Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LANDING SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Target Trailing With Safe Navigation for Maritime Autonomous Surface Vehicles

This software implements a motion-planning module for a maritime autonomous surface vehicle (ASV). The module trails a given target while also avoiding static and dynamic surface hazards. When surface hazards are other moving boats, the motion planner must apply International Regulations for Avoiding Collisions at Sea (COLREGS). A key subset of these rules has been implemented in the software. In case contact with the target is lost, the software can receive and follow a "reacquisition route," provided by a complementary system, until the target is reacquired. The programmatic intention is that the trailed target is a submarine, although any mobile naval platform could serve as the target. The algorithmic approach to combining motion with a (possibly moving) goal location, while avoiding local hazards, may be applicable to robotic rovers, automated landing systems, and autonomous airships. The software operates in JPL s CARACaS (Control Architecture for Robotic Agent Command and Sensing) software architecture and relies on other modules for environmental perception data and information on the predicted detectability of the target, as well as the low-level interface to the boat controls.

Wolf, Michael↗

Spatiotemporal dynamics of ecosystem fires and biomass burning-induced carbon emissions in China over the past two decades

Fire is a major type of disturbance that has important influences on ecosystem dynamics and carbon cycles. Yet our understanding of ecosystem fires and their carbon cycle consequences is still limited, largely due to the difficulty of large-scale fire monitoring and the complex interactions between fire, vegetation, climate, and anthropogenic factors. Here, using data from satellite-derived fire observations and ecosystem model simulations, we performed a comprehensive investigation of the spatial and temporal dynamics of China's ecosystem fire disturbances and their carbon emissions over the past two decades (1997–2016). Satellite-derived results showed that on average about 3.47 - 4.53 x 10 4 km 2 of the land was burned annually during the past two decades, among which annual burned forest area was about 0.81 - 1.25 × 10 4 km 2 , accounting for 0.33-0.51% of the forest area in China. Biomass burning emitted about 23.02 TgC per year. Compared to satellite products, simulations from the Energy Exascale Earth System Land Model (ELM) strongly overestimated China's burned area and fire-induced carbon emissions. Annual burned area and fire-induced carbon emissions were high for boreal forest in Northeast China's Daxing'anling region and subtropical dry forest in South Yunnan, as revealed by both the satellite product and the model simulations. Our results suggest that climate and anthropogenic factors play critical roles in controlling the spatial and seasonal distribution of China's ecosystem fire disturbances. Our findings highlight the importance of multiple complementary approaches in assessing ecosystem fire disturbance and its carbon consequences. Further studies are required to improve the methods of observing and modelling China's ecosystem fire disturbances, which will provide valuable information for fire management and ecosystem sustainability in an era when both human activities and the natural environment are rapidly changing.

54 ENVIRONMENTAL SCIENCES↗

Mars Exploration Rover Landing Site Selection

Selection of the landing sites for the Mars Exploration Rovers has involved over 2 years of research and analysis effort that has included the participation of broad sections of the planetary sciences community through a series of open landing site workshops. The effort has included the definition of the engineering constraints based on the landing system, mapping those engineering constraints into acceptable regions and prospective sites, the acquisition of new information from Mars Global Surveyor and Mars Odyssey orbiters, the evaluation of science and safety criteria for the sites, and the downselection and final site selection based on the sites science potential and safety. The final landing sites (Meridiani Planum and Gusev crater) were selected by NASA Headquarters on April 11, 2003, prior to launch in June. This paper presents engineering requirements, and potential landing sites for Mars Exploration Rovers.

M Golombek↗

Human Exploration Using Real-Time Robotic Operations (HERRO)- Crew Telerobotic Control Vehicle (CTCV) Design

The HERRO concept allows real time investigation of planets and small bodies by sending astronauts to orbit these targets and telerobotically explore them using robotic systems. Several targets have been put forward by past studies including Mars, Venus, and near Earth asteroids. A conceptual design study was funded by the NASA Innovation Fund to explore what the HERRO concept and it's vehicles would look like and what technological challenges need to be met. This design study chose Mars as the target destination. In this way the HERRO studies can define the endpoint design concepts for an all-up telerobotic exploration of the number one target of interest Mars. This endpoint design will serve to help planners define combined precursor telerobotics science missions and technology development flights. A suggested set of these technologies and demonstrator missions is shown in Appendix B. The HERRO concept includes a crewed telerobotics orbit vehicle as well three Truck rovers, each supporting two teleoperated geologist robots Rockhounds (each truck/Rockhounds set is landed using a commercially launched aeroshell landing system.) Options include a sample ascent system teamed with an orbital telerobotic sample rendezvous and return spacecraft (S/C) (yet to be designed). Each truck rover would be landed in a science location with the ability to traverse a 100 km diameter area, carrying the Rockhounds to 100 m diameter science areas for several week science activities. The truck is not only responsible for transporting the Rockhounds to science areas, but also for relaying telecontrol and high-res communications to/from the Rockhound and powering/heating the Rockhound during the non-science times (including night-time). The Rockhounds take the place of human geologists by providing an agile robotic platform with real-time telerobotics control to the Rockhound from the crew telerobotics orbiter. The designs of the Truck rovers and Rockhounds will be described in other publications. This document focuses on the CTCV design.

Oleson, Steven R.↗

DOE Centers of Excellence Performance Portability Meeting

Performance portability is a phrase often used, but not well understood. The DOE is deploying systems at all of the major facilities across ASCR and ASC that are forcing application developers to confront head-on the challenges of running applications across these diverse systems. With GPU-based systems at the OLCF and LLNL, and Phi-based systems landing at NERSC, ACES (LANL/SNL), and the ALCF – the issue of performance portability is confronting the DOE mission like never before. A new best practice in the DOE is to include “Centers of Excellence” with each major procurement, with a goal of focusing efforts on preparing key applications to be ready for the systems coming to each site, and engaging the vendors directly in a “shared fate” approach to ensuring success. While each COE is necessarily focused on a particular deployment, applications almost invariably must be able to run effectively across the entire DOE HPC ecosystem. This tension between optimizing performance for a particular platform, while still being able to run with acceptable performance wherever the resources are available, is the crux of the challenge we call “performance portability”. This meeting was an opportunity to bring application developers, software providers, and vendors together to discuss this challenge and begin to chart a path forward.

97 MATHEMATICS AND COMPUTING↗

Simulator Evaluation of a Display for Manual Zero-Zero Landings

A research program to study in flight the display, sensor, and computer requirements for airborne, manually piloted zero-zero landing systems is being undertaken at the Ames Research Center. An evaluation has been made, on a flight simulator, of the display which will be used in the flight tests. Results show that on the simulator the pilots performed at least as well when they used the display for zero-zero approaches and landings as they did when they made simulated ILS approaches followed by simulated VFR breakouts and landings. In some aspects, particularly in the presence of crosswind, performance for the zero-zero display landings was somewhat better than for the ILS-VFR landings. Eight configurations of the display were studied in an attempt to evaluate the several elements in the display. There was no evident difference among the eight display configurations. The pilots who participated in the simulator program doubt that this result will carry over into flight.

Douvillier, Joseph G., Jr.↗

Study of USGS/NASA land use classification system

The results of a computer mapping project using LANDSAT data and the USGS/NASA land use classification system are summarized. During the computer mapping portion of the project, accuracies of 67 percent to 79 percent were achieved using Level II of the classification system and a 4,000 acre test site centered on Douglasville, Georgia. Analysis of response to a questionaire circulated to actual and potential LANDSAT data users reveals several important findings: (1) there is a substantial desire for additional information related to LANDSAT capabilities; (2) a majority of the respondents feel computer mapping from LANDSAT data could aid present or future projects; and (3) the costs of computer mapping are substantially less than those of other methods.

Spann, G. W.↗

Evaluation of VICAR software capability for land information support system needs

A preliminary evaluation of the processing capability of the VICAR software for land information support system needs is presented. The geometric and radiometric properties of four sets of LANDSAT data taken over the Elk River, Idaho quadrangle were compared. Storage of data sets, the means of location, pixel resolution, and radiometric and geometric characteristics are described. Recommended modifications of VICAR programs are presented.

Yao, S. S.↗

Orion Landing and Recovery Systems Development - Government Contributions

This slide presentation reviews NASA's work in development of landing and recovery systems for the Orion space craft. It includes a review of the available tools and skills that assist in analyzing the aerodynamic decelerators. There is a description of the work that is being done on the Government Furnished Equipment (GFE) parachutes that will be used with the Orion Crew Exploration Vehicle (CEV)

Machin, Ricardo A.↗

The Flexible Lunar Architecture for Exploration (FLARE): Designed for the Artemis-3 Moon 2024 Mission and Beyond

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for 7 to 14 days and then return them safely to Earth by 2024. This meets NASA’s internal 2024 lunar landing deadline directed by President Trump (Trump, 2017) and the “5-year” goal set forth by Vice President Pence (Pence, 2019). FLARE is an alternative to NASA’s Human Landing System reference architecture from the Design Analysis Cycle (DAC) #2 (NASA, 2019b). The minimum FLARE concept uses one Space Launch System launch, one Orion, one European Service Module (ESM), and one human lander to deliver four crew to the Moon for a minimum surface duration of 7 days and return them to Earth. FLARE adds a new capability, called the SpaceTug, based upon the mature and successful United Launch Alliance “Common” Centaur Upper Stage vehicle, with modifications. In FLARE, the SpaceTug provides propulsion needed to return the Orion+ESM from the Moon to Earth. The SpaceTug also provides propulsion to deliver the human lander Descent Element (DE) and Ascent Element (AE) separately to lunar orbit. The Orion+ESM then completes a rendezvous with the mated DE+AE in lunar orbit. FLARE also offers optional phases to the Moon 2024 mission. The SpaceTug can also deliver components of the planned Gateway - including the Power and Propulsion Element and the Habitation and Logistics Outpost - to lunar orbit; however, the planned FLARE destination is a Low Lunar Frozen Polar Orbit unlike the NASA DAC2 plan for a Near Rectilinear Halo Orbit. FLARE also provides an option to deliver precursor equipment - including a habitation module, crew mobility devices and an In-Situ Resource Utilization demonstration - to the lunar surface for enhanced crew exploration and science with the extended 14-day surface mission.

Commercial Launch Vehicles (CLV)↗

Guidance and control requirements for high-speed Rollout and Turnoff (ROTO)

This report defines the initial requirements for designing a research high-speed rollout and turnoff (ROTO) guidance and control system applicable to transport class aircraft whose purpose is to reduce the average runway occupancy time (ROT) for aircraft operations. The requirements will be used to develop a ROTO system for both automatic and manual piloted operation under normal and reduced visibility conditions. Requirements were determined for nose wheel/rudder steering, braking/reverse thrust, and the navigation system with the aid of a non-real time, three degree-of-freedom MD-11 simulation program incorporating airframe and gear dynamics. The requirements were developed for speeds up to 70 knots using 30 ft exit geometries under dry and wet surface conditions. The requirements were generated under the assumptions that the aircraft landing system meets the current Category III touchdown dispersion requirements and that aircraft interarrival spacing is 2 nautical miles. This effort determined that auto-asymmetric braking is needed to assist steering for aft center-of-gravity aircraft. This report shows various time-history plots of the aircraft performance for the ROTO operation. This effort also investigated the state-of-the-art in the measurement of the runway coefficient of friction for various runway conditions.

Goldthorpe, Steve H.↗

Studies of advanced transport aircraft

Concepts for possible future airplanes are studied that include all-wing distributed-load airplanes, multi-body airplanes, a long-range laminar flow control airplane, a nuclear powered airplane designed for towing conventionally powered airplanes during long range cruise, and an aerial transportation system comprised of continuously flying liner airplanes operated in conjunction with short range feeder airplanes. Results indicate that each of these concepts has the potential for important performance and economic advantages, provided certain suggested research tasks are successfully accomplished. Indicated research areas include all-wing airplane aerodynamics, aerial rendezvous, nuclear aircraft engines, air-cushion landing systems, and laminar flow control, as well as the basic research discipline areas of aerodynamics, structures, propulsion, avionics, and computer applications.

Nagel, A. L.↗

Image interpretation for a multilevel land use classification system

The potential use is discussed of three remote sensors for developing a four level land use classification system. Three types of imagery for photointerpretation are presented: ERTS-1 satellite imagery, high altitude photography, and medium altitude photography. Suggestions are given as to which remote sensors and imagery scales may be most effectively employed to provide data on specific types of land use.

Source record↗

An RF link analysis of MSBLS during ALT

An analysis of the microwave scanning beam landing system (MSBLS) ground station to orbiter radio frequency (RF) link was made to determine if the expected signal levels will be compatible with orbiter receiver capabilities. Of primary interest was whether or not loss of data will occur due to interference caused by the orbiter 101 nose boom which provides additional air data during the approach and landing test. The results of the analysis indicate that a small amount of data loss may occur due to the proximity of the MSBLS antennas and the nose boom. Tabulated data of antenna radiation patterns are given.

Speir, R. E.↗

A Matter of Millimeters: Defining the Processes for Critical Clearances on Curiosity

The Mars Science Laboratory (MSL) mission presents an immense packaging problem in that it takes a rover the size of a car with a sky crane landing system and packs it tightly into a spacecraft. This creates many areas of close and critical clearances. Critical Clearances are defined as hardware-to-hardware or hardware-to-envelope clearances which fall below a pre-established location dependent threshold and pose a risk of hardware to hardware contact during events such as launch, entry, landing, and operations. Close Clearances, on the other hand, are defined as any clearance value that is chosen to be tracked but is larger than the critical clearance threshold for its region. Close clearances may be tracked for various reasons including uncertainty in design, large expected dynamic motion, etc.

Florow, Brandon↗

Accessing Martian Fluvial and Lacustrine Sediments by Landing in Holden Crater, Margaritifer Sinus

Rover missions to the surface of Mars after MER 2003, are likely to be centered around focused geologic field mapping. One objective with high priority in selecting landing sites for these missions will be to characterize the nature, spatial distribution, internal structure, composition, and depositional history of exposed sedimentary layered deposits by visiting a number of distributed outcrops identified previously (and with a high degree of certainty) from orbit. These deposits may contain prebiotic material, even fossil organisms, but their primary value will be to enable an assessment of the planet's climate at the time they were emplaced. High resolution imaging from a mobile rover will enable the detailed study of these deposits over a wide area, their internal structure and mineralogy at distributed localities, and could resolve biologically-derived structures (such as stromatolite-like textures) if they are present. With the addition of a spectrometer, it should be possible to ascertain the presence of carbonates, sulfates, organics, water (liquid, frost, and bound water), as well as a variety of silicate minerals in the context of the collected imagery. Such a mission approach is directly relevant to future exploration of Mars, because it provides the geologic context comparable to what a field geologist visiting a site for the first time would acquire. Rover missions after MER will likely have much better targeting and hazard avoidance landing systems, enabling access to planimetrically-challenged sites of high scientific interest. These vehicles will also likely have greater mobility than MER, capable of driving greater distances in a shorter amount of time. Many scientists and mission planners have realized the need to design a rover whose mobility can be comparable to the dimensions of its 3-sigma landing error ellipse.

Parker, T. J.↗

New Perspective On Slosh Dynamics in High-Gravity Regimes for Lunar Missions

Slosh dynamics particularly in high gravity regime is of high interest to the NASA Human Landing Systems program, which aims to return humans to the Moon. This paper reexamines the commonly accepted equivalence between pendulum and mass-spring-damper mechanical analogies, demonstrating the differences through simulations and their impact on design and analysis. This study re-derives equations of motion for these mechanical models including mass-spring-damper (MSD) and pendulum by relaxing simplifying assumptions that had been typically applied to large launch vehicles and may be violated for lunar and planetary landing applications. The newly derived equations uncovers potential modeling gaps when applying the pendulum and MSD models, and the need for additional considerations in their application. Finally, the newly derived equations are validated using MathWorks® Simscape™ Multibody™ dynamics toolbox simulation.

Slosh↗

The economic value of remote sensing of earth resources from space: An ERTS overview and the value of continuity of service. Volume 6: Land use. Part 2: The role of ERTS in the establishment and updating of a nationwide land cover information system

The utility of an ERS system as an effective tool in land use management is analyzed. The cost effectiveness of satellites as a component of an ERS system is presented based on various projected levels of demand. It is indicated that a cost savings potential of $7.9 to $37.1 million annually is attributable to the inclusion of ERS-like satellites in the ERTS system.

Christie, R. J.↗