Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

The OSIRIS-REx Asteroid Sample Return Mission Operations Design

OSIRIS-REx is an acronym that captures the scientific objectives: Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer. OSIRIS-REx will thoroughly characterize near-Earth asteroid Bennu (Previously known as 1019551999 RQ36). The OSIRIS-REx Asteroid Sample Return Mission delivers its science using five instruments and radio science along with the Touch-And-Go Sample Acquisition Mechanism (TAGSAM). All of the instruments and data analysis techniques have direct heritage from flown planetary missions. The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the mission's science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the Sample Return Capsule (SRC) lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis. Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together spacecraft, instrument and operations scenarios. Asteroid Touch and Go (TAG) has various options varying from ground only to fully automated (natural feature tracking). Spacecraft constraints such as thermo and high gain antenna pointing impact the timeline. The mission is sensitive to navigation errors, so a late command update has been implemented. The project implemented lessons learned from other "small body" missions. The key lesson learned was 'expect the unexpected' and implement planning tools early in the lifecycle. This paper summarizes the ground and spacecraft design as presented at OSIRIS-REx Critical Design Review(CDR) held April 2014.

mission operations↗

Additional Mission Applications for NASA's 13.3-kW Ion Propulsion System

NASA's Space Technology Mission Directorate has been recently developing critical technologies for high-power solar electric propulsion (SEP), including large deployable solar array structures and high-power electric propulsion components. An ion propulsion system based on these developments has been considered for many SEP technology demonstration missions, including the Asteroid Redirect Robotic Mission (ARRM) concept. These studies and the highpower SEP technology developments have generated excitement within NASA about the use of the ARRM ion propulsion system design for other types of potential missions. One application of interest is for Mars missions, especially with the types of orbiters now under consideration for flights in the early 2020's to replace the aging Mars Reconnaissance Orbiter. High-power SEP can deliver large payloads to Mars with many additional capabilities, including large orbital plane changes and roundtrip missions, compared to chemically-propelled spacecraft. Another application for high-power SEP is for exo-planet observation missions, where a large starshade spacecraft would need to be repositioned with respect to its companion telescope relatively frequently and rapidly. SEP is an enabling technology for the ambitious science goals of these types of missions. This paper will discuss the benefits of high-power SEP for these concepts based on the STMD technologies now under development.

Space Technology Mission Directorate↗

Standards Roadmapping for Mission Assurance in Commercial Spaceflight

This paper explores the application of established roadmapping approaches in standards planning and roadmap development to support mission assurance objectives. Mission assurance requires proactive planning across multiple domains including technical, schedule, cost, organizational, and policy. The intersection of these domains happens at the enterprise level, and enterprise systems engineering processes can systematically guide mission assurance activities, including development of standards roadmaps. Standards planning and development is a critical contributor to an effective mission assurance strategy, although standards are often developed and adopted reactively. Technology and standards planning is a key Enterprise Process Management activity, as identified by the Systems Engineering Body of Knowledge, and technology and standards roadmaps are strategic tools used to enable that process. Technology roadmapping has proven effective in guiding enterprise architecture and concept design, and standards planning supports enterprise requirements definition and management. However, there are limited methodologies to guide such standards planning activities. The application of technology roadmapping principles to standards planning formalizes the process and establishes a repeatable framework for standards development and integration. The framework development described in this paper fills a methodological gap by adapting proven roadmapping techniques to standards planning. Through a comparison of roadmapping methodologies and a case study analysis, this approach outlines a systematic process for anticipating and planning standards needs. In the case of developing a standards integration roadmap for NASA’s Office of Safety and Mission Assurance (OSMA), technology roadmapping principles were adapted to develop a roadmap framework to allow NASA and OSMA to define an agency-wide standards integration plan for commercial and industry safety and mission assurance standards. The outcome highlights key adaptations required for roadmapping in a standards context and describes the process steps to formalize a standards planning activity. The roadmapping framework adapted for standards development and integration enables more strategic, forward-looking standards planning and allows for better alignment between evolving capabilities and mission assurance requirements. Beyond its application to mission assurance, this methodology can be transferred to other domains requiring standards development, providing a systematic approach that integrates systems engineering principles into policy strategy and decision-making processes.

Enterprise Systems Engineering↗

Planning For Multiple NASA Missions With Use Of Enabling Radioisotope Power

Since the early 1960’s the Department of Energy (DOE) and its predecessor agencies have provided radioisotope power systems (RPS) to NASA as an enabling technology for deep space and various planetary missions. They provide reliable power in situations where solar and/or battery power sources are either untenable or would place an undue mass burden on the mission. In the modern era of the past twenty years there has been no time that multiple missions have been considered for launching from Kennedy Space Center (KSC) during the same year. The closest proximity of missions that involved radioisotope power systems would be that of Galileo (October 1989) and Ulysses (October 1990). The closest that involved radioisotope heater units would be the small rovers Spirit and Opportunity (May and July 2003) used in the Mars Exploration Rovers (MER) mission. It can be argued that the rovers sent to Mars in 2003 were essentially a special case since they staged in the same facility and used a pair of small launch vehicles (Delta II). This paper examines constraints on the frequency of use of radioisotope power systems with regard to launching them from Kennedy Space Center using currently available launch vehicles. This knowledge may be useful as NASA plans for its future deep space or planetary missions where radioisotope power systems are used as an enabling technology. Previous descriptions have focused on single mission chronologies and not analyzed the timelines with an emphasis on multiple missions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A brief history of Sandia's National security missions.

To help members of the workforce understand what factors contribute to Sandia National Laboratories national security mission, the authors describe the evolution of Sandia s core mission and its other mission components. The mission of Sandia first as a division of Los Alamos and later as Sandia Corporation underlies our core nuclear weapon mission of today. Sandia s mission changed in 1963 and twice more in the 1970s. This report should help staff and management appreciate the need for mission evolution. A clear definition and communication of a consistent corporate mission statement is still needed.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Performance potential of gas-core and fusion rockets - A mission applications survey.

This paper reports an evaluation of the performance potential of five nuclear rocket engines for four mission classes. These engines are: the regeneratively cooled gas-core nuclear rocket; the light bulb gas-core nuclear rocket; the space-radiator cooled gas-core nuclear rocket; the fusion rocket; and an advanced solid-core nuclear rocket which is included for comparison. The missions considered are: earth-to-orbit launch; near-earth space missions; close interplanetary missions; and distant interplanetary missions. For each of these missions, the capabilities of each rocket engine type are compared in terms of payload ratio for the earth launch mission or by the initial vehicle mass in earth orbit for space missions (a measure of initial cost). Other factors which might determine the engine choice are discussed. It is shown that a 60 day manned round trip to Mars is conceivable.-

Fishbach, L. H.↗

Mission operations for unmanned nuclear electric propulsion outer planet exploration with a thermionic reactor spacecraft.

Mission operations are presented for comet rendezvous and outer planet exploration NEP spacecraft employing in-core thermionic reactors for electric power generation. The selected reference missions are the Comet Halley rendezvous and a Jupiter orbiter at 5.9 planet radii, the orbit of the moon Io. The characteristics of the baseline multi-mission NEP spacecraft are presented and its performance in other outer planet missions, such as Saturn and Uranus orbiters and a Neptune flyby, are discussed. Candidate mission operations are defined from spacecraft assembly to mission completion. Pre-launch operations are identified. Shuttle launch and subsequent injection to earth escape by the Centaur D-1T are discussed, as well as power plant startup and the heliocentric mission phases. The sequence and type of operations are basically identical for all missions investigated.

Spera, R. J.↗

Vehicle management and mission planning in support of shuttle operations.

An operational approach to shuttle mission planning during high flight frequency years (20 or more flights per year) is described wherein diverse mission planning functions interface via an interactive computer system and common data base. The Vehicle Management and Mission Planning System (VMMPS) is proposed as a means of helping to accomplish the mission planning function. The VMMPS will link together into an interactive system the major mission planning areas such as trajectory, crew, vehicle performance, and launch operations. A common data base will be an integral part of the system and the concept of standard mission types and phases will be used to minimize mission to mission uniqueness. The use of this system will eliminate much redundancy and replanning, shorten interface times between functions, and provide a means to evaluate unplanned events and modify schedules.

Pruett, W. R.↗

Alternate multiple-outer-planet missions using a Saturn-Jupiter flyby sequence

A study has been made of a method for providing more frequent launch opportunities for multiple-planet Grand Tour type missions to the outer solar system. A Saturn-Jupiter flyby sequence was used in the analysis to initiate the mission instead of the normal Jupiter-Saturn sequence. The Saturn-first approach is shown to yield several new launch opportunities following the 1980 cutoff date for Jupiter-first missions. Results are given for various two-planet, three-planet, and four-planet Jupiter-first and Saturn-first missions. A unique five-planet Saturn-first mission and a Saturn-Jupiter flyby which returns to earth are also discussed. Mission performance is evaluated for each flyby technique by comparing Saturn-first and Jupiter-first missions with respect to launch energy requirements, available launch windows, planetary encounter conditions, and total mission times.

Young, J. W.↗

An interstellar precursor mission

A mission out of the planetary system, launched about the year 2000, could provide valuable scientific data as well as test some of the technology for a later mission to another star. Primary scientific objectives for the precursor mission concern characteristics of the heliopause, the interstellar medium, stellar distances (by parallax measurements), low-energy cosmic rays, interplanetary gas distribution, and the mass of the solar system. Secondary objectives include investigation of Pluto. The mission should extend to 400-1000 AU from the sun. A heliocentric hyperbolic escape velocity of 50-100 km/sec or more is needed to attain this distance within a reasonable mission duration (20-50 years). The trajectory should be toward the incoming interstellar gas. For a year 2000 launch, a Pluto encounter and orbiter can be included. A second mission targeted parallel to the solar axis would also be worthwhile. The mission duration is 20 years, with an extended mission to a total of 50 years. A system using one or two stages of nuclear electric propulsion (NEP) was selected as a possible baseline. The most promising alternatives are ultralight solar sails or laser sailing, with the lasers in earth orbit, for example. The NEP baseline design allows the option of carrying a Pluto orbiter as a daughter spacecraft.

Jaffe, L. D.↗

Solar and heliospheric physics space missions for the 1980's

Proposed space missions or observing facilities for the late 1980s and early 1990s that would enable research on specific problems in solar and heliospheric physics are reviewed. For studies of the sun's interior, mission possibilities include the Solar Internal Dynamics Mission (SIDM) or the Solar Beacon to provide continuous monitoring of solar oscillations, and the Starprobe grazing encounter flyby. Visible surface atmospheres of the sun may be studied by the repair of the Solar Maximum Mission, and an Advanced Solar Observatory making observations from the X-ray to the IR. Possible missions investigating the inner corona would involve the proposed Solar Interplanetary Satellite (SIS), which would complement the single-spacecraft International Solar Polar Mission, the Solar Corona Diagnostics Mission (SCDM), and Starprobe. The SIS, Interplanetary Physics Laboratory and SCDM missions would also permit measurement of the solar wind. Experiments of opportunity based on the SMM, SIS, SCDM and SIDM projects may be used for studies of solar-terrestrial interactions, together with dedicated programs such as the Solar Terrestrial Observatory.

Bohlin, J. D.↗

Impact of lunar and planetary missions on the space station: Preliminary STS logistics report

Space station requirements for lunar and planetary missions are discussed. Specific reference is made to projected Ceres and Kopff missions; Titan probes; Saturn and Mercury orbiters; and a Mars sample return mission. Such requirements as base design; station function; program definition; mission scenarios; uncertainties impact; launch manifest and mission schedule; and shuttle loads are considered. It is concluded that: (1) the impact of the planetary missions on the space station is not large when compared to the lunar base; (2) a quarantine module may be desirable for sample returns; (3) the Ceres and Kopff missions require the ability to stack and checkout two-stage OTVs; and (4) two to seven manweeks of on-orbit work are required of the station crew to launch a mission and, with the exception of the quarantine module, dedicated crew will not be required.

Source record↗

A Mars sample return mission using a rover for sample acquisition

Mission and vehicle concepts are discussed for obtaining surface and subsurface samples of Mars, acquired by a roving vehicle, and returning those samples to earth for detailed analyses in scientific laboratories. Mission options that were traded off in order to arrive at a baseline mission considered most worthy of further study comprised the following: (1) direct entry vs entry out of Mars orbit; (2) direct return from the Mars surface vs rendezvous in Mars orbit and return to earth from there; and (3) propulsive orbit injection and aeroballistic entry (similar to Viking) vs aerocapture into Mars orbit and aeromaneuvering entry. After a comparison of relative merits - based primarily on mass and cost estimates and secondarily on configurational constraints - a baseline mission was selected: out-of-orbit entry, return after Mars orbit rendezvous, and aerocapture/aeromaneuvering. Trajectory design is based on the 1996 launch opportunity. Launch mass requirements for eight mission options, a mission and vehicle description for the baseline mission, and the outline of a mission sequence of events are presented.

De Vries, J. P.↗

Further applications of a Figure-of-Merit in space missions

A redesigned figure-of-merit (FoM) approach is described with respect to its applications in projects that employ in situ resource utilization (ISRU) and advanced modular engines. The FoM considers long-term effects, reliability of hardware, and risks inherent to new technologies, as well as significant design parameters. A spreadsheet is utilized to describe the FoM by means of key mission characteristics and combinations of the characteristic inputs in terms of precise governing equations. Results of the FoMs for historical and Mars Sample Return (MSR) missions are given for the conventional mission as well as an ISRU mission for the MSR. A detailed description of the most effective Mars mission is presented, showing how different factors affect the FoM. The results demonstrate that the FoM gives quantitative results based on overall mission design, allowing intercomparisons of similar missions. The FoM can be used as a screening parameter by modifying aspects of the mission by means of the R-factor.

Preiss, Bruce↗

Superheavyweight missions SI versus DI: Ascent flight design options and recommendations

AFD has completed the trade study on Standard Insertion (SI) vs Direct Insertion (DI) for STS-50. RSOC Range Safety has developed acceptable DI targets from 130 n.mi. to 150 n.mi. and the corresponding performance assessment for these targets using STS-50 data has been completed. This mission has sufficient performance capability to perform this mission as a DI to 160 n.mi. A reduced OMS load corresponding to a DI mission is required for this option. The increase in altitude over the AFP baseline (SI to 145 n.mi.) is highly desirable for this mission. The orientation on orbit for the orbiter/USML-1 payload is such that orbital decay is maximized (maximum frontal cross-sectional area with vehicle normal to velocity vector). Increasing the operational altitude reduces the amount of vernier thruster firings necessary to maintain a constant gravity gradient. The results of this trade study can also be applied to other superheavyweight missions (EDO flights) and will allow for use of the DI technique for lower orbital altitudes, thereby eliminating the SI option for due east, low altitude missions. STSOC transmittal form no. 330-330-130, which documents the technical issues and assumptions used for this trade study effort in detail, should be referenced for further information. The main reason that a DI is desired for STS-50 and other superheavyweight flights (low altitude) is that ESMC range safety has expressed reservations about SI missions in general. The concern is that the current SI design underspeed exposes Africa and Madagascar to potential ET debris impact. In the past range safety has waived the requirement that these areas be protected in the event of an engine failure. With the advent of the pre-MECO OMS dump, the viability of DI and the high casualty expectations from the ACTA press to MECO hazard study, range safety has become more reluctant to approve SI flights. It is felt that to perform an SI mission there would have to be a large decrease in design underspeed to protect these landmasses, which would result in possible gaps between a late TAL and PTA. The assumed limit on a DI has been to altitudes greater than 160 n.mi. It was assumed that for altitudes less than 160 n.mi. the nominal ET impact envelope would overlap the Gilbert Islands.

Source record↗

Project APEX: Advanced Phobos Exploration. Manned mission to the Martian moon Phobos

The manned exploration of Mars is a massive undertaking which requires careful consideration. A mission to the moon of Mars called Phobos as a prelude to manned landings on the Martian surface offers some advantages. One is that the energy requirements, in terms of delta 5, is only slightly higher than going to the Moon's surface. Another is that Phobos is a potential source of water and carbon which could be extracted and processed for life support and cryogenic propellants for use in future missions; thus, Phobos might serve as a base for extended Mars exploration or for exploration of the outer planets. The design of a vehicle for such a mission is the subject of our Aerospace System Design course this year. The materials and equipment needed for the processing plant would be delivered to Phobos in a prior unmanned mission. This study focuses on what it would take to send a crew to Phobos, set up the processing plant for extraction and storage of water and hydrocarbons, conduct scientific experiments, and return safely to Earth. The size, configuration, and subsystems of the vehicle are described in some detail. The spacecraft carries a crew of five and is launched from low Earth orbit in the year 2010. The outbound trajectory to Mars uses a gravitational assisted swing by of Venus and takes eight months to complete. The stay at Phobos is 60 days at which time the crew will be engaged in setting up the processing facility. The crew will then return to Earth orbit after a total mission duration of 656 days. Both stellar and solar observations will be conducted on both legs of the mission. The design of the spacecraft addresses human factors and life science; mission analysis and control; propulsion; power generation and distribution; thermal control; structural analysis; and planetary, solar, and stellar science. A 0.5 g artificial gravity is generated during transit by spinning about the lateral body axis. Nuclear thermal rockets using hydrogen as fuel are selected to reduce total launch mass and to shorten the duration of the mission. The nuclear systems also provide the primary electrical power via dual mode operation. The overall spacecraft length is 110 meters and the total mass departing from low Earth orbit is 900 metric tons.

Source record↗

MRSR: Rationale for a Mars Rover/Sample Return mission

The Solar System Exploration Committee of the NASA Advisory Council has recommended that a Mars Rover/Sample Return mission be launched before the year 2000. The recommendation is consistent with the science objectives as outlined by the National Academy of Sciences committees on Planetary and Lunar Exploration, and Planetary Biology and Chemical Evolution. Interest has also focused on Mars Rover/Sample Return (MRSR) missions, because of their crucial role as precursors for human exploration. As a result of this consensus among the advisory groups, a study of an MRSR mission began early in 1987. The study has the following goals: (1) to assess the technical feasibility of the mission; (2) to converge on two or three options for the general architecture of the mission; (3) to determine what new technologies need to be developed in order to implement the mission; (4) to define the different options sufficiently well that preliminary cost estimates can be made; and (5) to better define the science requirements. This chapter briefly describes Mars Rover/Sample Return missions that were examined in the late 1980s. These missions generally include a large (1000 kg) rover and return of over 5 kg of sample.

Carr, Michael H.↗

Toward lowering the cost of mission operations

The mission operations system is one of the more significant drivers of the cost of the mission operations and data analysis segment of missions. In large or long-lived projects, the MOS can also be a driver in total mission cost. Larger numbers of missions, together with an increasingly cost-conscious environment, dictate that future missions must more strictly control costs as they perform to their requirements. It is therefore prudent to examine the conduct of past missions for ways to conserve resources. In this paper we review inputs made to past projects' 'lessons-learned' activities, in which personnel from past projects (among other things) identified major cost drivers of MOS's and considered how economies were or might have been realized in both design and performance of their MOS. Common themes among four such reviews are summarized in an attempt to provide suggestions for cost reduction in future missions.

Wall, S. D.↗