Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DISPATCHES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Bid-in Price-Sensitive Load: A Comparison with Fixed Load in a Realistic Test System

Bulk power systems operations, in both simulation and practice, are often built on the principle of minimizing production costs, which assumes to first order that demand is fixed and that the only degrees of freedom for balancing generation and load are supply-side unit commitment and dispatch decisions. The purpose of this report is to interrogate the value of welfare-maximizing markets that not only physically balance demand and supply but also ensure that market outcomes provide consumer value by directly maximizing welfare, defined as the value of consumption minus production costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Regional Real-Time PV Spinning Reserve Estimator

Curtailed photovoltaic (PV) generation is a zero-marginal-cost spinning reserve that can be used for a number of active power control services. Unlike traditional spinning reserve providers, however, i.e., fossil-fueled generators, which have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate knowledge of the PV PHL is essential. It ensures that enough headroom is reserved by the PV plants to deliver the award services in real time and informs feasible dispatch decisions made by the market operator. To tackle this challenge, a novel reference-control grouping-based PV plant reserve estimation method has been proposed by the National Renewable Energy Laboratory under past projects funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office. The estimation method separates inverters within a plant into two groups: a control group and a reference group. While the reference group is reserved to operate at its PHL, the control group can be curtailed to provide the grid services. Real-time outputs from the reference inverters are used to estimate the PHL for the whole plant based on the ratio between capacities of the reference group and of the plant. This work further enhances the methodology by (1) improving the model accuracy through machine learning; (2) automating the reference inverter selection through correlation analysis; (3) considering estimation look-ahead windows; and (4) applying to regional spinning reserve estimation. Significant performance improvement has been observed based on real-world data collected by CAISO, Southern Company, and Terabase Energy. Compared with the original scaling method, the newly proposed machine learning-based approach reduces the estimation errors by 30% and 13% at the plant level and region level, respectively. Results obtained from this project are intended to be used by grid operators, market operators, balancing authorities, and PV plant owners and operators to facilitate PV participation in ancillary service markets. Regulators, policymakers, and system planners can also consider the results of this work in their decision-making processes. In addition to the performance improvement on the existing reference-control based grouping method, we also investigated how the variability of PV generation from a single PV inverter can be used to represent the variability of PV generation at the plant level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Weather Analysis for Xcel Energy's 2030 Colorado Preferred Plan

The Public Service Company of Colorado (PSCo), a subsidiary of Xcel Energy (Xcel), plans to meet its target of an 80% reduction in CO 2 emissions over 2005 levels by 2030 through its Preferred Plan1,2 that includes increasing the wind and solar energy on its system, reducing coal, and adjusting the operation and dispatch of new and existing thermal generation. The objective of our analysis reported here is to identify how the PSCo generation and transmission of its Preferred Plan might operate in the face of specific weather events. We investigate weather events that currently cause stress to PSCo’s system, such as winter storms and extreme heat. In addition, we explore how the future system responds to scenarios that may be considered normal weather conditions today, but that have a large impact on wind and solar generation potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Photovoltaic Analysis and Response Support (PARS) Platform for Solar Situational Awareness and Resiliency Services

The project's primary objective is to develop a digital-twin based Photovoltaic (PV) Analysis and Response Support (PARS) platform, which aims to provide real-time situational awareness and optimal response plans. This platform is designed to enhance the performance of hybrid PV systems, making them competitive with or even superior to conventional generation resources. The PARS platform enabled the project team to develop and evaluate an extensive suite of grid support functionalities for the hybrid PV systems to enhance grid performance, across key areas including visibility, dispatchability, security, resilience, and reliability. Given the global push toward achieving 100% clean energy by 2035, there is a significant increase in the integration of inverter-based resources (IBRs) throughout the energy grid. Effectively managing the inherent variability and uncertainty associated with IBRs is crucial for ensuring cost-effectiveness, reliability, and security in both the main grid and islanded microgrids. Constrained to a limited array of IEEE test systems or standard feeder models, traditional IBR modeling struggles to assimilate new field data, accurately reflect system dynamics, and adapt to the evolving energy landscape. In our project, we embraced a Digital Twin (DT) strategy for crafting the PARS platform. A digital twin acts as a precise virtual counterpart of a physical system, built on historical data and continuously honed with real-time insights. This enables the high-fidelity DT to accurately mirror current system operations and forecast future scenarios. Consequently, the PARS platform becomes an ideal environment for testing and refining monitoring, control, power, and energy management algorithms designed to boost hybrid PV system performance. The defining feature of the PARS platform, distinguishing it from other advanced simulation tools, is its exceptional adaptability. This is achieved by employing actual network topologies and utilizing real-time field data for fine-tuning and calibration, ensuring a close emulation of real-world conditions. The project deliverables include: 1) High-fidelity IBR models and tools for real-time parameterization, utilizing real-time field measurements to refine IBR models for enhanced accuracy and performance; 2) Grid-forming and Grid-following capabilities to deliver resilience services, including blackstart, voltage and frequency support, cold-load pick-up, power reserves, and three-phase load balancing across grid-connected and microgrid settings; 3) Machine learning-based forecasting tools and methods for generating synthetic data and topologies, creating diverse and realistic simulation environments for evaluating varied operational scenarios; 4) Advanced microgrid power and energy management algorithms for optimizing the integration and operation of PV, storage, and demand response resources within both feeder and community scales. The power grid data sets are provided by four utility companies in North Carolina and the New York Power Administration. Acting as industry advisors, our industry partners communicated stakeholder needs and regulatory standards to the research teams, aiding technology transfer by incorporating the developed methodologies into their daily operations. This collaboration ensures that the PARS platform, functioning as a power system digital twin, enhances our understanding of IBR dynamic behaviors and enables the development and evaluation of IBR control functions that match or exceed the capabilities of conventional synchronous generators.

14 SOLAR ENERGY↗

Conceptual Design of Integrated Energy Systems via Multiscale Market Simulations and Surrogate Models for Market Interactions

This final report describes novel capabilities developed as part of DISPATCHES, Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems, for designing hybrid energy systems (HES) a.k.a. integrated energy systems (IES) in the context of a larger electricity market. Capabilities are demonstrated on case studies for nuclear and renewable power.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Simultaneous Design and Operation of a Coal-Fired Hybrid Energy System with Integrated Thermal Energy Storage

This final report describes novel capabilities developed as part of DISPATCHES, Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems, for designing hybrid energy systems (HES) a.k.a. integrated energy systems (IES) in the context of a larger electricity market. Capabilities are demonstrated on a case study with fossil-based power coupled to a molten salt thermal energy storage system.

20 FOSSIL-FUELED POWER PLANTS↗

High-Fidelity and High-Performance Computational Simulations for Rapid Design Optimization of Sulfur Thermal Energy Storage (CRADA Report)

NREL and Element 16 collaborated on sulfur thermal energy storage modeling using NREL’s high performance computing (HPC) resources to assist its application in industrial processes. Industrial process heat (IPH) accounts for ~70% of US manufacturing energy use and is primarily produced by fossil fuel combustion. Approximately, 1500 TWht (~60% Terawatt hour thermal) of IPH demand is in the temperature range of 100-300°C. Industrial applications in this temperature range include drying, hydrothermal processing, thermal enhanced oil recovery, food and beverage, bioethanol production, etc. Cost-effective thermal energy storage (TES) that increases the utilization of waste and renewable heat (solar, geothermal, etc.) could provide significant energy savings and reliable heat sources, decrease emissions, and increase US manufacturing competitiveness through reductions in fuel consumption. This HPC4EI project facilitated Element 16’s development of low-cost and high-impact molten sulfur TES for dispatchable IPH. The development of a high-fidelity model validated by experimental data and HPC simulations enabled the successful resolution of the complex interplay between fluid dynamics and heat transfer processes during transient operation of sulfur TES, overcoming the numerical challenges posed by the non-linear temperature-dependent physical properties of sulfur. The project helped accelerate Element 16’s molten sulfur TES product design and support its broad applications.

25 ENERGY STORAGE↗

Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation

This is the final scientific / technical report for Front End Engineering Design (FEED) study “Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation” funded by the US Department of Energy (DOE), Office of Fossil Energy and Carbon Management (FECM), Carbon Capture R&D Program under award DE-FE0032131. The prime recipient is General Electric Company working through its Gas Power division (GEGP) with subrecipients Southern Company and Linde Engineering plus subcontractor Kiewit. Southern Company’s Plant Barry, a 2x1 7F.04 CCGT, is the host site. GEGP led the overall integration of the carbon capture system (CCS) with the existing natural gas combined cycle (NGCC) facility. Linde provided the detailed process engineering and equipment costing for the carbon capture island. Kiewit focused on plant layout, constructability, and installation. With the FEED study finished, the engineering is approximately 50% complete towards the detailed design package needed to proceed to procure, install, build, commission, and operate the integrated NGCC+CCS facility. This FEED study focuses on retrofitting a 95% CO 2 capture system with attention on plant integration. The study was particularly challenging due to unique and substantial cost impacts related to global sourcing challenges associated with COVID. Additional incentives, regulatory support, and dispatch certainty are needed to move forward with implementing CCS at this or other sites in the US. This FEED study highlights the value of integrating NGCC+CCS and is a template for future CCS retrofit studies.

42 ENGINEERING↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine Learning Solutions for a Stable Grid Recovery

Grid operating security studies are typically employed to establish operating boundaries, ensuring secure and stable operation for a range of operation under NERC guidelines. However, if these boundaries are severely violated, existing system security margins will be largely unknown, as would be a secure incremental dispatch path to higher security margins while continuing to serve load. As an alternative to the use of complex optimizations over dynamic conditions, this work employs the use of machine learning to identify a sequence of secure state transitions which place the grid in a higher degree of operating security with greater static and dynamic stability margins. Several reinforcement learning solution methods were developed using deep learning neural networks, including Deep Q-learning, Mu-Zero, and the continuous algorithms Proximal Reinforcement Learning, and Advantage Actor Critic Learning. The work is demonstrated on a power grid with three control dimensions but can be scaled in size and dimensionality, which is the subject of ongoing research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IDAES Enterprise: Generation Expansion Planning with Enhanced Requirements for Capacity Adequacy Under Renewable Intermittency

Achieving net zero carbon emissions likely requires future power systems to integrate new, flexible energy technologies to accommodate higher levels of capacity from variable renewable energy sources. To determine the optimal deployment of new electricity capacity and to study the likelihood of deployments of new energy technologies, an expansion planning model has been developed as part of the IDAES-Enterprise suite of grid models. The Generation Expansion Planning (GEP) model is a multi-period model in which investment decisions occur yearly, and a Unit Commitment (UC) problem is examined on an hourly timescale. To reduce computational complexity of the GEP model, the UC problem is solved for average “representative days” which leaves out extreme, but relatively common, scenarios in which low renewable generation occurs, leaving the system with inadequacy in capacity. The IDAES-Enterprise GEP model has been modified to include these extreme scenarios while keeping the model reasonably tractable. Specifically, a lazy constraint technique was implemented to check for capacity adequacy on an hourly basis over a large data set of aligned load-wind-solar profiles. As a vast majority of the capacity constraints will not be violated, the technique lowers computational expense by searching for violated capacity constraints over an “iterative manner,” adding those infeasible constraints back into the model. Results on a test case of the Southwest Power Pool shows that the lazy constraint technique significantly reduces retirements and increases installments of natural gas combined cycles and flexible natural gas units. It also reduces some retirements of coal units. These modifications provide a more reasonable estimation of required dispatchable power generation capacity to ensure feasibility during peak net load.

Liu, Peng↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

A Multidisciplinary Approach to Integrated Energy Systems: Advanced Nuclear Plants with Thermal Storage for Dynamic and Flexible Operation in Diverse Markets

Energy supply, distribution, and demand are continuously evolving in accordance with the integration of new power generation sources. In the United States, there is a progressive shift toward incorporating fluctuating energy sources such as wind and solar into the energy mix, alongside the distributed generation. Simultaneously, we are seeing a revolution in consumer technologies such as electric vehicles, energy devices for both residential and commercial use, and industrial processes—all contributing to a fundamental change in energy consumption dynamics. These scenarios have led to huge demand for enhanced flexibility from nuclear power plants (NPPs), requiring them to operate with unprecedented adaptability. Furthermore, advanced NPPs (A-NPPs) could potentially apply to scenarios in which power generation flexibility is prioritized over its current and conventional baseload generation capacity for traditional demand patterns. The present work covers several configurations for coupling nuclear energy production with thermal energy storage (TES). Previous work evaluated systems entailing a simple nuclear-TES configuration that used steam as a heat source for the TES of three different advanced reactors (ARs), but its heat diversion ratio (HDR) for charging was limited. The present work proposes a new configuration that features full decoupling of the nuclear reactor and the power cycle, using reactor coolant (i.e., gas) as a heat source for the TES and offering a theoretically unlimited HDR. This configuration is, however, more complex, as both high- and low-temperature TES (HT-TES and LT-TES) systems are required in order to cover the extended temperature range. Although this configuration imposes certain limitations on the discharge system configuration, it also presents the opportunity to design a more efficient system. For this case in particular, a steam reheat cycle is advantageous. Conventional TES systems take advantage of nominal efficiency when discharging, whereas the reheat cycle in the fully decoupled TES system affords a significant efficiency increase over conventional cases. Material selection, component/equipment sizing, and costing analyses were performed, followed by economic dispatch and size optimization. Dynamic models were developed for the decoupled system in order to generate insights into aspects of off design operation (e.g., drops in cycle efficiency), and these models enable exploration of potential mitigation strategies for addressing such drops. The models also highlight the need to design fail-safes that ensure continuous operational stability and minimize the impact of power ramping on the reactor parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wholesale Electricity Analysis via Simulation & Learning Experiments (WEASLE): Platform Development and Pilot Competition

This document reports the development of the Wholesale Electricity Analysis via Simulation and Learning Experiments (WEASLE) platform and the pilot competition that was conducted to test the platform. Due to the increasing reliance on variable renewable energy resources for bulk power, the pilot competition, called the Energy Storage Participation Algorithm Competition (ESPA-Comp), was used to test the effect of various market designs on storage utilization and market efficiency. Basic details of the platform are provided, including an overview of the market clearing engine, the battery dispatch and degradation models, electric grid topology and resource mix, and software architecture. Two market designs were tested: a two-settlement market analogous to typical ISO design today, and a multi-settlement market that allows additional forward-trading periods during the real-time market. Results from the pilot competition show that the storage bidding problem is nontrivial and is well suited for future challenges. We find that: 1) all four teams utilized different approaches to the bidding problem, 2) different methodological approaches led to substantially different offer behaviors, 3) resource profits are clustered by team and methodological approach, 4) simulated offers reduced market surplus by about 0.5%, 5) substantially different prices between two-settlement and multi-settlement markets albeit minimal difference in overall market surplus.

24 POWER TRANSMISSION AND DISTRIBUTION↗