Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Budget Period 2 Summary Report Part 2: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, Statoil funded NREL to perform tasks in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This study expands upon the work conducted in Budget Period 1 (BP1) to investigate the influence of the wake generated from an upstream turbine on a downstream turbine using Computational Fluid Dynamics (CFD) high-fidelity modeling tool. Simulator fOr Wind Farms Application (SOWFA) is an NREL high fidelity modeling tool that couples OpenFOAM CFD and NREL’s Aero-Elastic code Fatigue, Aerodynamics, Structures, and Turbulence (FAST). In BP1 the configuration was based on Hywind-3MW at 140 m water depth in the Gulf of Maine; however this study for Budget Period 2 (BP2) the configuration investigated is based on Hywind-6MW at 220 m water depth off the coast of Boston. The objectives were to perform two-turbines One-Way Coupling (OWC), three-turbines Two-Way Coupling (TWC), and to investigate wind power plant optimization.

99 GENERAL AND MISCELLANEOUS↗

Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Maine

Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Maine. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or above tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-­head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.

13 HYDRO ENERGY↗

Analysis of HOM Problems in the C-ADS Main Linac

Excitation of higher-order modes (HOMs) in superconducting cavities may severely affect the operation of the main linac in the Chinese Accelerator Driven System (CADS). Preliminary analysis is made on the effects of beam dynamic, which includes possible longitudinal and transverse emittance enlargements, as well as the possibility of beam breakup. Suggestions are given for further investigation. Comparison is made between the C-ADS and the Fermilab Project X.

43 PARTICLE ACCELERATORS↗

Migration of Older to New Digital Control Systems in Nuclear Power Plant Main Control Rooms

The United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) has the primary mission to advance nuclear power by resolving socio-technical issues through research and development (R&D). One DOE-NE activity supporting this mission is the Light Water Reactor Sustainability (LWRS) program. LWRS has the overall objective to sustain the operation of existing commercial nuclear power plants (NPPs) through conducting R&D across multiple “pathways,” or R&D focus areas. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in operating U.S. NPPs. This work involves (1) ensuring that legacy analog II&C systems are not life-limiting issues for the LWR fleet, and (2) implementing digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Under the LWRS Advanced II&C pathway, Human Factors experts at Idaho National Laboratory (INL) have been conducting R&D in support of NPP main control room (MCR) modernization activities. Work in prior years has focused on migrating analog I&C systems to new digital I&C systems (). In fiscal year 2016 (FY16), one new focus area for this research is migrating older digital I&C systems to new and advanced digital I&C systems. This report summarizes a plan for conducting a digital-to-digital migration of a legacy digital I&C system to a new digital I&C system in support of control room modernization activities.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Urban Flooding Analysis Using Radar Rainfall Data and 2-D Hydrodynamic Model: A Pilot Study of Back Cover Area, Portland, Maine

This project is a part of the Regional Resiliency Assessment Program, led by the Department of Homeland Security, to address flooding hazards of regional significance for Portland, Maine. The pilot study was performed by Argonne National Laboratory to identify differences in spatial rainfall distributions between the radar-derived and rain-gauge rainfall datasets and to evaluate their impacts on urban flooding. The flooding impact analysis utilized a high-resolution 2-dimensional (2-D) hydrodynamic model (15 ft by 15 ft) incorporating the buildings, streets, stream channels, hydraulic structures, an existing city storm drain system, and assuming a storm surge along the coast coincident with a heavy rainfall event. Two historical storm events from April 16, 2007, and September 29, 2015, were selected for evaluation. The radar-derived rainfall data at a 200-m resolution provide spatially-varied rainfall patterns with a wide range of intensities for each event. The resultant maximum flood depth using data from a single rain gauge within the study area could be off (either under- or over-estimated) by more than 10% in the 2007 storm and more than 60% in the 2015 storm compared to the radar-derived rainfall data. The model results also suggest that the inundation area with a flow depth at or greater than 0.5 ft could reach 11% (2007 storm) and 17% (2015 storm) of the total study area, respectively. The lowland areas within the neighborhoods of North Deering, East Deering, East and West Baysides and northeastern Parkside, appear to be more vulnerable to the flood hazard in both storm events. The high-resolution 2-D hydrodynamic model with high-resolution radar-derived rainfall data provides an excellent tool for detailed urban flood analysis and vulnerability assessment. The model developed in this study could be potentially used to evaluate any proposed mitigation measures and optimize their effects in the future for Portland, ME.

54 ENVIRONMENTAL SCIENCES↗

TM 4: Beam through the Main Linac Cryomodule

On May 15th 2017, the CBETA project reached the major funding milestone, “Beam through the MLC.” For this test, the team had to successfully accelerate the electron beam to 6 MeV in the Injector Cryomodule (ICM), and then to a final energy of 12 MeV in the Main Linac Cryomodule (MLC). The MLC contains six superconducting accelerating cavities; for this initial test only a single cavity was powered.

43 PARTICLE ACCELERATORS↗

Main Injector ILA Lambertson Seal Installation

The Main Injector ILA Lambertson magnet uses an 18 inch tapered flange from EVAC. The flange resembles the flange on drawing MD-331910, Flange Weldment MIR Lambertson. Please note that these flanges are heavy. A PALD, portable automotive lifting device, i.e engine hoist, is required as well as the associated lifting fixture, to install the mating flange. The following are the steps to install the EVAC seal drawing MA331512, T/S Conventional Magnet MIR Lambertson Magnet Aluminum Knife Edge Seal.

43 PARTICLE ACCELERATORS↗

Main Injector ILA Lambertson Vacuum Description

The Main Injector ILA Lambertson is a magnet used to extract proton beam from one orbit to another. This device is built by Fermilab Technical Division. The drawing number is ME-331120 sheet 1 of 4. The device weights 23,300 lbs.

43 PARTICLE ACCELERATORS↗

Uptower Investigation of Main and High-Speed-Shaft Bearing Reliability

This purpose of this report is to summarize the investigation of the operational conditions conducive to premature main bearing wear and gearbox bearing axial cracking failures in wind turbines. The report fully describes the series of operations conducted and measurements gathered from commissioning of the instrumented drivetrain in January 2017 through the end of the wind season in May 2018.

17 WIND ENERGY↗

Injection considerations for PIP-III Linac to Main Injector

The PIP-III linac produces 8 GeV H- beam for injection into the Recycler or Main Injector (MI). Stripping to H + is needed, in a system that is vulnerable to magnetic stripping of H - in magnetic fields. The High power beam will heat stripping foils, perhaps unacceptably. The injection pulse is much longer than the MI circumference, so multiturn pulses with resulting heating and beam diffusion are required. We discuss design considerations for the injection scenario, the stripper foil and its location, foil heating and related beam loss issues.

43 PARTICLE ACCELERATORS↗

Ray-Tracing Simulations Characterising the Performance of the Proposed 2024 HFIR HB4 Main Shutter

The Main Shutter at HB4 will serve two purposes after the HFIR Beryllium Reflector Replacement planned to take place in 2024. First as the primary certified safety control controlling the passage of neutrons from the cold source in the HFIR pressure vessel into the cold guide hall, and second as the first set of reflecting surfaces used to guide neutrons from the source and into the individual guide starts for each instrument in the cold guide hall.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Linear Regression Systematics of the Q-weak Main Detector Asymmetry

The Q-weak collaboration has made the first direct measurement of the proton's weak charge at Jefferson Lab to tightly constrain new, parity-violating electron-quark interactions at the multi-TeV scale. Our experiment measured the ?200 ppb parity-violating asymmetry in the scattering of longitudinally polarized electrons from an unpolarized liquid hydrogen target at a luminosity of 1.8x10^39. Careful setup of the injector helped to suppress helicity correlated differences in beam position, angle, and energy which create false asymmetries due to changes in detector acceptance and the kinematic dependences of the e+p cross section. Measured differences in beam position were consistent among all 6 beam position monitors in front of the target, with a precision of ?1 nanometer. The size of corrections depends on the helicity correlated beam parameter differences, and averaged about 35 ppb per shift of data. The data were regressed using 10 different sets of Independent Variables. These were expected to give similar corrections yet showed differences at the +-10 ppb level. In this presentation I'll summarize how these different schemes have not only been helpful in understanding the sensitivities of the main detector but in assigning errors to the corrections.

Mack, David↗

Progress on an Electron Beam Profile Monitor at the Fermilab Main Injector

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam intensities in the Main Injector (MI) that will exceed 2 MW. Measuring the transverse profiles of these high intensity beams in a ring requires non-invasive techniques. The MI uses ionization profile monitors as its only profile system. An alternative technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. This type of device was installed in MI and initial studies of it have been previously presented. This paper will present the status and recent studies of the device utilizing different techniques.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Mechanically Tuned Superconducting Main Injector Cavity

Radio Frequency (RF) superconductivity has been a mainstay of accelerator science for decades. However, its benefits have yet to be applied to proton synchrotrons with demanding tuning requirements. For example, the Main Injector (MI), Fermilab's high-energy proton synchrotron, currently utilizes 20+ ferrite-loaded cavities for a targeted 1.2 s acceleration cycle. Harnessing the extremely high gradients associated with superconductivity, the required number of cavities could be reduced by an order of magnitude, dramatically lowering operational power requirements even with cryogenic considerations. Additionally, the current plans for the Fermilab Accelerator Complex Evolution (ACE) initiative involve almost doubling the number of cavities in MI if the same designs are to be used, further highlighting the potential benefits of superconductivity. These advantages are attractive, but to date, no tunable superconducting cavity suitable for MI has been proposed due to the incompatibility of conventional broadband tuning methods with superconductivity. Here, we present a tunable superconducting cavity concept capable of record-breaking performance. Tuning will be accomplished by using high-speed linear actuators to vary the insertion depth of metallic plungers into the cavity volume. This tuning concept is theoretically viable with currently available technology and will be fully compatible with a superconducting cavity.

43 PARTICLE ACCELERATORS↗

Interface Box for Dual Power Amplifier Modulators in Main Injector

The Proton Improvement Plan II (PIP-II) aims to enhance the current Fermilab particle accelerator complex to intensify and accelerate more beam. To achieve this, a second power amplifier will be added to the Main Injector (MI) cavities. However, the control unit could only read signals coming from the previous power supplies, so the interface box was designed to facilitate the issue.

Ayala, Diana↗