Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commercial Buildings Integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

A Generalized Nuclear Code of Accounts for Cost Estimation Standardization

This is a joint INL-EPRI study. Link to corresponding page at the Electric Power Research Institute (EPRI): https://www.epri.com/research/products/000000003002028937 Recent Advanced Reactor (AR) designs typically offer features and attributes that depart from traditional water-cooled reactors in terms of fuel forms, coolants, structural materials, size, safety margins, and other important design and operational aspects. These departures, relative to the industry experience, will likely present a challenge for potential owner-operators when evaluating one or more AR designs for commercial deployment on a like-for-like basis. This is further exacerbated with new classes of reactors gaining prominence (e.g., microreactors) and new emerging applications (e.g., floating barge reactors or space propulsion reactors). The differences in design-specific technologies are compounded by the differences in approach to cost estimation. The lack of consistency in build up toward cost estimates creates a challenge when comparing competing concepts and evaluating their associated cost drivers. The outcome of a 2019 Scoping Study conducted by the Electric Power Research Institute (EPRI) indicated the need for a cost modeling guide (CMG), which would be underpinned by a technology-neutral and inclusive Generalized Nuclear Code of Accounts (GN-COA). A code of accounts (COA) is a tool by which costs are identified in even more specific categories, providing clarity on what specific costs are included in an estimate. A parallel independent effort was meanwhile taking place at Idaho National Laboratory via funding by the Systems Analysis Integration (SA&I) campaign of the Office of Nuclear Energy under the U.S. Department of Energy (U.S. DOE-NE) to also update the COA structure to enable more flexibility and encompass a wider variety of reactor technologies. After being made aware of these synergistic efforts, the two parties decided to combine efforts and develop a joint new standard format for nuclear cost estimation that builds on previous structures. This document describes the development of this joint GN-COA and provides guidance on the implementation of the tool, which is provided as the associated GN-COA Excel document. The main attributes of this novel COA format are that all items are functionally defined (in order to be technology and application agnostic) and grouped into logical arrangements that facilitate the tabulation of costs for reactor constructions under consideration. The intent is for the GN-COA to form a standard that is endorsed by future vendors and customers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A critical review of cyber-physical security for building automation systems

Modern Building Automation Systems (BASs), as the brain that enable the smartness of a smart building, often require increased connectivity both among system components as well as with outside entities, such as the cloud, to enable low-cost remote management, optimized automation via outsourced cloud analytics, and increased building-grid integrations. As smart buildings move towards open communication technologies, providing access to BASs through the building's intranet, or even remotely through the Internet, has become a common practice. However, increased connectivity and accessibility come with increased cyber security threats. BASs were historically developed as closed environments with limited cyber-security considerations. As a result, BASs in many buildings are vulnerable to cyber-attacks that may cause adverse consequences, such as occupant discomfort, excessive energy usage, and unexpected equipment downtime. Therefore, there is a strong need to advance the state-of-the-art in cyber-physical security for BASs and provide practical solutions for attack mitigation in buildings. However, an inclusive and systematic review of BAS vulnerabilities, potential cyber-attacks with impact assessment, detection & defense approaches, and cyber resilient control strategies is currently lacking in the literature. This review paper fills the gap by providing a comprehensive up-to-date review of cyber-physical security for BASs at three levels in commercial buildings: management level, automation level, and field level. The general BASs vulnerabilities and protocol-specific vulnerabilities for the four dominant BAS protocols (i.e., BACnet, KNX, LonWorks, and Modbus) are reviewed, followed by a discussion on four attack targets and seven potential attack scenarios. Furthermore, the impact of cyber-attacks on BASs is summarized as signal corruption, signal delaying, and signal blocking. The typical cyber-attack detection and defense approaches are identified at the three levels. Cyber resilient control strategies for BASs under attack are categorized into passive and active resilient control schemes. Open challenges and future opportunities are finally discussed.

97 MATHEMATICS AND COMPUTING↗

Technology solutions for wind integration in ERCOT

Texas has for more than a decade led all other states in the U.S. with the most wind generation capacity on the U.S. electric grid. The State recognized the value that wind energy could provide, and committed early on to build out the transmission system necessary to move power from the windy regions in West Texas to the major population centers across the state. It also signaled support for renewables on the grid by adopting an aggressive renewable portfolio standard (RPS). The joining of these conditions with favorable Federal tax credits has driven the rapid growth in Texas wind capacity since its small beginning in 2000. In addition to the major transmission grid upgrades, there have been a number of technology and policy improvements that have kept the grid reliable while adding more and more intermittent wind generation. Technology advancements such as better wind forecasting and deployment of a nodal market system have improved the grid efficiency of wind. Successful large scale wind integration into the electric grid, however, continues to pose challenges. The continuing rapid growth in wind energy calls for a number of technology additions that will be needed to reliably accommodate an expected 65% increase in future wind resources. The Center for the Commercialization of Electric Technologies (CCET) recognized this technology challenge in 2009 when it submitted an application for funding of a regional demonstration project under the Recovery Act program administered by the U.S. Department of Energy1. Under that program the administration announced the largest energy grid modernization investment in U.S. history, making available some $3.4 billion in grants to fund development of a broad range of technologies for a more efficient and reliable electric system, including the growth of renewable energy sources like wind and solar. At that time, Texas was (and still is) the nation’s leader in the integration of wind into the grid, and was investing heavily in the infrastructure needed to increase the viability of this important resource. To help Texas and the rest of the nation address the challenges associated with the integration of large amounts of renewables, CCET seized on the federal opportunity to undertake a multi-faceted project aimed at demonstrating the viability of new “smart grid” technologies to facilitate larger amounts of wind energy through better system monitoring capabilities, enhanced operator visualization, and improved load management. In early 2010, CCET was awarded a $27 million grant, half funded by the Department of Energy and half-funded by project participants. With this funding, CCET undertook the project named Discovery Across Texas which has demonstrated how existing and new technologies can better integrate wind power into the state’s grid. The following pages summarize the results of seven technology demonstrations that will help Texas and the nation meet this wind integration challenge.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using EMIS to Identify Top Opportunities for Commercial Building Efficiency

Energy Management and Information Systems (EMIS) comprise a broad family of tools and services to manage commercial building energy use. These technologies offer a mix of capabilities to store, display, and analyze energy use and system data, and in some cases, provide control. EMIS technologies enable 10–20 percent site energy savings in best practice implementations. Energy Information System (EIS) and Fault Detection and Diagnosis (FDD) systems are two key technologies in the EMIS family. Energy Information Systems are broadly defined as the web-based software, data acquisition hardware, and communication systems used to analyze and display building energy performance. At a minimum, an EIS provides daily, hourly or sub-hourly interval meter data at the whole-building level, with graphical and analytical capability. Fault Detection and Diagnosis systems automatically identify heating, ventilation, and air-conditioning (HVAC) system or equipment-level performances issues, and in some cases are able to isolate the root causes of the problem. They use computer algorithms to continuously analyze system-level operational data to detect faults and diagnose their causes. Many FDD tools integrate the trend log data from a Building Automation System (BAS) but otherwise are stand-alone software packages; other types of FDD tools are implemented as “on-board” equipment-embedded diagnostics. (This document focuses on the former.) Analysis approaches adopted in FDD technologies span a variety of techniques from rule-based methods to process history-based approaches. FDD tools automate investigations that can be conducted via manual data inspection by someone with expert knowledge, thereby expanding accessibility and breath of analysis opportunity, and also reducing complexity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Current NASA In-Situ Resource Utilization (ISRU) Strategic Vision

Perform development to TRL 5/6 through ground demonstration in relevant environment. Perform component/subscale subsystem flight demonstrations on small/mid-size landers. Assess and characterize water in volatiles in lunar polar shadowed regions and craters. Reduce risk of ISRU for mission critical consumables through Integrated End-to-End Flight Demonstrations (pilot scale). Establish initial Human Mission Scale production capability to promote sustainable operations and as anchor for commercial involvement. Identify and characterize polar region environment and resources/volatiles for Science and future Exploration/Commercial applications. Provide ground-truth physical, mineral, and water/volatile resource characteristic information at multiple locations to provide geological context for science-focused theories of volatile placement and initial mining assessments.Test technologies and processes to reduce risk of future extraction/mining systems. Quantify concentration and lateral/vertical distribution of resources/volatiles. Utilize ISRU capabilities to Extend and Enhance Human Lunar Exploration Missions. Provide oxygen (and fuel) to enable reusable human lunar lander (10+ MT/yr O2)Process carbon-based crew waste/trash into gases and propellants; can reduce logistics while minimizing public perception issues (alternative is conversion to radiation shielding). Scavenge unused propellants and hardware from spent landers. Metal extraction from regolith as feedstock for in situ and in space manufacturing demonstrations. Civil engineering and construction aimed at future outpost/infrastructure build-up. Develop and Demonstrate ISRU for Human Mars Missions. ISRU for propellant production (10-15 MT/yr); Liquefy, store, transfer, and refuel ascent vehicle. Use Moon for operational experience and mission validation for Mars: Pre-deployment & remote activation and operation without crew. Storing and transferring mission consumables Landing crew with empty tanks with ISRU propellants already made and waiting. Support/Promote Commercialization of Space. Large scale polar ice mining (100+ MT/yr water)O2/H2 propulsion for landers/cis-lunar transportation with surface and in space depots. In situ construction and energy expansion at mining and human outpost site(s). ISRU Ground Development. Develop and advance ISRU technologies to enable acquisition of resources and processing into mission consumables. Utilize Multi-center collaboration with a portfolio that includes internal NASA work, external contracts, and collaborative agreements/partnerships. Where appropriate, develop lunar ISRU components and subsystems with a Mars-forward application. Engage industry through public-private partnerships to lay the foundation for long-term lunar and space economic development. Spin-in/spin-out technologies for terrestrial applications and industry (mining, oil & gas, alternative energy, construction). Flight Demonstration Path to Operational ISRU. Utilize small demonstrations with near off-the-shelf hardware to obtain critical information quickly on lunar resources and operations. Demonstrate critical technologies and processes that interact with lunar materials and environments. Perform 'pilot plant' demonstrations at architecture relevant scales and durations to reduce the risk for ISRU-provided products for critical human mission applications.

In-situ Resource Utilization↗

Designing the User Experience for Earth Observation Data Services in the Cloud

NASA's Earth Observation (EO) inventory is projected to grow by an order of magnitude over the next 5-6 years. The current mode for working with EO data of downloading the data to a local machine (laptop, desktop or server) will be difficult to sustain for these upcoming volumes. Therefore, NASA is in the process of developing a capability to host large volume data in commercial cloud, with an eye toward encouraging data analysis in the cloud. However, in order for the user community to take advantage of this new mode of data interaction, the user experience must be redesigned. Cloud-hosted data brings new challenges, such as managing the costs of data egress and working with data in Web Object Storage instead of a Posix filesystem. However, it also brings new opportunities. Scaling data transformation processes may permit more synchronous data services with near-immediate response vs. cumbersome ordering systems with latencies of hours or days. Data co-location in the cloud can facilitate data integration and fusion. Highly scalable filesystems and databases in the cloud support data reorganization to facilitate analysis at scale. In the course of NASA's reimagining of the User Experience for EO data usage relies on end user input gathered through surveys, workshops and meetings (such as this). At the same time, we have embarked on a course of pedagogy and capacity building to help the user community evolve to cloud-based analysis.

Lynnes, Christopher↗

Low-Flow Liquid Desiccant Air-Conditioning: Demonstrated Performance and Cost Implications

Cooling loads must be dramatically reduced when designing net-zero energy buildings or other highly efficient facilities. Advances in this area have focused primarily on reducing a building's sensible cooling loads by improving the envelope, integrating properly sized daylighting systems, adding exterior solar shading devices, and reducing internal heat gains. As sensible loads decrease, however, latent loads remain relatively constant, and thus become a greater fraction of the overall cooling requirement in highly efficient building designs, particularly in humid climates. This shift toward latent cooling is a challenge for heating, ventilation, and air-conditioning (HVAC) systems. Traditional systems typically dehumidify by first overcooling air below the dew-point temperature and then reheating it to an appropriate supply temperature, which requires an excessive amount of energy. Another dehumidification strategy incorporates solid desiccant rotors that remove water from air more efficiently; however, these systems are large and increase fan energy consumption due to the increased airside pressure drop of solid desiccant rotors. A third dehumidification strategy involves high flow liquid desiccant systems. These systems require a high maintenance separator to protect the air distribution system from corrosive desiccant droplet carryover and so are more commonly used in industrial applications and rarely in commercial buildings. Both solid desiccant systems and most high-flow liquid desiccant systems (if not internally cooled) add sensible energy which must later be removed to the air stream during dehumidification, through the release of sensible heat during the sorption process.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗

Integrated Capture and Conversion of CO 2 to Methanol (ICCCM) Process Technology - CRADA 449 (Final Report)

The goal of this project is to develop a prototype system that integrates the capture and catalytic hydrogenation of CO 2 into methanol in the same solvent. Ultimately, this integrated approach could provide a technology with projected reductions to capital and operating costs by at least 20% relative to a benchmark methanol synthesis via gas-phase CO 2 hydrogenation. There were five primary objectives for the project: 1. Optimize the selections of both the catalysts and the CO 2 capture solvents to achieve high conversion (>80%) and high selectivity (>90%) toward methanol in the targeted processing ranges (100-180°C, 1-60 bar). 2. Design a reactor system that provides a fixed catalyst surface area and high-efficiency heat exchange to assure compact modular processing. 3. Build and test a reactor system and demonstrate in a bench scale continuous flow system, and use the operating data to refine the comparison to existing conversion technologies. 4. Refine techno economic (TEA) and Tech-to-Market (TTM) analyses using the experimental data obtained from the bench-scale system. 5. Use the experimental data and TEA/TTM projections to develop a conceptual design for a pre-commercial system that targets a specific market opportunity.

09 BIOMASS FUELS↗

Advanced End-to-end Simulation for On-board Processing (AESOP)

Developers of data compression algorithms typically use their own software together with commercial packages to implement, evaluate and demonstrate their work. While convenient for an individual developer, this approach makes it difficult to build on or use another's work without intimate knowledge of each component. When several people or groups work on different parts of the same problem, the larger view can be lost. What's needed is a simple piece of software to stand in the gap and link together the efforts of different people, enabling them to build on each other's work, and providing a base for engineers and scientists to evaluate the parts as a cohesive whole and make design decisions. AESOP (Advanced End-to-end Simulation for On-board Processing) attempts to meet this need by providing a graphical interface to a developer-selected set of algorithms, interfacing with compiled code and standalone programs, as well as procedures written in the IDL and PV-Wave command languages. As a proof of concept, AESOP is outfitted with several data compression algorithms integrating previous work on different processors (AT&T DSP32C, TI TMS320C30, SPARC). The user can specify at run-time the processor on which individual parts of the compression should run. Compressed data is then fed through simulated transmission and uncompression to evaluate the effects of compression parameters, noise and error correction algorithms. The following sections describe AESOP in detail. Section 2 describes fundamental goals for usability. Section 3 describes the implementation. Sections 4 through 5 describe how to add new functionality to the system and present the existing data compression algorithms. Sections 6 and 7 discuss portability and future work.

Mazer, Alan S.↗

Scalable Asset Discovery, Vulnerability Scanning, and Penetration Testing for Remote Sites and Wireless Spectrums Utilizing an Embedded Linux Plug - PwniPlug and the Raspberry Pi B+ as a Sample Pen Test

All devices attached to the NASA KSC network are subject to security vulnerability scanning and/or penetration testing. In today's changing environment, vulnerable and/or unprotected systems can easily be overlooked. Systems that are not properly managed can become a potential threat to the operational integrity of our systems and networks. This includes all NASA (internal and external) information systems within NASA KSC Internet Protocol (IP) address space, and NASA KSC facilities. The Office of the Chief Information Officer (OCIO) recommends that all NASA Centers and information systems be subject to penetration testing on a regular interval in accordance with the guidelines identified by the National Institute of Standards and Technology (NIST). (ITS-HBK-2810.04-02A) Protecting information and equipment at NASA is an area of increasing concern. In addition to the CPU's on the network; Supervisory, Control and Data Acquisition (SCADA) systems are especially vulnerable because these systems have lacked standards, use embedded controllers with little computational power and informal software, are connected to physical processes, have few operators, and are increasingly also being connected to corporate networks. The scope of work is comprised of several individual components which together build upon previous work by Drew Branch, NASA KSC Intern. The Pwn Plug is the selected COTS (Commercial-Off-The-Shelf) device chosen to test simplification of mandatory IT Security tasks. The device will be utilized to provide services to NASA KSC and enable an assessment of infrastructure soundness and regulatory compliance in an efficient, economical, and business responsive manner. The Pwn Plug is designed as a pen testing appliance which provides a hardware platform that can support commercial penetration testing efforts at significantly reduced costs. The expected outcomes are: 1) External Penetration Testing, 2) Social Engineering, 3) Procedural Documentation, 4) Recommended Remediation Action Plan, 5) System Retest & Remediation Attestation and 6) Final Reports, out briefing and Presentation. Due to physical and material constraints beyond intern and mentor control, the project was redefined as a working pen-test scenario. Limitations of lab availability and tools dictated an academic exercise. This report was developed within the scenario guidelines suggested by the project mentor. The guidelines were to be creative in developing a Pen Test program for a client.

Penetration Testing↗

Preliminary Logistics Modeling of the Integrated Wash Aid Treatment Emergency Reuse System - 19495

We employed Analysis of Mobility Platform (AMP) and GoldSim software to model the logistics of deploying materials to implement the Integrated Wash Aid Treatment Emergency Reuse System (IWATERS) in a hypothetical cesium-contamination scenario covering a four-block strip of downtown Chicago, IL. In this deployment of IWATERS, buildings were washed down via fire-hosing and contaminated wash solution was collected in the city's waste/stormwater collection system. The contaminated wash water was treated to remove Cs via ad hoc sand/clay filtration beds, and the treated wash solution was recycled during continuing decontamination operations. A detailed task timeline for the IWATERS deployment and information (or assumptions) on the availability and location of required resources for operations provided input parameters, as well as a framework, to enable the AMP and GoldSim simulations. From the decision to deploy IWATERS to the end of operations, including the completion of processing all contaminated wash water, took 49 days with decontamination teams active for 35 days and treatment bed teams active for 37 days. The modeling results showed the availability of vermiculite clay (based on data supplied by its commercial vendors/distributors) as the limiting factor for deploying treatment bed teams and, consequentially, the recycling rate of wash water and the timeline for decontamination operations. These simulations represent the first attempt at understanding the material and personnel requirements for large-scale IWATERS operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficient Community Development in California: Chula Vista Research Project

In 2007, the U.S. Department of Energy joined the California Energy Commission in funding a project to begin to examine the technical, economic and institutional (policy and regulatory) aspects of energy-efficient community development. That research project was known as the Chula Vista Research Project for the host California community that co-sponsored the initiative. The researches proved that the strategic integration of the selected and economically viable buildings energy efficiency (EE) measures, photovoltaics (PV), distributed generation (DG), and district cooling can produce significant reductions in aggregate energy consumption, peak demand and emissions, compared to the developer/builder's proposed baseline approach. However, the central power plant emission reductions achieved through use of the EE-DG option would increase local air emissions. The electric and natural gas utility infrastructure impacts associated with the use of the EE and EE-PV options were deemed relatively insignificant while use of the EE-DG option would result in a significant reduction of necessary electric distribution facilities to serve a large-scale development project. The results of the Chula Vista project are detailed in three separate documents: (1) Energy-Efficient Community Development in California; Chula Vista Research Project report contains a detailed description of the research effort and findings. This includes the methodologies, and tools used and the analysis of the efficiency, economic and emissions impacts of alternative energy technology and community design options for two development sites. Research topics covered included: (a) Energy supply, demand, and control technologies and related strategies for structures; (b) Application of locally available renewable energy resources including solar thermal and PV technology and on-site power generation with heat recovery; (c) Integration of local energy resources into district energy systems and existing energy utility networks; (d) Alternative land-use design and development options and their impact on energy efficiency and urban runoff, emissions and the heat island effect; and (e) Alternative transportation and mobility options and their impact on local emissions. (2) Creating Energy-Efficient Communities in California: A Reference Guide to Barriers, Solutions and Resources report provides the results of an effort to identify the most innovative existing and emerging public policy, incentive and market mechanisms that encourage investment in advanced energy technologies and enabling community design options in the State of California and the nation. The report evaluates each of these mechanisms in light of the preceding research and concludes with a set of recommended mechanisms designed for consideration by relevant California State agencies, development and finance industry associations, and municipal governments. (3) Creating Energy-Efficient Communities in California: A Technical Reference Guide to Building and Site Design report contains a set of selected commercially viable energy technology and community design options for high-efficiency, low-impact community development in California. It includes a summary of the research findings referenced above and recommendations for energy technology applications and energy-efficient development strategies for residential, commercial and institutional structures and supporting municipal infrastructure for planned communities. The document also identifies design options, technology applications and development strategies that are applicable to urban infill projects.

03 NATURAL GAS↗

Ultra-Low SWaP CO 2 Sensing for Demand Control Ventilation (Final Report)

In this project PARC and Energy ETC aimed to develop an ultra-low cost, size, weight, and power (SWaP) printed CO 2 sensor system for occupancy detection to enable Demand Control Ventilation (DCV) on a per-room basis. The CO 2 sensor technology is based on the temperature variation when CO 2 reversibly physisorbs to a highly conductive and high surface area sorbent surface, and is compatible with integration with PARC innovations in printed sensors and flexible electronics, for which PARC is a globally leading research center. The printed CO 2 sensor itself is designed to be compatible with PARC’s “peel-and-stick” platform of ultra-low power, low-cost, distributed sensors, and to facilitate real-time DCV based on overall indoor air quality (IAQ). Previously, PARC has developed flexible hybrid electronics (FHE) compatible materials to measure humidity, temperature, light, strain, and gases such as carbon monoxide, methane, ammonia, and hydrogen sulfide. Through this project, PARC developed FHE-compatible materials to measure CO 2 . Thus, with one <$15 FHE “peel-and-stick” based sensor node, a building management system (BMS) will be able to capture a complete picture of the indoor environment. This includes IAQ, light, temperature, and other comfort factors that impact building operations. Combined with optimized DCV, this low-cost sensor capability can be a key enabler of annual primary energy savings of ~ 0.3-0.4 Quad in commercial buildings while ensuring healthy IAQ. Energy ETC is a leader in supplier-agnostic BMS deployments and will design the commissioning and deployment procedures to maximize system interoperability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Virtually simulating the next generation of clean energy technologies: NETL's AVESTAR Center is dedicated to the safe, reliable and efficient operation of advanced energy plants with carbon capture

Imagine using a real-time virtual simulator to learn to fly a space shuttle or rebuild your car's transmission without touching a piece of equipment or getting your hands dirty. Now, apply this concept to learning how to operate and control a state-of-the-art, electricity-producing power plant capable of carbon dioxide (CO{sub 2}) capture. That's what the National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training and Research (AVESTAR) Center (www.netl.doe.gov/avestar) is designed to do. Established as part of the Department of Energy's (DOE) initiative to advance new clean energy technology for power generation, the AVESTAR Center focuses primarily on providing simulation-based training for process engineers and energy plant operators, starting with the deployment of a first-of-a-kind operator training simulator for an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture. The IGCC dynamic simulator builds on, and reaches beyond, conventional power plant simulators to merge, for the first time, a 'gasification with CO{sub 2} capture' process simulator with a 'combined-cycle' power simulator. Based on Invensys Operations Management's SimSci-Esscor DYNSIM software, the high-fidelity dynamic simulator provides realistic training on IGCC plant operations, including normal and faulted operations, as well as plant start-up, shutdown and power demand load changes. The highly flexible simulator also allows for testing of different types of fuel sources, such as petcoke and biomass, as well as co-firing fuel mixtures. The IGCC dynamic simulator is available at AVESTAR's two locations, NETL (Figure 1) and West Virginia University's National Research Center for Coal and Energy (www.nrcce.wvu.edu), both in Morgantown, W.Va. By offering a comprehensive IGCC training program, AVESTAR aims to develop a workforce well prepared to operate, control and manage commercial-scale gasification-based power plants with CO{sub 2} capture. The facility and simulator at West Virginia University promotes NETL's outreach mission by offering hands-on simulator training and education to researchers and university students.

01 COAL, LIGNITE, AND PEAT↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

FOSTERING MULTI-LATERAL COOPERATION BETWEEN THE GOVERNMENTS OF DOMINICAN REPUBLIC, COLOMBIA, AND THE UNITED STATES TO ENHANCE THE PROTECTION OF HIGH-ACTIVITY RADIOACTIVE SOURCES

The Global Threat Reduction Initiative (GTRI) reduces and protects vulnerable nuclear and radiological material located at civilian sites worldwide from sabotage, theft or diversion. The GTRI has worked successfully with foreign countries to remove and protect nuclear and radioactive materials including high-activity sources used in medical, commercial, and research applications. There are many barriers to successful bilateral cooperation that must be overcome including language, preconceived perceptions, long distances, and different views on the threat and protection requirements. Successful cooperation is often based on relationships and building trusting relationships takes time. In the case of Dominican Republic, the GTRI first received contact in 2008 from the Government of Dominican Republic. They requested cooperation that was similar to the tri-partite cooperation between Colombia, Mexico and the United States. Throughout the region it was widely known that the GTRI’s cooperation with the Government of Colombia was a resounding success resulting in the securing of forty sites; the consolidation of numerous disused/orphan sources at a secure national storage facility; and, the development of a comprehensive approach to security including, inter alia, training and sustainability. The Government of Colombia also showcased this comprehensive approach to thirteen Central American and Caribbean countries at a GTRI regional security conference held in Panama in October 2004. In 2007, Colombia was an integral component of GTRI multi-lateral cooperation initiation in Mexico. As a result, twenty two of Mexico’s largest radioactive sites have been upgraded in the past eighteen months. These two endeavors served as catalysts for cooperation opportunities in the Dominican Republic. Representatives from the Colombian government were aware of GTRI’s interest in initiating cooperation with the Government of Dominican Republic and to facilitate this cooperation, they traveled to the Dominican Republic and provided briefings and presentations which demonstrated its successful cooperation with the GTRI. Shortly after that visit, the Government of Dominican Republic agreed to move forward and requested that the cooperative efforts in Dominican Republic be performed in a tripartite manner, leveraging the skills, experience, and resources of the Colombians, and the financial and technical support of the United States. As a result, two of Dominican Republic’s largest radioactive sites had security upgrades in place within 90 days of the cooperation visit in December 2008.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demontration of Integrated Optimization Software at the Baldwin Energy Complex

This project encompassed the design, development, and demonstration of integrated online optimization systems at Dynegy Midwest Generation's Baldwin Energy Complex (BEC) located in Baldwin, Illinois. The overall project objective was to improve coal-based generation's emission profile, efficiency, maintenance requirements and plant asset life in order to enhance the long-term viability of the United States abundant coal resources. Five separate but integrated optimization products were developed, addressing combustion, sootblowing, SCR operations, overall unit thermal performance, and plant-wide availability optimization. Optimization results are inherently unit-specific and cannot be known for a particular generating unit in advance. However, NeuCo believed that the following were reasonable targets for the completed, integrated set of products: Furnace NOx reduction improvement by 5%, Heat rate improvement by 1.5%, Increase of annual Available MWh by 1.5%, Commensurate reductions in greenhouse gases, mercury, and particulates; and Commensurate increases in profitability from lower costs, improved reliability, and greater commercial availability. The goal during Phase I was to establish each system and demonstrate their integration in unified plant optimization. Efforts during Phase I focused on: (1) developing, deploying, integrating, and testing prototypes for each of the five products; (2) identifying and addressing issues required for the products to integrate with plant operations; and (3) systematically collecting and assimilating feedback to improve subsequent product releases. As described in the Phase II continuation application NeuCo successfully achieved the goal for Phase I. The goal of Phase II was to improve upon the products installed and tested in Phase I and to quantify the benefits of the integrated system. As this report documents, NeuCo has also successfully achieved the goal for Phase II. The overall results of the project, compared with the project goals, are: (1) NOx Reduction: The 5% target for NOx reduction was exceeded with average CEMS and SCR Inlet (furnace) NOx reduction of between 12% and 14%. (2) Heat Rate Improvement: The optimization systems delivered an average heat rate improvement of between 0.67% and 0.7%. This falls short of the 1.5% heat rate improvement target largely because Cyclone Stability (availability) and CEMS and SCR Inlet NOx were prioritized over heat rate in the event they needed to be traded-off with one another. A different prioritization of objectives could have driven a different balance, thereby meeting the target of 1.5% improvement. There were also several factors that could have been masking greater heat rate improvements such as the decrease in fuel density over the course of the project and the impact of actions taken as a result of advice provided by the optimizers that are difficult to quantify. (3) Increased Annual Available MWh: Although difficult to measure precisely, the target of increasing available MWh's by 1.5% was met by providing prioritized alerts and knowledge-based diagnostics for a wide array of plant equipment and process anomalies; helping the plant to move from high sulfur, high Btu Illinois coal to PRB and run that fuel at low stoichiometries without derates; and improved management of cyclone flame quality as well as improved vigilance with respect to cyclone conditions which avoided some degree of temporary de-rate due to cyclone slag build up. (4) Commensurate Reductions in Greenhouse Gases, Mercury, and Particulates: Reductions in all three of these indices can be associated directly with the optimization leverage observed in the heat rate and NOx reductions. (5) Commensurate Increases in Profitability from Lower Costs, Improved Reliability, and Greater Commercial Availability: Commensurate improvements in costs, reliability and availability resulted from the previously described benefits. Also playing a role were the sustained operation of the cyclones while using more available, less expensive but off-design fuel; more effective catalytic reduction of NOx; and the reduced time required to discover, prioritize and diagnose plant equipment issues. The total annual dollar value of the benefits associated with the products installed, refined, and commercialized at BEC are estimated to range from $1.8 to $3.2 million dollars per-unit, and $7.2 to $8.1 million dollars per year plant-wide depending on whether CO{sub 2} benefits are included. In summary, the NeuCo project at BEC was successfully completed and has demonstrated that advanced optimization technologies can play an important role in improving the environmental footprint of coal-based power generation while achieving other important operating objectives.

01 COAL, LIGNITE, AND PEAT↗