Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Astronaut observations of the Persian (Arabian) Gulf during STS-45

As a result of the 1991 Persian Gulf war, between mid-January and June 1991, the Persian Gulf was contaminated with an estimated 4 to 6 million barrels of crude oil, released directly into the Gulf from refinement facilities, transhipment terminals, and moored tankers along the coast of Kuwait, and precipitated from oil fire smoke plumes. To assess the environmental impact of the oil, an international team of marine scientists representing 14 nations was assembled under the auspices of the United Nations International Oceanic Commission and the Regional Organization for Protection of the Marine Environment to conduct detailed surveys of the Persian Gulf, the Strait of Hormuz, and the Gulf of Oman, including hydrographic, chemical, and biological measurements. To supplement the field surveys and to serve as an aid in data interpretation, astronauts aboard the Space Shuttle Atlantis photographed water features and coastal habitats in the Persian Gulf during mission STS-45 (24 March to 02 April 1992). The astronauts collected 111 hand-held, color photographs of the Gulf (72 70-mm photographs and 39 5-inch photographs) from an altitude of 296 km (160 n.mi.). The photographs reveal distributions in water turbidity associated with outflow from the Shatt-al-Arab and water circulation along the entire coast of Iran and the Strait of Hormuz, coastal wetlands and shallow-water habitats, and sticks appearing in the sunglint pattern, which appear to be oil.

Ackleson, Steven G.↗

Earth observations during Space Shuttle mission STS-45 Mission to Planet Earth - March 24-April 2, 1992

A description is presented of the activities and results of the Space Shuttle mission STS-45, known as the Mission to Planet Earth. Observations of Mount St. Helens, Manila Bay and Mt. Pinatubo, the Great Salt Lake, the Aral Sea, and the Siberian cities of Troitsk and Kuybyshev are examined. The geological features and effects of human activity seen in photographs of these areas are pointed out.

Pitts, David E.↗

Forecasting the weather at the TAL sites during STS-40 using the grid point forecast output from the NMC MRF model

The NOAA's Spaceflight Meteorology Group has used the point forecast output from the Global Profile Archive and Global Profile Archive since 1990, and found this product to allow forecasters to examine the MRF model in a vertical profile, and thereby determine how different model parameters behave over time. Attention is presently given to the use of these resources in the illustrative case of the STS-40 mission, over northwestern Spain.

Hafele, Gene M.↗

STS-49 - A demonstration of EMU operational capabilities for Space Station Freedom assembly

One of the primary objectives for Space Shuttle mission STS-49 is to perform three EVAs on consecutive days in a manner similar to those planned for Space Station Freedom (SSF) assembly missions. The preparation and completion of this mission will serve as a pathfinder for future EVA intensive SSF assembly flights. Several operational issues pertaining to the EMU have been addressed in preparation for this mission. Provisioning and orbiter stowage of the EMU and associated hardware have been optimized for four EVA crewmembers. EMU preparatory and maintenance activities have been streamlined to help minimize crew overhead and have been carefully integrated into a very demanding mission timeline. The constraints and limitations have been assessed in providing a backup EMU capability for each EVA crewmember. Several EMU concerns have also been addressed in supporting new EVA task requirements, such as large mass handling and performing SSF assembly operations over the crew cabin and nose of the Shuttle orbiter.

Bleisath, Scott A.↗

STS-56 - Discovery in orbit with second ATLAS payload

The launching of Discovery on the STS-56 mission in April 1993 is described. The installation of experiments and launch delays of the space shuttle are discussed. A review of the activities of the crew is given for each day of the mission.

Schuiling, Roelof↗

Analysis of video imagery of the reentry and breakup of the STS-31 external tank

Some of the major questions concerning the reentry and breakup of the STS-31 external tank (ET), which had a deactivated tumble valve, are addressed. The time of breakup, the altitude, and the geographic location of the ET at breakup were determined. The tumble rate was estimated to be between 8.59 deg and 8.84 deg/s. The ET broke up into at least 50 pieces 7 s after initial rupture.

Snyder, Michael W.↗

Earth observations during Space Shuttle Mission STS-42 - Discovery's mission to planet earth

The noteworthy imagery acquired during Space Shuttle Mission STS-42 is documented. Attention is given to frozen Tibetan lakes, Merapi Volcano in Java, Mt. Pinatubo in the Philippines, the coastline east of Tokyo Japan, land use in southern India, and the Indus River Delta. Observations of Kamchatka Peninsula, Lake Baikal, Moscow, Katmai National Park and Mt. Augustine, Alaska, the Alaskan coast by the Bering Sea, snow-covered New York, the Rhone River valley, the Strait of Gibraltar, and Mt. Ararat, Turkey, are also reported.

Lulla, Kamlesh P.↗

STS-55 pad abort: Engine 2011 oxidizer preburner augmented spark igniter check valve leak

The STS-55 initial launch attempt of Columbia (OV102) was terminated on KSC launch pad A March 22, 1993 at 9:51 AM E.S.T. due to violation of an ME-3 (Engine 2011) Launch Commit Criteria (LCC) limit exceedance. The event description and timeline are summarized. Propellant loading was initiated on 22 March, 1993 at 1:15 AM EST. All SSME chill parameters and launch commit criteria (LCC) were nominal. At engine start plus 1.44 seconds, a Failure Identification (FID) was posted against Engine 2011 for exceeding the 50 psia Oxidizer Preburner (OPB) purge pressure redline. The engine was shut down at 1.50 seconds followed by Engines 2034 and 2030. All shut down sequences were nominal and the mission was safely aborted. The OPB purge pressure redline violation and the abort profile/overlay for all three engines are depicted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 013-414, OPB purge pressure redline exceeded. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to the oxidizer preburner augmented spark igniter purge check valve not being fully closed due to contamination. The source of the contaminant was traced to a cut segment from a rubber O-ring which was used in a fine clean tool during valve production prior to 1992. The valve was apparently contaminated during its fabrication in 1985. The valve had performed acceptably on four previous flights of the engine, and SSME flight history shows 780 combined check valve flights without failure. The failure of an Engine 3 (SSME No. 2011) check valve to close was sensed by onboard engine instruments even though all other engine operations were normal. This resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗

STS-32 Post-Flight Crew Press Conference

Video footage of the post-flight press conference of STS-32 is presented. The footage is narrated by the crew, and it covers the following topics: launch, deployment of Syncom IV-5, retrieval of the Long Duration Exposure Facility, in-orbit activities, and the landing.

Source record↗

STS-53 Space Shuttle mission report

The STS-53 Space Shuttle Program Mission Report provides a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle Main Engine (SSME) subsystems performance during the fifty-second flight of the Space Shuttle Program, and the fifteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Orbiter, the flight vehicle consisted of an ET, which was designated as ET-49/LWT-42; three SSME's, which were serial numbers 2024, 2012, and 2017 in positions 1, 2, and 3, respectively; and two SRB's, which were designated BI-055. The lightweight RSRM's that were installed in each SRB were designated 360L028A for the left SRB, and 360L028B for the right SRB. The primary objective of this flight was to successfully deploy the Department of Defense 1 (DOD-1) payload. The secondary objectives of this flight were to perform the operations required by the Glow Experiment/Cryogenic Heat Pipe Experiment Payload (GCP); the Hand-Held, Earth-Oriented, Real-Time, Cooperative, User-Friendly, Location-Targeting and Environmental System (HERCULES); the Space Tissue Loss (STL); the Battlefield Laser Acquisition Sensor Test (BLAST); the Radiation Monitoring Equipment-III (RME-III); the Microcapsules in Space-1 (MIS-1); the Visual Function Tester-2 (VFT-2); the Cosmic Radiation Effects and Activation Monitor (CREAM); the Clouds Logic to Optimize Use of Defense Systems-1A (CLOUDS-1A); the Fluids Acquisition and Resupply Experiment (FARE); and the Orbital Debris Radar Calibration Spheres (ODERACS). In addition to presenting a summary of subsystem performance, this report also discusses each Orbiter, ET, SSME, SRB, and RSRM in-flight anomaly in the applicable section of the report. Listed in the discussion of each anomaly is the officially assigned tracking number as published by each Project Office in their respective Problem Tracking List. All times given in this report are in Greenwich mean time (G.m.t.) as well as mission elapsed time (MET).

Fricke, Robert W., Jr.↗

STS-54 Space Shuttle mission report

The STS-54 Space Shuttle Program Mission Report is a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle Main Engine (SSME) subsystems performance during this fifty-third flight of the Space Shuttle Program, and the third flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET, which was designated ET-51; three SSME's, which were serial numbers 2019, 2033, and 2018 in positions 1, 2, and 3, respectively; and two retrievable and reusable SRB's which were designated BI-056. The lightweight RSRM's that were installed in each SRB were designated 360L029A for the left SRB, and 360L029B for the right SRB. The primary objectives of this flight were to perform the operations to deploy the Tracking and Data Relay Satellite-F/Inertial Upper Stage payload and to fulfill the requirements of the Diffuse X-Ray Spectrometer (DXS) payload. The secondary objective was to fly the Chromosome and Plant Cell Division in Space (CHROMEX), Commercial Generic Bioprocessing Apparatus (CGBA), Physiological and Anatomical Rodent Experiment (PARE), and the Solid Surface Combustion Experiment (SSCE). In addition to presenting a summary of subsystem performance, this report also discusses each Orbiter, ET, SSME, SRB, and RSRM in-flight anomaly in the applicable section of the report. The official tracking number for each in-flight anomaly, assigned by the cognizant project, is also shown. All times are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗

An evaluation of noise and its effects on shuttle crewmembers during STS-50/USML-1

High noise levels can lead to physiological, psychological, and performance effects in man, ranging from irritability, annoyance, and sleep interference to interference with verbal communication and fatigue, and to temporary or permanent threshold shift at more extreme levels. The current study evaluated the acoustic environment of the STS50/USML-1 mission. The major objectives were to gain subjective assessments of the STS-50 noise levels, document impacts of noise upon crewmember performance, collect inflight sound level measurements, compare noise levels across missions, evaluate the current Shuttle acoustic criterion, and to make recommendations regarding noise specifications for SSF and other long-duration manned space missions. Sound measurements indicated that background noise levels were 60, 64, and 61 A-weighted decibels, respectively, on the Orbiter middeck, flight deck, and Space lab. All levels were rated acceptable, with the Spacelab environment rated the most favorably. Sleep stations afforded attenuation from airborne noise sources, although all crewmembers reported being awakened by crew activity on the middeck. Models of distance for acceptable speech communications were generated, identifying situations of compromised verbal communications to be avoided.

Koros, Anton↗

STS-26 Post-Flight Crew Press Conference

This video tape contains footage selected and narrated by the STS-26 crew including launch, TDRS-C/IUS (Tracking and Data Relay Satellite C / Inertial Upper Stage) deployment, onboard activities, and landing.

Source record↗

STS-31 Post-Flight Conference

This video contains footage selected and narrated by the STS-31 Commander and crew including launch, Hubble Space Telescope deployment, onboard activities, and landing.

Source record↗

STS-33 Emergency Egress Training

The STS-33 crew is shown donning flight survival gear, then entering the CCT for bailout exercises. After completion of the exercises in the CCT, the bailout procedures are practiced in the FFT.

Source record↗

STS-33 Crew Post Flight Film

This video contains footage selected by the Commander and crew of the STS-33 DoD mission, including launch, limited onboard activities, and landing.

Source record↗