Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Decision Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Head-Worn Displays for NextGen

The operating concepts emerging under the Next Generation air transportation system (NextGen) require new technology and procedures - not only on the ground-side - but also on the flight deck. Flight deck display and decision support technologies are specifically targeted to overcome aircraft safety barriers that might otherwise constrain the full realization of NextGen. One such technology is the very lightweight, unobtrusive head-worn display (HWD). HWDs with an integrated head-tracking system are being researched as they offer significant potential benefit under emerging NextGen operational concepts. Two areas of benefit for NextGen are defined. First, the HWD may be designed to be equivalent to the Head-Up Display (HUD) using Virtual HUD concepts. As such, these operational credits may be provided to significantly more aircraft for which HUD installation is neither practical nor possible. Second, the HWD provides unique display capabilities, such as an unlimited field-of-regard. These capabilities may be integral to emerging NextGen operational concepts, eliminating safety issues which might otherwise constrain the full realization of NextGen. The paper details recent research results, current HWD technology limitations, and future technology development needed to realize HWDs as a enabling technology for NextGen.

Bailey, Randall E.↗

A Corrosion Risk Assessment Model for Underground Piping

The Pressure Systems Manager at NASA Ames Research Center (ARC) has embarked on a project to collect data and develop risk assessment models to support risk-informed decision making regarding future inspections of underground pipes at ARC. This paper shows progress in one area of this project - a corrosion risk assessment model for the underground high-pressure air distribution piping system at ARC. It consists of a Corrosion Model of pipe-segments, a Pipe Wrap Protection Model; and a Pipe Stress Model for a pipe segment. A Monte Carlo simulation of the combined models provides a distribution of the failure probabilities. Sensitivity study results show that the model uncertainty, or lack of knowledge, is the dominant contributor to the calculated unreliability of the underground piping system. As a result, the Pressure Systems Manager may consider investing resources specifically focused on reducing these uncertainties. Future work includes completing the data collection effort for the existing ground based pressure systems and applying the risk models to risk-based inspection strategies of the underground pipes at ARC.

Datta, Koushik↗

First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis

The First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis (aka the STEP 1 Project or the Project) aimed to (1) developed a brand-new web tool that could provide decision support through free, rapid techno-economic analysis of behind-the-meter solar+storage systems for industrial process heat and (2) conduct high-level analyses of the cost-competitiveness of the same systems across the US in key sectors. The STEP 1 web tool collects key location, land availability, thermal load profile, proccess heat temperature and media, and other key parameters through an easy-to-use user interface (UI). The UI was designed to meet the user at their level of understanding by minimizing the number of required inputs as much as possible while including options for more nuanced inputs if the user desires. STEP 1 advises users on which solar thermal tehcnologies that could fit their needs based on the inputs provided (namely process media and temperature). The tool can model a wide range of solar thermal technologies including flat plate collectors, evacuated tubes, parabolic troughs, linear Fresnel, and molten salt towers all with corresponding thermal energy storage (TES) - solar PV with resistive heating and TES is also included. Once the parameters are collected, a nominal thermal energy production profile for the facility's location is generated using NREL's System Advisory Model (SAM) and then passed to a modified version of NREL's REopt platform to optimize the size (capacity) and dispatch of the solar+storage system to minimize lifecycle costs subject to energy balance, fuel and electricity rates, emission reductions goals, and other constraints. This entire process takes less than 20 minutes, is completely free, requires zero coding skills, and provides the user with a high-level assessment on the techno-economic feasability of deploying solar+storage systems for their energy needs. In addition to the development of the STEP 1 web tool, the project completed two complementary analyses focused on leveraging the backend code of STEP 1, public industrial facility locations and fuel consumption data, and key sector information to assess the economic opportunity of reducing fuel costs at various levels of capacity factor around the US. Both analyses found that there are key markets, locations, industrial sectors (namely food and beverage), and degrees of offset where solar thermal technologies could be cost-effectively deployed, highlighting a key market entry point for these technologies, and assessing deployment potential. In summary, the STEP 1 project improved the opportunities for solar+storage systems to expand into the industrial process heat market through breaking down barriers to assessing these technologies.

14 SOLAR ENERGY↗

A Guide for Public Utility Commissions: Building Internal Technical Capacity and Recruiting Talent for Grid Resilience

This guide offers insight into how PUCs can strategically expand their technical workforce to meet evolving gird resilience demands. It outlines critical skill sets needed to support informed regulatory decision-making around resilience, such as modeling and weather forecasting, electric power systems analysis, and advanced data interpretation. In addition, it provides strategies for developing technical talent both internally and through additional recruitment efforts. Two appendices provide a list of grid resilience training resources and a compendium of sample job descriptions that reflect grid resilience technical expertise for PUC consideration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

WRPS Hanford Update [Slides]

The purpose of this report is to coordinate with the staff from WRPS, the current contract holder for operations at the Hanford site to better inform design decisions for the Autonomous systems for Hanford waste tank handling project. The project goals are to support risk reduction associated with monitoring, inspection and mapping of Hanford tank underground pits and includes: 1. A pit mock-up demonstration of Idaho National Laboratory’s (INL) Autonomous Pit Exploration System (APES) technology, which has two configurations: A. The Autonomous Robotic Arm, which is a proposed collaboration with Florida International University (FIU) and has capabilities to visually inspect, monitor, map and conduct simple tool manipulation tasks in the tank pits, and B. The robotic crawler configuration, which has capabilities to deploy to the bottom of the pits and conduct closer and bottom-up visual inspections. 2. An Implementation Plan that identifies Hanford site-wide application of the INL remote robotics technologies to enhance the performance of the tank farm systems and the characterization of the waste they contain to mitigate risk and optimize the overall waste mission. 3. A first-of-a-kind environmental digital twin will be produced. Digital twins to date require permanently installed sensors in order to produce asset specific predictions. This project will use the intermittent signals during inspections from deployed sensors on robotic systems to produce the data sets used by AI/ML to enable predictions of issues on tanks.

42 - ENGINEERING↗

Space applications of Automation, Robotics and Machine Intelligence Systems (ARAMIS). Volume 2: Space projects overview

Applications of automation, robotics, and machine intelligence systems (ARAMIS) to space activities, and their related ground support functions are studied so that informed decisions can be made on which aspects of ARAMIS to develop. The space project breakdowns, which are used to identify tasks ('functional elements'), are described. The study method concentrates on the production of a matrix relating space project tasks to pieces of ARAMIS.

Miller, R. H.↗

Space applications of Automation, Robotics and Machine Intelligence Systems (ARAMIS). Volume 4: Application of ARAMIS capabilities to space project functional elements

Applications of automation, robotics, and machine intelligence systems (ARAMIS) to space activities and their related ground support functions are studied, so that informed decisions can be made on which aspects of ARAMIS to develop. The specific tasks which will be required by future space project tasks are identified and the relative merits of these options are evaluated. The ARAMIS options defined and researched span the range from fully human to fully machine, including a number of intermediate options (e.g., humans assisted by computers, and various levels of teleoperation). By including this spectrum, the study searches for the optimum mix of humans and machines for space project tasks.

Miller, R. H.↗

Rolling Beam Umbilical System

The decision to make the Centaur Vehicle a Space Transportation System (STS) payload meant that new ground support equipment provisions at Launch Pads Pads 39A and 39B were required. These new equipment provisions were needed to service the Centaur vehicle while it was installed in the Orbiter's payload bay prior to launch. This paper describes the design of a new rolling beam umbilical syste (RBUS) being added to the pad fixed service structure (FSS) in order to provide the primary functions of liquid hydrogen (LH2) fill, drain, and vent. The carrier plate itself is a Government-furnished equipment item and of necessity became a T-O disconnect. This permits quick offloading in the event of an abort prior to lift-off. In addition to the rolling beam structure, mechanisms, and fluid lines, it was necessary to design and build a carrier plate simulator to support early development testing of the mast at the Launch Equipment Test Facility at Kennedy Space Center. The RBUS is designed to be compatible with the rotating service structure (RSS) to the extent that the umbilical may be deployed with the RSS mated with the vehicle. It is also designed to clear the RSS as the RSS rotates back out of the way. Accessibility to the Orbiter aft compartment via the 50-1 door had to be maintained.

Tatem, B. C., Jr.↗

The first year of teaming - A progress report

The National AeroSpace Plane (NASP) national contractor team began formal operations on January 31, 1991, and made considerable progress toward demonstrating the feasibility of the X-30 and the technology readiness to enter a full-scale development program. Two cycles of conceptual design are complete, preliminary design is initiated, and many of the major configuration and structural arrangement decisions are complete. Results of work in supporting technology areas for a variety of the propulsion system technologies are mentioned, including the low-speed oxidizer system, the production of slush hydrogen, and the use of external burning. Results of tests currently being performed on structural demonstration articles are satisfactory. Each of these demonstration articles is representative of structures and materials to be incorporated into the team's X-30 design. An operating team is outlined that encompasses not only the five principal contractors and their subcontractors, but also government and university laboratories through an innovative arrangement that brings this work into the mainstream of the program.

Waldman, Barry J.↗

A Final Approach Trajectory Model for Current Operations

Predicting accurate trajectories with limited intent information is a challenge faced by air traffic management decision support tools in operation today. One such tool is the FAA's Terminal Proximity Alert system which is intended to assist controllers in maintaining safe separation of arrival aircraft during final approach. In an effort to improve the performance of such tools, two final approach trajectory models are proposed; one based on polynomial interpolation, the other on the Fourier transform. These models were tested against actual traffic data and used to study effects of the key final approach trajectory modeling parameters of wind, aircraft type, and weight class, on trajectory prediction accuracy. Using only the limited intent data available to today's ATM system, both the polynomial interpolation and Fourier transform models showed improved trajectory prediction accuracy over a baseline dead reckoning model. Analysis of actual arrival traffic showed that this improved trajectory prediction accuracy leads to improved inter-arrival separation prediction accuracy for longer look ahead times. The difference in mean inter-arrival separation prediction error between the Fourier transform and dead reckoning models was 0.2 nmi for a look ahead time of 120 sec, a 33 percent improvement, with a corresponding 32 percent improvement in standard deviation.

Gong, Chester↗

Innovations for ISS Plug-In Plan (IPiP) Operations

Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

Moore, Kevin D.↗

Modeling of Complex and Diverse Aircraft Trajectories with the Trajectory Synthesizer Generalized Profile Interface

A flexible method to describe and generate aircraft trajectories called GenProf was developed for the Center TRACON Automation System (CTAS) software research platform. Generally CTAS is used to prototype new air traffic management decision support tools and concepts. Beyond this purpose, the GenProf methodology has enabled a variety of research and validation tasks to be performed. This paper briefly describes the methodology and details these applications.

trajectory modelling↗

Telemetry Anomaly Detection System using Machine Learning to Streamline Mission Operations

Spacecraft housekeeping telemetry is monitored at flight control centers by the operations engineers using tools that can perform limit checking or simple trend analysis. Recent developments in machine learning techniques for anomaly detection enables the implementation of more sophisticated systems that aim to augment current state-of-theart mission tools to provide valuable decision support for the spacecraft operators, assisting in anomaly detection and potentially saving console time for the engineers. We will show some results of the implementation of an anomaly detection tool for the NASA Mars Science Laboratory mission.

Weber, Romann↗

Addressing Critical Knowledge Gaps on Wildland Fires with UAS Technology

To better predict and respond to extreme fire behavior, wind shear, and superheated gases, there is a need for enhanced tactical microclimate wind forecasting. Collecting real-time or near-real-time three-dimensional atmospheric data during wildland fire suppression is vital for both ground firefighters and aviation safety. The use of balloons for soundings is not allowed due to aircraft operations, so new technology must be used. To address this need, the NASA FireSense Project has invested in co-developing and transitioning advanced technologies for atmospheric data collection to operational platforms to support decisions for wildland fire management. One of these technology investments has been with Uninhabited Aerial Systems (UAS) for atmospheric soundings. In collaboration with MITRE Corporation, a technology demonstration of Uninhabited Aerial Systems (UAS) for atmospheric soundings was held in Missoula, MT. This demonstration featured a NASA-designed payload on a Freefly Alta-X UAS, consistent with USFS UAS operations, balloon-borne soundings for data validation, and microscale modeling efforts. Results of this effort will be presented including comparison of forecasted conditions to data collection values as well as the impact on forecasts given real-time mixing heights and dispersion levels.

Jennifer Fowler↗

Integrating science for water security governance

Hydrological extremes are intensifying globally, increasing the complexity of decisions required to ensure water security. Advances in hydrological science, modeling, and data systems have expanded the technical frontier of water research, yet uptake of scientific insights in policy and management decisions remains limited. This persistent science–policy gap is not primarily a failure of knowledge generation or robustness, but an institutional challenge shaped by how scientific and governance systems are organized, coordinated, and connected to support the effective use of scientific knowledge. These challenges are particularly pronounced in multi-level and transboundary water governance, where decisions span jurisdictions and require coordination across institutional and political boundaries. We synthesize research at the science–policy interface and evidence from water security initiatives to show how institutional arrangements, scientific tool development, and research practices enable or constrain the sustained use of scientific knowledge in water-security governance processes. Building on these insights, we develop ‘shared decision infrastructure’ as a framing to describe how scientific knowledge is embedded within the institutional, relational, and procedural arrangements that connect science to decision-making processes over time. We translate this framing into a practical intervention roadmap centered on institutional design, tool translation, sustained co-production, and outcome-oriented evaluation to support the integration of science into ongoing governance processes. By positioning science as shared decision infrastructure, the roadmap clarifies how researchers can design scientific efforts that support more coordinated, accountable, and adaptive water security decisions amid deepening uncertainty.

M whitney, Kristen [NASA Goddard Space Flight Cent↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗

Source Data Applicability Impacts on Epistemic Uncertainty for Launch Vehicle Fault Tree Models

Launch vehicle systems are designed and developed using both heritage and new hardware. Design modifications to the heritage hardware to fit new functional system requirements can impact the applicability of heritage reliability data. Risk estimates for newly designed systems must be developed from generic data sources such as commercially available reliability databases using reliability prediction methodologies, such as those addressed in MIL-HDBK-217F. Failure estimates must be converted from the generic environment to the specific operating environment of the system where it is used. In addition, some qualification of applicability for the data source to the current system should be made. Characterizing data applicability under these circumstances is crucial to developing model estimations that support confident decisions on design changes and trade studies. This paper will demonstrate a data-source applicability classification method for assigning uncertainty to a target vehicle based on the source and operating environment of the originating data. The source applicability is determined using heuristic guidelines while translation of operating environments is accomplished by applying statistical methods to MIL-HDK-217F tables. The paper will provide a case study example by translating Ground Benign (GB) and Ground Mobile (GM) to the Airborne Uninhabited Fighter (AUF) environment for three electronic components often found in space launch vehicle control systems. The classification method will be followed by uncertainty-importance routines to assess the need to for more applicable data to reduce uncertainty.

Al Hassan, Mohammad↗

EDOS operations concept and development approach

The Earth Observing System (EOS) Data and Operations System (EDOS) is being developed by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) for the capture, level zero processing, distribution, and backup archiving of high speed telemetry data received from EOS spacecraft. All data received will conform to the Consultative Committee for Space Data Standards (CCSDS) recommendations. The major EDOS goals are to: (1) minimize EOS program costs to implement and operate EDOS; (2) respond effectively to EOS growth requirements; and (3) maintain compatibility with existing and enhanced versions of NASA institutional systems required to support EOS spacecraft. In order to meet these goals, the following objectives have been defined for EDOS: (1) standardize EDOS interfaces to maximize utility for future requirements; (2) emphasize life-cycle cost (LCC) considerations (rather than procurement costs) in making design decisions and meeting reliability, maintainability, availability (RMA) and upgradability requirements; (3) implement data-driven operations to the maximum extent possible to minimize staffing requirements and to maximize system responsiveness; (4) provide a system capable of simultaneously supporting multiple spacecraft, each in different phases of their life-cycles; (5) provide for technology insertion features to accommodate growth and future LCC reductions during the operations phase; and (6) provide a system that is sufficiently robust to accommodate incremental performance upgrades while supporting operations. Operations concept working group meetings were facilitated to help develop the EDOS operations concept. This provided a cohesive concept that met with approval of responsible personnel from the start. This approach not only speeded up the development process by reducing review cycles, it also provided a medium for generating good ideas that were immediately molded into feasible concepts. The operations concept was then used as a basis for the EDOS specification. When it was felt that concept elements did not support detailed requirements, the facilitator process was used to resolve discrepancies or to add new concept elements to support the specification. This method provided an ongoing revisal of the operations concept and prevented large revisions at the end of the requirement analysis phase of system development.

Knoble, G.↗