Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Delays”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Dark matter searches and energy accumulation and release in materials

Efforts to identify dark matter by detecting nuclear recoils produced by dark matter particles reveal low-energy backgrounds of unknown origin in different types of detectors. In many cases, energy accumulation and delayed burst-like releases of stored energy could provide an explanation. These dynamics follow Prigogine’s ideas on systems with energy flow and the general Self-Organized Criticality scenario. We compare these models with properties of excess backgrounds in cryogenic solid-state detectors, relaxation processes in glasses and crystals, our observations of delayed luminescence in NaI(Tl), and make predictions for more phenomena present in these systems and in superconducting photon detectors and qubits. Experiments to create accurate phenomenological models are needed.

Pereverzev, Sergey↗

Quarterly Management Document – FY20, 1st Quarter, Multi-pass Hybrid Laser Arc Welding of Alloy 740H

During the first quarter of FY20, work focused on implementing a subcontract with Penn State University to collaborate on the project. Significant delays prevented the subcontract from being placed until the end of December. As a result only limited progress was made on the project. Required equipment was researched and ordered during the first quarter but will not be delivered until the middle of the second quarter of FY20. Delays are not expected to adversely impact the schedule of the project.

36 MATERIALS SCIENCE↗

Annular Core Research Reactor (ACRR) Pulse Curve Characterization

Reactor pulse characterization at the Annular Core Research Reactor (ACRR) at Sandia Technical Area V (TA-V) is commonly done through photo conductive detection (PCD) and calorimeter detectors. Each of these offer a mode of analyzing a digital signal with different advantages/methods for determination of integrated dose or temporal based metrology. This report outlines a method and code that takes the millions of data points from such detectors and delivers a characteristic pulse trendline through two main methods: digital signal filtration and machine learning, in particular, Support Vector Machines (SVMs). Each method's endpoint is to deliver a characteristic curve for the many bucket environments of ACRR while considering other points of interest including delayed gamma removal for prompt dose metrics. This work draws and adds on previous work detailing the delayed gamma fraction contributions from CINDER simulations of the ACRR. Results from this project show a method to determine characteristic curves in a way that has previously been limited by data set size.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Programmatic Equipment Procurement: An Improved System for Coordinating the Procurement of New Programmatic Equipment

A better structured system that outlines the communication required between the Project Manager (PM) and all the Key Stakeholders. This system will help the PM work with the SMEs to define the scope of the equipment to be procured. It will also help the PM confirm that all associated key stakeholders (WCI IT, FPOC, etc.) have been contacted and have reviewed the new equipment being proposed to be procured. This step is crucial in order to confirm that the piece of equipment being procured not only meets the SME requirements but also the security, safety and building requirements on site. This is a step that is currently missed or overlooked and can cause delays in procurement after the piece of equipment has already been decided on. This new system should help mitigate any delays or miscommunication regarding the piece of equipment being procured.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CryoTARPOS Vibration Mitigation System for Layered Experiments

The goal of this project is to implement a system that can eliminate or mitigate vibration so that clear images can be taken without bypassing the cryocooler. By allowing for layer characterization and cryocooler operation at the same time, cooling capacity and thermal stability of the target would be improved, and more layer characterization data could be taken. Increased cooling capacity and thermal stability could allow for layering during occasional off normal conditions that would typically result in a loss of temperature control and NIF operational delays ranging from several hours to several days per month. The increased cooling capacity and thermal stability could also allow for layering of new target platforms that have less cooling margin. Additional layer images could be used for better characterization of defects and non-uniformities in the layer and would reduce the likelihood of layer seed loss, which typically adds ~12 hours per week in layering time. Motion blur from vibration due to off normal activity in the NIF Target Bay could also be mitigated that would usually result in NIF operational delays of several hours every month.

42 ENGINEERING↗

Real Time Applications Using Linear State Estimation Technology (RTA/LSE)

Electric Power Group, LLC (EPG) was awarded DOE OE0000849 to design, develop, and demonstrate three real-time applications for monitoring power system stability. The applications use phasor measurements and processing by a linear state estimator (LSE) to improve system visibility and accuracy. These applications leverage the large and expanding phasor measurement systems being deployed by utilities throughout the world, and specifically in the United States. Phasor measurements provide a much more detailed view of the power systems than traditional SCADA systems, so can provide better visibility of events and an early warning of developing problems. These three applications are real-time contingency analysis (RTCA), area angle monitoring (AAM), and a voltage stability index (VSI). The project was fully completed as proposed. All three applications were successfully implemented and demonstrated. There were challenges the caused project delays, however. While the RTCA is based on well-known concepts and readily available tools, its deployment using phasor measurements meant it needed to be adapted to sometimes sparse measurements and limited coverage areas. EPG met these challenges with extensive modeling and testing. The AAM is based on unproven research, so EPG had to deal with a lot of unknowns and develop additional methods for practical implementation. These activities took more time than anticipated, so required extra time for development. In addition, there was difficulty getting adequate measurement locations for successful deployment and utility installation delays. Consequently, the project required a time extension to complete. These three real-time applications, RTCA, AAM, and VSI, use only phasor measurement input. Since they do not require the EMS or other measurement systems, they can serve as a backup and security check for the EMS. Phasor measurements are validated and extended by an LSE. The LSE will always produce an output even when some inputs are impaired, so the RT applications will operate even when the EMS state estimator does not converge and the applications it supports cannot function. Consequently, these RT applications can provide valuable additional reliability for control center operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Physics Simulations of Molten Chloride Fast Reactor using Nek5000 and PROTEUS-NODAL

This report documents the FY20 work to demonstrate a specific multi-physics capability within NEAMS tools to model molten chloride fast reactors (MCFR). Specifically, the CFD code Nek5000 and the neutronics code PROTEUS-NODAL were coupled off-line to calculate the delayed neutron precursor distribution within the flowing fuel salts in an MCFR core. An MCFR benchmark problem and a 3D test problem based on a conceptual MSR design were successfully solved through the coupled simulation of Nek5000 and PROTEUS-NODAL. In the coupled simulations for these test problems, Nek5000 provided high-quality flow field information, and PROTEUS-NODAL performed the neutron diffusion calculation along with the precursor drift model. The impact of precursor drift on the core status was also investigated. Additionally, the precursor drift model implemented in PROTEUS-NODAL was verified by making use of the reference precursor distribution generated from Nek5000. Results of these test problems suggest that the multi-physics capability of Nek5000 and PROTEUS-NODAL was properly developed for tracking delayed neutron precursor drift.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

New Physics in the Hot Electron Furnace (Final Report)

The primary purpose of this award was experiments and simulations related to the idea of a ‘Hot Electron Furnace’ where nonlocal heat transport would allow unique new experimental opportunities at x-ray free electron lasers. The period of this award included beamtime at the MEC endstation of the LCLS, and the execution of those experiments was a primary goal. Unfortunately, the beamtime had limited success due to (1) inability of the LCLS to deliver the expected two-color operations mode, and (2) failure of the MEC endstation’s own software to save the cavity timing data that would have allowed inference of time delays for the few hours when two-color mode briefly operated. The beamtime was then switched to operate in single-color (one pulse) mode, and studies were performed of x-ray heating and probe, simultaneously. Two interesting manuscripts are finally near submission, having been delayed by student graduations, need for collaborator simulations of x-ray heating processes, and then COVID. I am hopeful that they will soon be submitted (especially the paper on x-ray heating of MgO) because one of the principal students involved has returned from industry to take a postdoc position at SLAC. Below, we first list all publications and other work products (including the two that are nearing submission) and then summarize several outcomes from this effort. During the term of this award three UW physics graduate students were at least partially supported, and all three received their Ph.D.’s with significant components of their supported work in the dissertation.

47 OTHER INSTRUMENTATION↗

Performance Demonstration of Self-Powered Neutron Detectors for Steady-State Reactor Operations

The irradiation testing of sensors in reactors is a crucial step towards calibrating and qualifying sensors prior to their deployment in experiments. This report details the process toward qualifying and calibrating custom-designed rhodium-based self-power neutron detectors (Rh-SPNDs) for steady-state reactor irradiations. This process serves to both demonstrate the performance capabilities of Rh-SPNDs as well as to provide experimental data for development of a sensor sensitivity model. Two designs of Rh-SPNDs were tested in various reactors to demonstrate: detection resolution in a low neutron flux environment, a delayed-response compensation technique, output linearity in a large range of neutron flux, and measurement accuracy verified with dosimetry. The detection resolution and compensation technique was demonstrated in the AGN-201m reactor at Idaho State University. The irradiation confirmed the sensors’ capability to perform steady-state operations in a low neutron flux of ~2E8 n/cm 2 -sec. Sensor output linearity coupled with the delayed-response compensation was investigated at the neutron radiography reactor at Idaho National Laboratory. A Rh-SPND was irradiated to neutron fluxes ranging from 2E8 to 2E13 n/cm2-sec range. The measured data demonstrated a wide and linear range of operation with a measured linear sensitivity of 1.0129 ×10 -13 A/W with a correlation-squared value of r 2 =0.9927. The measurement accuracy was investigated at the Advanced Test Reactor Critical reactor. The SPNDs were inserted into a test vehicle with collocated flux wires. Two irradiations with different flux levels were performed, and the SPNDs relative measurement between the two irradiations was calculated to be 1.2613 ± 0.0153 for the small SPND design and 1.1809 ± 0.0108 for the large SPND design. Both SPND measurements fell between the co-axial dosimetry result, which reported 1.218 ± 0.047. Additionally, the preliminary MCNP model for calculating SPND sensitivity was developed in parallel to this work. Modeled neutron spectrum with measured magnitude was used for inputs to determine the simulated SPND output. The results showed an overestimation of signal strength by a factor of 5, which was expected because of model simplification. This leads to future modeling work to account for signal losses from additional physical properties, including high temperature environments for FY-21.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID–19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission–critical” work was performed with approximately 25% on–site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of the Back End of the Nuclear Fuel Cycle

Management of spent nuclear fuel and high-level radioactive waste consists of three main phases – storage, transportation, and disposal – commonly referred to as the back end of the nuclear fuel cycle. Current practice for commercial spent nuclear fuel management in the United States (US) includes temporary storage of spent fuel in both pools and dry storage systems at operating or shutdown nuclear power plants. Storage pools are filling to their operational capacity, and management of the approximately 2,200 metric tons of spent fuel newly discharged each year requires transferring older and cooler spent fuel from pools into dry storage. Unless a repository becomes available that can accept spent fuel for permanent disposal, projections indicate that the US will have approximately 136,000 metric tons of spent fuel in dry storage systems by mid-century, when the last plants in the current reactor fleet are decommissioned. Current designs for dry storage systems rely on large multi-assembly canisters, the most common of which are so-called “dual-purpose canisters” (DPCs). DPCs are certified for both storage and transportation, but are not designed or licensed for permanent disposal. The large capacity (greater number of spent fuel assemblies) of these canisters can lead to higher canister temperatures, which can delay transportation and/or complicate disposal. This current management practice, in which the utilities continue loading an ever-increasing inventory of larger DPCs, does not emphasize integration among storage, transportation, and disposal. This lack of integration does not cause safety issues, but it does lead to a suboptimal system that increases costs, complicates storage and transportation operations, and limits options for permanent disposal. This paper describes strategies for improving integration of management practices in the US across the entire back end of the nuclear fuel cycle. The complex interactions between storage, transportation, and disposal make a single optimal solution unlikely. However, efforts to integrate various phases of nuclear waste management can have the greatest impact if they begin promptly and continue to evolve throughout the remaining life of the current fuel cycle. A key factor that influences the path forward for integration of nuclear waste management practices is the identification of the timing and location for a repository. The most cost-effective path forward would be to open a repository by mid-century with the capability to directly dispose of DPCs without repackaging the spent fuel into disposalready canisters. Options that involve repackaging of spent fuel from DPCs into disposalready canisters or that delay the repository opening significantly beyond mid-century could add 10s of billions of dollars to the total system life cycle cost.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Plus Other Alternative Fuels Risk Assessment Models (HyRAM+) (Technical Reference Manual V.4)

The HyRAM+ software toolkit provides a basis for conducting quantitative risk assessment and consequence modeling for hydrogen, methane, and propane infrastructure and transportation systems. HyRAM+ is designed to facilitate the use of state-of-the-art science and engineering models to conduct robust, repeatable assessments of safety, hazards, and risk. HyRAM+ includes generic probabilities for equipment failures, probabilistic models for the impact of heat flux on humans and structures, and experimentally validated first-order models of release and flame physics. HyRAM+ integrates deterministic and probabilistic models for quantifying accident scenarios, predicting physical effects, and characterizing hazards (thermal effects from jet fires, overpressure effects from delayed ignition), and assessing impact on people and structures. HyRAM+ is developed at Sandia National Laboratories to support the development and revision of national and international codes and standards. HyRAM+ is a research software in active development and thus the models and data may change. This report will be updated at appropriate developmental intervals. This document provides a description of the methodology and models contained in HyRAM+ version 4.0. The most significant change for HyRAM+ version 4.0 from HyRAM version 3.1 is the incorporation of other alternative fuels, namely methane (as a proxy for natural gas) and propane into the toolkit. This change necessitated significant changes to the installable graphical user interface as well as changes to the back-end Python models. A second major change is the inclusion of physics models for the overpressure associated with the delayed ignition of an unconfined jet/plume of flammable gas.

02 PETROLEUM↗

Rossi-alpha Analysis of CURIE Experiment [Slides]

Critical assembly measurement and operations are crucial to the development of benchmark data. Knowledge of the prompt neutron lifetime informs on the state of the system’s neutron spectrum. Rossi-alpha analysis can give us time-dependent information on the system. Teflon was selected, via genetic algorithm, as a moderator to target the URR in uranium for CURIE. Rossi-alpha measurements of the assembly's approach to critical using He-3 detectors estimated the prompt neutron decay constant (α) at delayed critical. α values of several subcritical measurements were then used to predict the α value at delayed critical.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

VERA-Grizzly Ex-Core Calculations: Watts Bar Unit 1 Cycles 1-2

The critical structures that comprise light-water reactor (LWR) nuclear power plants are subjected to operating environments that can challenge their integrity. Structures in close proximity to the reactor core, such as the reactor pressure vessel (RPV) and the biological shield wall, are subjected to high levels of radiation emanating from the core, as well as elevated temperatures. As the US fleet of operating LWRs ages, the effects of these operating environments on the integrity of these structures must be considered to ensure their continued safe operation. Extending the lifetime of commercial reactors and maintaining the aging reactor fleet require accurate prediction of the exposure of ex-core components to neutron and photon radiation. In particular, concrete degradation studies must be performed to evaluate the safety and long-term operation of reactors with lifetime extensions. The concrete reactor bioshield is important for providing radiological protection during operation and must last for the entire lifetime of the reactor. Recent interest in lifetime extensions furthers the need to accurately simulate concrete material degradation in the reactor bioshield. As a result of this need, the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program has funded this study to couple its tools, Virtual Environment for Reactor Applications (VERA) and Grizzly. VERA allows users to set up models to calculate time-dependent and fully coupled solutions (with thermal feedback) for ex-core quantities of interest such as vessel and coupon fluence and detector responses for multiple statepoints and cycles. Grizzly is a finite-element application based on the Multiphysics Object Oriented Simulation Environment (MOOSE) framework that is used to enable aging materials calculations. This report highlights the work performed to calculate the fluence in the vessel and concrete for Watts Bar Nuclear Plant Unit 1 (WBN1) Cycles 1 and 2. The fluences obtained from VERA were successfully transferred to Grizzly using a Python script. Four simulations were run with Grizzly: (1) the Mazars model with the initial Young’s modulus being the instantaneous modulus, (2) the Mazars model with the initial Young’s modulus being the delayed modulus, (3) the Mazars model with the initial Young’s modulus being the delayed modulus with the addition of the effects of micro-damage caused by irradiation, and (4) the Mazars model with the initial Young’s modulus being the instantaneous modulus, and with the addition of micro-damage and creep. Details regarding the methods used to obtain the fluence and the statistical errors associated with the VERA Monte Carlo Shift calculations are discussed in greater detail in this report. The results obtained from the four Grizzly models are also presented in this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

IER 555: Godiva Benchmark Update CED-2 (Final Design Report)

The International Criticality Safety Benchmark Evaluation Project (ICSBEP) evaluation of the Godiva IV critical assembly, HEU-MET-FAST-086: GODIVA-IV DELAYED-CRITICAL EXPERIMENTS (HMF-086), was completed by Russ Mosteller. Five critical experiment configurations performed at the Los Alamos National Laboratory (LANL) Technical Area (TA)-18 were evaluated as acceptable benchmark cases. The five cases consist of four delayed critical configurations which differ in control rod positions and one prompt critical configuration. All cases calculated a lower $k_{eff}$ than measured by experiment. This data is referred to as the TA-18 Godiva IV benchmark in this report. In 2005, Godiva IV was disassembled for relocation to the Nevada Test Site (NTS), now Nevada National Security Site (NNSS), at the National Criticality Experiments Research Center (NCERC). Following the disassembly and subsequent reassembly and startup of Godiva IV at NCERC, additional information about the Godiva IV components was obtained. An errata note was added to the HMF-086 evaluation in the ICSBEP handbook to provide this new information until a revision to the benchmark evaluation could be performed. In addition to those corrections, there are differences between the Godiva IV assembly at TA-18 and the Godiva IV assembly at NCERC. These differences include both assembly-specific differences (differences in the safety block gap, differences in the control rod positions, a new NCERC Top Hat and contamination shield) as well as environmental differences, such as the size and shape of the experimental building where the assembly is located. An additional model with similar cases, referred to as the NCERC Godiva IV benchmark in this report, will be added to the revised HMF-086 to capture these additional differences. This will provide the best benchmark model of Godiva for use by those performing experiments at NCERC. The IER 555 CED-2 report documents the information that will be updated in the HMF-086 revision, both the corrections to the TA-18 Godiva IV benchmark and the subsequent changes to create a NCERC Godiva IV benchmark. It describes the measurements that will be performed for cases similar to those performed at TA-18. It also describes measurements that will be included in the evaluation as additional data.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗