Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96

This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.

42 ENGINEERING↗

Hardening DOE R&D Software Tools for Web-based Visualization SBIR Phase I Final Report

Ubiquitous web-based visualization is essential to delivering large-scale data visualization to various stakeholders, from the scientist to the board member. These stakeholders will not tolerate a stalled application or a pop-up window asking them to wait for the processing to complete. They require a responsive and interactive visualization environment with high-quality imagery suitable for detailed analysis and boardroom presentations. At Kitware, Inc., we have accomplished web visualization to this point, leveraging state-of-the-art tools like HTML5, CSS3, SVG, Canvas, and WebGL. Solutions that leverage a combination of these technologies are necessary to handle workloads that vary significantly in data size efficiently. However, it is not always practical to move large data to the web client for visualization. Kitware's ParaView as a Service combines client-side visualization using both distributed processing and remote rendering on big data impractical to move. Existing distributed processing and remote rendering solution's interactivity is below the expectations of web-based applications. Our project examined proposed solutions to the areas outlined above in ParaView as a Service. We have investigated concurrent pipelines, streaming images, progressive rendering, and optimization of algorithms and data movement to address these concerns. For the Phase I project, we completed the proposed work plan. As a result, the project produced three prototypes of essential importance for web visualization and the ParaView as a Service community. We created a simple desktop application for an interactive streamline placement prototype, a web-based interactive streamline placement prototype, and a web-based progressive rendering utilizing raytracing prototype. These prototypes relied on the hardening of emerging software toolkits funded by the Department of Energy (DOE) Advanced Scientific Computing Research (ASCR) program (such as ParaView, VTK-m, and Mochi). We blended these components into web-based visualization prototypes that meet the industry's expectations for interactivity and responsiveness. The Phase I project had four essential focus areas: 1. Develop prototype ParaView as a Service backend server using asynchronous, non-blocking design principles. 2. Develop a prototype web application that uses the ParaView as a Service backend server for remote data visualization. 3. Implement image streaming with encoding/compression and progressive rendering capabilities in the proposed platform. 4. Evaluate the prototype developed and summarize observations, including the challenges and pitfalls of our approach. After our successful completion of Phase I, we are strongly positioned to propose a successful Phase II project.

Geveci, Berk↗

American Samoa: Unlocking Renewable Energy Potential

Located approximately between Hawaii and New Zealand, American Samoa is the only U.S. territory in the southern hemisphere. American Samoa faces similar climate and energy resilience challenges as other Pacific islands: geographic remoteness, dependence on imported fossil fuels, and increased vulnerability to natural hazards like earthquakes, cyclones, and tsunamis. In 2022, the average electricity price for residential customers in American Samoa was approximately 45 cents/kilowatt-hour (kWh) - almost three times the U.S. average of 15 cents/kWh. Renewable energy represents a small but growing power system contribution, although American Samoa relies almost entirely on imported fossil fuels. The territory possesses substantial solar resources and wind and biomass resource potential. Planned renewable power projects include utility-scale solar photovoltaic (PV) and wind generation with battery storage systems.

American Samoa↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Development of a security-by-design handbook.

There is an increasing awareness that efficient and effective nuclear facility design is best achieved when requirements from the 3S disciplines Safety, Safeguards, and Security - are balanced and intrinsic to the facility design. This can be achieved when policy, processes, methods, and technologies are understood and applied in these areas during all phases of the design process. For the purposes of this paper, Security-by-design will be defined as the system level incorporation of the physical protection system (PPS) into a new or retrofitted nuclear power plant (NPP) or nuclear facility (NF) resulting in intrinsic security. Security-by-design can also be viewed as a framework to achieve robust and durable security systems. This paper reports on work performed to date to create a Security-by-Design Handbook, under a bilateral agreement between the United States and Japan, specifically, a review of physical protection principles and best practices, and a decommissioning to better understand where these principles and practices can be applied. This paper describes physical protection principles and best practices to achieve security-by- design that were gathered from International, Japanese, and U.S. sources. Principles are included for achieving security early in the design process where security requirements are typically less costly and easier to incorporate. The paper then describes a generic design process that covers the entire facility lifecycle from scoping and planning of the project to decommissioning and decontamination. Early design process phases, such as conceptual design, offer opportunities to add security features intrinsic to the facility design itself. Later phases, including design engineering and construction, are important for properly integrating security features into a coherent design and for planning for and assuring the proper performance of the security system during the operation and decommissioning of the facility. The paper also describes some future activities on this bilateral project to create a Security-by-Design Handbook. When completed, the Handbook is intended to assist countries with less experience in nuclear power programs to apply principles and best practices in an effective and efficient manner as early in the design as possible to achieve robust and durable security.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report for the portion performed in the University of Illinois on the project entitled "Optimizing the Cloud-Aerosol-Radiation Ensemble Modeling System to Improve Future Climate Change Projections at Regional to Local Scales"

This is the final report for the closure of the research tasks on the project that have performed during the entire reporting period in the University of Illinois. It contains a summary of the achievements and details of key results as well as the future plan for this project to be continued in the University of Maryland.

58 GEOSCIENCES↗

Current status of R and D activities and future plan and role of JAEA's two generic URLs - 15356

The Japan Atomic Energy Agency (JAEA) has promoted R and D on geological disposal technology contribute to the implementation and safety regulation for high-level radioactive waste(HLW) disposal. JAEA launched two purpose-built generic URL projects to cover the diversity of geological environments in Japan, in accordance with 'Long-Term Program for Development and Utilization of Nuclear Energy' published in 1994 by the Japan Atomic Energy Commission. One is the Mizunami URL Project started in 1996. The Mizunami URL Project is a comprehensive geo-scientific research project investigating the deep underground environment within crystalline rock at Mizunami City in Gifu Prefecture, central Japan. The other one is the Horonobe URL Project started in 2001. The Horonobe URL Project consists of two major research areas, geo-scientific studies and R and D on geological disposal technology in the sedimentary rock environment at Horonobe Town in Hokkaido Prefecture, northern Japan. Both of the URL projects have been planned to proceed in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', with a total duration of about 20 years. Currently, the construction of research galleries in both of the Mizunami and the Horonobe URLs has been completed to 500 m and 350 m depths, respectively. R and D activities in Phase III are being conducted at both URLs. According to the latest five-year plan, announced in September 2014, JAEA will promote R and D activities in Phase III including study of the effects of long-term evolution of the geological environment on geological characteristics such as groundwater flow and chemistry for reducing the uncertainty inherent in the evaluation of the long-term stability of the geological environment. This has been a very critical issue for HLW geological disposal in Japan after the Great East Japan Earthquake in 2011. Furthermore, JAEA will contribute to international cooperation especially with countries having a similar geological environment such as those in the Circum-Pacific area, development of human resources and communication amongst stakeholders through the generic URL projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Information Automation and Human Technology Integration to Implement Integrated Operations for Nuclear

The purpose of the research effort described in this report is to develop and demonstrate an approach to the design and implementation of advanced, automated systems intended to increase operational efficiencies at nuclear power plants. In particular, we describe methods for considering human-technology integration (HTI) issues throughout the various phases of system design, test, and implementation and how these considerations help promote effective design. This research project will develop planning tools and comprehensive guidance on how HTI principles and methods, in combination with information automation technologies, can enable effective data integration and coordination for full nuclear plant modernization. Specifically, this research project will develop an approach to automate the mapping of data from plant systems and processes to application needs, thereby significantly reducing the amount of human workload currently required for the execution of these tasks. In addition to developing an automated solution as a replacement for these tasks, this research will also analyze digitalization’s effectiveness in reducing operational costs of compliance related activities. Compliance activities are estimated to account for as much as 50% of operations and maintenance (i.e., non-fuel and non-capital) costs of plant operation.

97 MATHEMATICS AND COMPUTING↗

Coal Gasification for Power Generation, 3. edition

The report provides a concise look at the challenges faced by coal-fired generation, the ability of coal gasification to address these challenges, and the current state of IGCC power generation. Topics covered include: an overview of Coal Generation including its history, the current market environment, and the status of coal gasification; a description of gasification technology including processes and systems; an analysis of the key business factors that are driving increased interest in coal gasification; an analysis of the barriers that are hindering the implementation of coal gasification projects; a discussion of Integrated Gasification Combined Cycle (IGCC) technology; an evaluation of IGCC versus other generation technologies; a discussion of IGCC project development options; a discussion of the key government initiatives supporting IGCC development; profiles of the key gasification technology companies participating in the IGCC market; and, a detailed description of existing and planned coal IGCC projects.

01 COAL, LIGNITE, AND PEAT↗

Developing The Organized Village of Kasaan's Strategic Energy Plan

The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribe's blueprint for creating long term energy self sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both supply side options of the development of sustainable energy sources, as well as demand-side options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal Energy Corporation Combined Heat and Power Project

To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power outages. TECO's operation is the largest Chilled Water District Energy System in the United States. The company used DOE's funding to help install a new high efficiency CHP system consisting of a Combustion Turbine and a Heat Recovery Steam Generator. This CHP installation was just part of a larger project undertaken by TECO to ensure that it can continue to meet TMC's growing needs. The complete efficiency overhaul that TECO undertook supported more than 1,000 direct and indirect jobs in manufacturing, engineering, and construction, with approximately 400 of those being jobs directly associated with construction of the combined heat and power plant. This showcase industrial scale CHP project, serving a critical component of the nation's healthcare infrastructure, directly and immediately supported the energy efficiency and job creation goals established by ARRA and DOE. It also provided an unsurpassed model of a district energy CHP application that can be replicated within other energy intensive applications in the industrial, institutional and commercial sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Is the 80 - 20 Principle a Friend or a Foe? Critical Remarks on the Dominant Flat Gradient - 17206

The well-known 80 - 20 principle, also known as the Pareto principle, describes the fact that usually 80 % of the result is achieved by 20 % of the effort, because many probability distributions are caused by a power-law. This principle is valued in the realm of project management and management in general because of the fast progress which generally takes place in the first fifth of the process. If the final result is not exactly specified or resources are spent wisely, 100 % of the planned result will be reached easily. However, in nuclear business safety is a principal parameter. Therefore precision is inevitable. In long-lasting projects the bad end of the Pareto-distribution is dominant: The very shallowly-inclined gradient at the end of the graph means that results at that point come at a very high effort and cost. The graph reaches the 100% only asymptomatically, meaning the initially projected results are never met. Especially if in earlier project phases the Pareto principle is applied very successfully, a lot of work is transferred to the future. For example, in decommissioning projects the waste often is badly characterized causing an enormous effort in the process of characterization and qualification. Especially if funding or time are limited, it is important to be aware of the asymmetric distribution of applied work and result. The 80 - 20 principle is a great advantage, if you start a project and respect the asymmetric distribution of applied resources and results in your project plan. Especially in long-lasting projects with changing perspectives, this asymmetric distribution may cause massive delays and expansion of costs, because small changes near the end cause large/big effort due to consequences on the existing data. If the proper goal of a project is not entirely known in the beginning, it is very probable that the last 5 - 10 % of the result will cause major financial threat and extensions of the estimated time frame. If funding or time are limited, it is almost impossible to readjust a project in the estimated frame of resources. In this case a complete restart of the project may be more reasonable than a long-lasting change management with uncertain results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial Program of Waste Management - Cigeo Project - 13033

The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enabling the Next Generation Of Facilities for Particle Physics

The report of the decadal US Particle Physics Community Planning Exercise known as “Snowmass” was released earlier this year. The Snowmass report serves as input for the second phase of planning, the Particle Physics Project Prioritization Panel (P5). P5 will develop a strategic plan for U.S. particle physics that will guide the field for the next decade and set R&D priorities beyond that. A broad range of proposals for future facilities were put forward during the Snowmass process, many requiring beyond state-of-the-art superconducting materials and magnets. This talk will give an overview of some of the collider options and outline elements of an R&D plan for the material and magnet development needed to meet the challenging requirements.

Gourlay, Steve↗

Controls Request Tracker

Controls groups at large accelerators are routinely called upon to build and support controls for virtually all machine systems. While construction projects within the US DOE system are normally carefully planned and tracked by project management professionals, this support ends when construction milestones are met. However, once construction is complete, work continues as the group performs ongoing support and maintenance while also implementing requested system improvements and upgrades. With customers from virtually every accelerator and experiment group, the demands on the group often exceed the capacity of available resources. This type of diverse workload needs to be well organized and managed in order set proper priorities and ensure efficient use of resources. At SNS, we have collaborated with Cosylab to develop Controls Request Tracker (CRT), which is adapted from the Cosylab Project Manager (CPM) software. The resulting system not only provides standard request tracking features, but is interfaced to the SNS Logbook and work control system. This paper will discuss CRT and how we use it to manage the work of our controls group.

project management controls↗

Making Progress toward Net Zero Sites in the Army Reserve through Analysis of Multiple Scenarios

The U.S. Army Reserve (USAR) prioritized achieving net zero as part of its Sustainability Program in 2013, and developed a pilot that investigated net zero energy, water, and waste at 10 sites. Pilot sites were selected based on mission requirements for energy and water resilience and the likelihood of achieving the technical and economic thresholds for net zero. USAR owns and operates hundreds of sites that typically consist of between 2 and 10 buildings. The pilot sites were intentionally dispersed across the U.S. and its territories to provide a range of geographic characteristics where the net zero potential could be analyzed and solutions could be developed. For the Army, changes to operations must support the mission and enhance readiness, which includes increasing efficiency and resiliency. To facilitate alignment of project prioritization with different goals and site-specific needs, a net zero roadmap outlined three scenarios for project implementation: (1) cost-effective measures, (2) net zero measures, and (3) recommended measures. Each scenario included the same measures for some sites, while others had three different outcomes. USAR has used these roadmaps to plan and execute projects and move toward net zero at multiple sites since 2014, with the primary focus on the cost-effective and recommended scenarios. As conditions and costs change, additional measures required to achieve net zero are considered. This paper describes the methodology deployed for analyzing net zero for the USAR and discusses the benefits of working toward net zero under three distinct scenarios.

Net Zero↗

NuMI proton beam diagnostics and control: achieving 2 megawatt capability

The NuMI proton beam at Fermilab currently delivers 120 GeV protons to the neutrino production target with design beam power capability to 400 kW. Upgrade capability to 700 kW is being prepared, with planning toward delivering 2.3 MW beam provided by the Project X accelerator upgrade plan. We report on the system of beam diagnostics and control used in operation of the NuMI beam. Also considered are the steps to provide a robust system for transport and targeting beam of 2 MW and beyond.

43 PARTICLE ACCELERATORS↗

cerf: A Python package to evaluate the feasibility and costs of power plant siting for alternative futures

Long-term electric power sector planning and capacity expansion is a key area of interest to stakeholders across a wide range of organizations because it helps in making informed decisions about investments in infrastructure within the context of potential future vulnerabilities under various natural and human stressors. Future power plant siting costs will depend on a number of factors including the characteristics of the electricity capacity expansion and electricity demand (e.g., fuel mix of future electric power capacity, and the magnitude and geographic distribution of electricity demand growth) as well as the geographic location of power plants. Electricity technology capacity expansion plans modeled to represent alternate future conditions meeting a set of scenario assumptions are traditionally compared against historical trends which may not be consistent with current and future conditions. We present the `cerf` Python package (a.k.a., the Capacity Expansion Regional Feasibility model) which helps evaluate the feasibility and structure of future, scenario-driven electricity capacity expansion plans by siting power plants in areas that have been deemed the least cost option while considering dynamic future conditions. We can use `cerf` to gain insight to research topics such as: 1) under what conditions future projected electricity expansion plans from models such as GCAM-USA are possible to achieve, 2) where and which on-the-ground barriers to siting (e.g., protected areas, cooling water availability) may influence our ability to achieve certain expansions, and 3) how electricity infrastructure build-outs and value may evolve into the future when considering locational marginal pricing (LMP) based on the supply and demand of electricity from a grid operations model.

20 FOSSIL-FUELED POWER PLANTS↗