Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “redesign”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Characterization of Silicon Sensors for HGCal in CMS

The High-granularity Calorimeter silicon sensors suffer from leakage currents. Measurements of the leakage current as a function of temperature and reverse bias voltage were carried out using a temperature chamber and digital source-meter. In addition to analysis of the sensors, a redesigned data acquisition software was written and utilized to simplify the setup. It was determined that the sensors do follow expected behavior for the leakage current as a function of both reverse bias voltage and temperature, but there is some slight deviation at lower temperatures.

43 PARTICLE ACCELERATORS↗

Genome Engineering for Materials Synthesis: Workshop Report

The Biological Systems Science Division (BSSD) within the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) funds basic research on plants and microbes relevant to several DOE bioenergy and environmental mission areas. BSSD has a long history of developing and supporting genomic, molecular, and structural characterization of biological systems. This sustained focus has led to important discoveries and increased understanding of these systems, as well as translational pathways to new processes and products. BSSD research seeks to understand the fundamental genome-encoded properties of plants and microbes that can be harnessed or redesigned for beneficial purposes. Current emphases are leading to the discovery, development, and understanding of numerous plant and microbial species with traits suitable for the production of fuels and chemicals from renewable biomass or light. Additionally, BSSD supports research leading to an understanding of the complex and essential interactions among plants, microbial communities, and the environment. The processes by which living organisms synthesize intricate and potentially valuable inorganic biomaterials are gaining increasing attention. The application of genomic, molecular, and structural tools offers great potential to better understand and potentially exploit these widespread, yet still poorly understood, genome-encoded biosynthetic processes. To engage the relevant scientific communities in discussions of this research opportunity, BER convened the Genome Engineering for Materials Synthesis workshop on October 9–11, 2018 (see Appendices 1–3, pp. 45–48). Workshop participants defined opportunities and challenges for future efforts by considering a foundation of existing experimental work relevant to the biosynthesis of three classes of renewable inorganic biomaterials: (1) inorganic biominerals, (2) inorganic-organic hybrids, and (3) composites of inorganic materials and living cells.

59 BASIC BIOLOGICAL SCIENCES↗

Testing of an Iodine and Tritium Capture System for an NO₂-Based Tritium Pretreatment Process

The reprocessing of used nuclear fuel would release volatile radionuclides into the off-gas streams of a processing plant, including ³H, ¹⁴C, ⁸⁵Kr, and ¹²⁹I. One potential simplification to the management of the off-gas streams could be achieved through an efficient tritium pretreatment (TPT) step in which the UO₂ fuel is oxidized by either air or NO₂ before dissolution. The oxidation of the UO₂ fuel matrix will result in the release of tritium from the fuel. Upfront release of tritium from the fuel in a pretreatment step with subsequent tritium abatement can minimize or eliminate the distribution of tritium throughout a plant. This can decrease or eliminate the need for tritium capture on multiple off-gas streams and prevent distribution to the aqueous inventory. The use of NO₂ as the oxidant in an advanced tritium pretreatment (ATPT) allows for the oxidation to be performed at lower temperatures and may also result in the quantitative release of iodine from the fuel. The ATPT off-gas will contain up to 75 vol% NO₂ gas. Spencer et al. identified the most promising iodine sorbent as silver nitrate-impregnated alumina (AgA) and the most promising tritium sorbents as 3Å molecular sieve (3Å MS) and silica gel for radionuclide capture from ATPT off-gas streams. An initial series of tests were conducted in fiscal years 2017–2018 with the intent of demonstrating the recovery of iodine and tritium using these sorbents from a recirculating gas stream that simulated the NO₂ recycle loop envisioned for the ATPT system. These initial tests showed low tritium recoveries and significant variations in the iodine recovery on the AgA. Ultimately it was concluded, following disassembly of the system, that corrosion within the system was partially the cause of the poor recovery of both species. All components of that system were disposed of at the end of the analysis. One of the conclusions drawn from the initial tests pointed to the reconsideration of the materials of construction. Based on that recommendation a new test bed for the advanced TPT off-gas system, that addresses the issues identified in the fiscal years 2017 and 2018 scoping tests, was designed and constructed. The test bed used high nickel alloys wherever possible to address the previously observed corrosion issues, a redesigned surge tank to permit ease of purging, an improved feed injection system and a more modular system design that allowed testing of incremental increases in system complexity to allow the isolation of any element that results in changes to recovery of target species. Accompanying that design, a multifaceted test plan was completed. The overarching goals of this test series were two-fold. The first goal was to demonstrate the ability to recover both the iodine and tritium that would be released during TPT in a manner that the releases from the fuel can be quantified. The second goal was to demonstrate that the combined recovery system could operate in any of the three proposed TPT modes (once-through air or O₂, recirculating air or O₂, or recirculating NO x ). A total of 22 tests were completed. Ten tests examined tritium behavior under varying operating parameters, 8 tests examined iodine behavior under varying operating parameters, and 4 tests examined both tritium and iodine behavior. Silica gel was used for the tritium sorbent, and AgA or Ag-mordenite (AgZ) was used as the iodine sorbent. The following conclusions were drawn: Full recovery is achieved for both sorbates when no sorbent is in place indicating no accumulation within the test system. In even the simplest of the configurations (i.e., no sorbents in the columns), iodine is more difficult to transport and recover from the system than tritium. Analysis of the AgA iodine sorbent beds from the integrated tritium and iodine tests indicate quantitative iodine recovery can be achieved (within anticipated experimental errors). This system may provide a means for the quantification of the iodine released by the ATPT process within the experimental uncertainties. This would support 0.33 to 1.00 kg demonstrations of the ATPT process with actual used nuclear fuel. Iodine penetrated further into AgZ than into AgA when operated in gas recirculation mode. Tritium adsorbs to and cannot be fully recovered from the 10-cm column of silica gel at regeneration temperatures up to 140 °C.; Tritium adsorbs to and cannot be recovered from the 10-cm column of AgA at desorption temperatures up to 200 °C. Co-adsorbed tritium was recovered to a greater extent from AgZ than from AgA, but recovery was not complete. No visible corrosion was observed in the test system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Revolutionizing Turbine Cooling with Micro-Architectures Enabled by Direct Metal Laser Sintering

The objective of this research effort was to explore innovative cooling architectures enabled by additive manufacturing techniques for improved turbine cooling performance. The ability to create complex internal geometries was leveraged to better distribute coolant as well as to integrate inherently unstable flow devices to enhance internal and external heat transfer. This was accomplished with a multi-faceted approach including analytical, experimental, and computational components. This final report documents progress during the total 4.25 year effort that was extended (at no additional cost) from the original 3-year cooperative agreement. Prior to starting the project, significant effort was invested in investigating innovative cooling designs from the open literature. When the project started, we quickly down-selected to 4 configurations: impingement jet fluidic oscillators (for internal leading edge cooling), reverse film cooling (for pressure surface), sweeping film cooling jets (for suction surface), and trailing edge slot cooling with microchannels. During the 2nd year, the reverse film cooling design was shown to be sub-optimal and work on that topic was halted. The three remaining technologies were integrated into a large scale nozzle guide vane and installed into a low-speed linear cascade facility for further interrogation. Initial results showed the sweeping film cooling jets (on the suction surface) to be the most promising technology compared to a baseline diffusion shaped film hole (777 design). The benefit was particularly evident at high blowing ratios (>1.5) when the 777 coolant film separated from the downstream surface. Benefits were also evident at elevated freestream turbulence levels. The leading edge cooling with unsteady jets was less effective in terms of peak or average cooling – however it was superior to round hole impingement cooling in terms of spatial uniformity. Finally, the trailing edge cooling design with micro-channels was scrapped in favor of a pinned arrangement with centerbody. During the 3rd year, the same three technologies were integrated into a transonic linear cascade for an assessment of compressibility effects. Again, the sweeping film cooling jets proved superior at high blowing ratios while the unsteady leading edge impingement and trailing edge pin-fins with centerbody designs yielded mixed results. Finally, during the 4th and final year, these 3 technologies were integrated into a direct metal laser sintered (DMLS) nozzle guide vane for testing in a high temperature, transonic annular vane cascade. The facility matches the flow temperature, Mach number, and coolant pressure ratios of an actual gas turbine. Before doing this, an additional series of tests were completed to validate a redesigned trailing edge cooling architecture. This final design included a centerbody with triangular pins between the centerbody and the vane external skin. The majority of these triangular pins are fabricated with a 30% gap to the centerbody – reducing their pressure drop considerably while still providing excellent heat transfer augmentation. This additional test campaign required an additional 3-month extension request to complete testing in the high temperature NGV test facility (Turbine Reacting Flow Rig – TuRFR). Testing of the DMLS vane in TuRFR pitted the 3 innovative cooling technologies against more traditional technologies (shaped 777 film hole, round impingement jet, and full pin arrangement in the trailing edge. The sweeping film cooling jets (on the suction surface) showed approximately 15% improvement in overall effectiveness compared to the 777 film hole while the trailing edge showed up to 20% improvement. The leading edge impingement was disappointing with a substantially lower effectiveness than traditional direct impingement. In summary, the study was successful in demonstrating that DMLS-enabled cooling technologies can yield significant gains in cooling performance.

03 NATURAL GAS↗

Design and Analysis of a Double Wall, Water Cooled Window for Accelerator Based Mo-99 Production

The electron accelerator based Mo-99 production technique requires the use of Rhodotrons to generate 38 MeV, 6.32 mA pulsed electron beams. The introduction of the pulsed beam structure has introduced fatigue concerns in the vacuum-helium windows that did not exist previously for electron beam production via linear accelerators. Previous analysis has shown that temperature fluctuations of approximately 100°C above and below the steady state operating temperature of ~500°C will occur within the windows. A water cooled window will eliminate this concern by reducing the primary mechanical stress due to the 300-psig helium pressure load as well as the secondary thermally induced stress. Although a water cooled window was considered years ago, the complexities of adding an additional water line was unattractive until now. A double wall, water cooled window has been designed and analyzed for this reason. The water cooled window design is shown to decrease the helium-side window temperature to as low as 125°C, while the vacuum-side window is maintained at 161°C at a water flow rate of 3.2 GPM. These low steady state temperatures reduce the thermal stress of the helium-side window significantly. Also, the primary mechanical stress has been reduced by roughly 50% due to the reduced pressure gradient across the helium-side window (150-psig water and 300-psig helium). Considering a Mo-99 production loss of roughly 1%, the water cooled window is a drastic improvement over the previous helium cooled designs and should be greatly considered for future upgrades and redesign.

43 PARTICLE ACCELERATORS↗

High operating temperature heat transfer fluids for solar thermal power generation. Final report

This is the final technical report for the DOE MURI project on developing high-operating temperature heat transfer fluids for solar thermal power generation. This project aimed to evaluate liquid metals as a heat-transport fluid and potential energy storage medium for concentrated solar powered (CSP) systems. The project consisted of five phases, starting with fluid selection and screen and ending with potential CSP integration. The initial fluid selection arrived at heavy liquid metals as candidate fluids such as lead bismuth eutectic (LBE) as the prime liquid-alloy candidate to be studied, given the conditions above. Fifty-seven liquid compositions were initially identified with liquidus temperatures lower than 200°C, composed of elements that provide no driving force to the reduction of Cr 2 O 3 or Al 2 O 3 passivation layers in pipe material which is required for corrosion prevention. LBE was identified as the primary candidate fluid after these compositions were compared against computational thermodynamic modeling to screen all of the selected systems that would be compatible with our design objectives. Twenty-eight of these compositions were also investigated with the rapid characterization methods; the accuracies of the liquidus temperature and the specific heats predicted by the computations were better than 3 percent and 9 percent, respectively. We conducted numerus corrosion tests of various Fe-Cr-Al based steels in LBE and its variants at temperate as high as 800°C. It was found that minor additions to the liquid did not provide sufficient corrosion protection to warrant their use in real applications. Furthermore, we investigated the detailed mechanism of corrosion between heavy liquid metal and the pipe material at these very high temperatures. A liquid metal loop was constructed to operate at these high temperatures. The loop construction and operation lead to valuable lessons learned that will be needed for industrial scale loops. Furthermore, we learned that electromagnetic pumps at these extreme temperatures will have to be reengineered and redesigned to be used for CSP applications.

14 SOLAR ENERGY↗

Fleet-wide Electrification Impacts Assessment for the Valley Transportation Authority

This report explores the long-term electrification opportunities for the Valley Transit Authority’s (VTA) transit bus fleet. The potential for transit bus electrification at VTA as well as the economic impacts of partial and complete electrification are explored. We use the Revenue Operation and Device Optimization model to determine the optimal charging, operation and lowest capital and operating cost solution to achieve different levels of electrification to meet their existing routes. This study finds that, relying on only depot charging, around 70% of the daily trips by VTA’s transit bus fleet can be replaced with battery electric buses (BEBs) today. The benefits and drawbacks of five methods for improving the electrification potential beyond that achievable with only depot charging are discussed including (1) increase charger power, (2) purchase of larger vehicle batteries, (3) en-route charging, (4) purchasing additional buses and swapping them to enable the existing routes/blocks1 to be met, and (5) route/block redesign. A strategy is developed to enable full fleet electrification by increasing charger power or allowing intraday charging as a proxy for the options mentioned above. This method allows us to develop an understanding of the impacts and trade-offs of full fleet electrification. Two charging strategies are examined. Immediate charging, when the bus is charged as soon as it arrives at a depot or en-route charging station, and smart charging, which uses a controller to determine the best times to charge to achieve the lowest charging cost, while maintaining the same trip schedules. Smart charging is effective at reducing the peak power consumption, which can be reduced by between 31% and 65% compared to immediate charging. This translates directly to lower electricity demand charges and lower costs for possible distribution system upgrades. The total lifetime net present value (NPV) costs for different scenarios are presented in Figure ES-1. Scenarios are separated into three sections. The first stacked bar on the left is the base case (business-as-usual) where all buses are diesel hybrids, the next four bars include partial and full fleet electrification utilizing only immediate charging, and the last four bars include partial and full fleet electrification utilizing smart charging. The results show that smart charging scenarios are within ±4% of the lifetime NPV cost of the diesel-hybrid only (business-as-usual) scenario. The scenarios with full fleet electrification (i.e., including intraday charging) are 4% lower cost and those with partial fleet electrification (i.e., without intraday charging) are 2%–3% higher. However, it is important to note that the intraday charging scenarios do not include any additional costs for the equipment necessary to achieve intraday charging (e.g., additional chargers, larger batteries, new route design). Additionally, it is worth noting that the Low Carbon Fuel Standard (LCFS) credit received for implementing electric buses is essential to achieving these results.

33 ADVANCED PROPULSION SYSTEMS↗

Design of the New DARHT X-ray and Neutron Shielding and Measured Results

The DARHT Weather Enclosure (WE) project provided an excellent opportunity to redesign and rebuild some of DARHT systems without introducing interruptions to normal operations. Multiple improvements were made to the facility to improve data quality and operational reliability.

43 PARTICLE ACCELERATORS↗

Improved temperature control for measuring the humidity dependence of aerosol optical properties

Aerosols impact climate and cloud formation by their ability to take up water, which leads to changes in their optical properties. To better characterize the interactions of aerosol with water vapor, a humidification section has been added to the Cavity Attenuation Phase-shift Spectrometry (CAPS) instrument. The CAPS is a diode based method that provides simultaneous measurements of both aerosol total optical extinction and scattering in real-time. We are improving the humidity controlled sample line with new temperature controls. The current system suffers from particlelosses and poorly controlled humidity profiles, both of which were corrected for in the systems redesign. This improved wet-CAPS system has been integrated with a dry-CAPS to simultaneously measure the wet and dry aerosol optical properties. The two CAPS monitors were operated in a dry collection mode to ensure there were no biases between the instruments. Initial calibrations and data were collected to test the functionality of the dual CAPS system (wet + dry). The new two channel CAPS system improves our ability to measure the effects of humidity on aerosol optical properties.

58 GEOSCIENCES↗

Controlled Pyroshock Test Transients Can Be Used To Better Match Operational Shock Transients and Reduce Artificial Pyroshock Test Failures [Slides]

Shock analysis is typically done via SRS (shock response spectrum). Oftentimes shock analysis is not performed because most loads specifications only supply SRS requirements with no representative shock transients that can be used for analysis. SRS analysis is too conservative. There is no structural dynamics involved as all modes are assumed to have peak responses simultaneously and in-phase with each other. It is possible that all other loads and combination of loads show the design to be good, whereas SRS analysis (1000 g’s are involved) results may require redesign. Multiple shock transients can satisfy a SRS, yet most loads documents don’t provide a representative shock transient that could be used for shock analysis. Shock testing is less common than harmonic and random vibration testing. Engineers typically go into shock tests with very little knowledge of what to expect. A pass/fail type of approach with very little engineering done to prepare for the test or to control the type of shock transient is used. Most engineers will not model the shock test fixture due to lack of knowledge about the details of the test setup. Shock analysis and testing is often an open loop type situation with no test setup modeling, no test correlation, and no control over the test shock transient. In this work, if we can create applied test force transient that comes close to matching calculated force transient then a more reasonable acceleration transient will be created at the test reference accelerometer that better matches operational shocks.

42 ENGINEERING↗

Task Force Report: ESR Linear Lattice Design

A new layout and optics for the Electron Storage Ring (ESR) have been produced with revised spin rotators in IRs 6 and 8, a redesign of IR10, and a new geometric layout for the ring. In this report, the efforts to produce this lattice are documented, including the motivation for design decisions. This new lattice, version 5.5, will be used as the baseline for future studies.

43 PARTICLE ACCELERATORS↗

Chamber Interior Viewing System (CIVS 2.0)

The NIF facility is used to conduct fusion and high-density scientific research. The experiments are conducted inside of a 10-meter diameter vacuum chamber called the “Target Chamber”. The target chamber is covered in ports to permit adding equipment to the exterior. Some of this equipment extends into the target chamber such as the target positioners and diagnostics. Other equipment sits on the surface and looks inward, such as the CIVS system. CIVS stands for Chamber Interior Viewing System. The CIVS system provides simple black and white digital images of the interior of the target chamber in real time. These images are used for positioner alignment, trouble shooting and observing for positioner collision. The views through these cameras need to be clear enough for the operators to safely conduct these tasks. One of the products of the experiments conducted in the target chamber are neutrons. These neutrons expand outward from the center of the target chamber with great energy. If the neutrons hit the sensor chip on a digital camera they will “kill” the sensor pixel where they contact, and the result will be a permanently bright white pixel on the image. Over time these “dead” pixels will build up and make the camera less and less usable providing a “staticky” image. The current solution of replacing the cameras when they become damaged is unsustainable due to both the cameras being out of production and the increased rate of camera failure based upon the increased number and energy of neutrons being generated. Current supplies of the correct camera type are dwindling with no source of replacement and the projected rate of replacement is unsustainable. Without a redesign, the function provided by the current CIVS system will be lost.

42 ENGINEERING↗

Opportunities for Simultaneous Efficiency Improvement and Refrigerant Transition in Air Conditioning

In October of 2016, nearly 200 Parties agreed to amend the Montreal Protocol in Kigali, Rwanda, to phase-down consumption and production of hydrofluorocarbons (HFCs) by 2050. Growth in the use of HFCs, including those currently used as refrigerants in air-conditioning systems, is being driven by demand from emerging economies, hot climates, and rising incomes that are also undergoing rapid urbanization and electrification. Air conditioners (ACs), as an energy-intensive end-use technology, are also covered by a growing number of energy efficiency standards, labeling, procurement, incentive, and other supporting efficiency programs. Therefore, improving room AC energy efficiency and transitioning to low-global warming potential (GWP) refrigerants simultaneously presents significant opportunities to deploy energy efficient technology and reduce the energy and emissions impacts of room ACs, while keeping costs low for consumers. This report aims to provide an initial sense of the opportunities to improve efficiency and transition to low-GWP refrigerants by reviewing the HCFC and HFC regulatory framework and energy efficiency standards and labeling programs in 19 economies that account for roughly 65 percent of global room AC demand. Based on this analysis, we identified key opportunities for coordinated action on efficiency improvement and refrigerant transition for the domestic room AC sector (i.e., ductless mini-split ACs), such as: - implementing or revising standards and labeling programs to improve efficiency levels with the possibility of adding a low-GWP criterion. - combining fixed speed and inverter AC product categories to account for seasonal variations in climate and part-load operating conditions, and using seasonal energy efficiency ratio (SEER) instead of energy efficiency ratio (EER) to better reflect performance of inverter ACs. - implementing market transformation programs, such as bulk procurement programs, to drive down the costs of efficient technology through economies of scale. - aligning timelines for implementing efficiency standards with timelines for refrigerant management plans to coordinate policy actions. - maximizing the energy efficiency improvements of Montreal Protocol investments by coordinating efforts to help keep costs low for consumers and manufacturers during equipment redesign and manufacturing line retooling for refrigerant transition. In order to realize the significant peak load, energy saving and climate benefits of these opportunities associated with improving energy efficiency in tandem with the refrigerant transition, some risks may need to be mitigated, principally safety concerns over risks of accidental ignition with refrigerants rated flammable. This can be mitigated by continuing and accelerating the development of safety standards currently being updated, for example, by the International Electrotechnical Commission (IEC) and improving training for production, installation and maintenance during the use of flammable refrigerants. While some low-GWP refrigerants may cost more than the current baseline refrigerants, the cost of refrigerants is only ~1% of lifecycle costs for an AC. Costs can also be reduced through manufacturing advances and efficiency improvements, particularly if they are supported by policies that encourage technological development through deployment of superefficient ACs at scale. Finally, during the transition, there is a risk of obsolete technology being deployed in markets that either have not updated their standards or have later compliance dates. This risk can be mitigated by updating standards and reviewing them periodically to ensure their effectiveness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NorthStar Facility Target Fab and Flow Testing - FY 21

The facility target fabrication and flow testing activity will consist of flow tests using the blower system at LANL to test the disk holder and target, both redesigned by the NorthStar prime contractor. The housing and transition system delivering helium cooling to the disc holder and target will be fabricated and tested at LANL facilities. The tests will include pressure drop versus flow measurements through the target and housing, optical flow diagnostics and fiber optic imaging of the disc stack. The pressure drop measurements will be compared to CFD simulations to verify the latter, the optical flow diagnostics will be used to determine whether modifications made to the housing and target holder allow sufficient flow through the bottom of the housing to adequately cool it and the fiber optics will be used to image the discs during operation as a proof of concept of the diagnostic, to be used at NorthStar facilities during preproduction testing. The work is a Partial Fulfillment of the Deliverable Requirement for NorthStar Facility Target Fab and Flow Testing and Production Target Testing Support by LANL

42 ENGINEERING↗

CRADA Number NFE-18-07313 with Nth Cycle, Inc. (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-18-07313 between Oak Ridge National Laboratory (ORNL) and Nth Cycle Inc. focused on developing a technology for sustainable recycling of rare earth and specialty metals (e.g., Y, Co, Li; RESE), as well as bulk and precious metals from industrial manufacturing and waste streams through the use of electrochemical carbon nanotube-enabled filters. The project outcome was expected to be a stronger mechanistic understanding of the electrochemical recovery of metals from real manufacturing process streams and e-waste streams, and the development of an optimized high-throughput pilot-scale device ready for commercialization. Testing, design, and development of a v1 prototype to prove the technology was unsuccessful (we were not able to reach the go/no-go outlined in Objective 1) and we were unable to continue our redesign due to COVID-19 lockdown and no access to lab from March 2020 – until our graduation from the program.

36 MATERIALS SCIENCE↗

Electronic Systems for Proposed Anti-Proton Source Accumulator Core Betatron Systems

New waveguide pickups and kickers have been proposed for the accumulator core betatron systems. With new waveguide components, the electronics of the system have to be redesigned. The waveguide components have new frequency bands and power concerns that have to be addressed. This paper discusses the calculations used to design the new electronic system, and it also discusses the practical concerns of the electronic hardware.

43 PARTICLE ACCELERATORS↗

Re-Designing the CSP Thermal Energy Storage System to Enable Higher-Temperature Performance at Reduced Cost (Final Technical Report)

Current commercial concentrating solar power (CSP) plants distinguish themselves from ordinary photovoltaic (PV) power plants by storing enough collected energy to enable generation for several hours after the sun goes down. CSP plants store this energy in the sensible heat of nitrate salts in large metallic storage tanks. Stainless-steel AISI 347H (SS347H) is needed for the hot tank operating at about 565 degrees C whereas carbon steel is sufficient for the cold-tank materials. Two-tank nitrate-salt thermal energy storage (TES) is presently in use in several trough-based CSP plants in Europe and in the U.S., operating up to about 390 degrees C. Three commercially operating tower-based CSP plants - Gemasolar in Spain, Crescent Dunes in Nevada, and Noor III in Morocco - use the same approach, storing nitrate salts at temperatures up to 580 degrees C. SS347H is many times more expensive than carbon steel and constitutes a significant cost element in today's CSP plants. Hence, CSP developers need to close the cost gap with PV-based solar plants by making cost reductions in every system of the plant. Redesigning the TES tanks is one opportunity for cost reduction.

14 SOLAR ENERGY↗