Dollars vs delays: the trend toward intervener settlements

The Sierra Club recently adopted a policy to challenge construction of any new power plants until stricter rules for air pollution and climate change are implemented. New coal-fired boiler permits may well be opposed and delayed by interveners. However, more and more utilities are negotiating with interveners regarding their construction permit in an attempt to avoid or resolve lawsuits. Recent deals settling contesting issues include specifying requirements for control devices and emissions limits, promoting renewable energy, offsetting carbon dioxide, and improving emission limits on several existing facilities. Crucial to these agreements is a stipulation that the environmental groups will not block the issuance of construction permits. Settlements can be cost effective and in the best interest of rate payers. 7 refs., 2 tabs.

20 FOSSIL-FUELED POWER PLANTS↗

Packaging, Transportation, and Disposal Logistics for Large Radioactively Contaminated Reactor Decommissioning Components

The packaging, transportation and disposal of large, retired reactor components from operating or decommissioning nuclear plants pose unique challenges from a technical as well as regulatory compliance standpoint. In addition to the routine considerations associated with any radioactive waste disposition activity, such as characterization, ALARA, and manifesting, the technical challenges for large radioactively contaminated components, such as access, segmentation, removal, packaging, rigging, lifting, mode of transportation, conveyance compatibility, and load securing require significant planning and execution. In addition, the current regulatory framework, domestically in Titles 49 and 10 and internationally in TS-R-1, does not lend itself to the transport of these large radioactively contaminated components, such as reactor vessels, steam generators, reactor pressure vessel heads, and pressurizers, without application for a special permit or arrangement. This paper addresses the methods of overcoming the technical and regulatory challenges. The challenges and disposition decisions do differ during decommissioning versus component replacement during an outage at an operating plant. During decommissioning, there is less concern about critical path for restart and more concern about volume reduction and waste minimization. Segmentation on-site is an available option during decommissioning, since labor and equipment will be readily available and decontamination activities are routine. The reactor building removal path is also of less concern and there are more rigging/lifting options available. Radionuclide assessment is necessary for transportation and disposal characterization. Characterization will dictate the packaging methodology, transportation mode, need for intermediate processing, and the disposal location or availability. Characterization will also assist in determining if the large component can be transported in full compliance with the transportation and disposal regulations and criteria or if special authorizations must be granted to transport and/or dispose. The U.S. DOT routinely issues special permits for large components where compliance with regulatory or acceptance criteria is impractical or impossible to meet. Transportation and disposal safety must be maintained even under special permits or authorizations. For example, if transported un-packaged, performance analysis must still be performed to assess the ability of the large component's outer steel shell to contain the internal radioactive contamination under normal transportation conditions and possibly incidence normal to transportation. The dimensions and weight of a large component must be considered when determining the possible modes of transportation (rail, water, or highway). At some locations, rail and/or barge access is unavailable. Many locations that once had an active rail spur to deliver new construction materials and components have let the spur deteriorate to the point that repair and upgrade of the spur is no longer economically feasible. Barge slips that have not been used since new plant construction require significant repair and/or dredging. Short on-site haul routes must be assessed for surface and subsurface conditions, as well as longer off-site routes. Off-site routes require clearance approvals from the regulatory authorities or, in the case of rail transport, the rail lines. Significant engineering planning and analysis must be performed during the pre-mobilization. In conclusion, the packaging, transportation, and disposal of large, oversized radioactively contaminated components removed during plant decommissioning is complex. However, over the last 15 years, a 100 or more components have been safely and compliantly packaged and transported for processing and/or disposal.

42 ENGINEERING↗

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solvated Electron Technology{sup TM}. Non-Thermal Alternative to Waste Incineration

Solvated Electron Technology (SET{sup TM}) is a patented non-thermal alternative to incineration for treating Toxic Substances Control Act (TSCA) and other mixed waste by destroying organic hazardous components. SET{sup TM} is a treatment process that destroys the hazardous components in mixed waste by chemical reduction. The residual material meets land disposal restriction (LDR) and TSCA requirements for disposal. In application, contaminated materials are placed into a treatment cell and mixed with the solvated electron solution. In the case of PCBs or other halogenated contaminants, chemical reactions strip the halogen ions from the chain or aromatic ring producing sodium chloride and high molecular weight hydrocarbons. At the end of the reaction, ammonia within the treatment cell is removed and recycled. The reaction products (such as sodium salts) produced in the process remain with the matrix. The SET{sup TM} process is 99.999% effective in destroying: polychlorinated biphenyls (PCBs); trichloroethane (TCA) and trichloroethene (TCE); dioxins; polycyclic aromatic hydrocarbons (PAHs); benzene, toluene, xylene (BTX); pesticides; fungicides; herbicides; chlorofluorocarbons (CFCs); hydro-chlorofluorocarbons (HCFCs), explosives and chemical-warfare agents; and has successfully destroyed many of the wastes listed in 40 Code of Federal Regulations (CFR) 261. In September 2007, U.S. Environmental Protection Agency (EPA) issued a Research and Development permit for SET for chemical destruction of 'pure' Pyranol, which is 60% PCBs. These tests were completed in November 2007. SET{sup TM} is recognized by EPA as a non-thermal process equivalent to incineration and three SET{sup TM} systems have been permitted by EPA as commercial mobile PCB destruction units. This paper describes in detail the results of select bench-, pilot-, and commercial-scale treatment of hazardous and mixed wastes for EPA, Department of Energy (DOE), and the Department of Defense(DoD), and the applicability of SET{sup TM} to currently problematic waste streams that have very limited treatment alternatives. In summary: SET{sup TM} operates as a non-thermal destruction process under low pressure. The process occurs in a closed system producing no hazardous off-gases and no regulated by-products such as dioxins or furans or their precursors. Advantages of SET{sup TM} include: - Organic contaminants are destroyed, not just removed, diluted or concentrated. - Operates as a closed system - produces no regulated secondary wastes. - Holds an EPA permit for PCB destruction. - Operates at ambient temperatures (70 deg. F). - Portable and sets up quickly in less than 4000 square feet of space. - Scalable to accommodate any size waste stream. - Requires minimal amounts of power, water and infrastructure. - Applicable to heterogeneous waste streams in all phases. The SET{sup TM} process is 99.9999% effective in destroying organic constituents of RCRA and TSCA waste, explosives and chemical-warfare agents; and has successfully destroyed many of the wastes listed in 40 Code of Federal Regulations (CFR) 261. The residual material meets land disposal restriction (LDR) and TSCA requirements for disposal. In November 2007, Commodore completed a treatability study on Pyranol to determine the effectiveness of SET{sup TM} treatment on oil containing 600,000 PPM PCBs. Laboratory results proved destruction of PCBs to less than 1 PPM at low temperatures and pressures. SET{sup TM} is a proven, safe and cost-effective alternative to incineration for some of the most difficult waste treatment problems that exist today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of fast reactor core spectra in changing a heavy liquid metal coolant by molten PB-208

In the paper neutron spectra of fast reactor cooled with lead-bismuth or lead-208 are given. It is shown that in changing the coolant from lead-bismuth to lead-208 the core neutron spectra of the fast reactor FR RBEC-M are hardening in whole by several percents when a little share of low energy neutrons (5 eV - 50 keV) is slightly increasing. The shift of spectra to higher energies permits to enhance the fuel fission while the increased share of low energy neutrons provides more effective conversion of uranium-238 into plutonium due to peculiarity of {sup 238}U neutron capture cross section. Good neutron and physical features of molten {sup 208}Pb permit to assume it as perspective coolant for fast reactors and accelerator driven systems. The one-group cross sections of neutron radiation capture, {sigma}(n,g), by {sup 208}Pb, {sup 238}U, {sup 99}Tc, mix of lead and bismuth, {sup nat}Pb-Bi, averaged over neutron spectra of the fast reactor RBEC-M are given. It is shown that one-group cross sections of neutron capture by material of the liquid metal coolant consisted from lead enriched with the stable lead isotope, {sup 208}Pb, are by 4-7 times smaller {sigma}(n,g) for the coolant {sup nat}Pb-Bi. The economy of neutrons in the core cooled with {sup 208}Pb can be used for reducing reactor's initial fuel load, increasing fuel breeding and transmutation of long lived fission products, for example {sup 99}Tc. Good neutron and physical features of lead enriched with {sup 208}Pb permit to consider it as a perspective low neutron absorbing coolant for fast reactors and accelerator driven systems. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Continuous Improvement and the Safety Case for the Waste Isolation Pilot Plant Geologic Repository - 13467

The Waste Isolation Pilot Plant (WIPP) is a geologic repository 2150 feet (650 m) below the surface of the Chihuahuan desert near Carlsbad, New Mexico. WIPP permanently disposes of transuranic waste from national defense programs. Every five years, the U.S. Department of Energy (DOE) submits an application to the U.S. Environmental Protection Agency (EPA) to request regulatory-compliance re-certification of the facility for another five years. Every ten years, DOE submits an application to the New Mexico Environment Department (NMED) for the renewal of its hazardous waste disposal permit. The content of the applications made by DOE to the EPA for re-certification, and to the NMED for permit-renewal, reflect any optimization changes made to the facility, with regulatory concurrence if warranted by the nature of the change. DOE points to such changes as evidence for its having taken seriously its 'continuous improvement' operations and management philosophy. Another opportunity for continuous improvement is to look at any delta that may exist between the re-certification and re-permitting cases for system safety and the consensus advice on the nature and content of a safety case as being developed and published by the Nuclear Energy Agency's Integration Group for the Safety Case (IGSC) expert group. DOE at WIPP, with the aid of its Science Advisor and teammate, Sandia National Laboratories, is in the process of discerning what can be done, in a reasonably paced and cost-conscious manner, to continually improve the case for repository safety that is being made to the two primary regulators on a recurring basis. This paper will discuss some aspects of that delta and potential paths forward to addressing them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transuranic Waste Processing Center (TWPC) Legacy Tank RH-TRU Sludge Processing and Compliance Strategy - 13255

The U.S. Department of Energy (DOE) needs to safely and efficiently treat its 'legacy' transuranic (TRU) waste and mixed low-level waste (LLW) from past research and defense activities at the Oak Ridge National Laboratory (ORNL) so that the waste is prepared for safe and secure disposal. The TWPC operates an Environmental Management (EM) waste processing facility on the Oak Ridge Reservation (ORR). The TWPC is classified as a Hazard Category 2, non-reactor nuclear facility. This facility receives, treats, and packages low-level waste and TRU waste stored at various facilities on the ORR for eventual off-site disposal at various DOE sites and commercial facilities. The Remote Handled TRU Waste Sludge held in the Melton Valley Storage Tanks (MVSTs) was produced as a result of the collection, treatment, and storage of liquid radioactive waste originating from the ORNL radiochemical processing and radioisotope production programs. The MVSTs contain most of the associated waste from the Gunite and Associated Tanks (GAAT) in the ORNL's Tank Farms in Bethel Valley and the sludge (SL) and associated waste from the Old Hydro-fracture Facility tanks and other Federal Facility Agreement (FFA) tanks. The SL Processing Facility Build-outs (SL-PFB) Project is integral to the EM cleanup mission at ORNL and is being accelerated by DOE to meet updated regulatory commitments in the Site Treatment Plan. To meet these commitments a Baseline (BL) Change Proposal (BCP) is being submitted to provide continued spending authority as the project re-initiation extends across fiscal year 2012 (FY2012) into fiscal year 2013. Future waste from the ORNL Building 3019 U-233 Disposition project, in the form of U-233 dissolved in nitric acid and water, down-blended with depleted uranyl nitrate solution is also expected to be transferred to the 7856 MVST Annex Facility (formally the Capacity Increase Project (CIP) Tanks) for co-processing with the SL. The SL-PFB project will construct and install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Water Treatment at a United States Environmental Protection Agency Superfund Site - 12322

A water treatment system at a United States Environmental Protection Agency (USEPA) Superfund site impacted by radiological contaminants is used to treat water entering the site. The United States Army Corps of Engineers (USACE) is actively managing the remedial action for the USEPA using contracts to support the multiple activities on site. The site is where former gas mantle production facilities operated around the turn of the century. The manufacturing facilities used thorium ores to develop the mantles and disposed of off-specification mantles and ore residuals in the surrounding areas. During Site remedial actions, both groundwater and surface water comes into contact with contaminated soils and must be collected and treated at an on-site treatment facility. The radionuclides thorium and radium with associated progeny are the main concern for treatment. Suspended solids, volatile organic compounds, and select metals are also monitored during water treatment. The water treatment process begins were water is pumped to a collection tank where debris and grit settle out. Stored water is pumped to a coagulant tank containing poly-aluminum chloride to collect dissolved solids. The water passes into a reaction tube where aspirated air is added or reagent added to remove Volatile Organic Compounds (VOC'S) by mass transfer and convert dissolved iron to a solid. The water enters the flocculent polymer tank to drop solids out. The flocculated water overflows to a fluidized bed contact chamber to increase precipitation. Flocculation is where colloids of material drop out of suspension and settle. The settled solids are periodically removed and disposed of as radioactive waste. The water is passed through filters and an ion exchange process to extract the radionuclides. Several million liters of water are processed each year from two water treatment plants servicing different areas of the remediation site. Ion exchange resin and filter material are periodically replaced and disposed of as radioactive waste. A total of 0.85 m{sup 3} of waste sludge per year requires disposal on average, in addition to another 6.6 m{sup 3} of waste cartridge filters. All water discharges are regulated by a state of New Jersey Pollutant Discharge Elimination System Permit implemented by the Federal Water Pollution Control Act (Clean Water Act). Laboratory analyses are required to satisfy requirements of the state NPDES permit. Specific monitoring parameters and discharge rates will be provided. Use of the water treatment systems drastically reduces the amount of contaminated water requiring solidification and water disposal to near zero. Millions of liters of potentially contaminated water from excavation activities is treated and released within permit limits. A small volume of solid radioactive waste (21 cubic meters) is generated annually from water treatment process operations. Management of ground and surface water is effectively controlled in remediation areas by the use of sumps, erosion control measures and pumping of water to storage vessels. Continued excavations can be made as water impacting the site is effectively controlled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Support of SRS salt-stone regulatory compliance - 15586

The SRS salt-stone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. The salt-stone Processing Facility (SPF) is permitted as a wastewater treatment facility per the South Carolina Department of Health and Environmental Control Regulations (SCDHEC) South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-67. The salt-stone Disposal Facility is permitted as a solid waste landfill site, as defined by SCDHEC Regulations R61-107.19. The salt-stone Sampling and Analysis Plan provides the SCDHEC with the chemical and physical characterization strategy for the salt solution and salt-stone waste form. During operation, samples are collected from Tank 50H on a quarterly basis and are analyzed by the Savannah River National Laboratory (SRNL) for over chemical and radioactive components. The analytical results are compared to the salt-stone waste acceptance criteria in a technical report. SRNL also prepares salt-stone samples from the quarterly sample and premix binder materials provided by the SPF to determine the non-hazardous nature of the grout to meet the requirements of the SCDHEC regulation for the 'Characteristic of Toxicity', R.61-79.261.24(b) and the 'Universal Treatment Standards', R.61-79.268.48.4. salt-stone samples are collected, size reduced, packaged, and shipped to an independent United States EPA certified laboratory, or a laboratory that holds an equivalent certification such as one from the National Environmental Laboratory Accreditation Program to perform the EPA Toxicity Characteristic Leaching Procedure (TCLP) extraction of the salt-stone sample. SRNL reviews the results of the TCLP analysis and prepares a report detailing the sample preparation and analysis that is used by the salt-stone Facility to demonstrate the nonhazardous nature of the salt-stone waste form. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA closure at the Connecticut Yankee atomic power company Haddam neck plant - 15655

From 1968 through 1996 Connecticut Yankee Atomic Power Company (CYAPCO) operated the Haddam Neck Plant (HNP) at 362 Injun Hollow Road, East Hampton, Connecticut. In 1980 CYAPCO applied to be a permitted generator and storage facility for hazardous waste and was issued a Resource Conservation and Recovery Act (RCRA) Part A Treatment, Storage, and Disposal Facility Permit. During the operational period, the HNP produced more than 110 billion kilowatt-hours of energy. In 1996, CYAPCO decided to close and decommission the HNP. Decommissioning activities began in 1998 and were successfully completed in 2007 in accordance with Nuclear Regulatory Commission (NRC) regulations and the CYAPCO License Termination Plan. As part of the closure process for the HNP, closure of the RCRA permit under the RCRA Corrective Action Program (CAP) was required. From 2002 through 2007, under the RCRA CAP, CYAPCO completed investigations and remediation work to address environmental impacts resulting from chemical usage at the HNP. The RCRA CAP was conducted under the regulatory authority of the United States Environmental Protection Agency (USEPA) and the Connecticut Department of Energy and Environmental Protection (CTDEEP). In the fall of 2014, the RCRA closure process was completed, and CYAPCO, with concurrence from USEPA, was issued a Letter of Completion from the CTDEEP signifying completion of the RCRA closure process. The paper discusses the RCRA closure process completed at the HNP, including the investigation, remediation, groundwater monitoring, and closure activities completed to achieve closure of the HNP under the RCRA requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hohlraum used as a single turn solenoid to generate seed magnetic field for inertial confinement fusion

Application of axial seed magnetic fields in the range 20-100 T that compress to greater than 10,000 T (100 MG) under typical NIF implosion conditions may significantly relax the conditions required for ignition and propagating burn in NIF ignition targets that are degraded by hydrodynamic instabilities. Such magnetic fields can: (a) permit the recovery of ignition, or at least significant alpha particle heating, in submarginal NIF targets that would otherwise fail because of adverse hydrodynamic instability growth, (b) permit the attainment of ignition in conventional cryogenic layered solid-DT targets redesigned to operate under reduced drive conditions, (c) permit the attainment of volumetric ignition in simpler, room-temperature single-shell DT gas capsules, and (d) ameliorate adverse hohlraum plasma conditions during laser drive and capsule compression. In general, an applied magnetic field should always improve the ignition condition for any NIF ignition target design.

Perkins, Lindsay John↗

Current Status of Decommissioning Plans and Chemical Decontamination of Metal Scraps in Chinshan NPP - 19304

The decommissioning of nuclear facilities has become a significantly attractive and worldwide topic due to the end of lifetime of many nuclear power plants within next coming years. In Taiwan, Chinshan nuclear power plant owned by the Taiwan Power Company will be the first candidate to be decommissioned according to the Nuclear Reactor Facilities Regulation Act. The Chinshan nuclear power plant located in New Taipei City has two units of 636 MWe boiling water reactors (BWRs) for the generation of 9 billion kWh of electricity per year. The date of cessation of operation of Unit No. 1 and Unit No. 2 will be December in 2018 and July in 2019, respectively. Based on the Regulations for the Review and Approval of Applications for a Decommissioning Permit of Nuclear Reactor Facilities, Taiwan Power Company have submitted a decommissioning plan of Chinshan nuclear power plant to the authority, Atomic Energy Council (AEC). After the review process, the decommissioning plan of Chinshan nuclear power plant has been permitted by AEC in 2017. Decontamination is generally utilized during the period of decommissioning of nuclear facility in order to minimize the radiation exposure of personnel and the cost of management of radioactive wastes. The successful decontamination also probably provides the benefits of lowering the level of radioactive wastes, facilitating potential releases, permitting the reuse of metals and facilitating the radiation principle of As Low As Reasonably Achievable (ALARA) management. Decontamination aims at the removal of radioactive materials from the contaminated surfaces by several technologies such as washing, heating, chemical reaction and mechanical process. The selection of proper decontamination technologies are depended on the requirement of the target materials and the purpose of the decontamination. Chemical decontamination has been proven to be an effective in reducing the radioactivity for metallic materials by using chemical reagents in contact with the contaminated surfaces. During the operation of Chinshan nuclear power plant, chemical decontamination was performed for Unit No.1 and No.2 in 2000 to decontaminate the Reactor Recirculation System (RRS) and Reactor Water Clean-up Systems (RWCU) by using LOMI-NP-LOMI process. Based on the previous experience of chemical decontamination, the dismantled metallic piping is provided as sample by Chinshan nuclear power plant for the evaluation of the feasibility of chemical decontamination. The provided metallic sample is composed of carbon steel with dose rate around 0.2 mSv/hr. In this report, a multistep decontamination process using strongly oxidizing solution and organic acid solution is performed to remove the contaminated oxide layer from the metal surface, and the resulting contact dose rate and decontamination factor (DF) are also shown to discuss the performance in relation to the process control factors. In this paper, the recent progress in decommissioning programs and preliminary results of the decontamination experiment are described to provide usable information regarding the future decommissioning for Chinshan nuclear power plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Ohio River Valley CO2 Storage Project AEP Mountaineer Plant, West Virginia Numerical Simulation and Risk Assessment Report

A series of numerical simulations of carbon dioxide (CO{sub 2}) injection were conducted as part of a program to assess the potential for geologic sequestration in deep geologic reservoirs (the Rose Run and Copper Ridge formations), at the American Electric Power (AEP) Mountaineer Power Plant outside of New Haven, West Virginia. The simulations were executed using the H{sub 2}O-CO{sub 2}-NaCl operational mode of the Subsurface Transport Over Multiple Phases (STOMP) simulator (White and Oostrom, 2006). The objective of the Rose Run formation modeling was to predict CO{sub 2} injection rates using data from the core analysis conducted on the samples. A systematic screening procedure was applied to the Ohio River Valley CO{sub 2} storage site utilizing the Features, Elements, and Processes (FEP) database for geological storage of CO{sub 2} (Savage et al., 2004). The objective of the screening was to identify potential risk categories for the long-term geological storage of CO{sub 2} at the Mountaineer Power Plant in New Haven, West Virginia. Over 130 FEPs in seven main classes were assessed for the project based on site characterization information gathered in a geological background study, testing in a deep well drilled on the site, and general site conditions. In evaluating the database, it was apparent that many of the items were not applicable to the Mountaineer site based its geologic framework and environmental setting. Nine FEPs were identified for further consideration for the site. These FEPs generally fell into categories related to variations in subsurface geology, well completion materials, and the behavior of CO{sub 2} in the subsurface. Results from the screening were used to provide guidance on injection system design, developing a monitoring program, performing reservoir simulations, and other risk assessment efforts. Initial work indicates that the significant FEPs may be accounted for by focusing the storage program on these potential issues. The screening method was also useful in identifying unnecessary items that were not significant given the site-specific geology and proposed scale of the Ohio River Valley CO{sub 2} Storage Project. Overall, the FEP database approach provides a comprehensive methodology for assessing potential risk for a practical CO{sub 2} storage application. An integrated numerical fate and transport model was developed to enable risk and consequence assessment at field scale. Results show that such an integrated modeling effort would be helpful in meeting the project objectives (such as site characterization, engineering, permitting, monitoring and closure) during different stages. A reservoir-scale numerical model was extended further to develop an integrated assessment framework which can address the risk and consequence assessment, monitoring network design and permitting guidance needs. The method was used to simulate sequestration of CO{sub 2} in moderate quantities at the Mountaineer Power Plant. Results indicate that at the relatively low injection volumes planned for pilot scale demonstration at this site, the risks involved are minor to negligible, owing to a thick, low permeability caprock and overburden zones. Such integrated modeling approaches coupled with risk and consequence assessment modeling are valuable to project implementation, permitting, monitoring as well as site closure.

20 FOSSIL-FUELED POWER PLANTS↗

Geothermal Development and the Use of Categorical Exclusions Under NEPA

This study focuses primarily on the Categorial Exclusions (CX) process and its applicability to geothermal exploration. In this paper, we: - Provide generalized background information on CXs, including previous NEPA reports addressing CXs, the process for developing CXs, and the role of extraordinary circumstances; - Examine the history of the Bureau of Land Management's (BLM) geothermal CXs; - Compare current CXs for oil, gas, and geothermal energy; - Describe bills proposing new statutory CXs; - Examine the possibility of standardizing geothermal CXs across federal agencies; and - Present analysis from the Geothermal NEPA Database and other sources on the potential for new geothermal exploration CXs. As part of this study, we reviewed Environmental Assessments (EAs) conducted in response to 20 geothermal exploration drilling permit applications (Geothermal Drilling Permits or Notices of Intents) since the year 2001, the majority of which are from the last 5 years. All 20 EAs reviewed for this study resulted in a Finding of No Significant Impact (FONSI).

15 GEOTHERMAL ENERGY↗

GeoVision - Barriers Taskforce

This submission includes papers, presentations, and data developed during the multi-year GeoVision Barriers Taskforce effort. Developers have identified many non-technical barriers to geothermal power development, including land access, permitting, and market barriers. Included in this submission are three papers submitted to the Geothermal Resources Council (GRC) which detail how land access, permitting, and market barriers delay geothermal project development. Also included is the GeoVision Barriers Analysis Summary report, which projects and quantifies the future electric and nonelectric deployment potentials of geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment.

15 GEOTHERMAL ENERGY↗

5 Easy Steps to SolarAPP+ Adoption

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems. Here's how your jurisdiction can get started.

automated permitting↗