Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Arcjet component conditions through a multistart test

A low power, dc arcjet thruster was tested for starting reliability using hydrogen-nitrogen mixtures simulating the decomposition products of hydrazine. More than 300 starts were accumulated in phases with extended burn-in periods interlaced. A high degree of flow stabilization was built into the arcjet and the power supply incorporated both rapid current regulation and a high voltage, pulsed starting circuit. A nominal current level of 10 A was maintained throughout the test. Photomicrographs of the cathode tip showed a rapid recession to a steady-state operating geometry. A target of 300 starts was selected, as this represents significantly more than anticipated (150 to 240), in missions of 10 yr or less duration. Weighings showed no apparent mass loss. Some anode erosion was observed, particularly at the entrance to the constrictor. This was attributed to the brief period during startup the arc mode attachment point spends in the high pressure region upstream of the nozzle. Based on the results obtained, startup does not appear to be performance or life limiting for the number of starts typical of operational satellite applications.

Curran, Frank M.↗

Nuclear powered Mars cargo transport mission utilizing advanced ion propulsion

Nuclear-powered ion propulsion technology was combined with detailed trajectory analysis to determine propulsion system and trajectory options for an unmanned cargo mission to Mars in support of manned Mars missions. A total of 96 mission scenarios were identified by combining two power levels, two propellants, four values of specific impulse per propellant, three starting altitudes, and two starting velocities. Sixty of these scenarios were selected for a detailed trajectory analysis; a complete propulsion system study was then conducted for 20 of these trajectories. Trip times ranged from 344 days for a xenon propulsion system operating at 300 kW total power and starting from lunar orbit with escape velocity, to 770 days for an argon propulsion system operating at 300 kW total power and starting from nuclear start orbit with circualr velocity. Trip times for the 3 MW cases studied ranged from 356 kW to 413 days. Payload masses ranged from 5700 to 12,300 kg for the 300 kW power level, and from 72,200 to 81, 500 kg for the 3 MW power level.

Galecki, Diane L.↗

Understanding natural language for spacecraft sequencing

The paper describes a natural language understanding system, START, that translates English text into a knowledge base. The understanding and the generating modules of START share a Grammar which is built upon reversible transformations. Users can retrieve information by querying the knowledge base in English; the system then produces an English response. START can be easily adapted to many different domains. One such domain is spacecraft sequencing. A high-level overview of sequencing as it is practiced at JPL is presented in the paper, and three areas within this activity are identified for potential application of the START system. Examples are given of an actual dialog with START based on simulated data for the Mars Observer mission.

Katz, Boris↗

Orbital transfer vehicle oxygen turbopump technology. Volume 2: Nitrogen and ambient oxygen testing

The testing of a rocket engine oxygen turbopump using high pressure ambient temperature nitrogen and oxygen as the turbine drive gas in separate test series is discussed. The pumped fluid was liquid nitrogen or liquid oxygen. The turbopump (TPA) is designed to operate with 400 F oxygen turbine drive gas which will be demonstrated in a subsequent test series. Following bearing tests, the TPA was finish machined (impeller blading and inlet/outlet ports). Testing started on 15 February 1989 and was successfully concluded on 21 March 1989. Testing started using nitrogen to reduce the ignition hazard during initial TPA checkout. The Hydrostatic Bearing System requires a Bearing Pressurization System. Initial testing used a separate bearing supply to prevent a rubbing start. Two test series were successfully completed with the bearing assist supplied only by the pump second stage output which entailed a rubbing start until pump pressure builds up. The final test series used ambient oxygen drive and no external bearing assist. Total operating time was 2268 seconds. There were 14 starts without bearing assist and operating speeds up to 80,000 rpm were logged. Teardown examination showed some smearing of silverplated bearing surfaces but no exposure of the underlying monel material. There was no evidence of melting or oxidation due to the oxygen exposure. The articulating, self-centering hydrostatic bearing exhibited no bearing load or stability problems. The only anomaly was higher than predicted flow losses which were attributed to a faulty ring seal. The TPA will be refurbished prior to the 400 F oxygen test series but its condition is acceptable, as is, for continued operating. This was a highly successful test program.

Brannam, R. J.↗

Wind-tunnel blockage and actuation systems test of a two-dimensional scramjet inlet unstart model at Mach 6

The present study examines the wind-tunnel blockage and actuation systems effectiveness in starting and forcibly unstarting a two-dimensional scramjet inlet in the NASA Langley 20-Inch Mach 6 Tunnel. The intent of the overall test program is to study (both experimentally and computationally) the dynamics of the inlet unstart; however, prior to the design and fabrication of an expensive, instrumented wind-tunnel model, it was deemed necessary first to examine potential wind-tunnel blockage issues related to model sizing and to examine the adequacy of the actuation systems in accomplishing the start and unstart. The model is equipped with both a moveable cowl and aft plug. Windows in the inlet sidewalls allow limited optical access to the internal shock structure; schlieren video was used to identify inlet start and unstart. A chronology of each actuation sequence is provided in tabular form along with still frames from the schlieren video. A pitot probe monitored the freestream conditions throughout the start/unstart process to determine if there was a blockage effect due to the model start or unstart. Because the purpose of this report is to make the phase I (blockage and actuation systems) data rapidly available to the community, the data is presented largely without analysis of the internal shock interactions or the unstart process. This series of tests indicated that the model was appropriately sized for this facility and identified operability limits required first to allow the inlet to start and second to force the unstart.

Holland, Scott D.↗

The Newton Modified Barrier Method for QP Problems

The Modified Barrier Functions (MBF) have elements of both Classical Lagrangians (CL) and Classical Barrier Functions (CBF). The MBF methods find an unconstrained minimizer of some smooth barrier function in primal space and then update the Lagrange multipliers, while the barrier parameter either remains fixed or can be updated at each step. The numerical realization of the MBF method leads to the Newton MBF method, where the primal minimizer is found by using Newton's method. This minimizer is then used to update the Lagrange multipliers. In this paper, we examine the Newton MBF method for the Quadratic Programming (QP) problem. It will be shown that under standard second-order optimality conditions, there is a ball around the primal solution and a cut cone in the dual space such that for a set of Lagrange multipliers in this cut cone, the method converges quadratically to the primal minimizer from any point in the aforementioned ball, and continues to do so after each Lagrange multiplier update. The Lagrange multipliers remain within the cut cone and converge linearly to their optimal values. Any point in this ball will be called a "hot start". Starting at such a "hot start", at most Omicron(1n 1n epsilon(exp -1)) Newton steps are sufficient to perform the primal minimization which is necessary for the Lagrange multiplier update. Here, epsilon > 0 is the desired accuracy. Because of the linear convergence of the Lagrange multipliers, this means that only Omicron(1n epsilon(exp -1))omicron(ln 1n epsilon(exp-1)) Newton steps are required to reach an epsilon-approximation to the solution from any "hot start". In order to reach the "hot start", one has to perform Omicron(square root(m) 1n C) Newton steps, where m characterizes the size of the problem and C > 0 is the condition number of the QP problem. This condition number will be characterized explicitly in terms of key parameters of the QP problem, which in turn depend on the input data and the size of the problem.

Melman, A.↗

Thermal Control of Liquid H2/O2 Rocket Engines and Vehicle Impact

Cryogenic propulsion systems are subjected to various engine start environments during ground testing, first burn, and restart after orbital coast. These operational modes necessitate careful engine-stage integration, particularly in thermal control of propellant feed systems and engine subsystems. The wide range of operational conditions imposed on propellant feed systems include varying heat loads and acceleration forces for static test first burn and orbital restart. One method used to provide Net Positive Suctign,Head (NPSH) and maintain turbopump I is thermal control propellant circulation through the feed system prior to engine start. The attendant design and operational criteria are inter-related with stage and vehicle systems, including for example, auxiliary propulsion and propellant ullaging methods such as propellant tank propulsive venting. Thermally sensitive engine components require environmental control, protection, or special sequencing in order to assure repeatable engine start performance. An example is thrust chamber pre-chill to avoid pump stall during rapid start transient. Trends in engine development are toward expanding system flexibility to accommodate the wide variety of environments without special pre-start conditioning.

Winstead, Thomas W.↗

Development and Operations of the Astrophysics Data System

The ADS was represented at the AAS meeting with 3 poster papers and a demonstration booth. We have setup a mirror site of the Vizier data base system at the CDS. functionality of the ADC at Goddard. This will replace the Preparations for the APS and LPSC meetings in March started. We will have demonstrations at both meetings. Preparations for the APS and LPSC meetings in March continued. We will have demonstrations at both meetings. The ADS was represented with a poster at the joint AGUEGU meeting in Nice, France. Discussions about the on-going collaboration between the ADS and the CDS in Strasbourg, France were held in Strasbourg. The ADS was invited to organize a session about the ADS and its mirror sites at the next United Nations Workshop on Basic Space Sciences in the Developing World. Efforts are under way to enter the tables of contents of all conference proceedings in the SA0 library into the ADS. This requires copying the tables of contents from all volumes in the library and have them typed in. This will greatly enhance the coverage of the literature in the ADS. We started the development of a search system for the full text of all scanned material in the ADS. This will eventually allow our users search capabilities that so far do not exist in any form. I order to enable the full text searching, we have purchased OCR software and are in the process of OCRing the scanned pages in the ADS. Efforts are in progress to handle the inclusion of data set identifiers in article manuscripts. The ADS will be the central system that will allow the journals to verify data set identifiers. The "master verifier" has been implemented in prototype form at the ADS. We started to include more journals in Geosciences/Geophysics in the ADS. The Royal astronomical Society has decided to archive their on-line journals in the ADS three years after publication. We have started to process these older on-line articles in order to archive them in the ADS. Our mirror site in Korea now has a full article mirror. We developed XML output capability in the ADS. This will make it easier to exchange data with other data systems. We started the development of new indexing software that will eventually reduce the indexing time for a database from days to hours or less. The ADS was represented at the IAU General Assembly with a poster. Discussions with the IAU management were held about extending the ADS IAU collaborations.

Murray, Stephen S.↗

Serial data transmission between redundant channels

Data is communicated between redundant channels formatted in blocks having an initial command word followed by a destination code, starting address and a variable number of data words including a word count. The blocks are transmitted between each channel and all of the channels over cross-channel data links, each channel receiving the data blocks and determining the validity thereof by counting the number of data words received and comparing that number to the word count transmitted for that block. An interrupt signal indicative of invalidity of a block is provided in the event of a miscompare. A stop address is generated for each block received for storage at the start address. A memory address is generated for each valid word received for storage in sequence starting immediately after the start address. The next block received has its start address placed immediately at the end of the previously received block.

Tulpule, Bhalchandra R.↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Onset of the Magnetic Explosion in On-Disk Solar Coronal Jets

In our recent studies of ~10 quiet region and ~13 coronal hole coronal jets, we found that flux cancelation is the fundamental process in the buildup and triggering of the minifilament eruption that drives the production of the jet. Here, we investigate the onset and growth of the ten on-disk quiet region jets, using EUV images (304, 171, 193, and 94 Å) from SDO/AIA and magnetograms from SDO/HMI. We find that: (i) in all ten events the minifilament starts to rise at or before the onset of the signature of internal or external reconnection; (ii) in two out of ten jets brightening from the external reconnection starts at the same time as the slow rise of the minifilament and (iii) in six out of ten jets brightening from the internal reconnection starts before the start of the brightening from external reconnection. These observations show that the magnetic explosion in coronal jets begins in the same way as the magnetic explosion in filament eruptions that make solar flares and coronal mass ejections (CMEs). Our results indicate (1) that coronal jets are miniature versions of CME-producing eruptions and flux cancelation is the fundamental process that builds and triggers both the small-scale and the large-scale eruptions, and (2) that, contrary to the view of Moore et al (2018), the current sheet at which the external reconnection occurs in coronal jets usually starts to form at or after the onset of (and as a result of) the slow rise of the minifilament flux-rope eruption, and so is seldom of appreciable size before the onset of the slow rise of the minifilament flux-rope eruption.

Panesar, Navdeep K.↗

International Space Station Bipropellant Plume Contamination Model Update for Short Thruster Pulse Widths

The International Space Station (ISS) Bipropellant Plume Contamination Model has been a vital tool for characterizing the thruster plume-induced contamination environment at the ISS but was not intended to be used for very short thruster pulse widths. This paper presents an updated model that ensures full start-up and shut-down phases are modeled for each thruster firing, when the majority of liquid phase contaminant mass is released. The updated ISS Bipropellant Plume Contamination Model prevents potential under-prediction of thruster plume-induced contamination due to visiting vehicle proximity operations and provides a way to take advantage of thruster start-up and shut-down data performance data gathered during thruster test programs, if available. The International Space Station (ISS) Bipropellant Plume Contamination Model developed by Boeing Space Environments is a semi-empirical model anchored in flight experiment data and has been a vital tool for characterizing the thruster plume-induced contamination environment at the ISS.[1] The current model utilizes flight experiment data from the Plume Impingement Contamination (PIC) and Shuttle Plume Impingement Flight Experiment (SPIFEX) studies, which include Orbiter 3870 N Primary Reaction Control System (PRCS) and Russian 130 N thrusters operating in pulse mode with 80-100 ms.[2] As the next generation of crew and cargo visiting vehicles are developed and arrive at ISS, minimum pulse widths of vehicle thrusters used for ISS proximity operations have decreased significantly below 80 ms. An update to the ISS Bipropellant Contamination Model is needed to prevent potential under-prediction of thruster plume-induced contamination for these very short pulse widths. Contamination due to thruster plumes occurs in the liquid phase (i.e., unburned or partially burned propellant in the plume). Liquid phase releases primarily occur during thruster start-up and shut-down phases, with the steady state phase contributing a small amount to the total contaminant mass released. The current ISS Bipropellant Plume Contamination Model includes functional dependencies on thruster parameters (thrust, mass flow rate, specific impulse (Isp)), distance to receiver surface, and angle off plume centerline. For modeling purposes, contaminant mass released scales linearly with pulse width. This is a conservative approach for pulse widths greater than 80 ms but could under-predict contamination for very short pulse widths (i.e., with little or no steady state phase). This paper presents a model update to add a functional dependency on commanded pulse width to ensure the portion of the pulse spent in start-up and shut-down phases is appropriately modeled, when the majority of liquid phase contaminant mass is released. The updated model prevents potential under-prediction of thruster plume-induced contamination due to visiting vehicle proximity operations while providing a way to take advantage of thruster start-up and shut-down data gathered during test programs, if available. Developing the plume model for a specific thruster using the ISS Bipropellant Plume Contamination Model must be done in consideration of all available thruster performance data. Example thruster data will be used to illustrate this point and options for implementing the model update with existing ISS Bipropellant Plume Contamination Model code will be discussed.

plume contamination↗

Vattenfall Decommissioning Planning in Sweden - 17544

A rapid decrease in the power prices in the Nordic market for the last three years has drastically reduced the profitability of the nuclear power plants in Sweden. This has resulted in a very quick re-evaluation of the optimal life-term of the older generation, from the 1970's, nuclear units in Sweden. Hence, it was decided last year to shut-down the Vattenfall Ringhals-1 BWR and the Ringhals-2 PWR by 2020 and 2019, respectively, for financial reasons. Before that decision, the planning had been to operate the units until 50 years life-time, i.e. 2024 and 2025. This decision resulted in a prompt start of the planning for decommissioning of the two units. The planning started with a project, called AVANS, to ensure that the overall planning and to-be-developed organisations had well defined requirements and a common platform. Another project, STURE, was started to ensure the continued operation and in some case movement of common site functions to the two younger units on the Ringhals site, i.e. the PWRs Ringhals-3 and Ringhals-4. This project also has the responsibility to optimise operation of Ringhals-1 and Ringhals-2 to EOL and the subsequent removal of the nuclear fuel from the units after necessary cool-down. A third project started is the actual decommissioning project, TYKO, benefiting from experience gained and staff involved in still ongoing decommissioning of a legacy materials reactor, i.e. the Studsvik R2/R2-0 reactor. The planning and experience to date for the three projects will be presented in the paper, as well as lessons-learned and future plans, including some critical items identified wrt dismantling and site function transfer. Half of the nuclear units in Sweden, six units, and one legacy power reactor, will be starting decommissioning within the next few years. Impacts on the back-end system; the financial situation, with respect to the state-controlled financial funding; and the supplier market are discussed in the paper. Furthermore, the planning process and the planned management of the interfaces between the involved organisations is described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geographic Information System Based Emergency Response Training Assessments for DOE Radioactive Materials Transport - 20027

Safety and security are priorities of U.S. Department of Energy (DOE) radioactive materials shipping campaigns. In the more than 70-year history of domestic transport of spent nuclear fuel (SNF), there has never been a transportation-related radiological injury. To support transportation planning, among the tools that DOE uses is the Stakeholder Tool for Assessing Radioactive Transportation (START). START contains geospatial data and transportation route analyses capabilities designed to support a range of DOE transportation planning initiatives. One of those functions is the capability to support emergency response planning and training for State and Tribal jurisdictions located on routes used for DOE shipments of radioactive materials. As part of the Department's commitment to public safety, DOE provides federally-funded radiological response training to emergency responders along DOE radioactive materials transportation corridors through its Transportation Emergency Preparedness Program (TEPP). START contains spatial data representing the locations and emergency-response capabilities of fire departments, police, hospitals, State emergency response centers, and where TEPP-trained personnel are based. The START tool supports State and Tribal users' ability to evaluate emergency-response coverage on active and potential DOE radioactive materials transport routes through their jurisdictions, provide expected response times to reach the scene of an incident, identify equipment available to support a response, and identify the number of response personnel and their respective training levels. In addition, START can be used to identify gaps in coverage along a transportation corridor where additional radiological emergency response training may be needed. This paper describes the data, features, and functionality DOE uses to provide a resource for emergency response training needs assessments for States and Tribes along active and potential routes for transporting radioactive materials, and illustrates its use. It also discusses future plans to integrate TEPP and Federal Emergency Management Agency (FEMA) radiological training data to provide a more comprehensive source of geospatial information on personnel who have received equivalent radiological response training. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Unified Universal Control and Coordination of Inverter-Based Resources, and Validation for a PV + Battery Hybrid Plant

As renewable energy deployment grows, hybrid power plants (HPPs) combining photovoltaic (PV) and battery systems must evolve to offer both energy and grid stability services. These systems typically include a mix of grid-following (GFL) and grid-forming (GFM) inverters, presenting unique coordination and control challenges. This Department of Energy–funded project developed and validated a Unified Universal Control and Coordination (UUCC) framework for such PV + battery hybrid plants, enabling seamless and stable operation, including ultrafast black start, autonomous synchronization, and robust frequency and voltage regulation, under different grid conditions. The project significantly advanced the understanding of inverter-based resource (IBR) control by developing and validating three complementary system-level approaches for hybrid GFL/GFM operation: 1. A combined Virtual Resistance (VR)-based GFL and Virtual Oscillator Control (VOC)-based GFM method, where each inverter type is governed by a specialized control strategy. Together, these achieve stable, fast-response coordination, eliminating inrush current and enabling smooth black start and grid synchronization across a wide range of grid strengths. 2. A Deadbeat-based UUCC strategy, which uses discrete-time, switching-cycle-level control for both GFL and GFM inverters. This approach replaces traditional PI/PLL control with a control parameter-free, high-bandwidth framework that supports stable LVRT and instantaneous synchronization under all conditions. 3. A benchmark comparison with Siemens’ commercial GFM microgrid controller, which provided a fast baseline platform. The commercial approach decoupled v & f control was implemented on a commercial microgrid controller.The baseline commercial benchmark helped highlight superior transient response and black start performance offered by the deadbeat and VOC approaches. These technical contributions offer substantial improvements over conventional inverter control schemes, which often rely on slow phase-locked loop (PLL)-based synchronization, require careful control parameters tuning, and prone to unstable in weak grids with GFL inverters and in stiff grid with GFM inverters therefore challenging for hybrid GFL+GFM under all grid conditions. The deadbeat-based UUCC framework enables simpler, faster, and more robust operation of hybrid IBR systems using wide-bandgap (WBG) devices such as SiC power semiconductors. The rapid expansion of hybrid distributed energy resources (DERs), including residential and commercial PV-BESS installations such as Tesla Powerwall, PV with vehicle-to-grid (V2G) capability, and other integrated configurations, presents complex operational challenges for medium-voltage radial distribution feeders. These networks are subject to frequent disturbances such as faults, switching operations, rapid reclosing sequences, and feeder reconfigurations, all of which introduce dynamic stress on IBRs. In addition, planned feeder segmentation and deliberate islanding for resilience will require DERs that can autonomously perform blackstart, establish voltage and frequency references, and resynchronize with the main grid. The advanced deadbeat-based UUCC control and blackstart functionalities developed in this project directly address these requirements, enabling decentralized and autonomous operation of inverter-dominated DERs in distribution systems under a wide range of fault and reconfiguration scenarios. From a public benefit perspective, these innovations enable more reliable and cost-effective integration of renewable energy into distribution networks. The ability to autonomously black start and stabilize grids under varying grid conditions support accelerates recovery from outages and support decentralized resilient energy systems. By reducing system complexity and improving performance, this project lays critical groundwork for future inverter-dominated power grids that are clean, reliable, and accessible to all.

14 SOLAR ENERGY↗

Contech to Accelerate Cleantech: Seeding Emerging Innovation Programs for Construction Productivity and Energy Efficiency Integration; Preprint

Investments in U.S.-based start-ups that focus on advanced building construction technologies to increase construction productivity (contech) surged to approximately $3.1 billion in 2018 (as per Crunchbase data). More recently, emerging programs by government funding agencies, philanthropic foundations, and venture capitalists have been instrumental in supporting contech start-ups for innovations that increase productivity of energy efficiency integration and accelerate clean energy technologies (cleantech) for the buildings sector. These programs include R&D support and funding mechanisms for contech and cleantech. Traditionally, contech and cleantech are considered as two different innovation ecosystems. To enhance and scale up energy efficiency in buildings, creative programs that bring together contech and cleantech are critical. This paper provides a landscape assessment of the "contech-for-cleantech" innovation ecosystem in the U.S. and its impact in accelerating technology readiness and the development pipeline of "contech-for-cleantech". Technologies highlighted are robotics for retrofits, prefabrication of energy-efficient products, and advanced manufacturing of low-carbon net-zero buildings construction. Programs discussed include those led by (1) government funding agencies: American-Made Challenges with prizes like E-ROBOT for retrofits with robotics, (2) philanthropic foundations: Wells Fargo Innovation Incubator (IN2) that includes focus on energy efficiency and prefabrication, and (3) venture capitalists: Shadow Ventures Green Building Accelerator program which provides funding support to start-ups with ambitious plans for decarbonizing the built environment. This paper will also expand upon robust processes and criteria involved in judging and down-selection of start-ups through vetting and feedback from national lab researchers and industry experts in both cleantech and contech.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cyanohydridoborate Anions: Synthesis, Salts, and Low‐Viscosity Ionic Liquids

Abstract High‐yield syntheses up to molar scales for salts of [BH(CN) 3 ] − ( 2 ) and [BH 2 (CN) 2 ] − ( 3 ) starting from commercially available Na[BH 4 ] (Na 5 ), Na[BH 3 (CN)] (Na 4 ), BCl 3 , (CH 3 ) 3 SiCN, and KCN were developed. Direct conversion of Na 5 into K 2 was accomplished with (CH 3 ) 3 SiCN and (CH 3 ) 3 SiCl as a catalyst in an autoclave. Alternatively, Na 5 is converted into Na[BH{OC(O) R } 3 ] ( R =alkyl) that is more reactive towards (CH 3 ) 3 SiCN and thus provides an easy access to salts of 2 . Some reaction intermediates were identified, for example, Na[BH(CN){OC(O)Et} 2 ] (Na 7 b ) and Na[BH(CN) 2 {OC(O)Et}] (Na 8 b ). A third entry to 2 and 3 uses ether adducts of BHCl 2 or BH 2 Cl such as the commercial 1,4‐dioxane adducts that react with KCN and (CH 3 ) 3 SiCN. Alkali metal salts of 2 and 3 are convenient starting materials for organic salts, especially for low viscosity ionic liquids (ILs). [EMIm] 3 has the lowest viscosity and highest conductivity with 10.2 mPa s and 32.6 mS cm −1 at 20 °C known for non‐protic ILs. The ILs are thermally, chemically, and electrochemically robust. These properties are crucial for applications in electrochemical devices, for example, dye‐sensitized solar cells (Grätzel cells).

Bischoff, Lisa A.↗