Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “subsystem design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Data Link Performance Analysis for LVLASO Experiments

Low-visibility Landing and Surface Operations System (LVLASO) is currently being prototyped and tested at NASA Langley Research Center. Since the main objective of the system is to maintain the aircraft landings and take-offs even during low-visibility conditions, timely exchange of positional and other information between the aircraft and the ground control is critical. For safety and reliability reasons, there are several redundant sources on the ground (e.g., ASDE, AMASS) that collect and disseminate information about the environment to the aircrafts. The data link subsystem of LVLASO is responsible for supporting the timely transfer of information between the aircrafts and the ground controllers. In fact, if not properly designed, the data link subsystem could become a bottleneck in the proper functioning of LVLASO. Currently, the other components of the system are being designed assuming that the data link has adequate capacity and is capable of delivering the information in a timely manner. During August 1-28, 1997, several flight experiments were conducted to test the prototypes of subsystems developed under LVLASO project, The back-round and details of the tests are described in the next section. The test results have been collected in two CDs by FAA and Rockwell-Collins. Under the current grant, we have analyzed the data and evaluated the performance of the Mode S datalink. In this report, we summarize the results of our analysis. Much of the results are shown in terms of graphs or histograms. The test date (or experiment number) was often taken as the X-axis and the Y-axis denotes whatever metric of focus in that chart. In interpreting these charts, one need to take into account the vehicular traffic during a particular experiment. In general, the performance of the data link was found to be quite satisfactory in terms of delivering long and short Mode S squitters from the vehicles to the ground receiver, Similarly, its performance in delivering control messages from the ground control to the vehicles (aircrafts) was also satisfactory. The report is organized as follows. In Section 2, we describe the background information for the LVLASO and the system flight experiments. Section 3 contains formats of the performance data that was analyzed during our research. Section 4 describes different experiments flight experiments and their setup. Section 5 analyzes each of the graphs produced in this report. Finally, Section 6 has a summary of observations that we make based on our research.

Mukkamala, Ravi↗

Assessment of international payload requirements on the dual keel space station - A systems analysis capabilities example

In the early stages of spacecraft conceptual design, an investigation of subsystem requirements and their impacts on the total system provides insight into many aspects of the spacecraft design. Such an analysis has been performed on the dual keel space station to examine the system effects contributed by three international payloads provided by the Canadian, Japanese, and European Space Agencies. This example is used to illustrate some capabilities of available computer-driven tools and methods for a system analysis. Two space station configurations were examined, one without international payloads (the baseline configuration for the study) and one with the three international payloads. Each configuration was evaluated to define viewing limitations, rigid body dynamics and controls, structural dynamics, orbit lifetime, environmental control and life support, and thermal management effects. The performance, based on each subsystem evaluation, was then compared for the two configurations, and the results and recommendations are presented.

Allen, C. L.↗

Study report recommendations for the next generation Range Safety System (RSS) Integrated Receiver/Decoder (IRD)

The Integrated Receiver/Decoder (IRD) currently used on the Space Shuttle was designed in the 1980 and prior time frame. Over the past 12 years, several parts have become obsolete or difficult to obtain. As directed by the Marshall Space Flight Center, a primary objective is to investigate updating the IRD design using the latest technology subsystems. To take advantage of experience with the current designs, an analysis of failures and a review of discrepancy reports, material review board actions, scrap, etc. are given. A recommended new design designated as the Advanced Receiver/Decoder (ARD) is presented. This design uses the latest technology components to simplify circuits, improve performance, reduce size and cost, and improve reliability. A self-test command is recommended that can improve and simplify operational procedures. Here, the new design is contrasted with the old. Possible simplification of the total Range Safety System is discussed, as is a single-step crypto technique that can improve and simplify operational procedures.

Crosby, Robert H.↗

Design Principles for Nickel/Hydrogen Cells and Batteries

Individual-pressure-vessel (IPV) nickel/hydrogen cells and bipolar batteries developed for use as energy-storage subsystems for satelite applications. Design principles applied draw upon extensive background in separator technology, alkaline-fuel-cell technology and several alkaline-cell technology areas. Principals are rather straightforward applications of capillary-force formalisms, coupled with slowly developing data base resulting from careful post-test analyses. Based on preconceived assumptions relative to how devices work and how to be designed so they display longer cycle lives at deep discharge.

Thaller, Lawrence H.↗

Conceptual design of a noncontacting power transfer device for the ASPS Vernier system

The conceptual of electrical power transfer across a magnetically controlled gap as discussed for several years. The design represents the culmination of the first serious attempt to design a very low force, noncontracting power transfer mechanism. The electromagnetic device advanced herein is an ironless, translatable secondary transformer in which one of the two coils is fixed to the entire magnetic core. The second coil is free to move within the core over the full range of motions required. The specific application considered for this design was the Vernier subsystem of the Annular Suspension and Pointing System (ASPS). The development of and rationale for the electromagnetics design is presented. Similar documentation is provided for the Electronics Design. The Appendices detail the results of small scale model tests, disturbance force calculations, the baseline transformer fabrication drawings, the AVS Converter Parts List, and model schematic diagrams.

Kroeger, J.↗

Regenerative fuel cell systems for space station

Regenerative fuel cell (RFC) systems are the leading energy storage candidates for Space Station. Key design features are the advanced state of technology readiness and high degree of system level design flexibility. Technology readiness was demonstrated through testing at the single cell, cell stack, mechanical ancillary component, subsystem, and breadboard levels. Design flexibility characteristics include independent sizing of power and energy storage portions of the system, integration of common reactants with other space station systems, and a wide range of various maintenance approaches. The design features led to selection of a RFC system as the sole electrochemical energy storage technology option for the space station advanced development program.

Hoberecht, M. A.↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, in a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation; testing results, and other information. Where appropriate, actual performance history was used for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to verify compliance with requirements and to highlight design or performance shortcomings for further decision-making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability and maintainability analysis, and present findings and observation based on analysis leading to the Ground Systems Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

Apollo experience report: Guidance and control systems; lunar module mission programer

A review of the concept, operational requirements, design, and development of the lunar module mission programer is presented, followed by a review of component and subsystem performance during design-feasibility, design-verification, and qualification tests performed in the laboratory. The system was further proved on the unmanned Apollo 5 mission. Several anomalies were detected, and satisfactory solutions were found. These problems are defined and examined, and the corrective action taken is discussed. Suggestions are given for procedural changes to be used if future guidance and control systems of this type are to be developed.

Vernon, J. A.↗

More About Beam-Steering Subsystem For Laser Communication

Two reports present additional information about developmental beam-steering subsystem of laser-communication system. Aspects of this subsystem described previously in "Beam-Steering Subsystem for Laser Communication" (NPO-19069) and "Digital Controller for Laser-Beam-Steering Subsystem" (NPO-19193). Reports reiterate basic principles of operation of beam-steering subsystem and of laser-communication system as whole. Also presents some of details of optical and mechanical design of prototype of subsystem, called Optical Communication Demonstrator.

Page, Norman A.↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, within a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability, and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation, testing results, and other information. Where appropriate, actual performance history was used to calculate failure rates for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to assess compliance with requirements and to highlight design or performance shortcomings for further decision making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability, and maintainability analysis, and present findings and observation based on analysis leading to the Ground Operations Project Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

The MAP Propulsion Subsystem

This paper describes the requirements, design, integration, test, performance, and lessons learned of NASA's Microwave Anisotropy Probe (MAP) propulsion subsystem. MAP was launched on a Delta-II launch vehicle from NASA's Kennedy Space Center on June 30, 2001. Due to instrument thermal stability requirements, the Earth-Sun L2 Lagrange point was selected for the mission orbit. The L2 trajectory incorporated phasing loops and a lunar gravity assist. The propulsion subsystem's requirements are to manage momentum, perform maneuvers during the phasing loops to set up the lunar swingby, and perform stationkeeping at L2 for 2 years. MAP's propulsion subsystem uses 8 thrusters which are located and oriented to provide attitude control and momentum management about all axes, and delta-V in any direction without exposing the instrument to the sun. The propellant tank holds 72 kg of hydrazine, which is expelled by unregulated blowdown pressurization. Thermal management is complex because no heater cycling is allowed at L2. Several technical challenges presented themselves during I and T, such as in-situ weld repairs and in-situ bending of thruster tubes to accommodate late changes in the observatory CG. On-orbit performance has been nominal, and all phasing loop, mid-course correction, and stationkeeping maneuvers have been successfully performed to date.

Davis, Gary T.↗

Pointing and Tracking Concepts for Deep Space Missions

This paper summarizes part of a FY1998 effort on the design and development of an optical communications (Opcomm) subsystem for the Advanced Deep Space System Development (ADSSD) Project. This study was funded by the JPL X2000 program to develop an optical communications (Opcomm) subsystem for use in future planetary missions. The goal of this development effort was aimed at providing prototype hardware with the capability of performing uplink, downlink, and ranging functions from deep space distances. Such a system was envisioned to support future deep space missions in the Outer Planets/Solar Probe (OPSP) mission set such as the Pluto express and Europa orbiter by providing a significant enhancement of data return capability. A study effort was initiated to develop a flyable engineering model optical terminal to support the proposed Europa Orbiter mission - as either the prime telecom subsystem or for mission augmentation. The design concept was to extend the prototype lasercom terminal development effort currently conducted by JPL's Optical Communications Group. The subsystem would track the sun illuminated Earth at Europa and farther distances for pointing reference. During the course of the study, a number of challenging issues were found. These included thermo-mechanical distortion, straylight control, and pointing. This paper focuses on the pointing aspects required to locate and direct a laser beam from a spacecraft (S/C) near Jupiter to a receiving station on Earth.

Alexander, J. W.↗

Lacie phase 1 Classification and Mensuration Subsystem (CAMS) rework experiment

An experiment was designed to test the ability of the Classification and Mensuration Subsystem rework operations to improve wheat proportion estimates for segments that had been processed previously. Sites selected for the experiment included three in Kansas and three in Texas, with the remaining five distributed in Montana and North and South Dakota. The acquisition dates were selected to be representative of imagery available in actual operations. No more than one acquisition per biophase were used, and biophases were determined by actual crop calendars. All sites were worked by each of four Analyst-Interpreter/Data Processing Analyst Teams who reviewed the initial processing of each segment and accepted or reworked it for an estimate of the proportion of small grains in the segment. Classification results, acquisitions and classification errors and performance results between CAMS regular and ITS rework are tabulated.

Chhikara, R. S.↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) spectrometer design and performance

The development of the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) has been completed at JPL. This paper outlines the functional requirements of the spectrometer optics subsystem, and describes the spectrometer optical design. The optical subsystem performance is shown in terms of spectral modulation transfer functions, radial energy distributions, and system transmission at selected wavelengths for the four spectrometers. An outline of the spectrometer alignment is included.

Macenka, Steven A.↗