Beyond “greening” and “browning”: Trends in grassland ground cover fractions across Eurasia that account for spatial and temporal autocorrelation
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
An alarm system is a vital component of any accelerator, as it provides a warning that some element of the system is not functioning properly. The severity and age of the alarm may sometimes signify whether urgent or deferred attention is required. For example, older alarms may be given a lower priority if an assumption is made that someone else is already investigating it, whereas those of higher severity or alarms that are more current may indicate the need for an immediate response. The alarm history also provides valuable information regarding the functionality of the overall system, thus careful tracking of these data is likely to improve response time, remove uncertainty about the current status and assist in the ability to promptly respond to the same warning/trigger in the future. Since one goal of every alarm display is to be free of alarms, a clear and concise presentation of an alarm along with useful historic annotations can help the end user address the warning more quickly, thus expediting the elimination of such alarm conditions. By defining a discrete set of very specific alarm management states and by utilizing database resources to maintain a complete and easily accessible alarm history, we anticipate facilitated work flow due to more efficient operator response and management of alarms.
No abstract prepared.
The plutonium facility is actively processing material on a daily basis at LANL (4000-5000 transactions/month): (1) Physical operations, material transformations, material mixing, splitting, etc.; and (2) Electronic manipulations resulting primarily from updated NDA measurements. Improvements in efficiency and effectiveness are essential due to impacts of recent Voluntary Separation Program and the need to meet mission requirements with fewer personnel. New storage requirements (DOE M 441.1-1, Nuclear Material Packaging Manual) to protect worker safety require tracking of material and its corresponding container over long periods of time. Material at Risk tracking is essential to protect public safety and to ensure continuous operations to meet national security mission needs.
The viewgraphs describe the status of PMOD477 for LANL. The meeting will occur at DOE-HQ with NA-11 and Military Applications personnel in attendance. Serves to repatriate material with a balance to zero by December 2012. Phase 1 -- Establish formality of operations for War Reserve (WR): Complete surrogate taskings to A90 through a Materials Channel and perform US/UK lessons learned; Complete the US/UK agreed Quality Acceptance Plan, Materials Plan, Shipping procedure, and establish the formal UK/US point of contacts. Phase 2 -- Metal Manufacture (WR): Process material and store material as electrorefined metal (ER) rings, with initial assay and isotopic analysis, prior to manufacturing. Material is cast into accepted configuration and appropriate acceptance document for each aliquot will be generated. Phase 3 -- Intermediate Material Manufacture, Packaging and Shipping (WR): Continue processing of the material in accepted configuration with appropriate acceptance documentation for each aliquot. Provide an initial tasking of the material owed to UK including appropriate quality acceptance documentation. Phase 4 -- Complete Tasking (WR). Phase 5 -- Residue Processing (Non-WR): Complete processing of residue material and waste into accepted configuration with appropriate acceptance document for disposal.
Abstract not provided
Abstract Not Provided
Abstract Not Provided
Abstract Not Provided
Abstract Not Provided