Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2024

This Fiscal Year (FY) 2024 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA), and associated operating disposal- authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory (INL). Annual review of the adequacy of the PA and CA for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2024, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Nineteen waste canister shipments were received at the RHLLW Disposal Facility, and all nineteen waste canisters were emplaced in disposal vaults.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

An Update of the Nation's Long-Term Strategic Needs for NASA's Aeronautics Test Facilities

The National Aeronautics and Space Administration's (NASA's) major wind tunnel (WT), propulsion test (PT), and simulation facilities exist to serve NASA's and the nation's aeronautics needs. RAND Corporation researchers conducted a prior study of these facilities from 2002 to 2003, identifying (1) NASA's continuing ability to serve national needs, (2) which facilities appear strategically important from an engineering perspective given the vehicle classes the nation investigates and produces, and (3) management challenges and issues. This documented briefing (DB) is the final report from a new, one-year study (conducted from September 2006 through January 2008), partially updating the prior assessment. The study focuses on updating the list of facilities in the prior study that were deemed to be strategically important (again, from an engineering perspective) in serving those needs. This update also adds a new assessment of national needs for six major aeronautics simulators at NASA and lists those deemed strategically important.

NASA FACILITIES↗

Testing and Starting up of the Plasma Melting Facility for Industrial Treatment of Radioactive Waste - 17362

The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. This facility is designed and built as an EPC contract by the Joint Venture Iberdrola Ingenieria y Construccion (Spain) and Belgoprocess (Belgium). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of a facility in a historical reactor at SRS: achieving both historical significance preservation and effective in-situ decommissioning - 15275

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions, LLC (SRNS). In 2004, US DOE recognized SRS as a structure within the Cold War Historic District of national, state and local significance because it is composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. US DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. The Disassembly Basin (DB) in C Reactor was evaluated for action under CERCLA. Data indicated there were over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 million (M) liters (L) of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. The need for an action was identified to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. In-situ decommissioning was selected as the remedy. The remedial action proceeded in stages: -Above-grade modifications to the interior of DB building -Relocation of irradiated scrap and reactor components to the deepest segments of the DB - Construction of a metal building to house evaporators - Forced evaporation of the DB's radiologically contaminated water - Grouting with special hybrid grouts - Removal of the evaporators and temporary building. Since the building itself was not demolished and will remain unchanged in appearance with the exception of filling the DB with grout, this ISD removal action/methodology did not adversely impact the historical significance of the 105-C Reactor Building, in accordance with the National Historic Preservation Act, nor did it adversely affect the ability to determine the full extent and details of preservation at some later date. Both special hybrid grout materials met all requirements. Overall average 7-day compressive strength for the dry area mix was 1.54 MPa (223 psi) and for the underwater mix 2.94 MPa (427 psi).Overall 28-day compressive strength for the dry area mix was 2.88 MPa (417 psi) and for the underwater mix 4.99 MPa (724 psi). A limited amount of testing was also performed at 91 days, where the overall compressive strength for the dry area mix was found to be 9.40 MPa (1363 psi) and for the underwater mix 13.98 MPa (2028 psi). All compressive strength values far exceeded the 0.34 MPa (50 psi) minimum requirements. The special, flowable-fill grouts designed and used for P- and R-Reactor ISD and used again for this 105-C ISD removal action resulted in considerable labor, cost, and schedule savings versus conventional materials. As an added bonus/benefit, the CO{sub 2} footprint of the SRS C-Reactor DB ISD was minimized by using a small amount of cement and byproduct material to produce the structural fill materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ecological risk assessment software for radioactive waste management facilities - 15464

Environmental Risk Assessment (ERA) is a systematic process which can be used to identify, quantify and characterize the risk posed by contaminants and physical stressors in the environment on biological receptors, including human and non-human biota. Human receptors can be addressed through a Human Health Risk Assessment and non-human biota can be addressed through an Ecological Risk Assessment (EcoRA). In 2012 the Canadian Standards Association (CSA) issued a CSA standard N288.6 Environmental Risk Assessment at Class I Nuclear Facilities and Uranium Mines and Mills. The standard applies to radioactive waste management facilities, as well as nuclear power plants. The ERA can also be used retrospectively, to estimate the effect that a contaminant or stressor has already had on the environment; and can be used to assist in determining possible remedial or risk management options to return the quality of the affected environment to a predetermined state. While industry-standard tools for estimating radiological doses to humans are readily available, there is a need for a tool to implement the CSA N288.6 standard for Ecological Risk Assessment. To address this need, AMEC developed a computer code called -Assessment of Impact of Contaminants on Ecological Receptors (AICER)-. The code was developed to be consistent with the CSA standard N288.6, by assessing the impact of radiological contamination on non-human biota for normal operations. The code can also be used to screen for the potential effects of conventional contamination on the environment. In addition, the code is also applicable for abnormal events and accidents with the appropriate modification of some parameters used in the code. The AICER code was qualified in accordance with the requirements of the Canadian quality standard CSA N286.7 -Quality Assurance of Analytical, Scientific, and Design Computer Programs for Nuclear Power Plants-. The functionality of the code is illustrated with screen shots in the paper, following the introduction of the theoretical model for the dose calculation. An inter-comparison with RESRAD-BIOTA and ERICA Assessment tool at the conceptual level was conducted. In addition, the practical application of the code for the assessment of the impacts related to an existing radioactive waste management facility is provided. In particular, analysis was conducted to evaluate radiological doses to non-human biota resulting from a fire accident scenario involving an existing waste storage and processing facility. Analysis included all feasible waterborne and airborne exposure pathways. Doses were evaluated for a range of species representing valued ecological components at various trophic levels and compared with benchmark values for indicator species. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Waste Facility Siting; 40 Years of Experience - 16521

In this study, siting efforts for radioactive waste management facilities in democratic countries have been reviewed to identify common factors of success and failure. The study has considered facility siting efforts in the past 40 years. The study has considered storage and disposal facilities for low-level wastes (LLW), transuranic wastes (TRU), intermediate-level wastes (ILW), high-level wastes (HLW) and used nuclear fuel (UNF). The study has reviewed thirty-nine facility siting efforts with the following results: - 13 successes in Finland, Germany, Japan, Korea, Spain, Sweden and the US. - 18 failures in Australia, Korea, the UK and the US. - 8 ongoing efforts in Canada, France, Germany, Japan, Sweden, Switzerland, the UK and the US. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The D and D of Nuclear Facilities: a Systemic Approach for Project Organization and Monitoring - 18099

The Decontamination and Decommissioning (D and D) of Licensed Nuclear facilities takes place under circumstances which make it a very complex field. On the one hand, more and more facilities of widely varying types are concerned, and many D and D projects are currently running or planned. A nuclear facility's life cycle is often very long and the building may be modified or impacted by incidents during its operation. These changes need to be known and taken into account for the D and D plans, in order to ensure safety at all times. In addition, the numerous stakeholders involved in a project express needs which impose many requirements. These encompass various points of view, and data from different detail levels must be managed to satisfactorily meet them. On the other hand, legacy data (including records, plans etc.) is a recurring issue for D and D projects. The quality and availability of relevant data regarding the different phases of the nuclear facility lifetime may be insufficient, for instance due to the lack of traceability practices in the past. The uncertainty level is not always specified and explained, old documents can be damaged and are not necessarily digitized, etc. It is therefore particularly important to define the relevant type of raw data to be collected and traced for D and D projects as early as possible. In this context, CEA (Commissariat a l'energie Atomique et aux energies Alternatives) has been analyzing past D and D projects for many years. The goal is to facilitate reproducibility by generalizing best practices and promoting efficient organizational rules and technical solutions. A method is currently being studied to help project managers to prepare specifications for future D and D operations and improve both the efficiency and the relevance of the decommissioning strategy throughout each project, depending on the expected quality of its end-state. This method first consists in formalizing and specifying the entire set of requirements to be taken into consideration, e.g. technical, operational, logistical, regulatory, financial, organizational, safety and security, human, ethical, or, naturally, environmental aspects. Second, based on these requirements, it will enable the project team to structure, check, and then to demonstrate the coherence and feasibility of the project from both the technological and organizational points of view. Lastly, the method will enable the evaluation of the various possible solutions for the management of dismantling products, for instance, regarding the waste outlets: direct disposal or interim storage. To conclude, the method should permit a constant re-evaluation of the D and D strategy depending on the possible evolution of the stakeholders' requirements, and thus it should optimize the monitoring of D and D projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Augmented Reality Tools for Nuclear Facilities - 18318

In this work we explore the possibility of improving nuclear facility operations through the use of emerging augmented reality technology. Specifically we focus on the use of augmented reality headsets. Augmented reality opens up the possibility for easy, on-the-fly access to documentation related to canisters, rooms, and carts. It also can be used to help plan complicated material moves in ways that do not violate nuclear criticality safety regulations. Modern augmented reality technology can also be interacted with using gaze, gesture and voice commands, thus making it particularly attractive for facilitating the documentation of nuclear material operations and work verification. An augmented reality-based nuclear facility criticality safety system would have a number of benefits for operations in nuclear facilities. This work could be used across the DOE complex to ensure technicians in gloveboxes work safely and securely. It could greatly reduce downtime associated with administrative criticality incidents. It would be a step forward in the process of improving the quality of documentation of the work that occurs in nuclear facilities while simultaneously increasing the ease with which this documentation can be collected. The augmented reality effectively endows the glovebox technicians with a sense for administrative nuclear criticality safety and the reactivity changes caused directly by their actions. Augmented reality also has great potential for facilitating inspections of nuclear infrastructure. Examples of Augmented Reality applications that facilitate infrastructure inspection and work verification will also be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Loading DOE Standard Canisters in the INL CPP-603 Irradiated Fuel Storage Facility - 20543

This paper looks at the equipment and operations necessary to load United States Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) into DOE Standard Canisters in the CPP-603 Irradiated Fuel Storage Facility (IFSF) in the Idaho Nuclear Technology and Engineering Center (INTEC) area at Idaho National Laboratory (INL). Two types of fuels are looked at in this evaluation: Advanced Test Reactor (ATR) fuel (uranium-aluminide fuel with aluminum cladding) and Peach Bottom fuel (thorium-uranium carbide fuel in a graphite matrix). The fuel ready for loading would come from fuel storage canisters in the CPP-603 facility. The paper describes the facility, the fuel types, the DOE Standard Canisters, and existing equipment; lists the needed loading operations; reviews facility features and equipment to perform the operations; and then lists the decisions, analyses, designs, demonstrations, and modifications that will be needed to perform the loading of DOE-owned SNF into DOE Standard Canisters in the CPP-603 IFSF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributionally robust facility location problem under decision-dependent stochastic demand

While the traditional facility location problem considers exogenous demand, in some applications, locations of facilities could affect the willingness of customers to use certain types of services, e.g., carsharing, and therefore they also affect realizations of random demand. Moreover, a decision maker may not know the exact distribution of such endogenous demand and how it is affected by location choices. In this paper, we consider a distributionally robust facility location problem, in which we interpret the moments of stochastic demand as functions of facility-location decisions. We reformulate a two-stage decision-dependent distributionally robust optimization model as a monolithic formulation, and then derive exact mixed-integer linear programming reformulation as well as valid inequalities when the means and variances of demand are piecewise linear functions of location solutions. We conduct extensive computational studies, in which we compare our model with a decision-dependent deterministic model, as well as stochastic programming and distributionally robust models without the decision-dependent assumption. Here, the results show superior performance of our approach with remarkable improvement in profit and quality of service under various settings, in addition to computational speed-ups given by formulation enhancements. These results draw attention to the need of considering the impact of location decisions on customer demand within this strategic-level planning problem.

97 MATHEMATICS AND COMPUTING↗

State-by-State comparison of combined heat and power to photovoltaic installations at manufacturing facilities with heat and power loads

Manufacturing facilities with large electricity and steam loads commonly meet those loads with a grid and boiler (GB) system configuration. In this study, two alternatives, a natural gas turbine cycle driven combined heat and power (CHP) system configuration and a grid boiler system augmented with photovoltaics (GB-PV), are investigated sustainable manufacturing in reference to the GB system configuration. For this purpose, their discounted payback period (DPP), carbon dioxide (CO 2 ) and nitrogen oxides (NO x ) emission reductions, and primary fossil energy impacts are calculated. The major contribution of this study is that it directly compares the application of both CHP and PV technologies at an assumed manufacturing facility in all 50 states of the United States. This highlights the location-specific impacts of the facility. The examined manufacturing facility utility requirements are 5 MW of power and over 12,000 kg/h of 250 kPa and 400 K saturated steam. A DPP of less than 25 years, the technology lifetime, is found in 44 states for the CHP system configuration and 6 states for the GB-PV system configuration. GB-PV and CHP cost-effectively reduce CO 2 in 44 and 38 states, respectively. CHP is better for NO x reduction, whereas GB-PV is better for primary fossil energy reduction.

14 SOLAR ENERGY↗

Evaluation of performance indicators applied to a material recovery facility fed by mixed packaging waste

Highlights: • Material Flows assessment of a Material Recovery Facility has been realized. • Performance Indicators for a generic MRF have been proposed. • A Dashboard has been utilized to measure the facility performance. • Experimental values of incoming waste and output products composition are reported. - Abstract: Most of the integrated systems for municipal solid waste management aim to increase the recycling of secondary materials by means of physical processes including sorting, shredding and reprocessing. Several restrictions prevent from reaching a very high material recycling efficiency: the variability of the composition of new-marketed materials used for packaging production and its shape and complexity are critical issues. The packaging goods are in fact made of different materials (aluminium, polymers, paper, etc.), possibly assembled, having different shape (flat, cylindrical, one-dimensional, etc.), density, colours, optical properties and so on. These aspects limit the effectiveness and efficiency of the sorting and reprocessing plants. The scope of this study was to evaluate the performance of a large scale Material Recovery Facility (MRF) by utilizing data collected during a long period of monitoring. The database resulted from the measured data has been organized in four sections: (1) data related to the amount and type of inlet waste; (2) amount and composition of output products and waste; (3) operating data (such as worked hours for shift, planned and unscheduled maintenance time, setting parameters of the equipment, and energy consumption for shift); (4) economic data (value of each product, disposal price for the produced waste, penalty for non-compliance of products and waste, etc.). A part of this database has been utilized to build an executive dashboard composed by a set of performance indicators suitable to measure the effectiveness and the efficiency of the MRF operations. The dashboard revealed itself as a powerful tool to support managers and engineers in their decisions in respect to the market demand or compliance regulation variation as well as in the designing of the lay-out improvements. The results indicated that the 40% of the input waste was recovered as valuable products and that a large part of these (88%) complied with the standards of the recycling companies. The evaluation of the indicators led to the decision to modify the layout to improve the interception of some polymers for which the performance indicators were poor. In particular, two additional optical sorters have to be inserted to increase the yield indicator and to the overall performance of the facility. Definitely, the results of the work allowed to: increase the yield and purity of products’ flows; ensure the compliance of waste flows; increase the workability.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental performances of different configurations of a material recovery facility in a life cycle perspective

Highlights: • An attributional LCA assessed the environmental performances of an integrated MRF. • Different configurations of the MRF technological evolution have been analysed. • Reliable data provide a large LCI table for all the configurations and each sub-units. • A biological treatment in-situ improves the potentials of land occupation and global warming. • The inclusion of a small-scale gasifier could improve almost all the environmental potentials. - Abstract: The study evaluated the environmental performances of an integrated material recovery facility (MRF) able to treat 32 kt/y of unsorted mixed waste, made of residuals from household source separation and separate collection. The facility includes a mechanical sorting platform for the production of a solid recovered fuel (SRF) utilized in an external waste-to-energy plant, bio-cells for tunnel composting of organic fraction, and a sanitary landfill for the safe disposal of ultimate waste. All the MRF sub-units have been analysed in depth in order to acquire reliable data for a life cycle assessment study, focused on the environmental performances of different configurations of the facility. The study investigated a “past” configuration, including just mechanical sorting, landfilling and biogas combustion in a gas engine, and the “present” one, which includes also a composting unit. Two possible “future” configurations, having a gasifier inside the MRF battery limits, have been also analysed, assessing the performances of two fluidized bed reactors of different size, able to gasify only the residues generated by the sorting platform or the whole amount of produced SRF, respectively. The analysis evaluated the contributions of each unit in the different configurations and allowed a reliable assessment of the technological evolution of the facility. The results quantified the positive effect of the inclusion of an aerobic treatment of the waste organic fraction. The SRF gasification in situ appears to improve the MRF environmental performances in all the impact categories, with the exclusion of that of global warming.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Techno-Economic and life cycle assessment of standalone Single-Stream material recovery facilities in the United states

Material Recovery Facilities (MRFs) are crucial players in achieving a circular economy. MRFs receive complex waste streams and separate valuable recyclables from these mixtures. This study conducts techno-economic analysis (TEA) to estimate the net present value (NPV) and life cycle assessment (LCA) to estimate different environmental impacts of a commercial scale standalone, single-stream MRF to assess the economic feasibility and environmental impacts of recovering valuable recyclables from an MRF processing 120,000 tonnes per year (t/y). The TEA employs a discounted cash flow rate of return (DCFROR) analysis over a 20-year facility lifetime, along with a sensitivity analysis on the impact of different operating and economic parameters. Results show that the total fixed cost of building the MRF facility is $\$ $23 MM, and the operating cost is $\$ $45.48/tonne. Further the NPV of the MRF can vary from $\$ $3.57 MM to $\$ $60 MM, while 100-year global warming potential can range from 5.98 to 8.53 kg carbon dioxide equivalents (CO2-eq) per tonne of MSW. We have also found that MSW composition (arising from regional effects) significantly impacts costs, 100-year global warming potential, and other impact categories such as acidification potential, eutrophication potential, ecotoxicity, ozone depletion, photochemical oxidation, carcinogenic effects, and non-carcinogenic effects. Sensitivity and uncertainty analysis indicate that waste composition and market prices significantly impact the profitability of the MRF, and the waste composition mostly impacts global warming potential. Our analysis also indicates that facility capacity, fixed capital cost, and waste tipping fees are vital parameters that affect the economic viability of MRF operations.

36 MATERIALS SCIENCE↗

The Sanford Underground Research Facility at Homestake

The former Homestake gold mine in Lead, South Dakota, has been transformed into a dedicated facility to pursue underground research in rare-process physics, as well as offering research opportunities in other disciplines such as biology, geology and engineering. A key component of the Sanford Underground Research Facility (SURF) is the Davis Campus, which is in operation at the 4850-foot level (4300 m.w.e.) and currently hosts two main physics projects: the LUX dark matter experiment and the MAJORANA DEMONSTRATOR neutrinoless double-beta decay experiment. In addition, two low-background counters currently operate at the Davis Campus in support of current and future experiments. Expansion of the underground laboratory space is underway at the 4850L Ross Campus in order to maintain and enhance low-background assay capabilities as well as to host a unique nuclear astrophysics accelerator facility. Plans to accommodate other future experiments at SURF are also underway and include the next generation of direct-search dark matter experiments and the Fermilab-led international long-baseline neutrino program. Planning to understand the infrastructure developments necessary to accommodate these future projects is well advanced and in some cases have already started. SURF is a dedicated research facility with significant expansion capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A button - type beam position monitor design for TARLA facility

Turkish Accelerator and Radiation Laboratory in Ankara (TARLA) facility is proposed as an IR FEL and Bremsstrahlung facility as the first facility of Turkish Accelerator Center (TAC). TARLA is essentially proposed to generate oscillator mode FEL in 3-250 microns wavelengths range, will consist of normal conducting injector system with 250 keV beam energy, two superconducting RF accelerating modules in order to accelerate the beam 15-40 MeV. The TARLA facility is expected to provide two modes, Continuous wave (CW) and pulsed mode. Longitudinal electron bunch length will be changed between 1 and 10 ps. The bunch charge will be limited by 77pC. The design of the Button-type Beam Position Monitor for TARLA IR FEL is studied to operate in 1.3 GHz. Mechanical antenna design and simulations are completed considering electron beam parameters of TARLA. Ansoft HFSS and CST Particle Studio is used to compare with results of simulations.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Restart of the Transient Reactor Test (TREAT) Facility Neutron Radiography Program

The TREAT radiography system is used to perform neutron radiography of fuels, experiments, and other specimens before and after irradiation within the TREAT reactor. The TREAT neutron radiography facility performed approximately 5,000 radiographs by the spring of 1977. Originally built in 1958, the TREAT Facility was in operation until it was placed in a shutdown status in 1994. Following the Fukishima disaster and seeing a need for enhanced accident tolerant fuels, the United Stated Department of Energy decided to restart the TREAT facility and resume transient operations. In November 2017, the TREAT reactor was successfully restarted and is currently performing operational testing in preparation for initial experiment irradiations and transient testing. This paper discusses efforts to reactivate the TREAT neutron radiography facility. To characterize the neutron beam, gold foil activation measurements were made to determine an average neutron flux and flux profile. An open beam image provides the information about variations in the beam profile. In conclusion, a series of system qualification radiographs have been acquired to determine the effective image acquisition parameters, resulting image quality, and the relationships between the two.

36 MATERIALS SCIENCE↗

Status of the High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. The background magnetic field of 15 T in the HFVMTF will be produced by a magnet provided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics (HEP), and Fusion Energy Sciences (FES), and will serve as a superconducting cable test facility in high magnetic fields and a wide range of temperatures for HEP and FES communities. This facility will also be used to test high-field superconducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of the facility, including construction, cryostat designs, top and lambda plates, and systems for powering, and quench protection and monitoring.

43 PARTICLE ACCELERATORS↗