Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CCS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase) (Final Report)

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership (RCSP) Initiative. The public/private consortium, funded through the MRCSP, brings together nearly 40 industry partners in 10 contiguous states in Mid-West and North-East regions. Battelle, as the project lead, oversees research & development, operations, and coordinates activities among various partners. Since its founding, MRCSP has made significant progress towards advancing CCS and CCUS technologies for participating states in the region. Between 2008 to 2020, Phase III of the MRCSP program focused on the development of large-scale injection tests. This report is part of a series of topical reports prepared under the MRCSP Phase III. The MRCSP Final Technical Report summarizes the research conducted while monitoring large-scale injection tests at a CO 2 -EOR facility in Northern Michigan. The project successfully injected more than one million metric tons of CO 2 into depleted oil fields in the Northern Niagaran Pinnacle Reef Trend (NNPRT) for enhanced oil recovery (EOR). These commercial-scale tests provided valuable real-world knowledge that has been used to refine technologies and methods, reduce uncertainties, and demonstrate safety and effectiveness of CCUS technologies to increase public acceptance. The Final Technical Report provides an overview of Phase III efforts including advancing the understanding of the regional geology, storage capacities, deployment of many monitoring and modeling techniques and its efficacy, and technical demonstration of large-scale CO 2 injection, containment, and associated storage in the NNPRT region. Specific topical reports on the subjects covered in the Final Technical Report are also available through EDX/OSTI.

01 COAL, LIGNITE, AND PEAT↗

Business Environment Study (Subtask 5.1)

In 2016, WVR acquired the Wabash Integrated Gasification Combined Cycle (IGCC) Plant north of Terre Haute, Indiana. Initially, WVR intended to use the plant to produce ammonia using syngas converted to hydrogen. Part of the business plan was to capture and sequester the CO 2 byproduct with the goal of a net-zero carbon emitting plant. Now, with the demand for clean hydrogen-based power and fuel cell energy, the plant intends to produce power and sell hydrogen as a fuel source, still with the intent to sequester CO 2 and achieve net-zero emissions. The Wabash CarbonSAFE project’s objectives are to establish the feasibility of developing a commercial-scale geological storage complex at the WVR plant in Vigo County, Indiana, for storage of 50 million tonnes or more of CO 2 . The plant is expected to produce up to 2 million tons (1.82 million tonnes) of CO 2 annually as a byproduct of hydrogen production. Wabash CarbonSAFE has examined the feasibility of geologic storage of the CO 2 in the Potosi Dolomite Storage Complex of the Illinois Basin via an onsite characterization well at the WVR plant site. This document explores the business requirements to undertake such a project, outlining the outside influences on a business venture such as legislation, legal, regulatory, and business climate factors. This document then discusses the CO 2 source, potential partner sources, and the business financials that allow CCS to be commercially viable for Wabash Valley Resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Install or Extend Additional Infrastructure (SECARB Work Product 6.1.b)

Infrastructure needs at the SECARB “early” Cranfield test are different from many other CCS sites, because this test is strongly supported by the commercial activities of site host Denbury Onshore LLC. Commercial development by Denbury provided the substantive cost-share required to make the project viable. Denbury contributions fundamental for the project included the retrofit of the former Sonat natural gas pipeline from the Jackson Dome CO 2 source to the center of Cranfield Field, construction of distributory pipelines to take CO 2 to injection wells, and construction of roads and well pads that allowed access for drilling and maintenance of injection wells. In addition, as part of the EOR operations, Denbury constructed a CO 2 separation plant to increase pressure from pipeline pressure to field pressure and support CO 2 recycle, construction of production lines to bring oil, water, CO 2 and gas to the separation plant, and worked over plugged and abandoned (P&A) wells to retrofit them as producers. Producers were used by the SECARB project as monitoring points to observe flood. Denbury’s well test facility allowed monthly quantification of the volumes of fluids produced and reinjected.

01 COAL, LIGNITE, AND PEAT↗

SECARB 2020 Semi-Annual Field Review Reports - Anthropogenic Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and the Electric Power Research Institute (EPRI) managed all activities associated with the Anthropogenic Test site. Advanced Resources International, Inc. (ARI) assisted EPRI with the management of site activities. EPRI and ARI followed reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semi-annual chronology. The SECARB Anthropogenic Test was the largest demonstration of a fully integrated, pulverized coal-fueled carbon capture and storage (CCS) project in the United States as of 2012 and supports a commercial prototype of CO 2 capture; transportation; subsurface storage; and monitoring, verification, and accounting (MVA); and assessment. The demonstration-scale, post-combustion CO 2 capture facility at Alabama Power Company’s Plant Barry diverted flue gas (25MW equivalent) from its Unit #5 coal burning facility and captured the CO 2 using Mitsubishi Heavy Industries (MHI) KM-CDRTM advanced amine technology. The captured CO2 was compressed at Plant Barry and transported by pipeline to the injection location southeast of Citronelle, Alabama. The Citronelle Project’s geologic storage and MVA sites were located on the flanks of the Citronelle Dome, approximately three miles southeast of the city of Citronelle. The injection zone, the Paluxy Formation, a saline formation that occurs at approximately 9,400 feet and overlies the oil production horizon of the Citronelle oilfield, presents a favorable injection reservoir in terms of areal extent and petrophysical characteristics. The confining zone, the basal shale of the overlying Washita-Fredericksburg Formation, is persistent throughout the Citronelle area and possesses the appropriate criteria to act as an effective CO 2 seal.

01 COAL, LIGNITE, AND PEAT↗

Present Early Test Results at SECARB Industry Briefing [Slides]

Contents include the following presentations: 1) SECARB Phase III Early Test Cranfield, MS; 2) SECARB Phase III Early Test at Cranfield, March 9, 2010; 3) Update on Results of SECARB "Early" Test of Monitoring Large Volume Injection at Cranfield; 4) Progress Update SECARB "Early" Test Monitoring 3.5 Million Tons at Cranfield, March 7, 2012; 5) Cranfield Geophysical Monitoring Status and Results, March 8, 2012; 6) Large Volume CO 2 Injection at Cranfield, Early Field Test of the SECARB Phase III–Near-Surface Monitoring, March 7, 2012; 7) Shallow Groundwater Study at the Cranfield Site, March 12, 2013; 8) Subsurface Monitoring Studies–Results and Integration, March 12, 2013; 9) Review of the Petrophysics for the Cranfield Phase III Project, March 12, 2013; 10) Geomechanics at Cranfield, March 5, 2014; 11) Gulf Coast Carbon Center Near-Surface Update, March 4-5, 2014; 12) Monitoring Design Best Practices, March 5, 2014; 13) Assessing Impacts of CO 2 Leakage on Groundwater Quality and Monitoring Network Efficiency–Case Study at a CO 2 -EOR site, March 11, 2013; 14) Near-surface Stratigraphy and Geophysics, March 11, 2015; 15) Update on Reservoir Modeling and Final Testing and P&A Underway, March 11, 2013; 16) SECARB Early Test Retrospective; 17) Fluid Source Attribution at CCS and CO 2 -EOR Sites, March 8, 2016; 18) SECARB "Early Test" at Cranfield, March 8-9, 2017; 19) Analysis of Seismic Time-Lapse Observations at Cranfield; 20) SECARB Phase III Cranfield Project (Early Test), March 8, 2018; 21) Enhanced Analytical Simulation Tool (EASiTool) Dynamic Capacity Estimation; 22) Net Carbon Negative Oil Mass Accounting–Cranfield Case Study; 23) Knowledge Sharing; 24) Advancing Toward Commercialization Final Stages of the Early Test; 25) CO 2 EOR Feasibility in SECARB Region Limited by CH 4 ; 26) Understanding of CO2 Migration and Entrapment–Cranfield Site

01 COAL, LIGNITE, AND PEAT↗

Wabash CarbonSAFE Roadmap for Network and Storage Deployment: Subtask 10.3 (Technical Report)

Wabash Valley Resources is incorporating carbon capture and storage (CCS) technologies into its hydrogen production plant in Terre Haute, Indiana, at an expected annual capture rate that will make Wabash Valley Resources one of the largest carbon capture facilities in the world. In addition to storing its own captured CO 2 , the geographic location and subsurface geology at Wabash Valley Resources suggest it may be an advantageous site for a carbon storage hub. This report analyzes the potential of nearby sources to transport their captured CO 2 to Wabash Valley Resources through an optimal pipeline network.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗