At least 757 records · Page 42

ECAR-7210 Rev 0 Steady-state Thermo-mechanical Analysis of the MARVEL Fuel Bundle

This document reports the steady-state thermal-hydraulic and static mechanical analyses of the MARVEL micro-reactor core. The objective of this work is to investigate whether fuel-to-fuel contact could occur due to the thermal deformation of the fuel cladding during the normal operation and to assess the resulting impact on the peak cladding temperatures (PCT) if contact occurs. The scope of the work consists of three computational tasks. First, a conjugate heat transfer analysis using computational fluid dynamics (CFD) model was performed to evaluate the PCTs during normal operating conditions. Second, a finite element analysis (FEA) using the cladding temperature field obtained from the CFD analysis was performed to evaluate the thermal deformation of cladding and determine the occurrence of fuel-to-fuel contact. Finally, a CFD analysis of FEA-informed fuel-to-fuel gap (represented by a conservative 0.05 mm uniform gap) was performed to evaluate whether the PCT exceeds the safety criteria.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

IDEAS and App Development Internship in Hardware and Software Design

In this report, I will discuss the tasks and projects I have completed while working as an electrical engineering intern during the spring semester of 2016 at NASA Kennedy Space Center. In the field of software development, I completed tasks for the G-O Caching Mobile App and the Asbestos Management Information System (AMIS) Web App. The G-O Caching Mobile App was written in HTML, CSS, and JavaScript on the Cordova framework, while the AMIS Web App is written in HTML, CSS, JavaScript, and C# on the AngularJS framework. My goals and objectives on these two projects were to produce an app with an eye-catching and intuitive User Interface (UI), which will attract more employees to participate; to produce a fully-tested, fully functional app which supports workforce engagement and exploration; to produce a fully-tested, fully functional web app that assists technicians working in asbestos management. I also worked in hardware development on the Integrated Display and Environmental Awareness System (IDEAS) wearable technology project. My tasks on this project were focused in PCB design and camera integration. My goals and objectives for this project were to successfully integrate fully functioning custom hardware extenders on the wearable technology headset to minimize the size of hardware on the smart glasses headset for maximum user comfort; to successfully integrate fully functioning camera onto the headset. By the end of this semester, I was able to successfully develop four extender boards to minimize hardware on the headset, and assisted in integrating a fully-functioning camera into the system.

CSS↗

EVA Health and Human Performance Benchmarking Study

Multiple HRP Risks and Gaps require detailed characterization of human health and performance during exploration extravehicular activity (EVA) tasks; however, a rigorous and comprehensive methodology for characterizing and comparing the health and human performance implications of current and future EVA spacesuit designs does not exist. This study will identify and implement functional tasks and metrics, both objective and subjective, that are relevant to health and human performance, such as metabolic expenditure, suit fit, discomfort, suited postural stability, cognitive performance, and potentially biochemical responses for humans working inside different EVA suits doing functional tasks under the appropriate simulated reduced gravity environments. This study will provide health and human performance benchmark data for humans working in current EVA suits (EMU, Mark III, and Z2) as well as shirtsleeves using a standard set of tasks and metrics with quantified reliability. Results and methodologies developed during this test will provide benchmark data against which future EVA suits, and different suit configurations (eg, varied pressure, mass, CG) may be reliably compared in subsequent tests. Results will also inform fitness for duty standards as well as design requirements and operations concepts for future EVA suits and other exploration systems.

Abercromby, A. F.↗

Chairmanship of the Neptune/Pluto outer planets science working group

The Outer Planets Science Working Group (OPSWG) is the NASA Solar System Exploration Division (SSED) scientific steering committee for the Outer Solar System missions. OPSWG consists of 19 members and is chaired by Dr. S. Alan Stern. This proposal summarizes the FY93 activities of OPSWG, describes a set of objectives for OPSWG in FY94, and outlines the SWG's activities for FY95. As chair of OPSWG, Dr. Stern will be responsible for: organizing priorities, setting agendas, conducting meetings of the Outer Planets SWG; reporting the results of OPSWG's work to SSED; supporting those activities relating to OPSWG work, such as briefings to the SSES, COMPLEX, and OSS; supporting the JPL/SAIC Pluto study team; and other tasks requested by SSED. As the Scientific Working Group (SWG) for Jupiter and the planets beyond, OPSWG is the SSED SWG chartered to study and develop mission plans for all missions to the giant planets, Pluto, and other distant objects in the remote outer solar system. In that role, OPSWG is responsible for: defining and prioritizing scientific objectives for missions to these bodies; defining and documenting the scientific goals and rationale behind such missions; defining and prioritizing the datasets to be obtained in these missions; defining and prioritizing measurement objectives for these missions; defining and documenting the scientific rationale for strawman instrument payloads; defining and prioritizing the scientific requirements for orbital tour and flyby encounter trajectories; defining cruise science opportunities plan; providing technical feedback to JPL and SSED on the scientific capabilities of engineering studies for these missions; providing documentation to SSED concerning the scientific goals, objectives, and rationale for the mission; interfacing with other SSED and OSS committees at the request of SSED's Director or those committee chairs; providing input to SSED concerning the structure and content of the Announcement of Opportunity for payload and scientific team selection for such missions; and providing other technical or programmatic inputs concerning outer solar system missions at the request of the Director of SSED.

Stern, S. Alan↗

Accelerated Over-The-Air Neural Receiver Training Using Self-Contrastive Learning

Self-contrastive learning (SCL), a self-supervised learning method, has been shown to improve image and signal classifier accuracies and reduce the training time for neural communications receivers. In particular, prior work has shown that SCL applied as a pre-training step can improve simulated performance of OFDM in 3GPP TDL channel models by reducing the training time of the downstream classification task (demodulation and demapping). In this work a practical implementation demonstrating SCL pre-training using software defined radios (SDRs) is proposed.

Cooke, Corey [ORNL] (ORCID:0000000234263672)↗

Constructor selection research

The process of space construction is defined by the construction goal and by the construction system selected to accomplish that goal. The former provides the tasks that must be executed, while the latter provides the capabilities to execute them. This presentation outlines a high-level model of space construction and illustrates the relationship between constructor and task. The construction model is then utilized to develop a preliminary theory of constructor selection. The need for broad models of construction, constructor selection, and constructor management is identified. From this preliminary work it can be concluded that task decomposition is dependent upon both task and constructor; the selection process is separable from the optimization process; and that logical, defensible selection is possible.

Helleckson, Brent↗

TU-EF-204-03: Task-Based KV and MAs Optimization for Radiation Dose Reduction in CT: From FBP to Statistical Model-Based Iterative Reconstruction (MBIR)

Purpose: The introduction of the highly nonlinear MBIR algorithm to clinical CT systems has made CNR an invalid metric for kV optimization. The purpose of this work was to develop a task-based framework to unify kV and mAs optimization for both FBP- and MBIR-based CT systems. Methods: The kV-mAs optimization was formulated as a constrained minimization problem: to select kV and mAs to minimize dose under the constraint of maintaining the detection performance as clinically prescribed. To experimentally solve this optimization problem, exhaustive measurements of detectability index (d’) for a hepatic lesion detection task were performed at 15 different mA levels and 4 kV levels using an anthropomorphic phantom. The measured d’ values were used to generate an iso-detectability map; similarly, dose levels recorded at different kV-mAs combinations were used to generate an iso-dose map. The iso-detectability map was overlaid on top of the iso-dose map so that for a prescribed detectability level d’, the optimal kV-mA can be determined from the crossing between the d’ contour and the dose contour that corresponds to the minimum dose. Results: Taking d’=16 as an example: the kV-mAs combinations on the measured iso-d’ line of MBIR are 80–150 (3.8), 100–140 (6.6), 120–150 (11.3), and 140–160 (17.2), where values in the parentheses are measured dose values. As a Result, the optimal kV was 80 and optimal mA was 150. In comparison, the optimal kV and mA for FBP were 100 and 500, which corresponded to a dose level of 24 mGy. Results of in vivo animal experiments were consistent with the phantom results. Conclusion: A new method to optimize kV and mAs selection has been developed. This method is applicable to both linear and nonlinear CT systems such as those using MBIR. Additional dose savings can be achieved by combining MBIR with this method. This work was partially supported by an NIH grant R01CA169331 and GE Healthcare. K. Li, D. Gomez-Cardona, M. G. Lubner: Nothing to disclose. P. J. Pickhardt: Co-founder, VirtuoCTC, LLC Stockholder, Cellectar Biosciences, Inc. G.-H. Chen: Research funded, GE Healthcare; Research funded, Siemens AX.

60 APPLIED LIFE SCIENCES↗

ASME Design Code Rule Changes for Nuclear Graphite

The American Society of Mechanical Engineers Boiler Pressure and Vessel Code (ASME BPVC) Section III, Division 5, Article HHA-3000 outlines graphite core component and graphite core assembly design guidelines. Graphite core components are defined as ?components manufactured from graphite that are installed to form a graphite core assembly within the reactor pressure vessel of a high temperature, graphite moderated fission reactor.? (p. 413) Graphites? inherent defect distributions do not allow for deterministic material reliability. Rather, graphite has variable strength distributions which change by grade. Article HHA-3000 outlines two semi-probabilistic methods, the full and simplified assessments, which set design load limit targets for each of three component structural reliability classes. The Design Task Group was officially recognized as a specialized task group within ASME November of 2023, though we?ve been collaborating since 2022. The purpose of the Design Task Group is to correct, clarify, and make HHA-3000 function as intended. The Design Task Group will sunset once we?ve achieved our objectives. The Design Task Group was specifically told to not write new Code. While there may be more precise and more accurate methods to determine reliability targets, the current methods are conservative, relatively simple to implement, and have thus far been considered satisfactory for setting design reliability targets. Much of the ground-work to write proposal files and background documents for records to make the changes needed to achieve our objective have been completed. The Design Task Group has documented much of their work through papers, presentations, and memorandums. Three memorandums in which INL team members had substantial contributions are found in the Appendices: FEA Modeling for the Baseline Program, Evaluating the Effects on Margin of Updating the Threshold and Shape Parameters in the Full Assessment, and Interpretations of the Full and Simplified Assessments in ASME BPVC. Most of the on-going work to achieve the Design Task Group?s objective will be addressing comments on existing records and moving records through the balloting process. The Design Task Group met bi-weekly mostly through the end of FY2023. Since February 2024, the Design Task Group has mostly been completed with solving and documenting the technical issues associated with the assessments. Unless new tasks are identified, the remaining work of the Design Task Group will be political and editorial.

97 MATHEMATICS AND COMPUTING↗

Center Planning and Development Student Engineer

This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

engineering↗

Advancing the practice of systems engineering at JPL

In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.

process improvement↗

Communication of industry knowledge, best practices, and lessons learned in the space of cellulosic biofuels plant design, project development and execution and operations. Task 1 report

ExxonMobil Research and Engineering Company, via a technical services agreement, engages Idaho National Laboratory (INL) to provide general industry knowledge, best practices, and lessons learned in cellulosic ethanol plant design, project execution, and operations. INL will also assess publicly proposed cellulosic plant designs. The scope of work will be accomplished in three tasks: Task 1, Communicate industry knowledge; Task 2, Present high-level lessons learned; Task 3, Provide an engineering assessment of publicly proposed ethanol plant designs. This Task 1 report provides a high-level summary of general industry knowledge, best practice, and lessons learned in biomass feedstock logistics and integration with bioconversion processes.

09 BIOMASS FUELS↗

Autonomous Coordination of Science Observations Using Multiple Spacecraft

This software provides capabilities for autonomous cross-cueing and coordinated observations between multiple orbital and landed assets. Previous work has been done in re-tasking a single Earth orbiter or a Mars rover in response to that craft detecting a science event. This work enables multiple spacecraft to communicate (over a network designed for deep-space communications) and autonomously coordinate the characterization of such a science event. This work investigates a new paradigm of space science campaigns where opportunistic science observations are autonomously coordinated among multiple spacecraft. In this paradigm, opportunistic science detections can be cued by multiple assets where a second asset is requested to take additional observations characterizing the identified surface feature or event. To support this new paradigm, an autonomous science system for multiple spacecraft assets was integrated with the Interplanetary Network DTN (Delay Tolerant Network) to provide communication between spacecraft assets. This technology enables new mission concepts that are not feasible with current technology. The ability to rapidly coordinate activities across spacecraft without requiring ground in the loop enables rapid reaction to dynamic events across platforms, such as a survey instrument followed by a targeted high resolution instrument, as well as regular simultaneous observations.

Estlin, Tara A.↗

Applied Meteorology Unit (AMU)

The AMU Team began four new tasks in this quarter: (1) began work to improve the AMU-developed tool that provides the launch weather officers information on peak wind speeds that helps them assess their launch commit criteria; (2) began updating lightning climatologies for airfields around central Florida. These climatologies help National Weather Service and Air Force forecasters determine the probability of lightning occurrence at these sites; (3) began a study for the 30th Weather Squadron at Vandenberg Air Force Base in California to determine if precursors can be found in weather observations to help the forecasters determine when they will get strong wind gusts in their northern towers; and (4) began work to update the AMU-developed severe weather tool with more data and possibly improve its performance using a new statistical technique. Include is a section of summaries and detail reporting on the quarterly tasks: (1) Peak Wind Tool for user Meteorological Interactive Data Display System (LCC), Phase IV, (2) Situational Lightning climatologies for Central Florida, Phase V, (3) Vandenberg AFB North Base Wind Study and (4) Upgrade Summer Severe Weather Tool Meteorological Interactive Data Display System (MIDDS).

Bauman, William↗

Beyond Widgets: Validated Systems Energy Savings and Utility Custom Incentive Program Systems Trends

Energy efficiency upgrades to buildings to date through avenues such as utility incentive programs have been largely limited to component-based products (e.g., lamps, RTUs). While some utilities do provide ‘custom’ incentive programs with whole building and system level technical assistance, these programs require deeper levels of analysis, resulting in higher program costs. This results in custom programs being restricted to utilities with greater resources, and are typically applied mainly to large or energy-intensive facilities, leaving much of the market without cost effective access and incentives for these solutions. In addition, with increasingly stringent energy codes, cost effective component-based solutions that achieve significant savings are dwindling. Integrated building systems (e.g., integrated façade, HVAC and/or lighting solutions) can deliver higher savings (Regnier et al. 2017) that translate into large sector-wide savings if deployed at the scale of these programs. However, systems application poses a number of challenges – energy savings assessments are inherently more complex and are not easily suited to the deemed measure model, and implementation of systems can be more disruptive. This paper presents the outcomes of a project to develop validated utility incentive program packages for three specific integrated building systems, in collaboration with ComEd, a consortium of California Public Owned Utilities (CA POUs) (Northern California Power Agency(NCPA) and the Southern California Public Power Authority(SCPPA)), and Xcel Energy (CO, MN). Previous work described the potential for energy savings of these systems at the individual and market level, early test findings for the task-ambient lighting system, and described the work products to develop utility incentive programs (Regnier et al. 2016). This paper presents validated end use energy savings of all three systems showing energy savings of ~20% for automated shading combined with daylight dimming (does not include light fixture retrofit savings); 30-46% for task-ambient lighting systems combined with plug load occupancy controls, depending on technology package and office building size (no daylight dimming impacts); and ~94% in the south-façade daylit zone for workstation specific lighting systems with daylight dimming (including lighting retrofit and task tuning). Using a U.S. Department of Energy (DOE) reference building model (DOE 2018), this translates to whole building savings of 2-5% (large-medium commercial), 12-23% (large-small commercial), and 13-15% (medium-large commercial) for these systems respectively. Early findings from the utilities in deploying these systems through their incentive programs indicate that deployment methods such as direct install programs might be best suited for these integrated systems. Further, early findings from a scoping study across custom utility programs and federal retrofit programs indicate that component level retrofits are still prevalent even in these programs, pointing towards an opportunity for deeper energy savings deployment. High performance retrofit case studies demonstrate that deeper energy savings is possible through integrated approaches. Market stakeholder interviews indicate however that there is generally a low level of awareness of the potential for energy savings of these three integrated systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the intern’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight mid deck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned for dual-use medical scrub and galley handwash facility. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Habitat↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide NASA’s Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the co-author’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight middeck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned to serve both as a medical scrub facility and for galley hand washing. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Common Habitat↗

Evaluation of scheduling techniques for payload activity planning

Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

Bullington, Stanley F.↗