiveness of U.S. PV module manufacturing. First, the fraction of announcements that resulted in established facilities in the time frame specified is analyzed, as well as firm nationality and the existence of any other U.S. facilities for the firm. The prevalence of different PV product types among the announcements was also analyzed, as well as the type of facilities selected for development (greenfield, existing PV factories, or repurposed buildings). The cost to build these facilities was also analyzed in the context of their capacity, the value of incentives received by state and local governments, and the number of jobs created. Case studies of Auxin Solar, First Solar, Hanwha Q Cells, JinkoSolar, LG, Silfab, Solaria, and SunPower were conducted and highlight five factors influencing firms’ decisions to expand their U.S. PV production capacity. These included: 1) proximity to demand, including supply contracts and demand for domestic content 2) tariffs and other incentives. The Section 201 tariffs on PV module imports were often described helpful but tariffs on cell imports (Section 201) or materials (Section 301, Section 232) were often described as counterproductive since U.S. supply chains do not exist for many necessary goods. The corporate tax decrease and local incentives were often mentioned as helpful. 3) the ability to move quickly in order to maximize the benefit of the Section 201 tariffs. This affected decisions to select localities with faster permitting or moving into existing buildings. 4) competition with scale, where competing with Asian PV imports or avoiding imports of material from China was challenging due to the larger scale of Asian manufacturers. Additionally, smaller firms expressed concerns that larger firms may not need their U.S. facilities to profitable. 5) access to capital, which was a particular challenge for smaller firms. Several U.S. tariffs affect the economics of PV cells, modules, and balance-of-module (BOM) materials, some of which are applicable to a long list of countries and others applicable only to China or Taiwan. We analyze how the tariffs interact to affect the prices of c-Si modules sourced under various assumptions about domestic and imported components and assembly. We estimate module prices under a range of baseline scenarios featuring U.S.-assembled modules with Southeast Asian cells (not from China or Taiwan). When all BOM components are sourced from the United States, baseline module prices are $0.37/W (below the 2.5-GW Section 201 cell cap) to $0.42/W (above the 2.5-GW cell cap). If all BOM components are sourced from China, the module price in this baseline U.S.-assembly scenario can reach up to $0.60/W. Imported module prices are lower than or within the range of the U.S.-assembled baseline prices under some conditions. Importing bifacial modules from Southeast Asia is the lowest-priced alternative, at $0.35/W, because bifacial modules are excluded from the Section 201 tariffs. Importing Southeast Asia modules that contain U.S. cells results in a price of $0.38/W, also owing to a Section 201 exclusion. Importing Southeast Asian modules that have Southeast Asian cells yields a price of $0.44/W, and importing Chinese modules that have U.S. cells yields a price of $0.58/W. These results suggest that U.S. tariff policy in 2019 may encourage U.S. assembly of mono-facial c-Si modules if the 2.5-GW cell import cap is not reached and Chinese BOM imports are negligible. However, some imported module options may offer the lowest prices if the 2.5-GW cell import cap is reached and/or U.S. module manufacturers must rely on significant Chinese BOM content. The analysis shows the 2.5-GW cell cap may be exceeded in 2019 and following years. It is also likely that U.S. module manufacturers will need to use at least some Chinese BOM content, since U.S. module manufacturers have stated that U.S. supply chains do not exist (or do not exist at a sufficient scale) for most BOM components, which makes them at least partially reliant on Chinese BOM and thus subject to Section 301 tariffs.
This exploratory analysis characterizes the balance-of-system (BOS) cost reduction opportunity for small, commercial, medium, and large distributed wind systems. To do this, we used the National Renewable Energy Laboratory’s (NREL’s) Land-based Balance of System Systems Engineering (LandBOSSE) model (Eberle et al. 2019). This model calculates the capital expenditures (CapEx) associated with installation and the system components (e.g., foundation and electrical infrastructure) other than the rotor nacelle assembly and tower. Then, building on the cost reduction potential assessment, we provide a more qualitative evaluation of prospective technology innovation concepts that may enable realization of those cost reductions for distributed wind systems.
In FY 2018 and 2019, ORNL personnel designed, prototyped, characterized, and tested the enhancement of amine-based carbon capture using additively manufactured intensified devices, i.e., devices combining multiple thermodynamic and kinetic processes into one unit operation. State of the art scrubbing technology often employs inter-stage cooling which requires multiple stages of single-purpose unit operations, leading to larger equipment size, higher capital cost, and sometimes less than optimal operating conditions for each piece of equipment. It was proposed that integrating multiple thermodynamic and kinetic operations into one unit could mitigate or negate these drawbacks. Heat and mass transfer studies demonstrated that an additively manufactured intensified device could significantly improve capture efficiency at bench scale. This project is a continuation of FEAA130 and aims at (1) demonstration and validation of enhanced CO 2 capture with 3D printed intensified devices (i.e., mass exchanger packing with internal cooling channels), for low-aqueous-solvent (LAS) based capture at the ORNL-constructed laboratory-scale (4.5-feet tall) column, namely Column A, with built-in cooling and (2) computational scoping on the conceptual design of a flexible and modular larger column, namely Column B, at ORNL for further demonstration of enhanced capture for aqueous solvent. To execute this multi-faceted project scope, an integrated project team from ORNL’s Manufacturing Science Division is tasked with applying capabilities in computational fluid dynamics (CFD), additive manufacturing, and absorber-scale demonstration/validation experiments.
LANL is committed to developing and maintaining a robust workforce with the expertise and skills necessary to meet the Weapons Production expanded mission, which includes the human capital to produce 30 ppy in 2026 while meeting all other plutonium missions.