Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

STS-32 Crew Training for Lower Body Negative Pressure Unit and AFE

Astronauts Dunbar, Ivins, and Low are shown preparing for the checkouts of the Lower Body Negative Pressure (LBNP) and American Flight Echocardiograph (AFE) tests. Dunbar gets into the LBNP suit, while technicians look on. Experiments on Dunbar are conducted while other crew members and technicians record data.

Source record↗

[STS-31 Onboard 16mm Photography Quick Release]

This video features scenes shot by the crew of onboard activities including Hubble Space Telescope deploy, remote manipulator system (RMS) checkout, flight deck and middeck experiments, and Earth and payload bay views.

Source record↗

STS-31 Crew Training: Firefighting, Food Tasting, EVA Prep and Post

The Space Shuttle crew is shown lighting a pond of gasoline and then performing firefighting tasks. The crew is also shown tasting food including lemonade, chicken casserole, and tortillas, and performing extravehicular activity (EVA) equipment checkouts in the CCT middeck and airlock.

Source record↗

Kennedy Space Center processing of Shuttle small payloads

There are many steps involved in preparing a payload for a mission into space on the Space Shuttle. Operations at the John F. Kennedy Space Center (KSC) are the last of those steps for the hardware before the payload is launched. To assure a successful and efficient KSC processing flow, a great deal of planning between the Robert H. Goddard Space Flight Center (GSFC) and KSC personnel is required before the payload arrives at KSC. After arrival, pre-flight operations occur between payload personnel, GSFC personnel, and KSC personnel for integration of the payload into its carrier (if required), in preparation for installation into a Orbiter. Once installed into an Orbiter, final test(s), checkout, and close-out of the payload is performed by GSFC and KSC personnel before launch. Mission support varies depending on the payload flying, but once the mission is complete and the Orbiter has returned to KSC, post-flight operations begin. This usually involves a reverse flow of the pre-flight operations. KSC operations conclude when the payload, its ground support equipment (GSE), and personnel depart KSC. A list of lessons learned is generated at the end of each payload flow, to avoid repeating the same mistakes (if any) for the next payload or for multiple repeat flights of the same payload. Always monitored are planned changes that may affect the payloads, GSE, KSC facilities, payload personnel, GSFC personnel, and/or KSC personnel.

Haddad, Michael E.↗

Radioastron flight operations

Radioastron is a space-based very-long-baseline interferometry (VLBI) mission to be operational in the mid-90's. The spacecraft and space radio telescope (SRT) will be designed, manufactured, and launched by the Russians. The United States is constructing a DSN subnet to be used in conjunction with a Russian subnet for Radioastron SRT science data acquisition, phase link, and spacecraft and science payload health monitoring. Command and control will be performed from a Russian tracking facility. In addition to the flight element, the network of ground radio telescopes which will be performing co-observations with the space telescope are essential to the mission. Observatories in 39 locations around the world are expected to participate in the mission. Some aspects of the mission that have helped shaped the flight operations concept are: separate radio channels will be provided for spacecraft operations and for phase link and science data acquisition; 80-90 percent of the spacecraft operational time will be spent in an autonomous mode; and, mission scheduling must take into account not only spacecraft and science payload constraints, but tracking station and ground observatory availability as well. This paper will describe the flight operations system design for translating the Radioastron science program into spacecraft executed events. Planning for in-orbit checkout and contingency response will also be discussed.

Altunin, V. I.↗

EOS ground data systems: A description and interface overview

The Earth Observing System (EOS) is planned as a space-based measurement system, earth-science research program, and data and information system (EOSDIS). It will consist of several high data rate spacecraft with multiple earth sensing instruments which provide investigators with a thorough, longterm view of the earth's environment. Up to seven spacecraft may be supported at once, either in operational, checkout, or testing phases; and the average data rate from the EOS satellites in orbit at any one time is expected to be from 18 to 60 Mbps. Providing the data processing and flight operations support for EOS will be the EOSDIS Core System (ECS). The ECS will command and control the spacecraft; process and store the EOS data; provide access to the data for years; and support researchers. The data processing aspects of the ECS consist of a collection of Distributed Active Archive Centers (DAAC's) which perform the product generation, data archive and distribution, and information management services. Flight operations aspects will be provided by the EOS Operations Center, by instrument control centers, and by widely distributed instrument support terminals. The communications and system management aspects will be provided by the EOSDIS Science Network and the System Management Center. In addition to the EOS satellite data, other data sets from earlier earth science missions are also to be added to designated DAAC's. Other ground data systems which will provide support to EOS for acquiring, transporting, processing, and distributing the transformed spacecraft data are currently being defined or are being upgraded for the EOS era. These systems include the Space Network consisting of the Tracking and Data Relay Satellite System (TDRSS), the TDRSS Ground Terminals, and the Network Control Center as well as the night Dynamics Facility, the EOS Data and Operations System, and EOS Communications. This paper briefly describes data handling by the ECS, the support data systems, their interfaces, and their roles.

Smith, Gene↗

Future space transportation system architecture avionics requirements

NASA began a multi-center study in January 1993 to examine options for providing the most cost effective space transportation system in the future. The key advanced avionics requirements for these vehicle concepts are envisioned to provide significantly improved operational efficiency and effectiveness. It is very desirable to have adaptive guidance, navigation, and control approaches that will allow launch and return in almost any weather condition. The vehicles must be able to accommodate atmospheric density variations and winds without software changes. The flight operations must become much more autonomous in all flight regimes like an aircraft, and preflight checkout should make use of the onboard systems. When the vehicle returns to the launch site, subsystem health must be known and maintenance tasks scheduled accordingly. Ground testing of most subsystems must be eliminated. Also, the health monitoring system must be designed to enhance the ability to abort the mission significantly and save the crew and the vehicle. The displays and controls must be much less complex than current systems and must significantly reduce pilot work load. It is important to have low power, light weight displays and controls. Rendezvous and docking and all flight phases must have autopilot capability to reduce pilot work load for routine operations and in abort situations. The vehicles must have the demonstrated ability to return to the launch site. Abort from all mission phases can put additional demands on the communications system.

Stone, Howard↗

Lunar Transportation Facilities and Operations Study, option 1

Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE and PSS by reviewing and commenting on architecture documents and concept definitions to ensure adequate considerations were given to the launch and landing function of an exploration initiative.

Source record↗

Scientific and technical support for the Galileo net flux radiometer experiment

This report describes work supported by a post-launch grant (NCC 2-679) that originally covered the period from 1 January 1990 through 31 December 1992. This was extended an additional nine months at no cost until 30 September 1993, and once more until to 30 November 93. A final report on the effort from 1 January 1990 through 30 November 1993 (anticipated) is provided following the background discussion. Tasks required during the post launch period are briefly as follows: (1) attend PSG (Project Science Group) meetings; (2) support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); (3) organize and maintain documentation; (4) finish calibration measurements, documentation, and analysis; (5) characterize and diagnose instrument anomalies; (6) develop descent data analysis tools; and (7) science data analysis and publication. The following sections provide background information on the NFR instrument followed by the complete progress report.

Sromovsky, Lawrence A.↗

Endurance Test and Evaluation of Alkaline Water Electrolysis Cells

The overall objective of this program is to assess the state of alkaline water electrolysis cell technology and its potential as part of a Regenerative Fuel Cell System (RFCS) of a multikilowatt orbiting powerplant. The program evaluates the endurance capabilities of alkaline electrolyte water electrolysis cells under various operating conditions, including constant condition testing, cyclic testing and high pressure testing. The RFCS demanded the scale-up of existing cell hardware from 0.1 sq ft active electrode area to 1.0 sq ft active electrode area. A single water electrolysis cell and two six-cell modules of 1.0 sq ft active electrode area were designed and fabricated. The two six-cell 1.0 sq ft modules incorporate 1.0 sq ft utilized cores, which allow for minimization of module assembly complexity and increased tolerance to pressure differential. A water electrolysis subsystem was designed and fabricated to allow testing of the six-cell modules. After completing checkout, shakedown, design verification and parametric testing, a module was incorporated into the Regenerative Fuel Cell System Breadboard (RFCSB) for testing at Life Systems, Inc., and at NASA JSC.

Kovach, Andrew J.↗

B-70 Aircraft Study

This volume contains cost, schedule, and technical information on the following B-70 aircraft subsystems: air induction system, flight control, personnel accommodation and escape, alighting and arresting, mission and traffic control, flight indication, test instrumentation, and installation, checkout, and pre-flight.

Taube, L. J.↗

Test plan. GCPS task 7, subtask 7.1: IHM development

The overall objective of Task 7 is to identify cost-effective life cycle integrated health management (IHM) approaches for a reusable launch vehicle's primary structure. Acceptable IHM approaches must: eliminate and accommodate faults through robust designs, identify optimum inspection/maintenance periods, automate ground and on-board test and check-out, and accommodate and detect structural faults by providing wide and localized area sensor and test coverage as required. These requirements are elements of our targeted primary structure low cost operations approach using airline-like maintenance by exception philosophies. This development plan will follow an evolutionary path paving the way to the ultimate development of flight-quality production, operations, and vehicle systems. This effort will be focused on maturing the recommended sensor technologies required for localized and wide area health monitoring to a technology readiness level (TRL) of 6 and to establish flight ready system design requirements. The following is a brief list of IHM program objectives: design out faults by analyzing material properties, structural geometry, and load and environment variables and identify failure modes and damage tolerance requirements; design in system robustness while meeting performance objectives (weight limitations) of the reusable launch vehicle primary structure; establish structural integrity margins to preclude the need for test and checkout and predict optimum inspection/maintenance periods through life prediction analysis; identify optimum fault protection system concept definitions combining system robustness and integrity margins established above with cost effective health monitoring technologies; and use coupons, panels, and integrated full scale primary structure test articles to identify, evaluate, and characterize the preferred NDE/NDI/IHM sensor technologies that will be a part of the fault protection system.

Greenberg, H. S.↗

Thermal design verification testing of the Clementine spacecraft: Quick, cheap, and useful

At this writing, Clementine had successfully fulfilled its moon-mapping mission; at this reading it will have also, with continued good fortune, taken a close look at the asteroid Geographos. The thermal design that made all this possible was indeed formidable in many respects, with very high ratios of requirements-to-available resources and performance-to-cost and mass. There was no question that a test verification of this quite unique and complex design was essential, but it had to be squeezed into an unyielding schedule and executed with bare-bones cost and manpower. After describing the thermal control subsystem's features, we report all the drama, close-calls, and cost-cutting, how objectives were achieved under severe handicap but (thankfully) with little management and documentation interference. Topics include the newly refurbished chamber (ready just in time), the reality level of the engineering model, using the analytical thermal model, the manner of environment simulation, the hand-scratched film heaters, functioning of all three types of heat pipes (but not all heat pipes), and the BMDO sensors' checkout through the chamber window. Test results revealed some surprises and much valuable data, resulting in thermal model and flight hardware refinements. We conclude with the level of correlation between predictions and both test temperatures and flight telemetry.

Kim, Jeong H.↗

CTAS data analysis program

The analysis program (AN) is specifically designed to produce graphic and tabular information to aid in the design and checkout of the Center TRACON Automation System (CTAS). To best reveal CTAS operation and possible problems, data are plotted in many different ways both in detail and summary form. AN has been designed to analyze both radar surveillance data and output data from CTAS. AN has been extensively used to debug and refine CTAS. It is also being used in the field to monitor and assess CTAS performance. AN is continuously refined to keep up with changing needs. The present version of AN grew out of analysis of Denver Center data. However, the AN software has been written to be adaptable to any other facility Center or TRACON. Presently, one can select Denver Stapleton, Denver International, Dallas/Fort Worth International Airport, and Dallas Love Field.

Neuman, Frank↗

Configurable technology development for reusable control and monitor ground systems

The control monitor unit (CMU) uses configurable software technology for real-time mission command and control, telemetry processing, simulation, data acquisition, data archiving, and ground operations automation. The base technology is currently planned for the following control and monitor systems: portable Space Station checkout systems; ecological life support systems; Space Station logistics carrier system; and the ground system of the Delta Clipper (SX-2) in the Single-Stage Rocket Technology program. The CMU makes extensive use of commercial technology to increase capability and reduce development and life-cycle costs. The concepts and technology are being developed by McDonnell Douglas Space and Defense Systems for the Real-Time Systems Laboratory at NASA's Kennedy Space Center under the Payload Ground Operations Contract. A second function of the Real-Time Systems Laboratory is development and utilization of advanced software development practices.

Uhrlaub, David R.↗

Research and technology: 1994 annual report of the John F. Kennedy Space Center

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, the John F. Kennedy Space Center is placing increasing emphasis on its advanced technology development program. This program encompasses the efforts of the Engineering Development Directorate laboratories, most of the KSC operations contractors, academia, and selected commercial industries - all working in a team effort within their own areas of expertise. This edition of the Kennedy Space Center Research and Technology 1994 Annual Report covers efforts of all these contributors to the KSC advanced technology development program, as well as our technology transfer activities. The Technology Programs and Commercialization Office (DE-TPO), (407) 867-3017, is responsible for publication of this report and should be contacted for any desired information regarding the advanced technology program.

Source record↗

[STS-43 Post Flight Press Conference]

The flight crew (Blaha, Baker, Low, Adamson, and Lucid) present and discuss their STS-43 Space Shuttle Mission in this press conference video. This mission was the first flight to deploy the Tracking Data and Relay Satellite (TDRS), the primary payload. A large number of secondary payload experiments were performed. The included: several cell tissue growth and enzyme analysis experiments; a Lower Body Negative Pressure Experiment; optic coupling and flame front propagation/combustion physics experiments; The Space Station Heat Pipe Advanced Radiator Experiment (SHARE) for the Space Station; a crystal control device evaluation; a software and hardware systems checkout for the Shuttle; some flight tests of the new orbiter auto-pilot system; some materials tests on polymer membranes; the Zero Gravity physics experiments; and the Space Shuttle Backscatter Ultraviolet Experiment. Earth views included: the Kuwait oil fires; cloud cover; and B/W lightning footage.

Source record↗

STS-70 Post Flight Presentation

In this post-flight overview, the flight crew of the STS-70 mission, Tom Henricks (Cmdr.), Kevin Kregel (Pilot), Major Nancy Currie (MS), Dr. Mary Ellen Weber (MS), and Dr. Don Thomas (MS), discuss their mission and accompanying experiments. Pre-flight, launch, and orbital footage is followed by the in-orbit deployment of the Tracking and Data Relay Satellite (TDRS) and a discussion of the following spaceborne experiments: a microgravity bioreactor experiment to grow 3D body-like tissue; pregnant rat muscular changes in microgravity; embryonic development in microgravity; Shuttle Amateur Radio Experiment (SAREX); terrain surface imagery using the HERCULES camera; and a range of other physiological tests, including an eye and vision test. Views of Earth include: tropical storm Chantal; the Nile River and Red Sea; lightning over Brazil. A three planet view (Earth, Mars, and Venus) was taken right before sunrise. The end footage shows shuttle pre-landing checkout, entry, and landing, along with a slide presentation of the flight.

Peterson, Glen↗