Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Identifying Common Coordination Procedures across Extensible Traffic Management (xTM) to Integrate xTM Operations into the National Airspace System

New categories of missions and vehicle types, such as drone delivery services, on-demand air taxi, and high-altitude long-endurance (HALE) vehicles are being proposed to operate using a novel, highly automated information exchange infrastructure and a community-based, cooperative traffic management concept. Collectively, these new operations are called Extensible Traffic Management (xTM). As these xTM vehicles become more prevalent, their operations will increasingly overlap with existing conventional aircraft and with each other. In order to seamlessly co-exist with current conventional aircraft operations, new coordination procedures, tools and services will be needed to integrate xTM into the future National Airspace System (NAS). In our prior work, we have identified a set of use cases for xTM interactions with air traffic control (ATC), categorized across different xTM operations based on trigger events. Events consisted of ones such as nominal xTM vehicle transition into the ATC environment or an off-nominal emergency landing situation. In this paper, we have extended the prior work to identify commonalities in the coordination procedures across xTM, as well as differences that are specific to the individual xTM operations. The overall results showed that two types of xTM-ATC interactions were prevalent: 1) xTM vehicles transitioning between xTM and ATC operational environments; 2) xTM vehicles being allowed to continue xTM operations in areas that are normally controlled by ATC. The results also suggested that emergency and rare off-nominal events may need specialized procedures for each vehicle type. The overall results suggest that there is a pathway to define a common method of handling and integrating diverse xTM operations in the future NAS, but there need to be procedures for individualized handling of xTM vehicles in infrequent, safety-critical events.

Extensible Traffic Management (xTM)↗

Automating Surface Attitude Positioning and Pointing Operations for Mars 2020

The Surface Attitude Positioning and Pointing (SAPP) subsystem of the Mars Perseverance rover keeps track of the rover’s position and attitude on the surface of Mars. The SAPP Downlink Engineering Operations team members receive data from the rover on a daily basis. They must interpret the data to make sure the rover is staying safe and to support uplink planning. The SAPP team keeps track of the error growth in the rover’s attitude estimate due to noise in the Rover Inertial Measurement Unit’s (RIMU) gyroscopes used to propagate that attitude estimate whenever the rover is moving. Whenever this error grows to a particular threshold, SAPP is responsible for updating the onboard attitude knowledge using the RIMU’s accelerometers to estimate rover roll and pitch and sun imaging to estimate rover yaw, thereby reducing this attitude estimation error. Accurate attitude estimation is required so that the rover can successfully point its High Gain Antenna (HGA) to receive information from Earth and as a backup to the Mars orbiters used for sending data from the rover to Earth, point instruments on its Remote Sensing Mast (RSM), and support safe movement and placement of instruments by the rover’s ARM relative to the Martian surface. The Mars 2020 Engineering Operations team has been working to increase the operational efficiency of the mission and eventually move to a five-hour timeline for daily operations. In pursuit of this goal, the SAPP Engineering Operations team has automated their downlink process by developing a centralized Jupyter notebook to analyze the data received daily from the rover. The SAPP downlink Jupyter notebook automatically collects the data relevant to the SAPP subsystem and visualizes this information in plots and tables that can be easily read by downlink operators to aid them in assessing the status of the subsystem. Various Application Programming Interfaces (APIs) have been incorporated into the downlink daily notebook to automate the collection and posting of data, such as gathering and posting data products to the cloud. The SAPP team has also developed a SAPP downlink software library that includes functions to aid the notebook in processing data. In addition to assessing the SAPP subsystem on a daily basis, operators need to assess the long-term trending behavior of the subsystem over time. An automated trending process has been developed to collect information from the daily notebooks in order to plot and analyze that data in a centralized place. These daily and trending processes have expedited the SAPP downlink assessment and laid the groundwork to completely automate the SAPP downlink process so that SAPP operators are unnecessary unless something unexpected occurs. This paper will provide an overview of the functions that the SAPP subsystem carries out on a daily basis, and will then dive into the automations that have been developed for daily and trending downlink assessment. An assessment of the downlink efficiency will be provided, along with a summary of lessons learned and work to go. Finally, the authors will discuss how these types of automated spacecraft health assessments could be more broadly used within mission operations.

Zarifian, Anais↗

High Density Vertiplex: Scalable Autonomous Operations Prototype Assessment Simulation

Urban Air Mobility (UAM) is a rapidly growing topic within the field of aviation because of the impact a refined ecosystem and uncrewed aerial vehicles could have on modern society, such as urban air mobility, cargo, and emergency transport. Before the UAM concept can be actualized, research is needed to understand how to integrate these new classes of vehicles and operations into the National Airspace System. One under-researched but critical piece of infrastructure required for UAM operations is Vertiport operations. Vertiports are the envisioned takeoff and landing locations for these uncrewed aerial vehicles. To accommodate the high use of the vertiport, new technologies and roles will be required for optimal use. At NASA, the High Density Vertiplex sub-project targets research into vertiports. The High Density Vertiplex team created an Urban Air Mobility ecosystem to test and evaluate different concepts and tools used to support higher density operations at vertiports. Part of the test and evaluation included the Prototype Assessment Operations simulation of highdensity operations around a vertiport to study vertiport management and vertiport operations. The research team also evaluated how the prototype Urban Air Mobility ecosystem supported fleet managers, ground control station operators, and vertiport managers in execution of nominal and off-nominal high-density operations. Results from this simulation provided insight regarding UAM ecosystem research and development and vertiport automation systems.

Small Uncrewed Aerial Vehicle (sUAS)↗

High Density Vertiplex: Scalable Autonomous Operations Prototype Assessment Simulation

Urban Air Mobility is a rapidly growing topic within the field of aviation because of the impact a refined ecosystem and uncrewed aerial vehicles could have on modern society, such as urban air, cargo, and emergency transport. Before the UAM concept can be actualized, research is needed to understand how to integrate these new classes of vehicles and operations into the National Airspace System. One under-researched but critical piece of infrastructure required for UAM operations is Vertiport operations. Vertiports are the envisioned takeoff and landing locations for these uncrewed aerial vehicles. To accommodate the high use of the vertiport, new technologies and roles will be required for optimal use. At NASA, the High Density Vertiplex sub-project targets research into vertiports. The High Density Vertiplex team created their own Advanced Air Mobility ecosystem to test and evaluate different concepts and tools used to support higher density operations at vertiports. Part of the test and evaluation included the Prototype Assessment Operations simulation of high-density operations around a vertiport to study vertiport management and vertiport operations. The research team also evaluated how their simulated Urban Air Mobility ecosystem supported fleet managers, ground control station operators, and vertiport managers in execution of nominal and off-nominal high-density operations. Takeaways from this simulation helped the team evaluate well how the users of the ecosystem were able to use the components of the ecosystem to complete Urban Air Mobility missions.

Small Uncrewed Aerial Vehicle (sUAS)↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for Gateway’s Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U) CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of cross-link ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle utilizing their Photon upper stage to deploy the CAPSTONE spacecraft into lunar orbit. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from Rocket Lab’s Photon stage and traversed an approximately 4 month highly efficient transfer phase entering the NRHO Novermber 13, 2022 for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is lead by Advanced Space, LLC. Spacecraft development and mission operations is conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstration of the accessibility of NHROs, validation of key operational concepts in the NHRO environment, laying the foundation for commercial support of future lunar operations, and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U)+ CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of crosslink ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip-scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle using their Photon upper stage to deploy the CAPSTONE spacecraft. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from the Photon stage and traversed an approximately 4-month, highly fuel-efficient transfer phase entering the NRHO November 13, 2022, for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is led by Advanced Space, LLC. Spacecraft development and mission operations are conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstrating the accessibility of NHROs; validating key operational concepts in the NHRO environment; laying the foundation for commercial support of future lunar operations; and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA’s Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Cryogenically-Operable Electronics for Surviving the Lunar Night

Current solar-powered robotic lunar landers and rovers have not demonstrated survivability of the extreme cold temperatures seen during the 354-hour lunar night. To address this capability gap, we have been investigating the feasibility of a passive hibernation approach to enable low-cost solar- and battery-powered missions to operate over multiple lunar cycles. This strategy relies on isolating the batteries from the main bus during the lunar night and allowing cells to freeze as temperatures descend as low as 50K. The entire power architecture remains in a hibernation state with no electrical activity until lunar dawn. When the sun returns over the horizon, the now-illuminated solar arrays begin generating power. In order to manage the array power, architecture consisting of cryogenically-operable COTS electronics must be utilized. This architecture will distribute and control power to subsystems - importantly controlling heaters to bring the frozen lithium-ion battery cells to normal operating conditions. This alternative approach to lunar operations will enable low-cost commercial lunar landers and payloads to passively survive the night and continue to operate over multiple lunar cycles without a significant impact to cost or payload mass. Research last year focused on creating a power supply that was capable of operation at cryogenic temperatures. At the end of FY23, our team successfully designed and manufactured a Sequential Switching Shunt Regulator (S3R) that is operational in a cryogenic vacuum chamber. It is capable of full operation down to the coldest lunar night temperatures (~50K). Our presentation will provide an overview of the Lunar Hibernation strategy but will focus mainly on the technical details of this cryogenically-operable shunt regulator and test results.

Cryogenic↗

Overview of an Exploratory, Real-Time, Multi-Pilot Simulation Study of Early eVTOL Operations at Non-Towered Vertiports

This paper provides a report out on an exploratory, multi-aircraft/multi-pilot, real-time simulation study conducted by NASA of early commercial powered-lift, Urban Air Mobility (UAM) operations at a non-towered vertiport. As used in this paper, vertiport refers to the primary ground and airspace elements facilitating the takeoff and landing of electric vertical takeoff and landing (eVTOL) aircraft with central emphasis on a vertipad, i.e. the physical touch-down and lift-off area and surrounding approach , departure, local pattern procedures. The study, known as the Piloted UML-2 ConOps Study (PUCS), had two high-level goals. The first goal was providing preliminary insights and observations relevant to the piloting and flight operations of early, commercial UAM operations aligned with the initial stage of the FAA’s Advanced Air Mobility (AAM) Implementation Plan and the second level NASA’s UAM Maturity Level (UML) scale. The second goal was evaluating a novel, medium-fidelity, extensible, many-pilot, real-time simulation capability known as the UAM Flyers developed by NASA. The Flyers are intended to allow rapid development, screening, evaluation, and demonstrations of potential Concepts of Operation (ConOps) for UAM flight operations and airspace management in a modular and low-cost, real-time, human-in-the-loop rapid simulation prototyping environment. For this study, ten Flyer cockpits were configured to evaluate flight operations through a non-towered vertiport with pilot interfaces and displays (external and in-cockpit) appropriate for operations under visual flight rules (VFR) and employing flight and communication procedures representative of current operations at non-towered airports. The presented results include an achieved operational tempo; durations of individual flight tasks for approaches and departures; off-nominal events and triggers; and pilot comments regarding potential procedural and technology improvements.

Urban Air Mobility↗

Overview of an Exploratory, Multi-Pilot Simulation Study of Early eVTOL Operations at Non-Towered Vertiports

This paper provides a report out on an exploratory, multi-aircraft/multi-pilot, real-time simulation study conducted by NASA of early commercial powered-lift, Urban Air Mobility (UAM) operations at a non-towered vertiport. As used in this paper, vertiport refers to the primary ground and airspace elements facilitating the takeoff and landing of electric vertical takeoff and landing (eVTOL) aircraft with central emphasis on a vertipad, i.e. the physical touch-down and lift-off area and surrounding approach , departure, local pattern procedures. The study, known as the Piloted UML-2 ConOps Study (PUCS), had two high-level goals. The first goal was providing preliminary insights and observations relevant to the piloting and flight operations of early, commercial UAM operations aligned with the initial stage of the FAA’s Advanced Air Mobility (AAM) Implementation Plan and the second level NASA’s UAM Maturity Level (UML) scale. The second goal was evaluating a novel, medium-fidelity, extensible, many-pilot, real-time simulation capability known as the UAM Flyers developed by NASA. The Flyers are intended to allow rapid development, screening, evaluation, and demonstrations of potential Concepts of Operation (ConOps) for UAM flight operations and airspace management in a modular and low-cost, real-time, human-in-the-loop rapid simulation prototyping environment. For this study, ten Flyer cockpits were configured to evaluate flight operations through a non-towered vertiport with pilot interfaces and displays (external and in-cockpit) appropriate for operations under visual flight rules (VFR) and employing flight and communication procedures representative of current operations at non-towered airports. The presented results include an achieved operational tempo; durations of individual flight tasks for approaches and departures; off-nominal events and triggers; and pilot comments regarding potential procedural and technology improvements.

Urban Air Mobility↗

Uncrewed Aerial System Traffic Management Beyond Visual Line of Sight Multi Operator Technology Assessment Simulation

UAS Traffic Management (UTM) is a rapidly evolving space with increasing demand for regulation surrounding more complex operations. Beyond visual line of sight (BVLOS) operations are among these complex operations. The NASA UTM BVLOS sub-project is focusing on enabling more routine BVLOS operations through data collection for support of standards formulation. The Multi Operator Technology Assessment (MOTA) simulation is one of these activities that collects data on BVLOS operations within the same geographical area while sharing operational intents through a USS. Data collected includes workload, situation awareness, and usability on nominal and off-nominal operations. Results of this study are intended to provide recommendations for standards as well as provide insight on improvements to the systems under test. NASA intends to incorporate those improvements into their operations to support and updated BVLOS waiver from the FAA’s Near-Term Approval Process (NTAP).

Bryan J Petty↗

Uncrewed Aerial System Traffic Management Beyond Visual Line of Sight Multi Operator Technology Assessment Simulation

UAS Traffic Management (UTM) is a rapidly evolving space with increasing demand for regulation surrounding more complex operations. Beyond visual line of sight (BVLOS) operations are among these complex operations. The NASA UTM BVLOS sub-project is focusing on enabling more routine BVLOS operations through data collection for support of standards formulation. The Multi Operator Technology Assessment (MOTA) simulation is one of these activities that collects data on BVLOS operations within the same geographical area while sharing operational intents through a USS. Data collected includes workload, situation awareness, and usability on nominal and off-nominal operations. Results of this study are intended to provide recommendations for standards as well as provide insight on improvements to the systems under test. NASA intends to incorporate those improvements into their operations to support and updated BVLOS waiver from the FAA’s Near-Term Approval Process (NTAP).

Bryan J Petty↗

DEVELOPMENT OF OPERATIONAL CONCEPTS FOR ADVANCED SMRs: THE ROLE OF COGNITIVE SYSTEMS ENGINEERING

Advanced small modular reactors (AdvSMRs) will use advanced digital instrumentation and control systems, and make greater use of automation. These advances not only pose technical and operational challenges, but will inevitably have an effect on the operating and maintenance (O&M) cost of new plants. However, there is much uncertainty about the impact of AdvSMR designs on operational and human factors considerations, such as workload, situation awareness, human reliability, staffing levels, and the appropriate allocation of functions between the crew and various automated plant systems. Existing human factors and systems engineering design standards and methodologies are not current in terms of human interaction requirements for dynamic automated systems and are no longer suitable for the analysis of evolving operational concepts. New models and guidance for operational concepts for complex socio-technical systems need to adopt a state-of-the-art approach such as Cognitive Systems Engineering (CSE) that gives due consideration to the role of personnel. This approach we report on helps to identify and evaluate human challenges related to non-traditional concepts of operations. A framework - defining operational strategies was developed based on the operational analysis of Argonne National Laboratory’s Experimental Breeder Reactor-II (EBR-II), a small (20MWe) sodium-cooled reactor that was successfully operated for thirty years. Insights from the application of the systematic application of the methodology and its utility are reviewed and arguments for the formal adoption of CSE as a value-added part of the Systems Engineering process are presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio – 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were “right-sized” at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented.

54 ENVIRONMENTAL SCIENCES↗

Design and Testing of a Water-Cooled Rotating Detonation Combustor at Elevated Operating Pressures - Abstract

This is an extended abstract being submitted for consideration that briefly describes the material that will be included in the final paper. This study will detail the design and testing of a water-cooled Rotating Detonation Combustor (RDC) that permits operation for extended periods of time ensuring that the device has reach a stable operating temperature. Extended run times also provides an opportunity to consider transient behaviors that occur as a result of altering the operating conditions such as equivalence ratio. The experimental setup is also unique in that it consists of a ducted exhaust with a downstream high-temperature valve that can control the pre-combustion pressure in the RDC independent of the combustor annulus and exit geometry. This paper will examine the results from the extended operation of the water-cooled RDC over a range of both transient and steady state equivalence ratios (0.5 - 1.0), pre-combustion operating pressures (0 - 207 kPa), mass flow rates (0.42 – 0.5 kg/sec) and air inlet throat area to combustor channel area ratios (0.09 – 0.32). All tests were performed while operating on hydrogen in air at a nominal air inlet temperature of 340 – 350 K. Limited data obtained at an elevated inlet air temperature of 480 K will also be discussed. Results suggest that under certain conditions the operating mode of the detonation wave can vary as it approaches a stable operating temperature. For the RDC tested, a stable operating temperature is not achieved until approximately 8-10 seconds of run time.

Ferguson, Donald↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio - 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were 'right-sized' at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Hanford Site Cleanup through Operations Research Modeling - 20238

The Hanford Site cleanup effort will require the integration of dozens of unique facilities and processes, many of which will be first-of-a-kind in implementation and design. Each facility will be governed by its own set of operating logic, configured with a unique array of unit operations, and subject to a set of constraints that will affect its behavior. The collection of facilities have multiple points of interface, making the operations of any one facility potentially significant to the operations of other up- or downstream processes. It is therefore highly desirable to accurately predict these operations, as it allows for Site officials to identify and preempt bottlenecks and vulnerabilities before they unexpectedly inhibit the cleanup mission. With the quantity and complexity of the processes that will be on Site, building a pen-and-paper or even a spreadsheet-assisted model of the cleanup mission quickly becomes overwhelming in scope and inaccurate in execution. The Engineering organization for the Site's Tank Operations Contract (TOC) has therefore implemented the use of operations research (OR) modeling to simulate and predict future operations of Site facilities. These models are created using a discrete event simulation tool that allows for the development of detailed, versatile, and robust models. Not only can these models account for complex logical behaviors, but they can also simulate process details down to the level of vessel sizing, labor utilization, equipment reliability, and resource availability. To date, the TOC has developed OR models for several facilities on Site, including for single-shell tank (SST) farms, double-shell tank (DST) farms, the Effluent Treatment Facility (ETF), and the waste transfer system. These models have focused on identifying bottlenecks and operational constraints, and have been used to quantify the effects of implementing process changes. This latter point is particularly valuable, as it allows for several alternatives to be studied in a virtual setting before committing resources to making a change in the field. The decision to develop OR models has gained tremendous support from the Site's stakeholders and the U.S. Department of Energy (DOE) management, and has prompted the use of the tool to support additional internal and external initiatives. Recently, an initiative was proposed to use the models to help identify and provide quantitative backing for risks and opportunities for the TOC. This application of OR could not only help inform how the TOC manages its risks (e.g. quantities and types of spare parts), but could also help drive process improvements whose benefits might otherwise be hard to quantify. The models have also been used to drive the TOC's cloud computing, artificial intelligence (AI), and machine learning (ML) initiatives. These initiatives will not only improve the ability of the TOC to more rapidly respond to the needs of its customers, but it will also aid in the ability of the TOC to analyze and improve the processes it studies. Partnership with two external software development and consulting companies (Lanner and Ynformed) has furthered not only the application of AI and ML within the TOC, but has also spurred the development of new/improved software tools and platforms used by the companies. These partnerships have proven to be mutually beneficial and productive, and have set a precedent for the types of gains that can be made by exploring such options. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Load-Follow Operations with Standalone BISON through VERA

As part of the Consortium for Advanced Simulation of Light Water Reactors (CASL), the Virtual Environment for Reactor Applications (VERA) is being developed to provide high-fidelity multiphysics simulations of nuclear reactor cores. VERA contains a number of single physics packages that are coupled together. MPACT is the primary deterministic neutron transport solver, CTF provides thermal hydraulics solutions, and BISON - which is built off of the MOOSE framework - is used for fuel performance simulations. Over the past year, a standalone BISON capability has been developed using a one-way coupling between MPACT/CTF coupling calculations and BISON. This has allowed CASL contributors to gain insight into the fuel performance characteristics while a more tightly coupled methodology between MPACT, CTF, and BISON has been under development. The standalone capability has been used to simulate Watts Bar Unit 1 (WBN1) Cycles 1-3 and to screen for quantities of interest to pellet-clad interaction in Cycles 6-7. The simulation and screening results are presented here. CASL recently partnered with Exelon and the University of Illinois at Urbana Champaign (UIUC) to begin simulating some of Exelon's plants, with particular focus on load-follow operations. In such operations, the power output from the plant will vary based on the demand or anticipated demand at the time. For example, demand is much lower late at night than during the day when people are awake, so it operating the plant at lower power in the evenings could be advantageous. Historically, nuclear power generation has been among the cheapest sources of energy, so most plants in the United States have been operated at full power except for outages and various small scale events. However, in the current economic climate, priorities have changed. A number of questions arise when load-follow operations are considered, particularly with respect to VERA's tools and capabilities. Can the coupled neutronics and thermal hydraulics simulations with MPACT and CTF perform well without substantial convergence issues? Can BISON handle the somewhat rapid power changes present with load-follow? Will clad hoop stresses be alarmingly high as a result of these power changes? This work addresses these questions and demonstrates operations to assess feasibility and robustness before Exelon and UIUC proceed with their simulations using VERA. To demonstrate load-follow capability, two test problems were developed. The first is a single rod that experiences nominal operations during Cycle 1, and then it simulates 18 months of representative load-follow operations in Cycle 2. This single-rod case was used to test the robustness of MPACT, CTF, and BISON on a typical rod. The second problem is a quarter-core model based on WBN1, Cycle 3, with a single month of load-follow operations inserted into the middle of the cycle. This provides better understanding of the stresses to the clad during the numerous power changes. Sections of this article are adapted from the original, full technical report on this capability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cassini Distributed Instrument Operations: What We've Learned Since Saturn Orbit Insertion

The Cassini mission to Saturn is complex with 12 science teams conducting distributed operations across the United States and Europe. Each Team includes scientists from around the world who actively participate in operations, including observation design, instrument commanding, downlink processing, and archiving. This represents a change in how JPL complex deep-space missions have been operated. Since Saturn Orbit Insertion (SOI), the Cassini Project has spent 17 months conducting science operations and has gained real-world experience that has tested the assumptions and rationale for this approach. We have learned that many of the expected benefits have been realized, but there were numerous unexpected challenges as well. This paper will discuss the lessons learned from the Cassini Tour experience to date. It will revisit the assumptions and rationale behind the distributed instrument operations design and will describe the results, good and bad, of implementing this method of operations. We will describe how Instrument Teams are structured, their roles and responsibilities, what challenges they faced going into orbital operations (the 'tour') and what creative solutions were proposed when funding limitations and schedule milestones prevented optimum solutions. We will also discuss the problems that have been encountered both on the ground and with the instruments, how these problems and anomalies were overcome, and what was learned along the way about the characteristics of distributed instrument operations.

Cassini↗