Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Publications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

On the Path to Energy Independence and a Clean Power Future – LED Lighting Retrofit and Solar Power Generation for the CTUIR Science and Engineering Laboratory and Public Transit Center (Rev.1)

This project supports the goals of the Energy Policy for the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through the implementation of an energy efficiency measure (LED lighting retrofit) and construction of a fixed rack (stationary) ground-mounted solar photovoltaic (PV) array energy generation system. The project objective was to eliminate the net demand for grid-based utility energy at two tribal facilities: the CTUIR Field Station and the Public Transit Center (consisting of bus barn and maintenance shop buildings). A total of 332 lighting fixtures were retrofitted with high efficiency LEDs at the three buildings within the project scope. The solar PV array constructed adjacent to the Field Station (46330 Timine Way, Pendleton, OR 97801) has a nameplate capacity of 97.98 kW DC . The project was managed by staff from the CTUIR Energy & Environmental Sciences Program within the Department of Natural Resources and the final budget was $\$ $288,206. Data was collected during a 12 month monitoring period following construction of the aptly named Ántukš–Tín̓qapapt Solar PV Array and assessed to determine project results. During this time, the solar PV system generated 125,580 kWh of energy according to SolrenView solar PV system monitoring service. In contrast, the total realized utility energy and cost savings due to the project were estimated by comparing 24 months of consecutive utility billing data. Results of this comparison indicate that grid-based utility energy demand was reduced by 121,280 kWh, or roughly 80% of the total electricity consumed by both facilities. The cost savings associated with this energy demand reduction were $\$ $11,104 and a payback period of 5.7 years was estimated for recovering the CTUIR’s investment. However, it should be noted that these figures are not representative of the savings that could be obtained under normal, error-free (i.e. faultless) conditions. Several undesirable events occurred during the 12 month monitoring and evaluation period, the effects of which were quantified using available data so that results under a “Faultless Scenario” could be estimated. Annual energy and cost savings estimated for the Faultless Scenario were approximately 166,289 kWh and $\$ $15,225, respectively. These figures should prove to be more representative of the long-term average annual results achieved in response to the project and suggest a payback period closer to 4.5 years for the CTUIR.

14 SOLAR ENERGY↗

Fermilab Technical Publications [PowerPoint]

Public Access Mandate: Many Fermilab papers are the result of collaboration with external researchers. Often the Fermilab author never obtains a copy of the final, accepted version. We have been working with our collaborations to find good practices that will enable us to easily fulfill our responsibility. Our aim is that this becomes a standard procedure in the HEP community.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

95th percentile doses to public and co-located workers based on five years (2010-2014) of LLNL meteorological data (WSF B625)

This calculation is to be used for accident analysis at the Waste Storage Facilities (WSF). The objective of this analysis is to determine: The 95th percentile dose to the public and co-located workers used for accident analysis consistent with NRC Regulatory Guide 1.145 Position 3 using MACCS2 and five years (2010-2014) of LLNL meteorological data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Wonders of Physics -- Public Outreach (Final Technical Report)

The mission of The Wonders of Physics (TWoP) outreach program is to generate interest in physics among people of all ages and backgrounds. The objective is to generate interest in physics, increase appreciation for the significance of physics in our lives, and encourage children to consider careers in science and plasma physics. The primary means for achieving that objective is to make entertaining presentations to audiences that would not normally be motivated to attend a lecture on physics or plasmas, while at the same time introducing some of the fundamental concepts and applications. During this reporting period, the students Michael Hall, Megan Tabbutt and Connor Sullivan, Director of Communications Sarah Perdue, Director of Undergraduate Program Jim Reardon, and Senior Information Processing Consultant Paul Wilhite worked to make outreach programs a success and prepare for the future of The Wonders of Physics, which will continue. Because of the curtailment of public events due to Covid-19, there will not be an in person Annual Show or Physics Fair in 2021, but a video competition has already been announced and planning continues for The Wonders of Physics in 2022 and beyond. The annual shows and Physics Fair are scheduled for February 12-13 and February 19-20, 2022. These continue to be our premier outreach events, engaging diverse audiences in real hands-on science. Further shows and exploration stations are planned.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Algae Testbed Public Private Partnership -ATP 3 (Final Closeout Report)

The Algae Testbed Public Private Partnership (ATP3) was proposed in response to the ADVANCEMENTS IN SUSTAINABLE ALGAL PRODUCTION (ASAP) FUNDING OPPORTUNITY NUMBER: DE-FOA-0000615 TOPIC AREA 2-DEVELOPMENT OF REGIONAL ALGAL FEEDSTOCK TESTBED (RAFT) PARTNERSHIPS in 2012. For six years, from 2013 through 2019, ATP 3 was operated as a multi-institutional effort funded by the Department of Energy to establish a network of operating testbeds that brought together world-class scientists, engineers and business executives whose goal it was to increase stakeholder access to high quality facilities by making available an unparalleled array of outdoor cultivation, downstream equipment, and laboratory facilities to the algal R&D community. ATP 3 utilized the same powerful combination of facilities and technical expertise to support TEA, LCA and resource modeling and analysis activities, helping to close critical knowledge gaps and inform robust analyses of the state of technology for algal based biofuels and bioproducts. ATP 3 included testbed facilities at Arizona State University’s (ASU) Arizona Center for Algae Technology and Innovation (AzCATI), and augmented by university and commercial facilities in Hawaii (Cellana), California (Cal Poly San Luis Obispo), Georgia (Georgia Institute of Technology), and Florida (Florida Algae), in addition to partners at the National Renewable Energy Laboratory, Sandia National Laboratories, Valicor Renewables (Michigan), University of Texas at Austin (Texas), Commercial Algae Management (Georgia), Harmon Consulting (Hawaii), Evodos (Netherlands), and Litree (China).

09 BIOMASS FUELS↗

Public – Private Partnership to Promote Efficient Manufacturing and Workforce Development (IAC Final Technical Report)

Through delivering ninety (90) energy assessments to small- and medium-sized manufacturing facilities in and around Tennessee, significant understandings were gained through providing detailed energy assessment reports to manufacturers and training seventy-seven (77) engineering students in which thirty-five (35) certified IAC students were recognized by DOE. The robust involvement of Tennessee Valley Authority (TVA), local utility and Tennessee Tech’s Cybersecurity Education, Research, and Outreach Center (CEROC) in majority of assessments made the technical operation very effective where leaded to 40.5% implementation rate of energy recommendations. Other benefits of the award to the public are a dynamic modeling tool capable of analyzing existing cooling towers for energy use optimization was developed and presented to DOE IAC, providing technical assistance to non-participating manufacturers in the form of workshop and training, publishing fifteen (15) peer-reviewed conference and journal papers as well as a book chapter in the area of industrial energy efficiency field, assisting the TVA Magnolia Combined Cycle Power Plant to become the First 50001 Ready Certified Power Plant in the U.S. through briefing them on ISO 50001 and 50001 Ready as well as providing an energy assessment to the plant, assisted the new IAC center at Clemson University with on-site and remote support, and provided assessment and training in unique areas of water, waste water, cyber security and smart manufacturing to our clients, students and community.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transforming Public Housing with Deep Energy Retrofits

Open Market ESCO’s (OME) Transforming Public Housing through Deep Energy Retrofits project demonstrated new design and financing solutions for implementing deep energy retrofits (DERs) in occupied low-income multifamily housing. The Project performed an integrated project delivery process, including designing low-carbon retrofit solution packages, construction pricing, and financing. The Project developed a constructible and financeable DER scope for a 102-unit extremely low-income multifamily property in Boston. This Project demonstrated a replicable approach for streamlining and implementing DER projects in occupied housing, including real solutions for overcoming design complexities and cost barriers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators (2019)

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrating Microtransit with Public Transit for Coordinated Multi-Modal Movement of People (Final Technical Report)

This project focused on potential benefits of mobility service providers and transit agencies cooperating to offer fully integrated, seamless multi-modal mobility services for commuters. Specifically, we aimed at developing a first/last mile microtransit and micromobility services tightly integrated with fixed-route transit to achieve the “point-to-point” service capability. Our goal was to provide fixed-route transit customers with two convenient and compelling options for accessing public transit that are also operational efficient.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗