Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

The optimum cost-effective test time for redundant systems with specified reliability and confidence

This paper investigates the optimum test time to determine the number of redundant units needed to achieve high reliability with high confidence. Newly designed systems often have high initial failure rates which can be reduced by testing to find failure modes and remove them by redesign. To accurately estimate the required number of redundant units, the test time must be extended to accurately determine the failure rate. If the measured failure rate is used, there is a 50% chance that the actual hardware failure rate is higher. Using the measured failure rate gives only a 50% confidence that the failure rate and number of spares are not too low. After the test, given the measured failure rate and the desired reliability, the number of spares can be determined and the confidence in the reliability computed. Instead of accepting the reliability results of a fixed duration test, it is possible to set the requirements for both the redundant reliability and the confidence level and then compute the test time needed to minimize the total cost required to achieve these requirements. The confidence that the redundant reliability is not too low is increased by using a higher than measured failure rate to increase the number of spares. The higher number of spares increases cost. Longer test time reduces the variance in the failure rate and the increase in the number of spares, so that test cost increases and spares cost decreases. The total cost is the sum of the cost of the test time and the spares. The optimum test time produces the minimum total cost for the system failure rate, mission length, and required reliability and confidence level. Longer testing is justified by reduced cost. Some examples are given.

Harry W Jones↗

Bayesian Rules of Thumb: Robust Uncertainty Quantification in Early Project Cost Estimation

Systems engineers often make use of cost Rules ofThumb in order to estimate cost during early phases of projectformulation. These Rules of Thumb typically take the form ofa sequence of percentages over which a total cost is allocatedacross NASA WBS elements. Rules of Thumb can then be usedto extrapolate cost from one or more known WBS elements tothe remaining unknown WBS elements, assisting early projectformulation architecture studies (such as those in JPL’s Team Xand A Team).A number of issues can arise when generating and using costRules of Thumb. For example, many records of project costsconsist of incomplete data. Typical methods of dealing withincomplete cost allocation data include (a) ignoring missionswith incomplete data, or (b) taking averages of the non-zero percentagesacross missions, but both of these methods can result inbiased estimates if the existence of incomplete data correlateswith total mission cost or any particular WBS element. Anothercommon example is cost reported in one or more incorrect WBSelements. This is especially prevalent in smaller missions whereit is more common for engineers to perform tasks that fall underthe purview of multiple WBS elements.Furthermore, a Rule of Thumb estimate is typically reported asa point estimate; there is no reported uncertainty around thepercentages used to generate an allocation. Even in the rarecase in which confidence intervals around mean percentages areprovided, there may be positive or negative correlations betweenWBS elements which can skew estimates.Here we attempt to address these problems by formulatingprobabilistic Rules of Thumb in which a distribution of allocationschemes, rather than a single allocation scheme, is generated.We use a bootstrap imputation method to simultaneouslyaccount for uncertainty in the missing data while using allavailable information contained in the dataset. The imputeddatasets are then input into a multivariate Bayesian modelwhich accounts for correlations between WBS elements andproperly accounts for uncertainty in the final Rule of Thumbpercentages and predictions. We describe the mathematicalmodel and provides snippets of R code utilizing the brms(Bayesian Regression Models using Stan) package. To illustratethis model, we generate a Bayesian Level 2 WBS Cost Rule ofThumb for MIDEX (Medium-Class Explorers) missions withdata extracted from NASA’s CADRe. We then compare thismethod’s performance with the classical Rule of Thumb method.

Hooke, Melissa A↗

Changes in Cleanup Strategies and Long-Term Monitoring Costs for DOE FUSRAP Sites - 17241

The Department of Energy (DOE) Office of Legacy Management (LM) is responsible for the post-closure management of remediated DOE sites. LM's objective for Formerly Utilized Sites Remedial Action Program (FUSRAP) includes the long-term surveillance and maintenance (LTSM) of sites that have been remediated by the US Army Corps of Engineers (USACE). FUSRAP was initiated in 1974 by the US Atomic Energy Commission, a predecessor agency of DOE. FUSRAP was managed by DOE from 1981 to 1997. Through a congressional act, the scope to remediate FUSRAP sites was transferred to USACE in 1997. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program, and had begun cleanups at 13 additional sites. USACE assumed responsibility for the cleanup of the 21 remaining FUSRAP sites, and 8 additional sites that have been recommended for cleanup. Presently, LM provides long-term stewardship for 30 completed FUSRAP sites while USACE is actively remediating 23 sites. FUSRAP sites are typically privately-owned factories or research facilities. However, there are four DOE owned FUSRAP sites. These sites are Maywood and Middlesex in New Jersey, and Colonie and Niagara Falls in New York. In support of LM's Beneficial Reuse strategic mission, the site in Wayne, New Jersey has been transferred to a municipality and the site in New Brunswick, New Jersey has been sold. Historically, most sites in FUSRAP were remediated to 'unlimited exposure and unrestricted use' cleanup levels consistent with residential use. Some sites were remediated using supplemental limits due to inaccessible areas while remaining sites have been remediated to other-than residential standards based on site-specific long-term land use assumptions. Of the 31 completed FUSRAP sites under LM stewardship, one site requires land-use controls and no site requires groundwater monitoring. Over the next 10 years USACE plans to transfer 11 sites to LM. Several of these sites will have additional long-term monitoring requirements as per their Records of Decisions (RODs). These transitioning sites include the Colonie, New York site, the Maywood and Deepwater, New Jersey, sites and the St. Louis, Missouri site. The additional stewardship requirements will include groundwater monitoring, enforcement of institutional and engineered controls, and five-year reviews. In addition to these sites, more than 100 vicinity properties will also be transferred to LM for stewardship. Given the increase in long-term stewardship activities for these sites and their associated vicinity properties, initiatives are under way to incorporate the additional LTSM requirements into the program's out-year planning. LM will be evaluating several methods to customize LTSM cost and liability estimates for all of the completed FUSRAP sites, planning to address the sites not yet transferred and those that are in LM's custody. Where necessary, LM will use remedial process optimization techniques and evaluate monitored natural attenuation protocols to reduced long-term monitoring costs. Methods for identifying costs include the cost estimates provided in RODs, cost estimates refined during remediation, operation and maintenance costs provided by USACE prior to transition, and presumptive remedies using USACE and Environmental Management / LM historic costs at similar sites. On the basis of this evaluation, a strategy for estimating site-specific LTSM costs will be selected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium from Seawater Cost Analysis: Recent Updates

Uranium from seawater can act as an economic backstop by putting an effective ceiling on the cost of recovering uranium. Although it is not meant to be a direct competitor with conventionally mined uranium there is significant effort, by a consortium of five national labs and ten universities, to improve the recovery process. Accurately predicting the cost associated with this method of uranium production is an important factor in determining a cost ceiling for uranium fuels and assuring supply security for uranium based nuclear fuel cycles. Given the evolving nature of this technology, this paper aims to provide an update of the economic model to reflect recent progress. The recovery system analyzed here is a passive collection process under persistent development by Oak Ridge and Pacific Northwest National Labs (ORNL and PNNL). The process relies on an amidoxime based uranium adsorbents constructed by co-grafting an amidoxime precursor and a hydrophilic comonomer onto a high density polyethylene (HDPE) backbone. After further chemical processing the adsorbent fibers are braided into 60 meter segments. The braids are then sent out to sea where they are moored to the bottom of the ocean. Upon realization of their soaking campaign the braids are winched up so the uranium may be eluted off the adsorbent. The acidic chemicals used in the elution process require an alkaline regeneration procedure to be applied to the adsorbent before it can be redeployed for another campaign. The deployment and elution process is repeated as many times as economically feasible, as dictated by the severity of degradation suffered by the braid due to the elution process and exposure to seawater. A large number of design and deployment parameters influence the final uranium production cost. Some are strongly affected by the chemical technologies, such as uranium uptake and degradation rate, while others are operational parameters, such as number of adsorbent uses and length of soaking campaign. Still others are both intrinsic and affected by operational choices, such as the ocean temperature and degree of oceanic biofouling. Recent experiments have been focused on improved characterization of the effect of: oceanic temperature, a novel elution method, adsorbent degradation rates, and oceanic biofouling, and they will therefore be the focus of this paper. The degradation results presented here are likely to represent a worst case scenario. Since chemically similar adsorbents were able to achieve a much lower degradation rate with the previous acidic elution process it is very possible that modifications can be made to the new adsorbents to ameliorate the degradation suffered, especially with the new bicarbonate elution process, which is believed to be less harsh. Similarly, the 30% loss in uptake suffered as a result of biofouling is likely an upper-bound. The experiments were conducted in full light and at 20 deg. C. In reality however the braids will be submersed approximately 100 meters beneath the surface, potentially subject to a temperature gradient that may influence biofouling patterns. Also the light reaching the adsorbent surface may not be as intense as in laboratory conditions due to seawater turbidity and shadows cast by nearby braids. In light of these factors, it is appropriate to present a range of costs, reflecting the best and worst case scenarios of all of the parameters considered here. Table II shows the updated parameter ranges and uranium production costs. Ongoing work, particularly into the mitigation of biofouling and degradation, is expected to tighten this cost range and reduce the predicted cost. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks, With Minimum Sustainable Price Analysis: Q1 2023

The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office (SETO) aims to accelerate the advancement and deployment of solar technology in support of an equitable transition to a decarbonized economy no later than 2050, starting with a decarbonized power sector by 2035. Its approach to achieving this goal includes driving innovations in technology, hardware, and soft cost reductions to make solar affordable and accessible for all. As part of this effort, SETO must track solar cost trends so it can focus its research and development (R&D) on the highest-impact activities. The benchmarks in this report are bottom-up cost estimates of all major inputs to PV and energy storage system installations. Bottom-up costs are based on national averages and do not necessarily represent typical costs in all local markets. Like last year's report, this year's report includes two distinct sets of benchmarks: minimum sustainable price (MSP) benchmarks and modeled market price (MMP) benchmarks. MSP benchmarks can be interpreted as the minimum price a company needs to charge to remain financially solvent in the long term based on the minimum sustainable prices of all inputs including minimum sustainable profit margins. MMP benchmarks can be interpreted as the actual cash sales price a company charges in the given benchmark period. These simplified estimates are useful for tracking technological progress, but they do not reflect all experiences. In fact, no individual estimate under any approach can reflect the diversity of the PV and storage manufacturing and installation industries. Our residential MMP benchmark ($2.90 per watt direct current [Wdc]) is 24% higher than the MSP benchmark ($2.34/Wdc) and 9% lower than our MMP benchmark ($3.18/Wdc) from Q1 2022 in 2022 U.S. dollars (USD). For community solar, our MMP benchmark ($1.75/Wdc) is 18% higher than our MSP benchmark ($1.49/Wdc). Our Q1 2022 benchmark report has no community solar system for comparison. For utility-scale systems with one-axis tracking, our MMP benchmark ($1.17/Wdc) is 22% higher than our MSP benchmark ($0.96/Wdc) and 10% higher than its counterpart ($1.07/Wdc) in Q1 2022 in 2022 USD.

14 SOLAR ENERGY↗

Adopting occupancy-based HVAC controls in commercial building energy codes: Analysis of cost-effectiveness and decarbonization potential

Recent research has shown the energy-saving potential of occupancy-based HVAC controls (OBCs) in commercial buildings. However, building energy codes have not fully adopted this technology. This study aims to evaluate the cost-effectiveness and decarbonization benefits of OBCs and provide guidance for integrating occupancy sensors into building energy code development. To this end, a parametric simulation using EnergyPlus and a nationwide cost-effectiveness analysis are carried out considering three building types and 40 representative cities in the U.S. Here, the findings reveal that the current cost-effectiveness performance of OBCs is limited due to the high cost of occupancy sensors. However, incorporating the societal cost of carbon factor in future energy and environmental policy could greatly enhance the actual cost-effectiveness performance. Besides, a reduction in the cost of occupancy sensors to approximately 60% of the current price level could also greatly shorten the discounted payback period of OBCs. Additionally, OBCs demonstrate significant potential in building decarbonization, with potential CO 2 emissions savings of more than 5.56 million metric tons across the three building types and 40 selected cities. Finally, policy implications are provided to guide the incorporation of occupancy-based HVAC controls in future energy codes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating the current perceived cost of ownership for buses and trucks in China

Decarbonizing commercial vehicles, including buses, trucks, and special purpose vehicles, is essential for China to achieve its carbon neutrality target by 2060. However, understanding the adoption barriers of alternative fuel technologies for commercial vehicles has largely been limited to the total cost of ownership approach that mainly considers tangible costs. Additionally, this study proposes a perceived cost of ownership (PCO) model, which monetizes both tangible and implicit costs, including charging annoyance for buses and trucks by size and classification under different use scenarios. In the case study for China's current bus and truck market, the PCO of alternative fuel technologies, such as battery electric vehicles (BEVs) and fuel cell electric vehicles (FCEVs) are 27%–129% and 31%–86% higher than the most economically competitive powertrains – the compressed natural/liquefied petroleum gas technology and hybrid electric technology. BEVs could be cost-effective in the mini/midsize bus segment or in the daily short-distance driving scenario, and FCEVs could firstly be deployed in cities with a low hydrogen price. Though the implicit costs caused by range anxiety and charging annoyance account for at least 27% of BEV's PCO, making BEV uncompetitive, the battery swapping technique could reduce the implicit cost and overall cash outflow for BEV owners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A cost-benefit analysis of landfill mining and material recycling in China

Highlights: • Assessing the economic feasibility of landfill mining. • We applied a cost-benefit analysis model for landfill mining. • Four material cycling and energy recovery scenarios were designed. • We used net present value to evaluate the cost-benefit efficiency. - Abstract: Landfill mining is an environmentally-friendly technology that combines the concepts of material recycling and sustainable waste management, and it has received a great deal of worldwide attention because of its significant environmental and economic potential in material recycling, energy recovery, land reclamation and pollution prevention. This work applied a cost-benefit analysis model for assessing the economic feasibility, which is important for promoting landfill mining. The model includes eight indicators of costs and nine indicators of benefits. Four landfill mining scenarios were designed and analyzed based on field data. The economic feasibility of landfill mining was then evaluated by the indicator of net present value (NPV). According to our case study of a typical old landfill mining project in China (Yingchun landfill), rental of excavation and hauling equipment, waste processing and material transportation were the top three costs of landfill mining, accounting for 88.2% of the total cost, and the average cost per unit of stored waste was 12.7 USD ton{sup −1}. The top three benefits of landfill mining were electricity generation by incineration, land reclamation and recycling soil-like materials. The NPV analysis of the four different scenarios indicated that the Yingchun landfill mining project could obtain a net positive benefit varying from 1.92 million USD to 16.63 million USD. However, the NPV was sensitive to the mode of land reuse, the availability of energy recovery facilities and the possibility of obtaining financial support by avoiding post-closure care.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost and Performance Assumptions for Modeling Electricity Generation Technologies

The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Analysis of the Cost and Performance of Photovoltaic Systems as a Function of Module Area

We investigate the potential effects of module area on the cost and performance of photovoltaic systems. Applying a bottom-up methodology, we analyzed the costs associated with mc-Si and thin-film modules and systems as a function of module area. We calculate a potential for savings of up to $0.04/W, $0.10/W, and $0.13/W in module manufacturing costs for mc-Si, CdTe, and CIGS respectively, with large area modules. We also find that an additional $0.05/W savings in balance-of-systems costs may be achieved. However, these savings are dependent on the ability to maintain efficiency and manufacturing yield as area scales. Lifetime energy yield must also be maintained to realize reductions in the levelized cost of energy. We explore the possible effects of module size on efficiency and energy production, and find that more research is required to understand these issues for each technology. Sensitivity of the $/W cost savings to module efficiency and manufacturing yield is presented. We also discuss non-cost barriers to adoption of large area modules.

14 SOLAR ENERGY↗

Cost Projections for Utility-Scale Battery Storage

In this work we document the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of over 25 publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reduction for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of 124 dollars/kWh, 207 dollars/kWh, and 338 dollars/kWh in 2030 and 76 dollars/kWh, 156 dollars/kWh, and 258 dollars/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

Quality Guidelines for Energy System Studies: Capital Cost Scaling Methodology (Revision 4 Report)

NETL regularly updates legacy analysis with new studies as the Department of Energy objectives change, technology performance improves, costs are reduced, regulations change, market drivers are established, fuel prices fluctuate, and any number of other relevant factors vary in the market. As legacy studies are updated by NETL, the underlying performance and cost of the cases changes, and the methods for interpreting and scaling the cost estimates change. Therefore, it is important that NETL maintain public guidance documents associated with different sets of cost estimates that delineate how a specific set should be scaled. This QGESS report, providing guidance on capital cost scaling, should generally be applied to NETL case costs included in the report “Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity Revision 4” (BBR4), or any cases derived from the cases presented in the referenced report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Model of Operation-and-Maintenance Costs for Photovoltaic Systems

This article presents a method for calculating costs associated with operation and maintenance (O&M) of photovoltaic (PV) systems. It compiles details regarding the cost and frequency of multiple O&M services to estimate annual O&M costs ($\$$/year) for each year of an analysis period, the net present value ($\$$) of life cycle costs accumulated over the analysis period, and the reserve account amount ($\$$). Here we show that this method is an improvement over the previous averaged or levelized per-unit ($\$$/kW/year) valuations for estimating PV O&M costs, because it allows a detailed selection of services to perform based on system size, market served (e.g., residential, commercial, or utility), type and configuration of system components (e.g., micro-, string or central inverter) and site and environmental conditions (e.g., snow, pollen, bird populations). This model also distinguishes costs that vary from year to year and increase at different rates over time because of heuristic failure distributions (e.g. Weibull or Lognormal distribution) based on actuarial data for many of the services. This cost model was created by the PV O&M Working Group of researchers and industry, sponsored by DOE Solar Energy Technologies Office, and has been published in an on-line version hosted by SunSpec Alliance at apsuite.sunspec.org. A spreadsheet version is included with this paper as supplementary material.

14 SOLAR ENERGY↗

Uncertainty Quantification and Sensitivity Analysis of Nuclear Construction Cost Reduction Pathways

High construction costs have plagued recent nuclear projects and they hamper the widespread deployment of nuclear technology. The Nuclear Cost Reduction Tool is a plant economic framework that quantifies the impact that various plant design and construction attributes have on construction costs and cost overruns and shows the positive effects of learning over a series of deployments. However, a downside of the current model is that all model outputs and capabilities are deterministic. To provide a more comprehensive view, this study evaluated the impact of model parameter uncertainty through a sensitivity analysis applied to 18 model parameters. This approach quantified the impact of model uncertainty on the output variables of Net Overnight Capital Cost (Net OCC), Construction Duration (CD), and Levelized Cost of Electricity (LCOE). Monte Carlo analysis revealed uncertainty distributions for these variables, showing that absolute uncertainty decreases over a series of deployments. A local sensitivity analysis showed that even small parameter perturbations (5%) can have a significant impact on project execution, highlighting areas that could reduce costs by billions across an order book of plants. The results of this study have improved the understanding of the model and identified the most impactful model parameters and construction attributes.

Levelized Cost of Electricity↗

Evaluation of Contrail Reduction Strategies Based on Environmental and Operational Costs

This paper evaluates a set of contrail reduction strategies based on environmental and operational costs. A linear climate model was first used to convert climate effects of carbon dioxide emissions and aircraft contrails to changes in Absolute Global Temperature Potential, a metric that measures the mean surface temperature change due to aircraft emissions and persistent contrail formations. The concept of social cost of carbon and the carbon auction price from recent California's cap-and-trade system were then used to relate the carbon dioxide emissions and contrail formations to an environmental cost index. The strategy for contrail reduction is based on minimizing contrail formations by altering the aircraft's cruising altitude. The strategy uses a user-defined factor to trade off between contrail reduction and additional fuel burn and carbon dioxide emissions. A higher value of tradeoff factor results in more contrail reduction but also more fuel burn and carbon emissions. The strategy is considered favorable when the net environmental cost benefit exceeds the operational cost. The results show how the net environmental benefit varies with different decision-making time-horizon and different carbon cost. The cost models provide a guidance to select the trade-off factor that will result in the most net environmental benefit.

social cost of carbon↗

Evaluating Tradeoffs Between Environmental Impact and Operational Costs for Enroute Air Traffic

The rapid growth of air traffic has drawn attention to aircraft-induced environmental impact. Aviation operations affect the environment mainly through the release of emissions and by the formation of contrails. Recent research has shown that altering aircraft cruise altitudes can reduce aviation environmental impact by reducing Absolute Global Temperature Change Potential, a climate assessment metric that adapts a linear system for modeling the global temperature response to aviation emissions and contrails. However, these methods will increase fuel consumption that leads to higher operational costs imposed on airlines resulting in reluctance to adopt a new routing strategy. This paper evaluates the tradeoff between environmental impact reduction and the corresponding added operational costs for enroute air traffic. The concept of social cost of carbon and the carbon auction price from California's recent cap-and-trade system were used to provide estimates and a methodology to evaluate environmental costs for carbon dioxide emissions and contrail formations. Depending on the specific environmental policy, the strategy is considered favorable when the reduction in environmental costs exceeds the increase in operational costs. The results show how the net environmental bene t varies with different decision-making time horizons, different carbon and fuel costs, and different days. The study provides guidance towards the development of the environmental reduction strategies.

environmental impact↗

Blind Validation Study of Parametric Cost Estimation Tool SEER-H for NASA Space Missions

One of the primary parametric cost modeling tools used by NASA and the aerospace industry to estimate the development and production cost of future spacecraft hardware is SEER-H by Galorath. To date, no independent validation of this tool for cost estimation of space missions has been reported in the literature. In the present validation study, cost estimators used SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. The point estimates of SEER-H had an average error of 23%, median error of -0.3%, and a standard deviation of 43%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates. Several factors independent of SEER that may have affected the accuracy of the results have been identified and are discussed; these include: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER-H↗

Renewable Energy Planning: Multiparametric Cost Optimization

This paper describes a method for determining the combination of renewable energy technologies that minimize life-cycle cost at a facility, often with a specified goal regarding percent of energy use from renewable sources. Technologies include: photovoltaics (PV); wind; solar thermal heat and electric; solar ventilation air preheating; solar water heating; biomass heat and electric (combustion, gasification, pyrolysis, anaerobic digestion); and daylighting. The method rests upon the National Renewable Energy Laboratory's (NREL's) capabilities in characterization of technology cost and performance, geographic information systems (GIS) resource assessment, and life-cycle cost analysis. The paper discusses how to account for the way candidate technologies interact with each other, and the solver routine used to determine the combination that minimizes life-cycle cost. Results include optimal sizes of each technology, initial cost, operating cost, and life-cycle cost, including incentives from utilities or governments. Results inform early planning to identify and prioritize projects at a site for subsequent engineering and economic feasibility study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗