Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROOFS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Keep It Smart and Simple - Henriette - The Advanced Designed Drum Gripper for Remote Handling Tasks - 19327

A power manipulator has many applications in the handling, treatment and packaging of radioactive waste. In high radiation environments, where humans cannot work safely, a power manipulator is essential to perform difficult and heavy tasks. For more than 40 years, Waelischmiller has provided power manipulators to the nuclear market. Specifically in a high radiation nuclear environment, electrical driven manipulators are preferred. The basic design of a power manipulator is divided into the following parts: Bridge, carriage, telescopic mast and manipulator arm. All parts are customizable in length, width and capacity. The standard power manipulator version is equipped with a manipulator arm. For the nuclear waste disposal industry, there is a special need for a drum gripper. Drums are used for packing low, medium or high activated material and for storage. After packing, the drums must be handled remotely. For both tasks, a power manipulator with a drum gripper is needed. For this project KTE (Kerntechnische Entsorgung Karlsruhe GmbH) required a total refurbishment of equipment in a cell used for handling, sorting and packaging radioactive waste drums. The power manipulator was obsolete and provided low availability and through put. This cell was an essential asset in their decommissioning process and was impacting KTE's ability to meet their volume objectives. Our challenge was to develop a new system with few details from the original cell construction. The new manipulator must meet all capabilities of the old system and in addition have the ability to achieve 180 degree tilting of the drums. An additional challenge was the requirement to use the existing rails in the cell which were very close to the roof structure which required a special design. Our project, named internally Henriette, is the first of its kind. The drum gripper is based on the power manipulator A1000 series. The biggest challenges in this project were to adapt the standard components of the power manipulator to the non-standard type of gripper to have 180 deg. tilting of the drum and a handling capacity of 1200 kg in the whole working range. The new manipulator fits to the old rails and is mountable in a hot cell with restricted access and can operate with the other A1000 manipulator which is located in the cell. The result is a system with no external wiring, maintenance-free and easy to decontaminate. Other features include a 5 t auxiliary hoist on additional and parallel carriages, emergency drives for bridge and carriage, emergency drive for telescope turn movement and emergency lifting unit for telescope. A tilt and pan holder for camera on the telescope and external mechanical emergency drives on the gripper were also essential. This paper will address the complexity, challenges and engineering ingenuity required to replace very old and obsolete equipment with a state-of-the-art system within very limited physical space and within a high radiation environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Analysis for SRS Saltstone Disposal Unit Facility

Saltstone Disposal Units (SDU) are long term disposal units for low activity grout produced from the solidification of decontaminated non-hazardous salt waste at SRS. The unit is a cylindrical disposal vault of 150 ft. in diameter and 23 ft. in height. The total volume the SDU can hold is 3 million gallons of grout. The hydration process of the grout material produces heat from an exothermic chemical reaction. If the grout reaches temperatures higher than the maximum safety temperature of 95 deg. C, cracks can start forming leading to contamination of the environment. The purpose of this study is to develop the optimal baseline domain boundary conditions and to perform a sensitivity analysis with respect to the baseline modeling conditions. The following assumptions were made for the modeling calculations: - The system geometry is axisymmetric; - The system was at steady state; - Ambient temperature was set to 100 deg. F; - Air was assumed to be an incompressible ideal gas; - Radiation was neglected for a conservative estimation; - Natural convection for the SDU vapor space is assumed to be turbulent because Rayleigh number based on typical operating conditions is higher than 10{sup 8}; - Water tables were not taken into consideration. The following sensitivity analyses were performed to find the optimal domain boundary: - Mesh size sensitivity; - Soil depth sensitivity - Soil depth varied from 30 ft to 250 ft with a soil thickness of 90 ft; - Soil thickness sensitivity - Soil thickness varied from 30 ft to 270 ft with a soil depth of 180 ft; - Soil conductivity sensitivity - Soil thermal conductivity varied from 0.25 W/m-K to 1 W/m-K; - Ambient Temperature Sensitivity - Ambient temperature varied from 70 deg. F to 110 deg. F. For the thermal calculations, the temperature of the bottom of the soil was set to 17.4 deg. C. The heat flux on the roof of the building and surface of the earth is 163.2 W/m{sup 2}. The soil sides are set to be adiabatic. The sensitivity analysis shows that the mesh size has no effect on the numerical results. This is mainly due to a small convection zone and large conduction zones in the modeling domain. The optimal domain boundary was found to be a soil thickness of 90 ft and a soil depth of 150 ft. The different sensitivity analysis performed here shows the optimal boundary domain to be used for thermal calculations is a soil depth of 150 ft beneath the SDU and a soil thickness of 90 ft. Anything larger would produce similar solutions but at a longer computational time to solve. The maximum temperature was more sensitive to soil properties as shown here. While the ambient temperature affected the max temperature linearly. Most of the heat transfer takes place downward vertically between the SDU and the soil beneath it. Using the optimal domain boundary determined by the sensitivity analyses, the maximum thermal loading to keep the maximum grout temperature below 95 deg. C is 1.646 W/m{sup 3}.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

VENTSAR V3.0: A Python GUI for Estimating Contaminant Concentrations on or Near Buildings Due to Building Effects and Plume Rise and For Calculating Inhalation and Plume Shine Doses

VENTSAR: Originated as VENTAX (Smith and Weber 1983) on the IBM Mainframe at the Savannah River Site (SRS) as a Fortran program. Updated to VENTSAR XL V1.0 (Simpkins 1997) as a spreadsheet version using macros created in Microsoft Excel. Later updated to VENTSAR XL V2.0 (Dixon 2018) as a spreadsheet executing a modified version of the original VENTAX Fortran code. Estimates contaminant concentrations on or near a building from a release at a nearby location. Calculates concentrations for a given meteorological exceedance probability or for a given stability and wind speed combination. Can model a single building with or without a penthouse on top or a ground location from either a stack or ground release. Plume rise can be considered. Contaminant releases can be chemical or radioactive with downwind concentrations determined at user-specified distances. Wind passing over and around buildings creates a complicated dispersion pattern. Air-intake vents may be located on building roofs or near the ground downwind of a release source. An estimation of pollutant concentrations on or near a structure is important in determining expected pollutant levels. Meteorological data are selected based on a specific area of the site. Fortran-based VENTAX able to make fast, complex mathematical calculations. Not user-friendly VENTSAR XL V1.0 no longer supported due to obsolete Excel macros. VENTSAR XL V2.0 an interim solution using an Excel spreadsheet to interface with the modified VENTAX Fortran code. Requires user to have Microsoft Excel. Not an intuitive interface for someone unfamiliar with VENTSAR. Does not perform dose calculations. VENTSAR V3.0 goal to combine the strengths of previous versions of VENTSAR into a single, powerful yet user-friendly program with a Graphical User Interface (GUI). Not dependent upon a specific program or plug-ins. Self-contained package to be used on any computer running Microsoft Windows. User-friendly, intuitive GUI created in Python for parameter input. Executes same modified VENTAX Fortran code as VENTSAR XL V2.0. Outputs formatted text file of completed calculations for easy review and dissemination. Performs inhalation and plume shine dose calculations for up to 11 user-selected nuclides from a nuclide dose factor library of almost 500 nuclides. 12 test cases were created for verification of V1.0 and V2.0. Same test cases run in V3.0 to verify correct performance. V3.0 produced similar results to V1.0. Confirmed GUI did not alter calculations in any way. Comparisons of the test case results confirm the V3.0 GUI does not influence the VENTSAR calculations. Simply passes same input parameters to VENTAX Fortran code for execution. Provides end user an easy-to-use, intuitive tool to quickly make building effect and plume rise calculations, as well as, inhalation and plume shine dose calculations. No experience with or working knowledge of Fortran, Excel, command line, or macros required. Self-contained package allows VENTSAR be deployed to any Windows computer without the need for specific programs or plug-ins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History of Ultrasonic Inspection of High-Level Waste Tanks at SRS - 20220

The Liquid Waste Disposition Projects (LWDP) Structural Authority and Inspection Engineering Support Group has teamed with the Materials Science and Technology Non-destructive Evaluation Group of Savannah River National Laboratory (SRNL) to implement a comprehensive In-Service Inspection (ISI) program for the High-Level Waste (HLW) tanks in the sites tank farms. The purpose of this program is to demonstrate the structural and leak integrity of the tanks to maintain the function of waste containment throughout the desired service life. Four types of waste tanks were constructed at Savannah River Site (SRS) from 1951 thru 1981 to store radioactive nuclear waste from the separations process. The Type I, II and III are carbon steel cylindrical tanks with varying degrees of access to the side walls and very limited access to the tank bottom. The tanks contain 750,000 to 1.3 million gallons of waste and are buried or backfilled with soil. The tanks are 75'-85' in diameter and 24'-33' from tank bottom to the tank roof. Inspection of the HLW tanks is made difficult by radiation, contamination, and small access openings. Through the years these challenges have been overcome by progressive improvements to programs and equipment resulting in the sophisticated wall crawler Ultrasonic Testing (UT) technology of today. A formal inspection program was developed and put in service in 1972. UT thickness measurements were first made in 1967 and 1969 of selected waste tanks using an analog-type instrument to measure the thickness of the carbon steel walls. Routine inspections for thinning were performed from 1972-1985 and then discontinued because no thinning had been observed and this technique could not detect pitting or cracking. UT inspections resumed in 1994 using a sophisticated robotic wall crawler with UT technology capable of detecting thinning, cracking and pitting. The current program focuses on the newer Type III tanks that are used primarily for storage. The program was upgraded in 2003 to include selected regions of the tank wall, secondary wall and annulus floor on a 7 to 10-year frequency. The facility is currently in its third cycle of tank inspections. Thus far, there have been no reportable indications of service induced degradation. This result provides assurance that the chemistry control program has been effective at mitigating corrosion and that the tanks remain structurally sound even after more than 40 years of service. This paper will present the UT technology first used at SRS and the evolution to the current systems and their capabilities. Additionally, plans for equipment upgrades that will improve the extent of inspection will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atmospheric {sup 41}Ar Plume Tracking of the UF Training Reactor Using a Large-Volume NaI Detector

The ability to track and monitor gaseous radioactive materials is important in the event of a radioactive release such as from a nuclear power plant accident, weapons testing, or other unintended release scenarios. The International Monitoring System (IMS) is currently in place to monitor for weapons testing and has been used to monitor nuclear power plant accidents. However, only 80 radionuclide stations for the IMS exist in the world and are stationary, limiting the resolution of any radioactive plumes detected. Furthermore, the IMS radionuclide stations are designed to be sensitive specifically to atmospheric radio-xenon and no other radionuclides. Historically, monitoring radioactive releases has been limited to the detection of radio-xenon and radio-krypton, both arising as fission products from nuclear fuel. After the accident at Three Mile Island Unit 2, scientists were interested in finding the dose the public received from released radioactive material. This was achieved by analyzing radiation monitors in the exhaust stack and filters within the reactor building. furthermore, a series of 20 thermoluminescent dosimeters (TLD's), 8 air sampling station positioned around Three Mile Island, and a helicopter survey which used a NaI(Tl) detector array provided data on radionuclides, specifically {sup 137}Cs, that escaped the confines of the reactor building. The TLD's and air sampling stations were stationary, and therefore limited the resolution of the radioactive release plume. The helicopter survey using the NaI detectors was limited by the technology available at the time. The NaI detector array output was compressed from 1024 channels to 256 channels, limiting the energy resolution of the spectral data. The helicopter used a microwave ranging system to establish position. Since this survey was taken in October of 1982, advancements in technology allow spectral data to be saved in its full 1024 channel format and the advent of GPS can give a more accurate account of the detector position. An updated mobile system for tracking a radioactive release would help to alleviate these issues as well as gain the ability to track a radioactive release in real-time. We investigate the feasibility of mobile tracking through study and measurement of the {sup 41}Ar plume released from the University of Florida Training Reactor (UFTR) research reactor. We use a large-volume NaI(Tl) detector placed on the roof near the reactor. This detector may also be placed and moved on a cart to survey the area surrounding the reactor. We compare the spectral data taken when the reactor is running at full power to the background to analyze the effectiveness of the detector at identifying atmospheric {sup 41}Ar. Finally we discuss the implications of these measurements with regards to validation of plume models and the capability to track releases over a localized area from the source. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulation of the Prompt Dose Environment in the NIF during High Yield Shots

The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory is the world's largest and most energetic laser system for inertial confinement fusion. NIF is a 192-laser beam facility, capable of producing 1.8 MJ, 500 TW of ultraviolet light. The main laser systems are installed in two laser bays. Each laser bay delivers 96 beams into one of two switchyards. Sets of turning mirrors in each Switchyard (SY) redirect the beams into the Target Bay (TB). Additional sets of optics in the TB will align and focus the beams onto the target in the center of the Target Chamber (TC). The 192 beams enter the TC through 48 indirect-drive beam ports. Laser beams are then focused to enter a small metal can (hohlraum) held at the center of the TC creating thermal x-rays that heat the surface of the fusion capsule contained within. The Target Bay has a cylindrical design with an inner radius of 15.24 m, 1.83-m-thick concrete walls and 1.37-m-thick concrete roof. A total of 239 and 121 penetrations are present in the Target Bay and switchyard walls, respectively. Figure 1 shows the facility's layout. There are seven floor levels within the TB at elevations of -33'9'', -21'9'', -3'6'', 17'6'', 29'6'', 40'0'', and 50'6'' with respect to the ground level. The TC is positioned in the middle of the TB with its center at elevation of 23'0'' from the ground level. The NIF will routinely utilize deuterium-tritium (D-T) targets with up to 20 MJ yield per shot, and maximum annual yield of 1200 MJ. This summary focuses on analyzing the expected prompt dose environment during the NIF's high yield phase of operations. Previous publications evaluated the expected doses associated with lower yield phases of operation. During shots, the Target Bay, Switchyards, and Laser Bays are interlocked and unoccupied. On the other hand, Personnel can be present inside the Operations Support Building (OSB), the control room, and the visitor center during the shots. The radiation shielding has been optimized to meet the NIF radiological design goals and the Department of Energy (DOE) limits. The goal is to limit the maximum prompt dose in any potentially occupied area to less than 50 {mu}Sv per shot as well as limiting the annual dose to individuals in the occupied areas to less than 1 mSv.

61 RADIATION PROTECTION AND DOSIMETRY↗

Protection factors for French dwellings - 25573

IRSN's current method of assessment of public exposure from atmospheric releases of radioactivity from nuclear installations assumes an exposed person outside of any building; even though the majority of time is spent inside. A more realistic assessment would take into account the protection from atmospheric contamination and deposits provided by dwellings. Therefore, IRSN carried out a study to estimate protection factors for gamma ray emitting radionuclides. This was done with the MCNP calculation code and assumed several French dwelling types. Air contamination (outside and inside) and deposits on soil (outside and inside) and on a roof are considered. Method and results are set out for a few radionuclides. The results show the influence of dwelling type, and also of room sealing (considering inner contamination or not) in case of radiological emergency. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Wind Turbine Blade Repurposing and Recycling: Coupling Repurposing Methods with 3D Printing Technology

Fiber-reinforced thermoplastic composites continue to be implemented in several marketsbecause of their strength capacity and light weight. Especially in the wind industry, wind bladesare made of this material which makes them ideal for wind energy generation, but bladesbecome a problem at end-of-life. Because recycling thermoplastic composites technologiesare still not cost and environmentally effective, research in this space is needed. This paperpresents a case study for coupling repurposed wind turbine blades and 3D printing technology.The purpose is to remanufacture decommissioned wind blades into bus stop roof and seatingsections to then use recycled glass fiber from a decommissioned wind turbine blade to 3Dprint structural and/or fixtures needed in the assembly. We provide an overview of the designprocess, and the development process steps in repurposing and 3D printing the material,delving into key parameters required for a successful implementation.

Henao, Yulizza↗

Field Testing of PID-p Susceptible Bifacial PERC Modules: Impact of Light, Voltage and Module History ​

This work investigates the potential induced degradation-polarization (PID-p) of bifacial passivated emitter and rear contact (PERC) modules installed in the field at the Florida Solar Energy Center. 22 modules were stressed over 1 year under various voltage (-1500V, -3500, +1500V) and mounting configurations (close to ground, 2 meters from ground, close to roof). The positively stressed modules were anticipated to have experiences PID-p on their front side. However, no degradation was observed, as the light-induced recovery effect effectively counteracted the degradation. The negatively stressed modules experienced Pmax drops during 2 weeks before stabilizing at 5-6% loss. I-V and EL characteristics suggest a PID-p degradation on the rear side. Lower degradation rates are observed with lower voltage and when the mounting configuration allows more albedo light on the rear side to compensate for the degradation. PID-p is observed to stabilize at similar level for the voltage and mounting configuration tested with slightly lower Pmax in winter. EL imaging reveals that cells are not degrading at the same rate across a module. Some cells get darker and then brighter which corresponds to the silicon/passivation interface going through depletion and then inversion when enough positive charges are accumulated. After full light-recovery, the modules were tested again along with 22 brand-new ones to assess the impact of the module history. Results confirmed the trends observed in the first year with PID-p occurring at voltage as low as -600V and recovered modules degrading faster than brand-new ones.

14 SOLAR ENERGY↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗

GAS MIXING ANALYSIS IN A LARGE-SCALED SALTSTONE FACILITY

Computational fluid dynamics (CFD) methods have been used to estimate the flow patterns mainly driven by temperature gradients inside vapor space in a large-scaled Saltstone vault facility at Savannah River site (SRS). The purpose of this work is to examine the gas motions inside the vapor space under the current vault configurations by taking a three-dimensional transient momentum-energy coupled approach for the vapor space domain of the vault. The modeling calculations were based on prototypic vault geometry and expected normal operating conditions as defined by Waste Solidification Engineering. The modeling analysis was focused on the air flow patterns near the ventilated corner zones of the vapor space inside the Saltstone vault. The turbulence behavior and natural convection mechanism used in the present model were benchmarked against the literature information and theoretical results. The verified model was applied to the Saltstone vault geometry for the transient assessment of the air flow patterns inside the vapor space of the vault region using the potential operating conditions. The baseline model considered two cases for the estimations of the flow patterns within the vapor space. One is the reference nominal case. The other is for the negative temperature gradient between the roof inner and top grout surface temperatures intended for the potential bounding condition. The flow patterns of the vapor space calculated by the CFD model demonstrate that the ambient air comes into the vapor space of the vault through the lower-end ventilation hole, and it gets heated up by the Benard-cell type circulation before leaving the vault via the higher-end ventilation hole. The calculated results are consistent with the literature information. Detailed results and the cases considered in the calculations will be discussed here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEMOLISHING A COLD-WAR-ERA FUEL STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB) siding. The project's mission was to complete demolition of the structure over the K East basin within six months of tumover from facility deactivation activities. The demolition project team implemented open-air demolition techniques to demolish the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovation that aided demolition was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building, portions of the interior walls, and was an integral part of the multiple layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by removing the CAB during demolition using heavy equipment. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that similar open-air demolition ofcontaminated structures can be performed successfully.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DEMOLISHING A COLD WARE ERA FULE STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB) siding. The project's mission was to complete demolition of the structure over the KE Basin within six months of turnover from facility deactivation activities. The demolition project team applied open-air demolition techniques to bring the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives during the demolition; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovative approach that made demolition easier was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building and portions of the interior walls, and was an integral part of the multiple-layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by using heavy equipment to remove the CAB during demolition. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that contaminated structures can be torn down successfully using similar open-air demolition techniques.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydronic rooftop cooling systems

A roof top cooling unit has an evaporative cooling section that includes at least one evaporative module that pre-cools ventilation air and water; a condenser; a water reservoir and pump that captures and re-circulates water within the evaporative modules; a fan that exhausts air from the building and the evaporative modules and systems that refill and drain the water reservoir. The cooling unit also has a refrigerant section that includes a compressor, an expansion device, evaporator and condenser heat exchangers, and connecting refrigerant piping. Supply air components include a blower, an air filter, a cooling and/or heating coil to condition air for supply to the building, and optional dampers that, in designs that supply less than 100% outdoor air to the building, control the mixture of return and ventilation air.

42 ENGINEERING↗

The Cosmic Ray Observatory Project A Statewide Outreach Education Experiment in Nebraska

The Cosmic Ray Observatory Project (CROP) is a statewide education and research experiment involving Nebraska high school students, teachers, and college undergraduates in the study of extended cosmic-ray air showers. A network of high school teams construct, install, and operate school-based detectors in coordination with University of Nebraska physics professors and graduate students. The detector system at each school is an array of scintillation counters recycled from the Chicago Air Shower Array in weather-proof enclosures on the school roof, with a GPS receiver providing a time stamp for cosmic-ray events. The detectors are connected to triggering electronics and a data-acquisition PC inside the building. Students share data via the Internet to search for time coincidences with other sites. Funded by the U.S. National Science Foundation, CROP enlisted its first 11 schools in the summers of 2000 and 2001 with the aim of expanding to the 314 high schools in the state over the next several years. Similar school-based cosmic ray efforts in the U.S. and abroad will also be described.

43 PARTICLE ACCELERATORS↗

Verification and Validation of EnergyPlus Phase Change Material Model for Opaque Wall Assemblies

Phase change materials (PCMs) represent a technology that may reduce peak loads and HVAC energy consumption in buildings. A few building energy simulation programs have the capability to simulate PCMs, but their accuracy has not been completely tested. This study shows the procedure used to verify and validate the PCM model in EnergyPlus using a similar approach as dictated by ASHRAE Standard 140, which consists of analytical verification, comparative testing, and empirical validation. This process was valuable, as two bugs were identified and fixed in the PCM model, and version 7.1 of EnergyPlus will have a validated PCM model. Preliminary results using whole-building energy analysis show that careful analysis should be done when designing PCMs in homes, as their thermal performance depends on several variables such as PCM properties and location in the building envelope.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗