SEARCH · Engineering Papers
Results for “Qualification”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
STATUS OF PIP-II 650 MHZ PROTOTYPE DRESSED CAVITY QUALIFICATION
Explore the source record for details and available documents.
Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification
This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.
PD21A680: Additive Manufacturing Process Optimization and Qualification FY21 Year-end Report
This project builds upon knowledge gained from previous projects on Additive Manufacturing (AM) operation, process control and monitoring, repeatability, and process improvement. This project will exclusively focus on metal powder bed additive manufacturing (PBAM). Objective 1: Advance metal powder bed AM R&D capabilities. Perform enhanced R&D on increased build volumes and throughput, safety and handling controls, process monitoring, and diagnostics with a focus on production end-states. Objective 2: Build upon knowledge gained from previous PDRD projects to develop deeper understanding of process controls, essential for transitioning metal AM processes for future applications. Objective 3: Maintain business development and research advantages through collaborations with external industry and university partners.
DFLAW Glass and Feed Qualifications for AP-107 to Support WTP Start-Up and Flow-Sheet Development (VSL-18R4500-1, Rev 0)
About 50 million gallons of high-level mixed waste is currently stored in underground tanks at The United States Department of Energy’s (DOE’s) Hanford site in the State of Washington. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will provide DOE’s Office of River Protection (ORP) with a means of treating this waste by vitrification for subsequent disposal. The tank waste will be separated into low- and high-activity waste fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High Level Waste (IHLW) products. The ILAW product will be disposed in an engineered facility on the Hanford site while the IHLW product is designed for acceptance into the national deep geological disposal facility for high-level nuclear waste. The ILAW and IHLW products must meet a variety of requirements with respect to protection of the environment before they can be accepted for disposal. The Low Activity Waste (LAW) at Hanford will be vitrified in a Joule Heated Ceramic Melter (JHCM) to produce a stable product for safe disposal. Although present in relatively small amounts, a few key constituents in the LAW streams play particularly important roles. Sulfur, chlorine, and fluorine can have significant impacts on LAW glass formulation and waste loadings, while technetium and iodine are important for waste form performance, with technetium being the constituent of most concern with respect to waste disposal in the Integrated Disposal Facility (IDF). The IDF is designed to accept ILAW, secondary waste associated with ILAW production, and other on-site Hanford Non-Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) waste. As a result of volatilization of these species during the vitrification process, they are also present in significant amounts in the liquid effluents from the off-gas treatment system. Understanding the fraction of each constituent incorporated in the LAW glass or in WTP liquid effluents is critical for assessing the performance of waste forms to be disposed in the IDF. Liquid effluents from the LAW vitrification process that are not recycled will likely be solidified to produce a secondary waste form that is not as chemically durable as glass. Therefore, understanding partitioning of the key constituents between the glass and non-glass waste forms is a significant factor in the Performance Assessment (PA) for the Hanford IDF. Clearly, it is preferable to incorporate as much of the technetium into the glass as possible because of the superior chemical durability of that waste form. The objective of the present work is to improve the understanding of the partitioning of technetium and other key waste constituents between the glass and non-glass waste forms.
Sandia COTS Surveillance Programs & Tie-In w/ Qualification Plans to Ensure Reliability.
Abstract not provided.
Qualification of Laser-induced Damage Resistance by a Holistic Suite of Optical Probes
Explore the source record for details and available documents.
Determining Hazard Severity via Probabilistic Risk Assessment in the Commercial Trucking Industry to Inform Design and Qualification.
Abstract not provided.
RCT Training and Qualification
The RCT training program prepares Radiological Control Technicians to support the advancement of the laboratory’s mission objectives while ensuring the health and safety of the workforce and public from radiological hazards, utilizing a multi-disciplinary, hands-on approach. Currently located at the MESA complex within the University of New Mexico – Los Alamos Campus, the RP Training department has established an immersive training environment that simulates realistic work conditions in which RCTs may develop the fundamental knowledge and skills required to control radiological work across the Laboratory
How Modal Information Can Improve Confidence in Vibration Qualification.
Abstract not provided.
Testing of the Defense Waste Processing Facility Cold Chemical Dissolution Method in Sludge Batch 10 Qualification
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) tests the applicability of the digestion methods used by the DWPF Laboratory for elemental analysis of Sludge Receipt and Adjustment Tank (SRAT) Receipt samples and SRAT Product process control samples. DWPF SRAT samples are typically dissolved using a method referred to as the DWPF Cold Chemical or Cold Chem Method (CC), (see DWPF Procedure SW4-15.201- 2.1).
Determining Hazard Severity via Probabilistic Risk Assessment in the Commercial Trucking Industry to Inform Design and Qualification.
Abstract not provided.
Status of SNS Proton Power Upgrade SRF Cavities Production Qualification
The Proton Power Upgrade project at Oak Ridge National Lab’s Spallation Neutron Source (SNS PPU) currently being constructed will double the proton beam power from 1.4 to 2.8 MW by adding 7 additional cryomodules, each contains four six-cell high beta (\beta = 0.81) superconducting radio frequency cavities. The cavities were built by Research Instruments, Germany, with all the cavity processing done at the vendor site, including electropolishing as the final active chemistry step. All 28 cavities needed for 7 cryomodules were delivered to Jefferson Lab, ready to be tested. The cryogenic RF qualifications and helium vessel welding were done at Jefferson Lab. The performance largely exceed the requirements, and greatly exceeded the performance of the original SNS cavity production series. Here, we present the summary of RF test on production cavities to this date.
Project update 2022: Machine Learned Uranium Potentials for Accelerated Nuclear Fuel Qualification [Slides]
Abstract not provided.
Low Activity Waste Tuning Feed Material Testing; Qualification and Transition Testing (Final Report)
The primary objective of this work was to collect data to support processing of the proposed LAW tuning feed composition at the WTP. This was achieved through assessment of the modified LAWB83 feed and glass composition by feed rheology testing and by processing selected LAW feeds through a DM100 melter to confirm that the tuning feed material can be fed to the melter with acceptable commercial or hazards risk. The testing also confirmed that transitions from the startup frit to the LAWB83 tuning feed and then to the cold commissioning simulant composition can be performed without causing any significant melter performance issues.
Qualification of ANSI/HPS N13.1-2011 Mixing Criteria by Computational Fluid Dynamics Modeling for the 3430 Building Fan Addition and Increased Ventilation Capacity
Additional ventilation capacity has been designed for the 3430 Building filtered exhaust stack system. The updated system will increase the number of fans from two to three and include new ductwork with a larger diameter to integrate the new fan into the existing stack. Stack operations will involve running various fan combinations at any given time. The air monitoring system of the existing two-fan stack previously was found to comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard. Full-scale, three-dimensional computational fluid dynamics (CFD) modeling was used to evaluate the modified three-fan system for compliance with the ANSI/HPS N13.1-2011 standard, which essentially is equivalent to the ANSI/HPS N13.1-1999 standard. The four mixing criteria evaluated are 1) flow angle, 2) velocity, 3) gas tracer, and 4) particle tracer. Benchmarking of the CFD modeling methodology showed good agreement with previous testing used to qualify the stack, and modeling of the existing two-fan system showed good agreement with test data collected from the 3430 Building stack. Modeling was performed to develop a suitable three-fan design. Initial modeling of the three-fan design and basic ductwork showed that flow angles and velocity uniformity were acceptable; however, the gas tracer and particle tracer mixing results were not acceptable. To meet ANSI/HPS N13.1-2011 criteria, an air blender was added to the stack design.
Qualification of ANSI/HPS N13.1-2011 Mixing Criteria by Computational Fluid Dynamics Modeling for the 3430 Building Fan Addition and Increased Ventilation Capacity
Additional ventilation capacity has been designed for the 3430 Building filtered exhaust stack system. The updated system will increase the number of fans from two to three and include new ductwork with a larger diameter to integrate the new fan into the existing stack. Stack operations will involve running various fan combinations at any given time. The air monitoring system of the existing two-fan stack previously was found to comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard. Full-scale, three-dimensional computational fluid dynamics (CFD) modeling was used to evaluate the modified three-fan system for compliance with the ANSI/HPS N13.1-2011 standard, which essentially is equivalent to the ANSI/HPS N13.1-1999 standard. The four mixing criteria evaluated are 1) flow angle, 2) velocity, 3) gas tracer, and 4) particle tracer. Benchmarking of the CFD modeling methodology showed good agreement with previous testing used to qualify the stack, and modeling of the existing two-fan system showed good agreement with test data collected from the 3430 Building stack. Modeling was performed to develop a suitable three-fan design. Initial modeling of the three-fan design and basic ductwork showed that flow angles and velocity uniformity were acceptable; however, the gas tracer and particle tracer mixing results were not acceptable. To meet ANSI/HPS N13.1-2011 criteria, an air blender was added to the stack design. This revision models the individual maximum fan reduced flow capacity from 38,000 cfm to 31,200 cfm; no changes to the duct design are made.