Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONITOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2018

Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) as a result of storm runoff. This activity supports U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. The meteorological station collects air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content data. The maximum, minimum, and average or total values (as appropriate) for each of these parameters are recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrologic station are also recorded for each 10-minute interval. This report presents the data collected from these stations during fiscal year (FY) 2018. During the FY2018 reporting period, the warmest months were June, July, and August and the coldest were December through March. Solar radiation showed the same seasonal trend. Monthly mean wind speeds were highest in the spring (March through May) and early summer (June). Winds were generally from the west during the summer and from the north throughout the fall and winter. The monthly average relative humidity ranged from the mid-teens to approximately 50 percent. Humidity was lowest in the fall and highest in the winter. Monthly total precipitation ranged from 0 in October, December, and June to approximately 1.38 inches (in) (35.05 millimeters [mm]) in July. Total precipitation for FY2018 was 3.86 in (98.04 mm). During the reporting period, two runoff events were recorded at the flume. One occurred on July 14, 2018, in response to precipitation earlier the same day. This event produced a peak water depth of 11.26 in (28.60 centimeters [cm]) in the flume, which is equivalent to a discharge of 1.86 cubic feet per second (cfs) (0.05 cubic meters per second [cm/s]) and a velocity of 3.97 feet per second (fps) (1.21 meters per second [m/s]) through the flume. Applying the flume hydraulic measurements to the channel geometry at the nearest surveyed cross-section it was determined that the velocity through the channel was 1.29 fps (0.39 m/s), which is sufficient to transport silts and fine sands. The second flow event occurred in response to earlier precipitation on September 4, 2018. This event produced a peak water depth of 0.78 in (1.98 cm) in the flume, which is equivalent to a discharge of 0.03 cfs (0.001 cm/s) and a velocity of 1.17 fps (0.36 m/s) through the flume. Applying the flume hydraulic measurements to the channel geometry at the nearest surveyed cross-section it was determined that the velocity through the channel was 0.03 fps (0.01 m/s). Although neither runoff event produced sufficient flow velocities through the natural channel to cause local erosion and transport of coarser bedload materials, the velocity of the first runoff event was sufficient to transport silts and fine sands, which have been shown to be preferentially associated with radionuclide contaminants. Therefore, a sampling event was planned after the first flow event in conjunction with a periodic maintenance inspection. As no suspended load sampling is available at this location, bedload samples were collected from the vicinity of the flume on August 7, 2018. The collected sediment was separated into three particle size fractions and each fraction was analyzed for americium-241 (Am-241), plutonium-238 (Pu-238), and plutonium-239/240 (Pu-239/240) by alpha spectrometry. The two smaller particle size fractions had higher concentrations of all three radionuclides than the largest particle size fraction. Additionally, Pu-239/240 had the highest concentration and Pu-238 had the lowest concentration in all samples. The same relationship between the concentrations of Pu-238 and Pu-239/240 was seen in samples reported in FY2013 and FY2014. Observation of meteorological and environmental conditions that lead to storm runoff will help identify parameters and threshold conditions that should be incorporated into postclosure monitoring plans for this and similar sites as well as aid in determining appropriate closure strategies for other Soils CAUs.

54 ENVIRONMENTAL SCIENCES↗

Dashboard for Marine Energy Site Assessment and Monitoring

The marine energy (ME) industry presently relies upon fragmented site assessment solutions that require high resource expenditure for deployment at each site and do not leverage the wealth of readily available tools and information. A wave energy resource assessment dashboard, currently in development, will substantially improve siting, permitting, operations, and maintenance of ME projects by providing an integrated solution that is a one-stop-shop for a developer’s needs. The Site Energy Assessment and MOnitoring Dashboard (SEAMOD) will be of commercial interest to anyone seeking to deploy an ME project and is easily expandable to include tidal and wind energy site assessments. The integrated dashboard is being developed using state-of-the-art database and cloud computing methods and data-assimilative modeling tools that can be coupled with low-cost, rapidly deployable wave buoys and environmental sensing hardware. The combined software and hardware dashboard will reduce wave energy site characterization and wave climate monitoring costs by more than 60 percent and provide assessments that meet international industry standards. To realize a thriving global ME industry, the physical environment at a potential deployment site must be understood, not only for resource characterization, but also for optimization of device and power conversion performance. SEAMOD directly addresses these needs with a commercially marketable product. SEAMOD is a low-cost solution that provides comprehensive ME resource assessments, baseline environmental monitoring, and offshore characterizations required for successful ME development. The key technical objectives for Phase I were a series of software development goals, which when implemented with monitoring solutions, produced an initial proof-of-concept low-cost wave energy resources dashboard. In Phase II, the development of the prototype SEAMOD continued. The basic framework employed was the development of a revised dashboard and monitoring tool customized for ME applications by focusing on IEC site assessment and method requirements. Development was focused on the integration of full hindcast metocean products to provide hindcast resource characterization and environmental information. The final integrated dashboard provides a low-cost solution that delivers comprehensive, scalable, industry-standard energy resource assessments and offshore characterizations required for successful ME development. The integrated dashboard offers visibility of the most recent site modeling, measurements, and historical data. The application and integration of consensus-based standards for wave energy resource assessment, as determined by the International Electrotechnical Commission (IEC), are crucial for the impact and value of SEAMOD. SEAMOD includes monthly, seasonal, and yearly statistics, as well as the total 30-year record, offering temporal resolution of the IEC parameters to aid potential developers in determining the available wave energy resources in their area of interest.

16 TIDAL AND WAVE POWER↗

Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Juveniles, 2007-2008 Report of Research.

This report provides results from an ongoing project to monitor the migration behavior and survival of wild juvenile spring/summer Chinook salmon in the Snake River Basin. Data reported is from detections of PIT tagged fish during late summer 2007 through mid-2008. Fish were tagged in summer 2007 by the National Marine Fisheries Service (NMFS) in Idaho and by the Oregon Department of Fish and Wildlife (ODFW) in Oregon. Our analyses include migration behavior and estimated survival of fish at instream PIT-tag monitors and arrival timing and estimated survival to Lower Granite Dam. Principal results from tagging and interrogation during 2007-2008 are listed below: (1) In July and August 2007, we PIT tagged and released 7,390 wild Chinook salmon parr in 12 Idaho streams or sample areas. (2) Overall observed mortality from collection, handling, tagging, and after a 24-hour holding period was 1.4%. (3) Of the 2,524 Chinook salmon parr PIT tagged and released in Valley Creek in summer 2007, 218 (8.6%) were detected at two instream PIT-tag monitoring systems in lower Valley Creek from late summer 2007 to the following spring 2008. Of these, 71.6% were detected in late summer/fall, 11.9% in winter, and 16.5% in spring. Estimated parr-to-smolt survival to Lower Granite Dam was 15.5% for the late summer/fall group, 48.0% for the winter group, and 58.5% for the spring group. Based on detections at downstream dams, the overall efficiency of VC1 (upper) or VC2 (lower) Valley Creek monitors for detecting these fish was 21.1%. Using this VC1 or VC2 efficiency, an estimated 40.8% of all summer-tagged parr survived to move out of Valley Creek, and their estimated survival from that point to Lower Granite Dam was 26.5%. Overall estimated parr-to-smolt survival for all summer-tagged parr from this stream at the dam was 12.1%. Development and improvement of instream PIT-tag monitoring systems continued throughout 2007 and 2008. (4) Testing of PIT-tag antennas in lower Big Creek during 2007-2008 showed these antennas (and anchoring method) are not adequate to withstand high spring flows in this drainage. Future plans involve removing these antennas before high spring flows. (5) At Little Goose Dam in 2008, length and/or weight were taken on 505 recaptured fish from 12 Idaho stream populations. Fish had grown an average of 40.1 mm in length and 10.6 g in weight over an average of 288 d. Their mean condition factor declined from 1.25 at release (parr) to 1.05 at recapture (smolt). (6) Mean release lengths for detected fish were significantly larger than for fish not detected the following spring and summer (P < 0.0001). (7) Fish that migrated through Lower Granite Dam in April and May were significantly larger at release than fish that migrated after May (P < 0.0001) (only 12 fish migrated after May). (8) In 2008, peak detections at Lower Granite Dam of parr tagged during summer 2007 (from the 12 stream populations in Idaho and 4 streams in Oregon) occurred during moderate flows of 87.5 kcfs on 7 May and high flows of 197.3 kcfs on 20 May. The 10th, 50th, and 90th percentile passage occurred on 30 April, 11 May, and 23 May, respectively. (9) In 2007-2008, estimated parr-to-smolt survival to Lower Granite Dam for Idaho and Oregon streams (combined) averaged 19.4% (range 6.2-38.4% depending on stream of origin). In Idaho streams the estimated parr-to-smolt survival averaged 21.0%. This survival was the second highest since 1993 for Idaho streams. Relative parr densities were lower in 2007 (2.4 parr/100 m{sup 2}) than in all previous years since 2000. In 2008, we observed low-to-moderate flows prior to mid-May and relatively cold weather conditions throughout the spring migration season. These conditions moved half of the fish through Lower Granite Dam prior to mid-May; then high flows moved 50 to 90% of the fish through the dam in only 12 days. Clearly, complex interrelationships of several factors drive the annual migrational timing of the stocks.

13 HYDRO ENERGY↗

Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Juveniles, 2007-2008

This report provides results from an ongoing project to monitor the migration behavior and survival of wild juvenile spring/summer Chinook salmon in the Snake River Basin. Data reported is from detections of PIT tagged fish during late summer 2007 through mid-2008. Fish were tagged in summer 2007 by the National Marine Fisheries Service (NMFS) in Idaho and by the Oregon Department of Fish and Wildlife (ODFW) in Oregon. Our analyses include migration behavior and estimated survival of fish at instream PIT-tag monitors and arrival timing and estimated survival to Lower Granite Dam. Principal results from tagging and interrogation during 2007-2008 are: (1) In July and August 2007, we PIT tagged and released 7,390 wild Chinook salmon parr in 12 Idaho streams or sample areas. (2) Overall observed mortality from collection, handling, tagging, and after a 24-hour holding period was 1.4%. (3) Of the 2,524 Chinook salmon parr PIT tagged and released in Valley Creek in summer 2007, 218 (8.6%) were detected at two instream PIT-tag monitoring systems in lower Valley Creek from late summer 2007 to the following spring 2008. Of these, 71.6% were detected in late summer/fall, 11.9% in winter, and 16.5% in spring. Estimated parr-to-smolt survival to Lower Granite Dam was 15.5% for the late summer/fall group, 48.0% for the winter group, and 58.5% for the spring group. Based on detections at downstream dams, the overall efficiency of VC1 (upper) or VC2 (lower) Valley Creek monitors for detecting these fish was 21.1%. Using this VC1 or VC2 efficiency, an estimated 40.8% of all summer-tagged parr survived to move out of Valley Creek, and their estimated survival from that point to Lower Granite Dam was 26.5%. Overall estimated parr-to-smolt survival for all summer-tagged parr from this stream at the dam was 12.1%. Development and improvement of instream PIT-tag monitoring systems continued throughout 2007 and 2008. (4) Testing of PIT-tag antennas in lower Big Creek during 2007-2008 showed these antennas (and anchoring method) are not adequate to withstand high spring flows in this drainage. Future plans involve removing these antennas before high spring flows. (5) At Little Goose Dam in 2008, length and/or weight were taken on 505 recaptured fish from 12 Idaho stream populations. Fish had grown an average of 40.1 mm in length and 10.6 g in weight over an average of 288 d. Their mean condition factor declined from 1.25 at release (parr) to 1.05 at recapture (smolt). (6) Mean release lengths for detected fish were significantly larger than for fish not detected the following spring and summer (P < 0.0001). (7) Fish that migrated through Lower Granite Dam in April and May were significantly larger at release than fish that migrated after May (P < 0.0001) (only 12 fish migrated after May). (8) In 2008, peak detections at Lower Granite Dam of parr tagged during summer 2007 (from the 12 stream populations in Idaho and 4 streams in Oregon) occurred during moderate flows of 87.5 kcfs on 7 May and high flows of 197.3 kcfs on 20 May. The 10th, 50th, and 90th percentile passage occurred on 30 April, 11 May, and 23 May, respectively. (9) In 2007-2008, estimated parr-to-smolt survival to Lower Granite Dam for Idaho and Oregon streams (combined) averaged 19.4% (range 6.2-38.4% depending on stream of origin). In Idaho streams the estimated parr-to-smolt survival averaged 21.0%. This survival was the second highest since 1993 for Idaho streams. Relative parr densities were lower in 2007 (2.4 parr/100 m2) than in all previous years since 2000. In 2008, we observed low-to-moderate flows prior to mid-May and relatively cold weather conditions throughout the spring migration season. These conditions moved half of the fish through Lower Granite Dam prior to mid-May; then high flows moved 50 to 90% of the fish through the dam in only 12 days. Clearly, complex interrelationships of several factors drive the annual migrational timing of the stocks.

13 HYDRO ENERGY↗

Calibration Monitor for Dark Energy Experiments

The goal of this program was to design, build, test, and characterize a flight qualified calibration source and monitor for a Dark Energy related experiment: ACCESS - 'Absolute Color Calibration Experiment for Standard Stars'. This calibration source, the On-board Calibration Monitor (OCM), is a key component of our ACCESS spectrophotometric calibration program. The OCM will be flown as part of the ACCESS sub-orbital rocket payload in addition to monitoring instrument sensitivity on the ground. The objective of the OCM is to minimize systematic errors associated with any potential changes in the ACCESS instrument sensitivity. Importantly, the OCM will be used to monitor instrument sensitivity immediately after astronomical observations while the instrument payload is parachuting to the ground. Through monitoring, we can detect, track, characterize, and thus correct for any changes in instrument senstivity over the proposed 5-year duration of the assembled and calibrated instrument.

79 ASTRONOMY AND ASTROPHYSICS↗

The effect of monitoring complexity on stakeholder acceptance of CO2 geological storage projects in the US gulf coast region

Environmental monitoring at geologic CO 2 storage sites is required by regulations for the purposes of environmental protection and emissions accounting in the case of leakage to surface. However, another very important goal of environmental monitoring is to assure stakeholders that the project is monitored for safety and effectiveness. With current efforts to optimize monitoring for cost-effectiveness, the question remains: will optimization of monitoring approaches degrade stakeholder assurance, or do heavily-instrumented sites communicate higher risk to a stakeholder? We report the results of a stakeholder survey in Gulf Coast states of the US where carbon capture and storage (CCS) is developing quickly. We rely on a 2 by 2 factorial experiment in which we manipulate message complexity (complex v. simple) and social norm (support from scientists v. support from community members). Subjects were randomly assigned to one of four conditions: 1) complex message with scientist support; 2) complex message with community member support; 3) simple message with scientist support; or 4) simple message with community member support. In addition to the experimental stimuli, subjects were also asked about their need for cognition, attitudes toward science and scientists, attitudes about climate change and support for carbon capture and storage (CCS). Our sample is drawn from residents in states bordering the western Gulf of Mexico (Texas, Louisiana, Florida) where CO 2 geologic storage is being planned both onshore and offshore. The results offer important implications for public outreach efforts to key stakeholders.

54 ENVIRONMENTAL SCIENCES↗

Operational-Condition-Independent Criteria Dedicated to Monitoring Wind Turbine Generators: Preprint

To date the existing wind turbine condition monitoring technologies and commercially available systems have not been fully accepted for improving wind turbine availability and reducing their operation and maintenance costs. One of the main reasons is that wind turbines are subject to constantly varying loads and operate at variable rotational speeds. As a consequence, the influences of turbinefaults and the effects of varying load and speed are coupled together in wind turbine condition monitoring signals. So, there is an urgent need to either introduce some operational condition de-coupling procedures into the current wind turbine condition monitoring techniques or develop a new operational condition independent wind turbine condition monitoring technique to maintain high turbineavailability and achieve the expected economic benefits from wind. The purpose of this paper is to develop such a technique. In the paper, three operational condition independent criteria are developed dedicated for monitoring the operation and health condition of wind turbine generators. All proposed criteria have been tested through both simulated and practical experiments. The experimentshave shown that these criteria provide a solution for detecting both mechanical and electrical faults occurring in wind turbine generators.

17 WIND ENERGY↗

Integrated Systems-Based Approach to Monitoring Environmental Remediation

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the existing contamination use techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is a key element for implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost and labor intensive point-source monitoring. A systems-based approach to monitoring design focuses monitoring on controlling features and processes to enable effective interpretation of remedy performance.

environmental remediation↗

ROBUST ONLINE MONITORING FOR CALIBRATION ASSESSMENT OF TRANSMITTERS AND INSTRUMENTATION

Robust online monitoring (OLM) technologies are expected to enable the extension or elimination of periodic sensor calibration intervals in operating and new reactors. Specifically, the next generation of OLM technology is expected to include newly developed advanced algorithms that improve monitoring of sensor/system performance and enable the use of plant data to derive information that currently cannot be measured. These advances in OLM technologies will improve the safety and reliability of current and planned nuclear power systems through improved accuracy and increased reliability of sensors used to monitor key parameters. In this paper, we discuss an overview of research being performed within the Nuclear Energy Enabling Technologies (NEET)/Advanced Sensors and Instrumentation (ASI) program, for the development of OLM algorithms to use sensor outputs and, in combination with other available information, 1) determine whether one or more sensors are out of calibration or failing and 2) replace a failing sensor with reliable, accurate sensor outputs. Algorithm development is focused on the following OLM functions: • Signal validation – fault detection and selection of acceptance criteria • Virtual sensing – signal value prediction and acceptance criteria • Response-time assessment – fault detection and acceptance criteria selection A GP-based uncertainty quantification (UQ) method previously developed for UQ in OLM, was adapted for use in sensor-fault detection and virtual sensing. For signal validation, the various components to the OLM residual (which is computed using an AAKR model) were explicitly defined and modeled using a GP. Evaluation was conducted using flow loop data from multiple sources. Results using experimental data from laboratory-scale flow loops indicate that the approach, while capable of detecting sensor drift, may be incapable of discriminating between sensor drift and model inadequacy. This may be due to a simplification applied in the initial modeling, where the sensor degradation is assumed to be stationary. In the case of virtual sensors, the GP model was used in a predictive mode to estimate the correct sensor reading for sensors that may have failed. Results have indicated the viability of using this approach for virtual sensing. However, the GP model has proven to be computationally expensive, and so alternative algorithms for virtual sensing are being evaluated. Finally, automated approaches to performing noise analysis for extracting sensor response time were developed. Evaluation of this technique using laboratory-scale data indicates that it compares well with manual techniques previously used for noise analysis. Moreover, the automated and manual approaches for noise analysis also compare well with the current “gold standard”, hydraulic ramp testing, for response time monitoring. Ongoing research in this project is focused on further evaluation of the algorithms, optimization for accuracy and computational efficiency, and integration into a suite of tools for robust OLM that are applicable to monitoring sensor calibration state in nuclear power plants.

calibration interval extension↗

Evaluations of Silicon Carbide Temperature Monitors

The effect of irradiation on materials properties is an important field of study for materials usage in both fission and fusion systems for energy production. Neutron flux and energy spectrums are well understood; however, the irradiation temperature can be more difficult to determine. Since the early 1960s, Silicon Carbide (SiC) has been used as a passive post-irradiation temperature monitor because the irradiation defects anneal out above the irradiation temperature. Irradiation temperature is determined by measuring a property change after isochronal annealing or during a continuously monitored annealing process. There are many properties that may be measured including electrical resistivity, bulk density, dimensions, thermal diffusivity, or lattice spacing. Electrical resistivity is accepted as a robust measurement technique; however, such method is time-consuming since the steps involved must be performed in a serial manner. The use of thermal expansion from continuous dilatometry is an automated process requiring minimal setup time. As part of a Nuclear Science User Facilities (NSUF) project, low dose silicon carbide monitors were irradiated in the BR2 material test reactor at SCK, Belgium, and were then evaluated at the Idaho National Laboratory (INL) High Temperature Test Laboratory (HTTL) to determine their peak temperature achieved during irradiation. The technical significance of this work was that the monitors were irradiated to a dose that was significantly less than recommended in published literature. This paper will discuss the evaluation processes available at HTTL and the performance of the low dose silicon carbide temperature monitors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Best practices in environmental monitoring for coal-fired power plants: lessons for developing Asian APEC economies

The report assesses environmental monitoring and reporting by individual coal-fired power plants, makes recommendations regarding how monitoring should be applied, and evaluates the interrelationship of monitoring and regulation in promoting CCTs. Effective monitoring is needed to ensure that power plants are performing as expected, and to confirm that they are complying with applicable environmental regulations. Older coal-fired power plants in APEC economies often have limited monitoring capabilities, making their environmental performance difficult to measure. 585 refs., 5 figs., 85 tabs.

01 COAL, LIGNITE, AND PEAT↗

Performance of a GM tube based environmental dose rate monitor operating in the Time-To-Count mode

The events at the Fukushima Daiichi power plant in the aftermath of a natural disaster underline the importance of a large array of networked environmental monitors to cover areas around nuclear power plants. These monitors should meet a few basic criteria: have a uniform response over a wide range of gamma energies, have a uniform response over a wide range of incident angles, and have a large dynamic range. Many of these criteria are met if the probe is qualified to the international standard IEC 60532 (Radiation protection instrumentation - Installed dose rate meters, warning assemblies and monitors - X and gamma radiation of energy between 50 keV and 7 MeV), which specifically deals with energy response, angle of incidence, dynamic range, response time, and a number of environmental characteristics. EcoGamma is a dual GM tube environmental gamma radiation monitor designed specifically to meet the requirements of IEC 60532 and operate in the most extreme conditions. EcoGamma utilizes two energy compensated GM tubes operating with a Time-To-Count (TTC) collection algorithm. The TTC algorithm extends the lifetime and range of a GM tube significantly and allows the dual GM tube probe to achieve linearity over approximately 10 decades of gamma dose rate (from the Sv/hr range to 100 Sv/hr). In the TTC mode of operation, the GM tube is not maintained in a biased condition continuously. This is different from a traditional counting system where the GM tube is held at a constant bias continuously and the total number of strikes that the tube registers are counted. The traditional approach allows for good sensitivity, but does not lend itself to a long lifetime of the tube and is susceptible to linearity issues at high count rates. TTC on the other hand only biases the tube for short periods of time and in effect measures the time between events, which is statistically representative of the total strike rate. Since the tube is not continually biased, the life of the tube is extended and the linearity is greatly improved. Testing has been performed at Pacific Northwest National Laboratory (PNNL) in the USA and confirms compliance to IEC 60532 as well as linearity (± 10%) up to 100 Sv/hr. Furthermore, a network of EcoGamma probes may be linked through available supervisory software to provide a dose rate map of an area. This allows for real time monitoring of dose rates from one (or multiple) remote locations. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Progress in the development of the neutron flux monitoring system of the French GEN-IV SFR: simulations and experimental validations [ANIMMA--2015-IO-392]

France has a long experience of about 50 years in designing, building and operating sodium-cooled fast reactors (SFR) such as RAPSODIE, PHENIX and SUPER PHENIX. Fast reactors feature the double capability of reducing nuclear waste and saving nuclear energy resources by burning actinides. Since this reactor type is one of those selected by the Generation IV International Forum, the French government asked, in the year 2006, CEA, namely the French Alternative Energies and Atomic Energy Commission, to lead the development of an innovative GEN-IV nuclear- fission power demonstrator. The major objective is to improve the safety and availability of an SFR. The neutron flux monitoring (NFM) system of any reactor must, in any situation, permit both reactivity control and power level monitoring from startup to full power. It also has to monitor possible changes in neutron flux distribution within the core region in order to prevent any local melting accident. The neutron detectors will have to be installed inside the reactor vessel because locations outside the vessel will suffer from severe disadvantages; radially the neutron shield that is also contained in the reactor vessel will cause unacceptable losses in neutron flux; below the core the presence of a core-catcher prevents from inserting neutron guides; and above the core the distance is too large to obtain decent neutron signals outside the vessel. Another important point is to limit the number of detectors placed in the vessel in order to alleviate their installation into the vessel. In this paper, we show that the architecture of the NFM system will rely on high-temperature fission chambers (HTFC) featuring wide-range flux monitoring capability. The definition of such a system is presented and the justifications of technological options are brought with the use of simulation and experimental results. Firstly, neutron-transport calculations allow us to propose two in-vessel regions, namely the above-core and under-core structures. We verify that they comply with the main objective, that is the neutron power and flux distribution monitoring. HTFC placed in these two regions can detect an inadvertent control rod withdrawal that is a postulated initiating event for safety demonstration. Secondly, we show that the HTFC reliability is enhanced thanks to a more robust physical design and the fact that it has been justified that the mineral insulation is insensitive to any increase in temperature. Indeed, the HTFC insulation is subject to partial discharges at high temperature when the electric field between their electrodes is greater than about 200 V/mm or so. These discharges give rise to signals similar to the neutron pulses generated by a fission chamber itself, which may bias the HTFC count rate at start-up only. However, as displayed in Figure 1, we have experimentally verified that one can discriminate neutron pulses from partial discharges using online estimation of pulse width. Thirdly, we propose to estimate the count rate of a HTFC using the third order cumulant of its signal that is described by a filtered Poisson process. For such a statistic process, it is known that any cumulant, also called cumulative moment, is proportional to the process intensity that is here the count rate of a fission chamber. One recalls that the so-called Campbelling mode of such a detector is actually based on the signal variance, which is the second-order cumulant as well. The use of this extended Campbelling mode based on the third-order cumulant will permit to ensure the HTFC response linearity over the entire neutron flux range using a signal processing technique that is simple enough to satisfy design constraints on electric devices important for nuclear safety. We also show that this technique, named high order Campbelling method (HOC), is significantly more robust than another technique based on the change in the HTFC filling gas, which consists in adding a few percent of nitrogen. Finally, we also present an experimental campaign devoted to the required calibration process of the so-called HOC method. The Campbelling results show a good agreement with the simple pulse counting estimation at low count rates. It is also shown that the HOC technique provides a linear estimation of the count rates at higher power levels as well.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Time-lapse VSP data processing for monitoring CO2 injection

As a part of the effort of the Southwest Regional Partnership on Carbon Sequestration supported by U.S. Department of Energy and managed by the National Energy Technology Laboratory, two sets of time-lapse VSPs were acquired and processed in oil fields undergoing CO{sub 2} injection. One set of VSPs was acquired at the Aneth oil field in Utah, the other set at the Scurry Area Canyon Reef Operators Committee (SACROC) field in West Texas. One baseline and two repeat VSP surveys were conducted from 2007 to 2009 at the Aneth oil field in Utah for monitoring CO{sub 2} injection. The aim of the time-lapse VSP surveys is to study the combined enhanced oil recovery (EOR) and CO{sub 2} sequestration in collaboration with Resolute Natural Resources, Inc. VSP data were acquired using a cemented geophone string with 60 levels at depth from 805 m to 1704 m, and CO{sub 2} is injected into a horizontal well nearby within the reservoir at depth approximately from 1730 m to 1780 m. For each VSP survey, the data were acquired for one zero-offset source location and seven offset source locations (Figure 1). The baseline VSP survey was conducted before the CO{sub 2} injection. More than ten thousand tons of CO{sub 2} was injected between each of the two repeat VSP surveys. There are three horizontal injection wells, all originating from the same vertical well. One is drilled towards Southeast, directly towards the monitoring well (Figure 2), and the other two towards Northwest, directly away from the monitoring well. The injection is into the top portion of the Desert Creek formation, just beneath the Gothic shale, which acts as the reservoir seal. The initial baseline acquisition was done in October 2007; subsequent time-lapse acquisitions were conducted in July 2008, and January 2009. The acquisition geometry is shown in Figure 1. Shot point 1 is the zero-offset source location, Shot points 2 to 8 are the seven offset VSPs, arranged in a quarter circle on the Northwest side of the monitoring well. The horizontal injection well is shown in green. The black lines in Figure 1 show the approximate reflection coverage al reservoir depth from the respective offset source locations. VSP source location 5 is in a direct line with the injection. The 60 geophone sondes were cemented into the monitor well just before the baseline VSP acquisition and consisted of 96 geophone channels, with 18 three-component geophones (at the bottom of the string) and 42 single vertical component phones above. For this study, only the vertical geophone data were used.

54 ENVIRONMENTAL SCIENCES↗

THE MULTI-ISOTOPE PROCESS (MIP) MONITOR: A NEAR-REAL-TIME, NON-DESTRUCTIVE, INDICATOR OF SPENT NUCLEAR FUEL REPROCESSING CONDITIONS

Researchers from Pacific Northwest National Laboratory and The Ohio State University are working to develop a system for monitoring spent nuclear fuel reprocessing facilities on-line, non-destructively, and in near-real-time. This method, known as the Multi-Isotope Process (MIP) Monitor, is based upon the measurement of distribution patterns of a suite of indicator (radioactive) isotopes present within product and waste streams of a nuclear reprocessing facility. Signatures from these indicator isotopes are monitored on-line by gamma spectrometry and compared, in near-real-time, to patterns representing "normal" process conditions using multivariate pattern recognition software. By targeting gamma-emitting indicator isotopes, the MIP Monitor approach is compatible with the use of small, portable, high-resolution gamma detectors that may be easily deployed throughout an existing facility. In addition, utilization of a suite of radio-elements, including ones with multiple oxidation states, increases the likelihood that attempts to divert material via process manipulation would be detected. Proof-of-principle modeling exercises simulating changes in acid strength have been completed and the results are promising. Laboratory validation is currently under way and significant results are available. The latest experimental results, along with an overview of the method will be presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring Carbon Storage Sites with Time-Lapse Gravity Surveys

Monitoring technologies are deployed on carbon storage sites to demonstrate that the injected CO2 is contained within the storage complex during and long after the active life of the project and that the CO2 behavior is conforming to expectations. Detection of gravity variations accompanying mass redistributions in the subsurface caused by fluid movements in reservoirs provides a unique means for monitoring the dynamics of a carbon sequestration site. Time-lapse gravity surveys have a long history of effectively monitoring temporal density changes in the subsurface. However, monitoring of carbon storage sites with time-lapse gravity surveys using surface or borehole measurements remains limited, although it gained more attention during the last decade. With the recent progresses in instrument capabilities, and the increased number of fluid storage sites (e.g., wastewater, CO2, natural gas, etc.), the gravity method (with its unique ability to remotely estimate both the mass of an injected fluid and its location) has a promising future in monitoring. This chapter provides background information regarding the gravity method and discusses its modeling and application to various carbon storage sites.

Carbon Sequestration, time-lapse gravity, monitori↗

Long-term Biological Monitoring of an Impaired Stream: Synthesis and Environmental Management Implications

The long-term ecological recovery of an impaired stream in response to an industrial facility's pollution abatement actions and the implications of the biological monitoring effort to environmental management is the subject of this special issue of Environmental Management. This final article focuses on the synthesis of the biological monitoring program's components and methods, the efficacy of various biological monitoring techniques to environmental management, and the lessons learned from the program that might be applicable to the design and application of other programs. The focus of the 25-year program has been on East Fork Poplar Creek, an ecologically impaired stream in Oak Ridge, Tennessee with varied and complex stressors from a Department of Energy facility in its headwaters. Major components of the long-term program included testing and monitoring of invertebrate and fish toxicity, bioindicators of fish health, fish contaminant accumulation, and instream communities (including periphyton, benthic macroinvertebrate, and fish). Key parallel components of the program include water chemistry sampling and data management. Multiple lines of evidence suggested positive ecological responses during three major pollution abatement periods. Based on this case study and the related literature, effective environmental management of impaired streams starts with program design that is consistent across space and time, but also adaptable to changing conditions. The biological monitoring approaches used for the program provided a strong basis for assessments of recovery from remedial actions, and the likely causes of impairment. This case study provides a unique application of multidisciplinary and quantitative techniques to address multiple and complex regulatory and programmatic goals, environmental stressors, and remedial actions.

54 ENVIRONMENTAL SCIENCES↗

ROLE OF TOXICITY ASSESSMENT AND MONITORING IN MANAGING THE RECOVERY OF A WASTEWATER RECEIVING STREAM

We evaluate the roles of a long-term comprehensive toxicity assessment and monitoring program in management and for ecological recovery of a freshwater receiving stream impacted by industrial discharges and legacy contamination. National Pollution Discharge Elimination Permit (NPDES)-driven whole effluent toxicity (WET) tests using Ceriodaphnia and fathead minnows were conducted for more than twenty years to characterize wastewaters at the US National Nuclear Security Agency s Y-12 National Security Complex in Oak Ridge, Tennessee. Ambient toxicity tests also were conducted to assess water samples from EFPC, the stream receiving the wastewater discharges. The ambient tests were conducted as part of an extensive biological monitoring program that included routine surveys of fish, invertebrate and periphyton communities. WET testing, associated toxicant identification evaluations (TIEs), and ambient toxicity monitoring were instrumental in identifying toxicants and their sources at the Y-12 Complex, guiding modifications to wastewater treatment procedures, and assessing the success of various pollution-abatement actions. Through time, as requirements changed and water quality improved, the toxicity monitoring program became more focused. Ambient testing with Ceriodaphnia and fathead minnow larvae also was supplemented with less-standardized but more-sensitive alternative laboratory and in situ bioassays. The Y-12 Complex biological monitoring experience demonstrates the significant roles effluent and ambient toxicity testing can have in controlling and managing toxic discharges to receiving waters. It also emphasizes the value of supplementing WET and standardized ambient toxicity tests with alternative laboratory and in situ toxicity tests tailored to address specific problems.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗