Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Lessons Learned From the Development, Operation, and Review of Mechanical Systems on the Space Shuttle, International Space Station, and Payloads

The Mechanical Design and Analysis Branch at the Johnson Space Center (JSC) is responsible for the technical oversight of over 30 mechanical systems flying on the Space Shuttle Orbiter and the International Space Station (ISS). The branch also has the responsibility for reviewing all mechanical systems on all Space Shuttle and International Space Station payloads, as part of the payload safety review process, through the Mechanical Systems Working Group (MSWG). These responsibilities give the branch unique insight into a large number of mechanical systems, and problems encountered during their design, testing, and operation. This paper contains narrative descriptions of lessons learned from some of the major problems worked on by the branch during the last two years. The problems are grouped into common categories and lessons learned are stated.

Dinsel, Alison↗

NASA Tech Briefs, October 2008

Topics covered include: Control Architecture for Robotic Agent Command and Sensing; Algorithm for Wavefront Sensing Using an Extended Scene; CO2 Sensors Based on Nanocrystalline SnO2 Doped with CuO; Improved Airborne System for Sensing Wildfires; VHF Wide-Band, Dual-Polarization Microstrip-Patch Antenna; Onboard Data Processor for Change-Detection Radar Imaging; Using LDPC Code Constraints to Aid Recovery of Symbol Timing; System for Measuring Flexing of a Large Spaceborne Structure; Integrated Formation Optical Communication and Estimation System; Making Superconducting Welds between Superconducting Wires; Method for Thermal Spraying of Coatings Using Resonant-Pulsed Combustion; Coating Reduces Ice Adhesion; Hybrid Multifoil Aerogel Thermal Insulation; SHINE Virtual Machine Model for In-flight Updates of Critical Mission Software; Mars Image Collection Mosaic Builder; Providing Internet Access to High-Resolution Mars Images; Providing Internet Access to High-Resolution Lunar Images; Expressions Module for the Satellite Orbit Analysis Program Virtual Satellite; Small-Body Extensions for the Satellite Orbit Analysis Program (SOAP); Scripting Module for the Satellite Orbit Analysis Program (SOAP); XML-Based SHINE Knowledge Base Interchange Language; Core Technical Capability Laboratory Management System; MRO SOW Daily Script; Tool for Inspecting Alignment of Twinaxial Connectors; An ATP System for Deep-Space Optical Communication; Polar Traverse Rover Instrument; Expert System Control of Plant Growth in an Enclosed Space; Detecting Phycocyanin-Pigmented Microbes in Reflected Light; DMAC and NMP as Electrolyte Additives for Li-Ion Cells; Mass Spectrometer Containing Multiple Fixed Collectors; Waveguide Harmonic Generator for the SIM; Whispering Gallery Mode Resonator with Orthogonally Reconfigurable Filter Function; Stable Calibration of Raman Lidar Water-Vapor Measurements; Bimaterial Thermal Compensators for WGM Resonators; Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks; Ensemble: an Architecture for Mission-Operations Software; Object Recognition Using Feature-and Color-Based Methods; On-Orbit Multi-Field Wavefront Control with a Kalman Filter; and The Interplanetary Overlay Networking Protocol Accelerator.

Source record↗

Orion Pad Abort 1 GN and C Design and Development

The first flight test of the Orion Abort Flight Test project is scheduled to launch in Spring 2010. This flight test is known as Pad Abort 1 (PA-1) and it is intended to accomplish a series of flight test objectives, including demonstrating the capability of the Launch Abort System (LAS) to propel the Crew Module (CM) to a safe distance from a launch vehicle during a pad abort. The PA-1 Flight Test Article (FTA) is actively controlled by a guidance, navigation, and control (GN&C) system for much of its flight. The purpose of this paper is to describe the design, development, and analysis of the PA-1 GN&C system. A description of the technical solutions that were developed to meet the challenge of satisfying many competing requirements is presented. A historical perspective of how the Orion LAV compares to the Apollo Launch Escape Vehicle (LEV) design will also be included.

Medina, Edgar A.↗

Risk-Informed Decision Making: Application to Technology Development Alternative Selection

NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.

Dezfuli, Homayoon↗

Comparing Apollo and Mars Exploration Rover (MER) Operations Paradigms for Human Exploration During NASA Desert-Rats Science Operations

NASA's Desert Research and Technology Studies (D-RATS) field test is one of several analog tests that NASA conducts each year to combine operations development, technology advances and science under planetary surface conditions. The D-RATS focus is testing preliminary operational concepts for extravehicular activity (EVA) systems in the field using simulated surface operations and EVA hardware and procedures. For 2010 hardware included the Space Exploration Vehicles, Habitat Demonstration Units, Tri-ATHLETE, and a suite of new geology sample collection tools, including a self-contained GeoLab glove box for conducting in-field analysis of various collected rock samples. The D-RATS activities develop technical skills and experience for the mission planners, engineers, scientists, technicians, and astronauts responsible for realizing the goals of exploring planetary surfaces.

Yingst, R. A.↗

Red Dragon: Low-cost Access to the Surface of Mars using Commercial Capabilities

We will discuss the feasibility of using a minimally-modified variant of a SpaceX Dragon capsule as a low-cost, large-capacity, near-term, Mars lander for scientific and human-precursor missions. We have been evaluating such a Red Dragon platform as an option for a Discovery Program mission concept. A Red Dragon lander has the potential to be low cost primarily because it would be derived from a routinely-flying spacecraft. Dragon is being developed to ferry cargo and crew to and from the International Space Station (ISS). The cargo variant is currently undergoing test flights, which will be followed by standard ISS cargo missions and, eventually, crewed flights. The human variant, unlike other Earth-return vehicles, appears to also have most of the capabilities necessary to land on Mars. In particular, it has a set of high-thrust, throttleable, storable bi-propellant Super- Draco engines integrated directly into the capsule which are intended for launch abort and powered landings on Earth. These thrusters suggest the possibility of a parachute-free, fully-propulsive deceleration at Mars from supersonic speeds to the surface. Concepts for large, human-relevant landers (see, e.g., [1]) also often employ supersonic retro-propulsion; Red Dragon's entry, descent, and landing approach would scale to those landers. Further, SpaceX's Falcon Heavy launch vehicle, currently under development and expected to have its first flight in 2013, will be capable of sending Dragon on a trajectory to Mars. We will discuss our motivation for exploring a Red Dragon lander, the primary technical questions which determine its feasibility, and the current results of our analysis. In particular, we will examine entry, descent, and landing (EDL) in detail. We will describe the modifications to Dragon necessary for interplanetary cruise, EDL, and operations on the Martian surface.

Karcz, John↗

Mdao Research on Performance Adaptive Aeroelastic Wing at NASA Ames

This presentation to be presented at Boeing Technical Interchange Meeting in Mukilteo, WA gives an overview of MDAO (Multidisciplinary Analysis Design and Optimization) research at NASA Ames on Performance Adaptive Aeroelastic Wing under NASA AATT (Advanced Air Transport Technologies) project.

Nguyen, Nhan↗

Integrated Requirements Analysis and Technology Roadmaps

In fiscal year 1997, Strategic Insight performed analytical studies for NASA's Highly Reusable Space Transportation (HRST) program, creating program documents which illuminated technical requirements and critical research opportunities. Studies were performed to structure and confirm HRST's evolving technical requirements, building on Marshall's Phase 1 work, which defined HRST system concepts, analytical tools and high-level issues for assessment in Phase 2. Specifically, Strategic Insight: (1) Performed a requirements analysis to update HRST: An Advanced Concepts Study, Study Guidelines, Version 2.0 of January 22, 1996; only minor changes were recommended for the given parameters of interest to concept designers; (2) Conducted mini-workshops during HRST Working Group meetings on April 14-15, 1997 and July 22-24, 1997; and (3) Created structures for technology road maps of candidate HRST concepts, both subsystem and end-to-end concepts, emerging from the 13 cooperative agreement projects.

Source record↗

Aircraft Icing Analysis of Alternatives

This paper provides a description of a recent comprehensive Analysis of Alternatives (AoA) for icing research. A team of NASA icing subject matter experts (SMEs) was assembled from NASA’s Glenn and Langley Research Centers, which began by gathering inputs from icing stakeholders in industry, Government, and academia. Those inputs, which were grouped into a number of themes, were used by the SMEs to identify needed icing technical elements. Each of these high-level technical elements included the icing physics, modeling capabilities, and experimental capabilities needed to address a particular element. A multivariable analysis technique called TOPSIS (Technique for Order Preference by Similarity to Ideal Solutions) was then applied to prioritize the technical elements for several potential future realities. A large number of icing research needs were identified and analyzed to determine the highest priorities for NASA key focus areas and those that will endure into the future. The primary outcome of the AoA is the identification of legacy and newly identified capability areas in priority order to guide future investment.

Icing↗

Aircraft Icing Analysis of Alternatives

This paper provides a description of a recent comprehensive Analysis of Alternatives (AoA) for icing research. A team of NASA icing subject matter experts (SMEs) was assembled from NASA’s Glenn and Langley Research Centers, which began by gathering inputs from icing stakeholders in industry, Government, and academia. Those inputs, which were grouped into a number of themes, were used by the SMEs to identify needed icing technical elements. Each of these high-level technical elements included the icing physics, modeling capabilities, and experimental capabilities needed to address a particular element. A multivariable analysis technique called TOPSIS (Technique for Order Preference by Similarity to Ideal Solutions) was then applied to prioritize the technical elements for several potential future realities. A large number of icing research needs were identified and analyzed to determine the highest priorities for NASA key focus areas and those that will endure into the future. The primary outcome of the AoA is the identification of legacy and newly identified capability areas in priority order to guide future investment

Icing, Rotorcraft↗

TASS Model Application for Testing the TDWAP Model

One of the operational modes of the Terminal Area Simulation System (TASS) model simulates the three-dimensional interaction of wake vortices within turbulent domains in the presence of thermal stratification. The model allows the investigation of turbulence and stratification on vortex transport and decay. The model simulations for this work all assumed fully-periodic boundary conditions to remove the effects from any surface interaction. During the Base Period of this contract, NWRA completed generation of these datasets but only presented analysis for the neutral stratification runs of that set (Task 3.4.1). Phase 1 work began with the analysis of the remaining stratification datasets, and in the analysis we discovered discrepancies with the vortex time to link predictions. This finding necessitated investigating the source of the anomaly, and we found a problem with the background turbulence. Using the most up to date version TASS with some important defect fixes, we regenerated a larger turbulence domain, and verified the vortex time to link with a few cases before proceeding to regenerate the entire 25 case set (Task 3.4.2). The effort of Phase 2 (Task 3.4.3) concentrated on analysis of several scenarios investigating the effects of closely spaced aircraft. The objective was to quantify the minimum aircraft separations necessary to avoid vortex interactions between neighboring aircraft. The results consist of spreadsheets of wake data and presentation figures prepared for NASA technical exchanges. For these formation cases, NASA carried out the actual TASS simulations and NWRA performed the analysis of the results by making animations, line plots, and other presentation figures. This report contains the description of the work performed during this final phase of the contract, the analysis procedures adopted, and sample plots of the results from the analysis performed.

Switzer, George F.↗

International Space Station Passive Thermal Control System Analysis, Top Ten Lessons-Learned

The International Space Station (ISS) has been on-orbit for over 10 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The analysis lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

Iovine, John↗

Outline of cost-benefit analysis and a case study

The methodology of cost-benefit analysis is reviewed and a case study involving solar cell technology is presented. Emphasis is placed on simplifying the technique in order to permit a technical person not trained in economics to undertake a cost-benefit study comparing alternative approaches to a given problem. The role of economic analysis in management decision making is discussed. In simplifying the methodology it was necessary to restrict the scope and applicability of this report. Additional considerations and constraints are outlined. Examples are worked out to demonstrate the principles. A computer program which performs the computational aspects appears in the appendix.

Kellizy, A.↗

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

NASA Langley Systems Analysis & Concepts Directorate Technology Assessment/Portfolio Analysis

Systems analysis develops and documents candidate mission and architectures, associated system concepts, enabling capabilities and investment strategies to achieve NASA s strategic objectives. The technology assessment process connects the mission and architectures to the investment strategies. In order to successfully implement a technology assessment, there is a need to collect, manipulate, analyze, document, and disseminate technology-related information. Information must be collected and organized on the wide variety of potentially applicable technologies, including: previous research results, key technical parameters and characteristics, technology readiness levels, relationships to other technologies, costs, and potential barriers and risks. This information must be manipulated to facilitate planning and documentation. An assessment is included of the programmatic and technical risks associated with each technology task as well as potential risk mitigation plans. Risks are assessed and tracked in terms of likelihood of the risk occurring and consequences of the risk if it does occur. The risk assessments take into account cost, schedule, and technical risk dimensions. Assessment data must be simplified for presentation to decision makers. The Systems Analysis and Concepts Directorate (SACD) at NASA Langley Research Center has a wealth of experience in performing Technology Assessment and Portfolio Analysis as this has been a business line since 1978.

Cavanaugh, Stephen↗

Technical and investigative support for high density digital satellite recording systems

Recent results of dropout measurements and defect analysis conducted on one reel of Ampex 721 which was submitted for evaluation by the manufacturer are described. The results or status of other tape evaluation activities are also reviewed. Several changes in test interpretations and applications are recommended. In some cases, deficiencies in test methods or equipment became apparent during continued work on this project and other IITRI tape evaluation projects. Techniques and equipment for future tasks such as tape qualification are also recommended and discussed. Project effort and expenditures were kept at a relatively low level. This rate provided added development time and experience with the IITRI Dropout Measurement System, which is approaching its potential as a computer based dropout analysis tool. Another benefit is the expanded data base on critical parameters that can be achieved from tests on different tape types and lots as they become available. More consideration and effort was directed toward identification of critical parameters, development of meaningful repeatable test procedures, and tape procurement strategy.

Schultz, R. A.↗