Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Systems design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Applying Contamination Modelling to Spacecraft Propulsion Systems Designs and Operations

Molecular and particulate contaminants generated from the operations of a propulsion system may impinge on spacecraft critical surfaces. Plume depositions or clouds may hinder the spacecraft and instruments from performing normal operations. Firing thrusters will generate both molecular and particulate contaminants. How to minimize the contamination impact from the plume becomes very critical for a successful mission. The resulting effect from either molecular or particulate contamination of the thruster firing is very distinct. This paper will discuss the interconnection between the functions of spacecraft contamination modeling and propulsion system implementation. The paper will address an innovative contamination engineering approach implemented from the spacecraft concept design, manufacturing, integration and test (I&T), launch, to on- orbit operations. This paper will also summarize the implementation on several successful missions. Despite other contamination sources, only molecular contamination will be considered here.

Chen, Philip T.

Doppler Lidar System Design via Interdisciplinary Design Concept at NASA Langley Research Center - Part I

Optimized designs of the Navigation Doppler Lidar (NDL) instrument for Autonomous Landing Hazard Avoidance Technology (ALHAT) were accomplished via Interdisciplinary Design Concept (IDEC) at NASA Langley Research Center during the summer of 2013. Three branches in the Engineering Directorate and three students were involved in this joint task through the NASA Langley Aerospace Research Summer Scholars (LARSS) Program. The Laser Remote Sensing Branch (LRSB), Mechanical Systems Branch (MSB), and Structural and Thermal Systems Branch (STSB) were engaged to achieve optimal designs through iterative and interactive collaborative design processes. A preliminary design iteration was able to reduce the power consumption, mass, and footprint by removing redundant components and replacing inefficient components with more efficient ones. A second design iteration reduced volume and mass by replacing bulky components with excessive performance with smaller components custom-designed for the power system. Mechanical placement collaboration reduced potential electromagnetic interference (EMI). Through application of newly selected electrical components and thermal analysis data, a total electronic chassis redesign was accomplished. Use of an innovative forced convection tunnel heat sink was employed to meet and exceed project requirements for cooling, mass reduction, and volume reduction. Functionality was a key concern to make efficient use of airflow, and accessibility was also imperative to allow for servicing of chassis internals. The collaborative process provided for accelerated design maturation with substantiated function.

Boyer, Charles M.

UWB Tracking System Design for Lunar/Mars Exploration

This paper describes a design effort for a prototype ultra-wideband (UWB) tracking system that is currently under development at NASA Johnson Space Center (JSC). The system is being studied for use in tracking of lunar/Mars rovers during early exploration missions when satellite navigation systems are not available. The UWB technology is exploited to implement the tracking system due to its properties such as high data rate, fine time resolution, low power spectral density, and multipath immunity. A two-cluster prototype design using commercially available UWB products is proposed to implement the Angle Of Arrival (AOA) tracking methodology in this research effort. An AOA technique using the Time Difference Of Arrival (TDOA) information is utilized for location estimation in the prototype system, not only to exploit the precise time resolution possible with UWB signals, but also to eliminate the need for synchronization between the transmitter and the receiver. After the UWB radio at each cluster is used to obtain the TDOA estimates from the UWB signal sent from the target, the TDOA data is converted to AOA data to find the angle of arrival, assuming this is a far field application. Since the distance between two clusters is known, the target position is computed by a simple triangulation. Simulations show that the average tracking error at a range of 610 meters is 2.7595 meters, less than 0.5% of the tracking range. Outdoor tests to track the SCOUT vehicle (The Science Crew Operations and Utility Testbed) near the Meteor Crater, Flagstaff, Arizona were performed on September 12-13, 2005. The tracking performance was obtained with less than 1% tracking error at ranges up to 2000 feet. No RF interference with on-board GPS, video, voice and telemetry systems was detected. Outdoor tests demonstrated the UWB tracking capability.

Ni, Jianjun

MOD-Amp System Design Spring: Spring 2026 – Georgetown University, SYSM–5620

High-energy lasers (HELs) play an important role in both national defense and scientific research. In defense applications, HELs are used for target detection, tracking, and engagement. In research environments, they support studies of extreme physical conditions relevant to fusion energy and plasma science. These systems depend on the amplification of light through stimulated emission of radiation, allowing optical energy to be increased to the levels required for operation. This amplification occurs when light passes through an energized gain medium that receives energy from an external optical or electrical source. To achieve the desired output, laser systems often use multiple amplification stages, including high-gain preamplifiers and lower-gain power or booster amplifiers. At Lawrence Livermore National Laboratory (LLNL) and other national laboratories, many large-aperture laser amplifier systems are aging and rely on system-specific hardware, obsolete technologies, and incomplete documentation. These legacy systems create challenges for maintenance, supportability, and long-term operation. Their lack of standardization also increases the difficulty of sustaining reliable performance over time. As this infrastructure continues to age, the likelihood of unplanned downtime grows, which can negatively affect both national security missions and scientific research programs that depend on dependable HEL capabilities. The purpose of this document is to demonstrate the application of systems engineering fundamentals and design thinking through the development of a laser amplifier case study. The proposed system concept is intended as an academic exercise and not as a finalized engineering design. As a result, the development presented in this document is incomplete and may contain technical assumptions or errors that would require further investigation before any real-world implementation.

42 ENGINEERING

Modeling and Simulation for Exercise Vibration Isolation and Stabilization System Design

The microgravity environment that crew members experience on orbit presents a well-known health challenge, particularly when it comes to loss of muscle and bone mass. To counteract these negative effects, exercise countermeasures play a critical role in the daily routine of the crew on the International Space Station (ISS). To help inform requirements for upcoming exploration missions such as the Gateway Program, a new device, called the European Enhanced Exploration Exercise Device (E4D), is being built by the European Space Agency through their contractor, the Danish Aerospace Company. The E4D is being demonstrated on the ISS and is unique from other current exercise devices in that it provides four separate modalities in a single device: resistive, cycle ergometry, seated aerobic rowing, and rope pulling. To support the integration of E4D on ISS, a passive Vibration Isolation and Stabilization (VIS) system was required by NASA, and this responsibility was given to the Johnson Space Center. This paper describes the end-to-end process of modeling, simulation, and analysis used to inform the mechanical design of the VIS system. The process begins with the collection of representative exerciser motion capture (MoCap) through ground-based testing with the developmental E4D in both the Prototype Immersive Technology (PIT) Laboratory and the Active Response Gravity Offload System (ARGOS) facility at the Johnson Space Center. These collected MoCap data are processed through human biomechanics modeling to create forcing functions as input to a multibody dynamics simulation of the combined E4D/VIS system, with numerous resulting outputs. These outputs include microgravity accelerations, overall system displacements, internal and transmitted loads, as well as collisions. Microgravity accelerations are compared for compliance against ISS requirements while displacements are used for sway space determinations on the design and volumetric constraints within the targeted module. Internal loads are supplied to the supporting stress analysis teams and external loads for structural loads and dynamics teams, both at NASA and ESA. Finally, contact and clearance analysis is performed using the simulation to eliminate potential design issues. To ensure that the elements of the multibody simulation were verified and validated, correlation against multiple VIS related ground hardware testbeds was performed and characterized. In addition to the isolation part of the VIS problem, stabilization is also key to the integrated performance and evaluation. Due to the difficulty in defining ISS requirements in this area, the stability of the exerciser was inspected via analysis. Loss of balance was defined analytically as occurring when the resultant force vector acting on the exerciser lies outside the base of support of the feet. Both the VIS and E4D teams have recently gone through their Critical Design Reviews (CDRs) and the iterative model-based approach has been integral to inform mechanical design, particularly in the case of the VIS. This same end-to-end approach is now being applied for the Gateway Program, where an Exploration Exercise Device (EED) derived from the E4D and notional VIS for the device are under concept development.

Countermeasures

UWB Two-Cluster AOA Tracking Prototype System Design

This presentation discusses a design effort for a prototype ultra-wideband (UWB) tracking system that is currently under development at NASA Johnson Space Center (JSC). The system is being studied for use in tracking of lunar/Mars rovers during early exploration missions when satellite navigation systems are not available. The UWB technology is exploited to implement the tracking system due to its properties such as fine time resolution, low power spectral density and multipath immunity. A two cluster prototype design using commercially available UWB radios is employed to implement the Angle of Arrival (AOA) tracking methodology in this design effort. In order to increase the tracking range, low noise amplifiers (LNA) and high gain horns are used at the receiving sides. Field tests were conducted jointly with the Science and Crew Operation Utility Testbed (SCOUT) vehicle near the Meteor Crater in Arizona to test the tracking capability for a moving target in an operational environment. These tests demonstrate that the UWB tracking system can co-exist with other on-board radio frequency (RF) communication systems (such as Global Positioning System (GPS), video, voice and telemetry systems), and that a tracking resolution less than 1% of the range can be achieved.

Ngo, Phong H.

CO2 Removal Onboard the International Space Station – Material Selection and System Design

The previous three years of efforts have focused on the study of the sorbent materials available for use in a 4-bed molecular sieve system. The accumulation of knowledge has been invaluable for further decisions and for reflecting on the conclusions of past decisions. The goal of the next system is perfect uptime for nearly 20,000 hours of operation, but no complex life support system has yet reached this lofty goal. In addition to reliability, CO2 removal performance improvements have been intensively studied. The achievements toward this end include highly detailed isotherm measurements which drive system simulations as well as testing physical design improvements. Looking back on the successes and failures of past systems, correlating tests with long-duration data, and carefully projecting the future are all needed for the success of the next system. This work intends to reveal the path we have taken and illuminate the steps to come for CO2 removal life support with the 4BCO2 flight demonstration.

Cmarik, Gregory E.

Object-Oriented Control System Design Using On-Line Training of Artificial Neural Networks

This report deals with the object-oriented model development of a neuro-controller design for permanent magnet (PM) dc motor drives. The system under study is described as a collection of interacting objects. Each object module describes the object behaviors, called methods. The characteristics of the object are included in its variables. The knowledge of the object exists within its variables, and the performance is determined by its methods. This structure maps well to the real world objects that comprise the system being modeled. A dynamic learning architecture that possesses the capabilities of simultaneous on-line identification and control is incorporated to enforce constraints on connections and control the dynamics of the motor. The control action is implemented "on-line", in "real time" in such a way that the predicted trajectory follows a specified reference model. A design example of controlling a PM dc motor drive on-line shows the effectiveness of the design tool. This will therefore be very useful in aerospace applications. It is expected to provide an innovative and noval software model for the rocket engine numerical simulator executive.

Rubaai, Ahmed

Thermal Management System Design for Electrified Aircraft Propulsion Concepts

This paper describes the development of thermal management systems (TMS) for three electrified aircraft propulsion (EAP) vehicle concepts released by NASA that span the UAM, regional, and single-aisle markets. For each EAP concept, a conventional TMS is designed for two electric component technology levels: state of the art and advanced. The goals for the paper are to compare the TMS designs for the above EAP concepts, to study how changes in requirements affect the TMS subcomponents, and to develop generalized TMS sizing relations. Each conventional TMS concept utilizes a liquid-based cooling methodology and is designed to cool the EAP electrical components only. The design parameters considered in this study include TMS architecture variation due to differing vehicle cooling requirements, electrical component efficiencies, vehicle total fuel burn or energy consumption, and electrical component operating temperatures. Results show that cooling components with low temperature limits increases TMS weight and demonstrate that efficiency gains of the specific technologies can net a lower weight TMS system despite more stringent temperature limits.

Thermal Management System

Thermal Management System Design for Electrified Aircraft Propulsion Concepts

This paper describes the development of thermal management systems (TMS) for three electrified aircraft propulsion (EAP) vehicle concepts released by NASA that span the UAM, regional, and single-aisle markets. For each EAP concept, a conventional TMS is designed for two electric component technology levels: state of the art and advanced. The goals for the paper are to compare the TMS designs for the above EAP concepts, to study how changes in requirements affect the TMS subcomponents, and to develop generalized TMS sizing relations. Each conventional TMS concept utilizes a liquid-based cooling methodology and is designed to cool the EAP electrical components only. The design parameters considered in this study include TMS architecture variation due to differing vehicle cooling requirements, electrical component efficiencies, vehicle total fuel burn or energy consumption, and electrical component operating temperatures. Results show that cooling components with low temperature limits increases TMS weight and demonstrate that efficiency gains of the specific technologies can net a lower weight TMS system despite more stringent temperature limits.

Thermal management system

Thermal Management System Design for Electrified Aircraft Propulsion Concepts

This paper describes the development of thermal management systems (TMS) for three electrified aircraft propulsion (EAP) vehicle concepts released by NASA that span the UAM, regional, and single-aisle markets. For each EAP concept, a conventional TMS is designed for two electric component technology levels: state of the art and advanced. The goals for the paper are to compare the TMS designs for the above EAP concepts, to study how changes in requirements affect the TMS subcomponents, and to develop generalized TMS sizing relations. Each conventional TMS concept utilizes a liquid-based cooling methodology and is designed to cool the EAP electrical components only. The design parameters considered in this study include TMS architecture variation due to differing vehicle cooling requirements, electrical component efficiencies, vehicle total fuel burn or energy consumption, and electrical component operating temperatures. Results show that cooling components with low temperature limits increases TMS weight and demonstrate that efficiency gains of the specific technologies can net a lower weight TMS system despite more stringent temperature limits.

Thermal management system

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, in a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation; testing results, and other information. Where appropriate, actual performance history was used for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to verify compliance with requirements and to highlight design or performance shortcomings for further decision-making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability and maintainability analysis, and present findings and observation based on analysis leading to the Ground Systems Preliminary Design Review milestone.

Gernand, Jeffrey L.