Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Decontamination and Decommissioning Program of a Radiopharmaceuticals Production Facility - 17103

On May 2012, Best Medical Belgium (BMB) S.A., a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and the decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF/NIRAS Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel supports the definition of the clean-up and decommissioning strategies; the drafting of the Final Decommissioning Plan (FDP) and License Application for decommissioning; and the follow-up of the clean-up and upcoming D and D works on site. Four nuclear buildings are part of the clean-up and D and D activities. One of them, Building 14 (B14), represents the most challenging task with the clean-up of highly contaminated areas and their further decommissioning up to greenfield. Beside its two cyclotrons successively used for the production of radioisotopes, this building features hot cells and glove boxes used for the purification of radioisotopes and the conditioning of the final pharmaceutical product. The present paper aims at presenting the development of the D and D program in terms of modifications of existing facilities to allow carrying out the clean-up and D and D activities and the management of dismantled radioactive materials in a safe, efficient and cost-effective way as well as in terms of strategic options to be developed for the FDP. To support the clean-up and D and D activities, several workshops have been designed in order to treat radioactive materials removed from the building rooms. Those workshops feature an input buffer storage area, a common output buffer storage area and installations for the treatment of radioactive materials and waste (handling devices, cutting means, decontamination means, free release measurements means, etc.). Some modifications to the existing auxiliary systems will be required in order to dispose of appropriate systems to operate those workshops in a safe way. Activated concrete structures will constitute the most important part of radioactive materials that will arise from the decommissioning activities. To limit the total decommissioning costs, and especially the costs associated to radioactive waste management, two strategies have been developed in order to manage a part of activated concrete as candidate for free release with a certain decay period or as candidate for conventional landfill. Both strategies will have to be further detailed and discussed with the competent Authorities to ensure they can actually be implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Propulsion Research Facility (B-2): An Innovative, Multi-Purpose Test Facility

The Space Propulsion Research Facility, commonly referred to as B-2, is designed to hot fire rocket engines or upper stage launch vehicles with up to 890,000 N force (200,000 lb force), after environmental conditioning of the test article in simulated thermal vacuum space environment. As NASA s third largest thermal vacuum facility, and the largest designed to store and transfer large quantities of propellant, it is uniquely suited to support developmental testing associated with large lightweight structures and Cryogenic Fluid Management (CFM) systems, as well as non-traditional propulsion test programs such as Electric and In-Space propulsion. B-2 has undergone refurbishment of key subsystems to support the NASA s future test needs, including data acquisition and controls, vacuum, and propellant systems. This paper details the modernization efforts at B-2 to support the Nation s thermal vacuum/propellant test capabilities, the unique design considerations implemented for efficient operations and maintenance, and ultimately to reduce test costs.

Hill, Gerald M.↗

Decontamination and Decommissioning Activities of a Radiopharmaceuticals Production Facility - 18067

On May 2012, Best Medical Belgium S.A. (BMB), a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel: - Supports the definition of the clean-up and decommissioning strategies; - Drafts the Final Decommissioning Plan (FDP) and Safety Analysis Report (SAR) that will be submitted to FANC/AFCN (Belgian Federal Agency for Nuclear Control) in order to get the License for decommissioning; - Drafts the technical specifications of the public tendering process related to the D and D program; - Ensures the day to-day follow-up of the D and D activities on site. Four nuclear buildings are part of the D and D activities. One of them, building 14 (B14), represents the most challenging and extensive task with the clean-up of highly contaminated areas and its further decommissioning up to the final state. This building features two cyclotrons (CGR and IBA cyclotrons) successively used to produce radioisotopes, as well as hot cells and glove boxes used for their purification and the conditioning of the final pharmaceutical product. The present paper aims at presenting the most recent development steps of the clean-up phase regarding the adaptations of existing facilities and the upcoming activities in preparation of the decommissioning activities. To allow the sorting and the treatment of the radioactive material identified in the physical and radiological inventory, several workshops have been implemented within the B14 building in order to deal with radioactive materials arising from the clean-up and D and D activities. Following the conceptual design phase, Tractebel has actively monitored the on-site activities for the construction of those workshops such as: - The modification of the civil works; - The revamping of the ventilation system; - The installation of dedicated lifting equipment and workstations equipped with cutting devices; - The assembly of a docking station for filling the radioactive packages. The removal of the activated concrete surrounding the IBA cyclotron requires the erection of a containment structure and an extension structure. The containment structure, composed of light metallic beams, is located above the cyclotron and its irradiation zones. For operational security reasons and working efficiency, the cutting process of the concrete ceilings and walls will be performed from the top inside the containment structure by means of an eight tons overhead bridge crane. Concrete blocks resulting from the cutting process will then be lifted, without any loss of containment, towards the extension zone of the nuclear zone of the IBA cyclotron for further resizing, sorting and evacuation towards the identified waste routes. To prepare this task which will be performed during the decommissioning phase, Tractebel sets up the necessary technical specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials Science Research Rack Onboard the International Space Station

The Materials Science Research Rack (MSRR) allows for the study of a variety of materials including metals, ceramics, semiconductor crystals, and glasses onboard the International Space Station (ISS). MSRR was launched on STS-128 in August 2009, and is currently installed in the U. S. Destiny Laboratory Module. Since that time, MSRR has performed virtually flawlessly logging more than 550 hours of operating time. Materials science is an integral part of development of new materials for everyday life here on Earth. The goal of studying materials processing in space is to develop a better understanding of the chemical and physical mechanisms involved. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility containing two furnace inserts in which Sample Cartridge Assemblies (SCAs), each containing one material sample, can be processed up to temperatures of 1400C. Once an SCA is installed by a Crew Member, the experiment can be run by automatic command or science conducted via telemetry commands from the ground. Initially, 12 SCAs were processed in the first furnace insert for a team of European and US investigators. The processed samples have been returned to Earth for evaluation and comparison of their properties to samples similarly processed on the ground. A preliminary examination of the samples indicates that the majority of the desired science objectives have been successfully met leading to significant improvements in the understanding of alloy solidification processes. The second furnace insert will be installed in the facility in January 2011 for processing the remaining SCA currently on orbit. Six SCAs are planned for launch summer 2011, and additional batches are planned for future processing. This facility is available to support additional materials science investigations through programs such as the US National Laboratory, Technology Development, NASA Research Announcements, ESA application oriented research programs, and others. The development of the research rack was a cooperative effort between NASA's Marshall Space Flight Center and the European Space Agency (ESA).

Frazier, Natalie C.↗

The HEPCloud Facility: elastic computing for High Energy Physics – The NOvA Use Case

The need for computing in the HEP community follows cycles of peaks and valleys mainly driven by conference dates, accelerator shutdown, holiday schedules, and other factors. Because of this, the classical method of provisioning these resources at providing facilities has drawbacks such as potential overprovisioning. As the appetite for computing increases, however, so does the need to maximize cost efficiency by developing a model for dynamically provisioning resources only when needed. To address this issue, the HEPCloud project was launched by the Fermilab Scientific Computing Division in June 2015. Its goal is to develop a facility that provides a common interface to a variety of resources, including local clusters, grids, high performance computers, and community and commercial Clouds. Initially targeted experiments include CMS and NOvA, as well as other Fermilab stakeholders. In its first phase, the project has demonstrated the use of the “elastic” provisioning model offered by commercial clouds, such as Amazon Web Services. In this model, resources are rented and provisioned automatically over the Internet upon request. In January 2016, the project demonstrated the ability to increase the total amount of global CMS resources by 58,000 cores from 150,000 cores - a 25 percent increase - in preparation for the Recontres de Moriond. In March 2016, the NOvA experiment has also demonstrated resource burst capabilities with an additional 7,300 cores, achieving a scale almost four times as large as the local allocated resources and utilizing the local AWS s3 storage to optimize data handling operations and costs. NOvA was using the same familiar services used for local computations, such as data handling and job submission, in preparation for the Neutrino 2016 conference. In both cases, the cost was contained by the use of the Amazon Spot Instance Market and the Decision Engine, a HEPCloud component that aims at minimizing cost and job interruption. This paper describes the Fermilab HEPCloud Facility and the challenges overcome for the CMS and NOvA communities.

Fuess, S.↗

SIRTF Studies of Galaxy Evolution

SIRTF, the Space Infrared Telescope Facility, will compete NASA's family of Great Observatories, and is planning for launch in 2001. Two of the four scientific objectives being used to define SIRTF's capabilities concern galaxy evolution: the study of redshifted starlight from quiescent galaxies, enabling measurement of the field galaxy luminosity function to z>3; and the study of infrared luminous starburst galaxies, which SIRTF can observe to z~ 10 for the most luminous examples.

starburst galaxies↗

Ariane 5 verification and associated test facilities

The philosophy of verification tests of the Ariane 5 launcher program is already established. It corresponds to the development and the ground and flight qualification phases for both unmanned and manned launches. The different types of test are outlined for the system, booster, main core and upper structures, allowing the identification of the associated test facilities which are described.

Vedrenne, M.↗

Absolute Calibration of the AXAF Telescope Effective Area

The prelaunch calibration of AXAF encompasses many aspects of the telescope. In principle, all that is needed is the complete point response function. This is, however, a function of energy, off-axis angle of the source, and operating mode of the facility. No single measurement would yield the entire result. Also, any calibration made prior to launch will be affected by changes in conditions after launch, such as the change from one g to zero g. The reflectivity of the mirror and perhaps even the detectors can change as well, for example by addition or removal of small amounts of material deposited on their surfaces. In this paper, we give a broad view of the issues in performing such a calibration, and discuss how they are being addressed in prelaunch preparation of AXAF. As our title indicates, we concentrate here on the total throughput of the observatory. This can be thought of as the integral of the point response function, i.e. the encircled energy, out ot the largest practical solid angle for an observation. Since there is no standard x-ray source in the sky whose flux is known to the -1% accuracy we are trying to achieve, we must do this calibration on the ground. we also must provide a means for monitoring any possible changes in this calibration from pre-launch until on-orbit operation can transfer the calibration to a celestial x-ray source whose emission is stable. In this paper, we analyze the elements of the absolute throughput calibration, which we call Effective Area. We review the requirements for calibrations of components or subsystems of the AXAF facility, including mirror, detectors, and gratings. We show how it is necessary to calibrate this ground-based detection system at standard man-made x-ray sources, such as electron storage rings. We present the status of all these calibrations, with indications of the measurements remaining to be done, even though the measurements on the AXAF flight optics and detectors will have been completed by the time this paper is presented. We evaluate progress toward the goal of making 1% measurements of the absolute x-ray flux from astrophysical sources, so that comparisons can be made with their emission at other wavelengths, in support of observations such as the Sunyaev-Zeldovitch effect, which can give absolute distance measurements independent of the traditional distance measuring techniques in astronomy.

Kellogg, E.↗

Dismantling of Loop-Type Channel Equipment of MR Reactor in NRC 'Kurchatov Institute' - 13040

In 2009 the project of decommissioning of MR and RTF reactors was developed and approved by the Expert Authority of the Russian Federation (Gosexpertiza). The main objective of the decommissioning works identified in this project: - complete dismantling of reactor equipment and systems; - decontamination of reactor premises and site in accordance with the established sanitary and hygienic standards. At the preparatory stage (2008-2010) of the project the following works were executed: loop-type channels' dismantling in the storage pool; experimental fuel assemblies' removal from spent fuel repositories in the central hall; spent fuel assembly removal from the liquid-metal-cooled loop-type channel of the reactor core and its placement into the SNF repository; and reconstruction of engineering support systems to the extent necessary for reactor decommissioning. The project assumes three main phases of dismantling and decontamination: - dismantling of equipment/pipelines of cooling circuits and loop-type channels, and auxiliary reactor equipment (2011-2012); - dismantling of equipment in underground reactor premises and of both MR and RTF in-vessel devices (2013-2014); - decontamination of reactor premises; rehabilitation of the reactor site; final radiation survey of reactor premises, loop-type channels and site; and issuance of the regulatory authorities' de-registration statement (2015). In 2011 the decommissioning license for the two reactors was received and direct MR decommissioning activities started. MR primary pipelines and loop-type facilities situated in the underground reactor hall were dismantled. Works were also launched to dismantle the loop-type channels' equipment in underground reactor premises; reactor buildings were reconstructed to allow removal of dismantled equipment; and the MR/RTF decommissioning sequence was identified. In autumn 2011 - spring 2012 results of dismantling activities performed are: - equipment from underground rooms (No. 66, 66A, 66B, 72, 64, 63) - as well as from water and gas loop corridors - was dismantled, with the total radwaste weight of 53 tons and the total removed activity of 5,0 x 10{sup 10} Bq; - loop-type channel equipment from underground reactor hall premises was dismantled; - 93 loop-type channels were characterized, chopped and removed, with radwaste of 2.6 x 10{sup 13} Bq ({sup 60}Co) and 1.5 x 10{sup 13} Bq ({sup 137}Cs) total activity removed from the reactor pool, fragmented and packaged. Some of this waste was placed into the high-level waste (HLW) repository of the Center. Dismantling works were executed with application of remotely operated mechanisms, which promoted decrease of radiation impact on the personnel. The average individual dose for the personnel was 1.9 mSv/year in 2011, and the collective dose is estimated as 0.0605 man x Sv/year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Update on Risk Reduction Activities for a Liquid Advanced Booster for NASA's Space Launch System

Dynetics has designed innovative structure assemblies; manufactured them using Friction Stir Welding (FSW) to leverage NASA investments in tools, facilities, and processes; conducted proof and burst testing, demonstrating viability of design/build processes Dynetics/AR has applied state-of-the-art manufacturing and processing techniques to the heritage F-1, reducing risk for engine development Dynetics/AR has also made progress on technology demonstrations for ORSC cycle engine, which offers affordability and performance for both NASA and other launch vehicles Full-scale integrated oxidizer-rich test article. Testing will evaluate performance and combustion stability characteristics. Contributes to technology maturation for ox-rich staged combustion engines.

Crocker, Andy↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham of NASA Public Affairs hosted this press conference. Wayne Hill, Space Shuttle Deputy Program Manager; John Muratore, Shuttle Systems and Integration Manager; Mike Wetmore, Director for Shuttle Processing were present. Wayne started with a video from Shuttle Logistics Depot showing details of a point sensor box commonly named the black box. Work with the trouble shooting continues on a day to day basis, no definite launching date is set. John reports that they are in a mission support mode all over the country until the sensor problem is solved. Mike reports his team will complete scrub and securing tasks through the next day, restore the facility to its normal mode, and will start to a four day process of getting back to launch once trouble shooting is completed. Tanking test, thermal environment, problem identification, engine cut-off sensor problems, sensors, risk, design reviews, test and analysis, correlation of the problem with Columbia, are some of the topics covered with the News media.

Source record↗

MSRR Rack Materials Science Research Rack

The Materials Science Research Rack (MSRR) is a research facility developed under a cooperative research agreement between NASA and the European Space Agency (ESA) for materials science investigations on the International Space Station (ISS). The MSRR is managed at the Marshall Space Flight Center (MSFC) in Huntsville, AL. The MSRR facility subsystems were manufactured by Teledyne Brown Engineering (TBE) and integrated with the ESA/EADS-Astrium developed Materials Science Laboratory (MSL) at the MSFC Space Station Integration and Test Facility (SSITF) as part of the Systems Development Operations Support (SDOS) contract. MSRR was launched on STS-128 in August 2009, and is currently installed in the U. S. Destiny Laboratory Module on the ISS. Materials science is an integral part of developing new, safer, stronger, more durable materials for use throughout everyday life. The goal of studying materials processing in space is to develop a better understanding of the chemical and physical mechanisms involved, and how they differ in the microgravity environment of space. To that end, the MSRR accommodates advanced investigations in the microgravity environment of the ISS for basic materials science research in areas such as solidification of metals and alloys. MSRR allows for the study of a variety of materials including metals, ceramics, semiconductor crystals, and glasses. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility with a modular design capable of supporting multiple types of investigations. Currently the NASA-provided Rack Support Subsystem provides services (power, thermal control, vacuum access, and command and data handling) to the ESA developed Materials Science Laboratory (MSL) which accommodates interchangeable Furnace Inserts (FI). Two ESA-developed FIs are presently available on the ISS: the Low Gradient Furnace (LGF) and the Solidification and Quenching Furnace (SQF). Sample-Cartridge Assemblies (SCAs), each containing one or more material samples, are installed in the FI by the crew and can be processed at temperatures up to 1400 C. Once an SCA is installed, the experiment can be run by automatic command or science conducted via telemetry commands from the ground. This facility is available to support materials science investigations through programs such as the US National Laboratory, Technology Development, NASA Research Announcements, and others. TBE and MSFC are currently developing NASA Sample Cartridge Assemblies (SCA's) with a planned availability for launch in 2017.

Reagan, Shawn↗

Effect of two ion species on the propagation of shear Alfven waves of small transverse scale

The results of a theoretical modeling study and experimental investigation of the propagation properties of shear Alfven waves of small transverse scale in a plasma with two ion species are reported. In the two ion plasma, depending on the mass of the heavier species, ion kinetic effects can become prominent, and significant parallel electric fields result in electron acceleration. The theory predicts the appearance of frequency propagation gaps at the ion-ion hybrid frequency and between harmonics of the lower cyclotron frequency. Within these frequency bands spatial structures arise that mix the cone-propagation characteristics of Alfven waves with radially expanding ion Bernstein modes. The experiments, performed at the Basic Plasma Science Facility (BaPSF) at UCLA, consist of the spatial mapping of shear waves launched by a loop antenna. Although a variety of two ion-species combinations were explored, only results from a helium-neon mix are reported. A clear signature of a shear wave propagation gap, as well as propagation between multiple harmonics, is found for this gas combination. The evanescence of shear waves beyond the reflection point at the ion-ion hybrid frequency in the presence of an axial magnetic field gradient is also documented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Shuttle payload processing at KSC

Two basic systems of Shuttle payload and checkout are discussed. The first system is called 'off-line' checkout and checks out payloads or payload segments after they are brought to the launch complex laboratories, as individual units and transfer them to an integration facility where they are assembled into a total Shuttle payload. In this scheme all payload assembly and checkout is performed away from the Orbiter. Any problems concerning the payloads will allow rescheduling another payload for flight and therefore not subjecting the Orbiter to delays in its recycling flow. The second payload processing scheme is the 'on-line' checkout which employs a 'factory to pad' concept. Payloads are delivered directly to the pad, placed in the Payload Changeout Room where they are checked out and integrated and, after completion of servicing, are installed vertically into the Orbiter. A combination of off-line and on-line processing will be used to meet all flight requirements.

Phillips, J. D.↗